CN110144855A - 一种解决严寒地区碾压混凝土坝越冬层层间开裂的施工方法 - Google Patents
一种解决严寒地区碾压混凝土坝越冬层层间开裂的施工方法 Download PDFInfo
- Publication number
- CN110144855A CN110144855A CN201910444520.4A CN201910444520A CN110144855A CN 110144855 A CN110144855 A CN 110144855A CN 201910444520 A CN201910444520 A CN 201910444520A CN 110144855 A CN110144855 A CN 110144855A
- Authority
- CN
- China
- Prior art keywords
- overwintering
- winter
- rest
- concrete
- dam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/16—Sealings or joints
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/02—Fixed barrages
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本发明公开了一种解决严寒地区碾压混凝土坝越冬层层间开裂的施工方法,在冬歇前浇筑混凝土中埋设升温水管及半圆钢管,半圆钢管露出越冬层面一半,埋入冬歇前浇筑混凝土一半,在冬歇前浇筑混凝土坝面设置聚氨酯,在第二年开工时候在升温水管中通高温水,使冬歇前浇筑混凝土温度升高,然后浇筑上层混凝土,冬歇前浇筑混凝土与上层混凝土温差小,从而减小了上层混凝土冬歇前浇筑混凝土的强约束,避免了裂缝产生,解决了越冬层面的结合问题。本发明为解决严寒地区碾压混凝土浇筑不可避免的冬季见歇、越冬层间开裂问题提供了新方法,确保建筑物施工质量,提高混凝土结构耐久性。
Description
技术领域
本发明涉及防止混凝土裂缝产生的方法,尤其是一种解决严寒地区碾压混凝土坝越冬层层间开裂的施工方法。
背景技术
在严寒地区,碾压混凝土的浇筑不可避免的面临冬季长间歇问题,根据《水工碾压混凝土施工规范》(DL/T 5112—2009),气温在-10℃以下时不宜施工,日平均气温连续5天在5℃以下应按低温季节施工,采取必要的保温措施。虽然已有大量的专项研究,采取了掺加外加剂、蓄热施工、仓面保温等各种工程措施,但局部越冬层的层间结合仍不理想,开裂问题始终难以得到解决。观音阁大坝位于辽宁省本溪县境内,坝址多年最低月平均温度-21℃,属严寒地区,冰冻严重,大坝三个越冬层面全部开裂,裂缝长度几乎达到整个坝段,深度为3.0~6.0cm,宽度多为0.5~1.0mm,最宽达2.0mm。白山水电站是东北地区最大的水电站,位于吉林省东部长白山区,其大坝越冬层间同样存在开裂问题。
发明内容
本发明所要解决的技术问题是,提供一种解决严寒地区碾压混凝土坝越冬层层间开裂的施工方法,防止产生裂缝,确保建筑物施工质量。
为了解决上述技术问题,本发明采用的技术方案是:一种解决严寒地区碾压混凝土坝越冬层层间开裂的施工方法,包括以下步骤:
(1)在冬歇前浇筑混凝土中埋设升温水管和半圆钢管,升温水管铺设于冬歇前浇筑混凝土内部,半圆钢管沿着坝轴线方向连续铺设并露出越冬层面一半,半圆钢管的开口冲着临空面,在冬歇前浇筑混凝土坝面设置聚氨酯;
(2)在第二年开工时候,在升温水管中通高温水,使冬歇前浇筑混凝土温度升高,然后浇筑上层混凝土,在上层混凝土坝面设置聚氨酯。
所述半圆钢管距离临空面的距离为80~100cm。
所述升温水管距离越冬层面为50~75cm。
所述半圆钢管为直径≥15cm,壁厚≥5mm。
在浇筑上层混凝土时,提前15~20天通温度≥20℃的水,升高冬歇前浇筑混凝土温度。
在浇筑上层混凝土时,聚氨酯同时施工。
所述升温水管为蛇形管。
本发明的有益效果是:能够解决严寒地区碾压混凝土浇筑不可避免的冬季见歇、越冬层间开裂问题,防止产生裂缝,确保建筑物施工质量,提高混凝土结构耐久性。
附图说明
图1为采用本发明方法的实施方式正面示意图。
图2为采用本发明方法的实施方式侧面示意图。
图3为采用本发明方法的实施方式升温水管埋设示意图。
具体实施方式
下面结合附图和具体实施方式对本发明作进一步详细说明:
如图1-3所示,本发明的解决严寒地区碾压混凝土坝越冬层层间开裂的施工方法,包括以下步骤:
(1)在冬歇前浇筑混凝土2中埋设升温水管4及半圆钢管5,升温水管4铺设于冬歇前浇筑混凝土2内部,半圆钢管5沿着坝轴线方向连续铺设并露出越冬层面3一半,半圆钢管5的开口冲着临空面,在冬歇前浇筑混凝土2坝面设置聚氨酯6;
(2)在第二年开工时候,在升温水管4中通高温水,使冬歇前浇筑混凝土2温度升高,然后浇筑上层混凝土1,在上层混凝土1坝面设置聚氨酯6。
所述半圆钢管5距离临空面的距离为80~100cm。所述半圆钢管5为直径≥15cm,壁厚≥5mm。
所述升温水管4距离越冬层面3为50~75cm。
在浇筑上层混凝土1时,提前15~20天通温度≥20℃的水,升高冬歇前浇筑混凝土2温度。
在浇筑上层混凝土1时,聚氨酯6同时施工。
所述升温水管4为蛇形管。
本发明方法使冬歇前浇筑混凝土2与上层混凝土1温差小,从而减小了上层混凝土1冬歇前浇筑混凝土2的强约束,避免了裂缝产生,解决了越冬层面3的结合问题。
所述聚氨酯6采用异氰酸酯和聚醚混合而成。
新疆某工程在冬歇前浇筑混凝土2中,距离越冬层面75cm处埋设直径32mm的塑料升温塑料水管4及半径30cm壁厚5mm的半圆钢管5,半圆钢管5沿着坝轴线方向连续铺设并露出越冬层面3一半,半圆钢管5距离临空侧为80cm,半圆钢管5的开口冲着临空面,在冬歇前浇筑混凝土2坝面喷涂8cm聚氨酯6;在第二年开工时候,在升温水管4中通25℃温水,使冬歇前浇筑混凝土2温度升高,然后浇筑上层混凝土1,在上层混凝土1坝面喷涂8cm聚氨酯6。工程水平层间未见裂缝,效果良好。
以上所述实例仅用于说明本发明的技术思想及特点,其目的在于本领域的技术人员能够理解本发明的内容并据以实施,不能仅以本实例来限定本发明的专利范围,即凡本发明所揭示的精神所作的同等变化或修饰,仍落在本发明的范围内。
Claims (7)
1.一种解决严寒地区碾压混凝土坝越冬层层间开裂的施工方法,其特征在于,包括以下步骤:
(1)在冬歇前浇筑混凝土(2)中埋设升温水管(4)及半圆钢管(5),升温水管(4)铺设于冬歇前浇筑混凝土(2)内部,半圆钢管(5)沿着坝轴线方向连续铺设并露出越冬层面(3)一半,半圆钢管(5)的开口冲着临空面,在冬歇前浇筑混凝土(2)坝面设置聚氨酯(6);
(2)在第二年开工时候,在升温水管(4)中通高温水,使冬歇前浇筑混凝土(2)温度升高,然后浇筑上层混凝土(1),在上层混凝土(1)坝面设置聚氨酯(6)。
2.根据权利要求1所述解决严寒地区碾压混凝土坝越冬层层间开裂的施工方法,其特征在于,所述半圆钢管(5)距离临空面的距离为80~100cm。
3.根据权利要求1所述解决严寒地区碾压混凝土坝越冬层层间开裂的施工方法,其特征在于,所述升温水管(4)距离越冬层面(3)为50~75cm。
4.根据权利要求2所述解决严寒地区碾压混凝土坝越冬层层间开裂的施工方法,其特征在于,所述半圆钢管(5)为直径≥15cm,壁厚≥5mm。
5.根据权利要求1所述解决严寒地区碾压混凝土坝越冬层层间开裂的施工方法,其特征在于,在浇筑上层混凝土(1)时,提前15~20天通温度≥20℃的水,升高冬歇前浇筑混凝土(2)温度。
6.根据权利要求1所述解决严寒地区碾压混凝土坝越冬层层间开裂的施工方法,其特征在于,在浇筑上层混凝土(1)时,聚氨酯(6)同时施工。
7.根据权利要求1所述解决严寒地区碾压混凝土坝越冬层层间开裂的施工方法,其特征在于,所述升温水管(4)为蛇形管。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910444520.4A CN110144855A (zh) | 2019-05-24 | 2019-05-24 | 一种解决严寒地区碾压混凝土坝越冬层层间开裂的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910444520.4A CN110144855A (zh) | 2019-05-24 | 2019-05-24 | 一种解决严寒地区碾压混凝土坝越冬层层间开裂的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110144855A true CN110144855A (zh) | 2019-08-20 |
Family
ID=67592108
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910444520.4A Pending CN110144855A (zh) | 2019-05-24 | 2019-05-24 | 一种解决严寒地区碾压混凝土坝越冬层层间开裂的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110144855A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593209A (zh) * | 2019-09-24 | 2019-12-20 | 中水北方勘测设计研究有限责任公司 | 严寒地区碾压混凝土坝越冬层面防止水平裂缝的处理方法 |
CN111042139A (zh) * | 2019-12-27 | 2020-04-21 | 中水北方勘测设计研究有限责任公司 | 一种防止严寒地区碾压混凝土坝产生裂缝的方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1330238A1 (ru) * | 1985-11-19 | 1987-08-15 | Сибирский филиал Всесоюзного научно-исследовательского института гидротехники им.Б.Е.Веденеева | Устройство дл охлаждени бетонных массивов |
CN1525012A (zh) * | 2003-02-26 | 2004-09-01 | 中国水利水电科学研究院 | 重力坝加高后新老混凝土结合面防裂方法 |
JP2004360333A (ja) * | 2003-06-05 | 2004-12-24 | Sumitomo Mitsui Construction Co Ltd | マスコンクリートのパイプクーリング方法 |
KR100750385B1 (ko) * | 2006-09-29 | 2007-08-27 | 주식회사 삼안 | 중력식 옹벽설치구조 |
CN201962680U (zh) * | 2010-12-08 | 2011-09-07 | 中国水电顾问集团成都勘测设计研究院 | 大仓面浇筑混凝土坝用冷却水管布置形式 |
CN208533531U (zh) * | 2018-05-23 | 2019-02-22 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种寒冷地区碾压混凝土越冬保温防裂结构 |
-
2019
- 2019-05-24 CN CN201910444520.4A patent/CN110144855A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1330238A1 (ru) * | 1985-11-19 | 1987-08-15 | Сибирский филиал Всесоюзного научно-исследовательского института гидротехники им.Б.Е.Веденеева | Устройство дл охлаждени бетонных массивов |
CN1525012A (zh) * | 2003-02-26 | 2004-09-01 | 中国水利水电科学研究院 | 重力坝加高后新老混凝土结合面防裂方法 |
JP2004360333A (ja) * | 2003-06-05 | 2004-12-24 | Sumitomo Mitsui Construction Co Ltd | マスコンクリートのパイプクーリング方法 |
KR100750385B1 (ko) * | 2006-09-29 | 2007-08-27 | 주식회사 삼안 | 중력식 옹벽설치구조 |
CN201962680U (zh) * | 2010-12-08 | 2011-09-07 | 中国水电顾问集团成都勘测设计研究院 | 大仓面浇筑混凝土坝用冷却水管布置形式 |
CN208533531U (zh) * | 2018-05-23 | 2019-02-22 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种寒冷地区碾压混凝土越冬保温防裂结构 |
Non-Patent Citations (1)
Title |
---|
师宁焉: "设置"工作缝"消除混凝土大坝裂缝危害分析", 《东北水利水电》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593209A (zh) * | 2019-09-24 | 2019-12-20 | 中水北方勘测设计研究有限责任公司 | 严寒地区碾压混凝土坝越冬层面防止水平裂缝的处理方法 |
CN110593209B (zh) * | 2019-09-24 | 2021-01-26 | 中水北方勘测设计研究有限责任公司 | 严寒地区碾压混凝土坝越冬层面防止水平裂缝的处理方法 |
CN111042139A (zh) * | 2019-12-27 | 2020-04-21 | 中水北方勘测设计研究有限责任公司 | 一种防止严寒地区碾压混凝土坝产生裂缝的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202099816U (zh) | 一种地下室外墙后浇带预制防水挡土板 | |
CN110144855A (zh) | 一种解决严寒地区碾压混凝土坝越冬层层间开裂的施工方法 | |
CN103031835B (zh) | 一种提高地基承载力的方法 | |
CN101845830B (zh) | 一种沉井纠偏施工方法 | |
CN104230274A (zh) | 一种古建筑城墙修复的材料及其施工工艺 | |
CN203891251U (zh) | 一种单排孔自保温配筋砌块砌体剪力墙体系 | |
CN104652371A (zh) | 以旧坝为基础建立的过水胶凝堆石坝及其施工方法 | |
CN105484209A (zh) | 沥青混凝土心墙与混凝土基座的连接结构及其施工方法 | |
CN103590508B (zh) | 一种复合保温墙体的施工方法 | |
CN205934951U (zh) | 一种多年冻土区桩基础 | |
CN202850011U (zh) | 一种适用于多年冻土区的保温盲沟设施 | |
CN210152167U (zh) | 装配式预制沟槽地暖保温板 | |
CN203668785U (zh) | 基于xps保温板与通风管的复合路基 | |
CN204662459U (zh) | 坡改平护坡砖 | |
CN205776191U (zh) | 一种用于港口码头永久支护的桩 | |
CN204212105U (zh) | 柔性装配式护坡结构 | |
CN204456478U (zh) | 开槽式xps板外墙保温系统 | |
CN211773666U (zh) | 一种溢洪道泄槽底板混凝土贯穿性裂缝化学灌浆孔布置结构 | |
CN108547372B (zh) | 一种临时移动厕所化粪池及其施工方法 | |
CN203923887U (zh) | 一种桥梁水中墩防冻融板连接结构 | |
CN203230070U (zh) | 现浇式保温墙体 | |
CN206143818U (zh) | 一种新型的防腐房建基础 | |
CN105804109B (zh) | 一种混凝土装配式基础 | |
CN202077485U (zh) | 抗沉降易清洗的养殖池 | |
CN205296669U (zh) | 一种新型eps装饰构件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190820 |