CN110142596A - 10 kilovolts of fittings of one kind and method - Google Patents
10 kilovolts of fittings of one kind and method Download PDFInfo
- Publication number
- CN110142596A CN110142596A CN201910399187.XA CN201910399187A CN110142596A CN 110142596 A CN110142596 A CN 110142596A CN 201910399187 A CN201910399187 A CN 201910399187A CN 110142596 A CN110142596 A CN 110142596A
- Authority
- CN
- China
- Prior art keywords
- support rod
- kilovolts
- rib
- ribs
- components
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P19/00—Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
- B23P19/04—Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for assembling or disassembling parts
- B23P19/06—Screw or nut setting or loosening machines
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The invention discloses a kind of 10 kilovolts of fittings and methods, it is more that it solves climbing shaft tower tool in the prior art, there are problems that being easy to fall, with convenient for staff's carrying, improve the beneficial effect of working efficiency, its scheme is as follows: a kind of 10 kilovolts of fittings, including support rod, one end of support rod is equipped with six different rib components of multiple sizes, for the hollow setting of six rib component one ends to cooperate various sizes of screw, six rib components are vertical with support rod or are arranged in set angle.
Description
Technical field
The present invention relates to insulator works, more particularly to a kind of 10 kilovolts of fittings and method.
Background technique
In 10 kilovolts of insulator installment works, insulator is made according to needing a variety of installation tools to be used cooperatively in the process
Tool is carried at staff and there is the problems such as more, miscellaneous, weight, and tool is not inherently portable, then there are multiple feelings
Under condition, the climbing tower that staff's carrying quality seriously affects greatly staff is ascended a height.During ascending a height, because multiple types of tools is taken
Band, once fixed there are unstable phenomenon or staff's climbing motion are excessive, easy generating tool is slid, and generates to equipment
The personal injury of personnel under damage and tower.
And staff needs repeatedly to replace erector when climbing to setting height carries out insulator installment work
Tool, tool is not in most cases in the range of visibility of staff, and repeatedly replacement undoubtedly reduces working efficiency, increases height
The difficulty and risk of sky installation insulator.
Existing fittings type is more, needs in the installation process of 10 kilovolts of insulator using more
Kind tool, virtually increases the cost that tool is chosen, causes unnecessary waste.
Summary of the invention
For overcome the deficiencies in the prior art, the present invention provides a kind of 10 kilovolts of fittings, structure is simple,
It is convenient, it is able to achieve the organic unity of different six rib components, the number of tools carried during staff's climbing is reduced, drops simultaneously
Low tool chooses cost, reduces waste.
A kind of concrete scheme of 10 kilovolts of fittings is as follows:
A kind of 10 kilovolts of fittings, including support rod, one end of support rod are equipped with different six of multiple sizes
Rib component, for the hollow setting of six rib component one ends to cooperate various sizes of screw, six rib components are vertical with support rod or in setting
Determine angle setting.
In the installation tool, by the setting of six rib components of multiple and different sizes, for different screws using different
Six rib components of size are operated, and such a tool can realize the operation to multiple screws, climb without staff
Multiple tools are carried in the process, are also correspondingly reduced the carrying burden of staff, are enhanced the practicability of tool, effectively improve
Working efficiency.
Further, in order to for 10 kilovolts of insulators the installation six ribs component there are three, 3 six ribs components
Size be respectively 30mm, 17mm and 14mm.
Alternatively, in order to widen the application range of tool, multiple six ribs components are set to mounting head, peace in another program
It dress head and the support boom end and is connect with support rod, is not necessarily to be equipped with more support rod so at the scene, it is only necessary to one
The settable multiple mounting heads of support rod, different mounting heads are equipped with various sizes of hollow six ribs component, can be pacified at the scene
The replacement of head, the wherein hollow setting in mounting head side are filled, and screw thread is set, external screw thread is arranged in support rod, and the two passes through screw thread knot
Structure cooperation, the replacement or mounting head that can fast implement mounting head are bolted with support rod.
Further, in order to guarantee every one or six rib component in the relative independentability of operating process, part of adjacent two
Angle between a six ribs component is 90 °, is arranged there are two six rib components in same straight line.
Further, the six ribs component is detachably arranged with the support rod.
Further, the six ribs component ends are connected by a snap with the support rod, alternatively, six rib components and institute
The support rod stated is bolted, and blind hole is arranged in support boom end, and the one end of six rib components is hollow for cooperating with screw,
Threaded hole is arranged in the other end, and such bolt passes through threaded hole and is inserted into support rod blind hole, realizes the reliable of six rib components and support rod
Connection.
Further, the length of the support rod is 20-30cm.
Further, the length of the support rod is 28cm, carrying of not only conveniently ascending a height in this way, but also having an effect when being easily installed
Rotation.
Further, the six ribs component has the length of setting, and the length of multiple six ribs components is different.
In addition, support rod is equipped with locking hook, locking hook is set to support rod close to the side of six rib components, is specifically existed
Support rod is reliably connected with locking hook, locks the opening side of hook outside support rod, because safety belt is equipped with hanging ring, passes through lock
Tight hook cooperates with hanging ring, facilitates staff to climb steel tower, will not counteract to staff.
For overcome the deficiencies in the prior art, the present invention also provides a kind of 10 kilovolts of insulator installation methods, using institute
The 10 kilovolts of fittings stated.
Specifically used method is as follows:
1) staff fixes support rod and staff, and pole-climbing is simultaneously climbed at insulator setting;
2) it after insulator being installed, selects various sizes of six ribs component that screw to be installed according to the model of screw, revolves
Turn support rod, to realize the assembly of various different model screws.
It is wherein provided projectingly because of six rib components relative to support rod, because staff wears safety belt, supports rod end in this way
The six rib components in portion facilitate is limited by safety belt, and surface support rod during climbing shaft tower is inadvertently fallen off.
Compared with prior art, the beneficial effects of the present invention are:
1) tool provided by the invention, structure is simple, is able to achieve the unification of multiple types of tools, enhances the practicability of tool,
It reduces staff and climbs the quantity that shaft tower carries, and a tool realizes the installation of multiple screws, correspondingly reduces in height
In the air to the selection of tool and replacement, insulator installation difficulty is reduced, is improved work efficiency.
2) present invention reduces the number of tools needed in installation process, phase by the mating multiple six ribs components of support rod
The cost that tool is chosen should be reduced, company's operating cost is effectively saved, avoids unnecessary waste.
3) setting of the invention by mounting head, the mounting head of settable a variety of different sizes are needed replacing according to scene
The replacement to different six rib components of size can be realized in mounting head, no replacement is required in this way kit, accordingly reduces cost.
4) present invention is detachably arranged by six rib components with support rod, but one of them six rib component is because of long-time use
After abrasion, no replacement is required entire tool, it is only necessary to replace the six ribs component.
5) present invention not only facilitates the connection of tool and safety belt, but also avoid climbing by the setting of locking hook
Staff is influenced in the process.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present application, and the application's shows
Meaning property embodiment and its explanation are not constituted an undue limitation on the present application for explaining the application.
Fig. 1 is overall structure main view in the embodiment of the present invention;
Fig. 2 is overall structure side view in the embodiment of the present invention;
Fig. 3 is overall structure main view in another embodiment of the present invention;
Wherein, six rib component of 1.17mm, six rib component of 2.14mm, six rib component of 3.30mm, 4. support rods, 5. lockings are hung
Hook.
Specific embodiment
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another
It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field
The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root
According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular
Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet
Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
As background technique is introduced, the deficiencies in the prior art, in order to solve technical problem as above, this Shen
It please propose a kind of 10 kilovolts of fittings.
In a kind of typical embodiment of the application, as shown in Figure 1, a kind of 10 kilovolts of fittings, including
Support rod 4, one end of support rod 4 are equipped with six different rib components of multiple sizes, and six rib component one ends are hollow to be arranged to cooperate
Various sizes of screw, six rib components are vertical with support rod 4 or are arranged in set angle.
In the installation tool, a tool can realize the operation to multiple screws, without staff during climbing
Multiple tools are carried, the carrying burden of staff is also correspondingly reduced, enhances the practicability of tool, effectively increase work
Efficiency.
In order to there are three the installation six ribs components for 10 kilovolts of insulators, 3 six rib components are respectively 30mm six
Six rib component 2 of rib component 3, six rib component 1 of 17mm and 14mm.
Alternatively, in order to widen the application range of tool, multiple six ribs components are set to mounting head, installation in another embodiment
Multiple six ribs components are connected as one by head, mounting head and 4 end of support rod and are connect with support rod 4, so at the scene
Without being equipped with more support rod, settable multiple mounting heads carry multiple mounting heads, different mounting heads during climbing
It is equipped with various sizes of hollow six ribs component, can carry out the replacement of mounting head at the scene, the wherein hollow setting in mounting head side, and
Screw thread is set, and external screw thread is arranged in support rod one end, and the two passes through bolt by helicitic texture cooperation or mounting head and support rod
Connection.
In order to guarantee every one or six rib component in the relative independentability of operating process, part of two adjacent six rib components
Between angle be 90 °, be arranged in same straight line there are two six rib components.
In some embodiments, six rib components are detachably arranged with the support rod.Specifically, in the present embodiment,
Every one or six rib component ends are detachably connected with the support rod 4 by screw thread, are specifically equipped with multiple spiral shells in support boom end
Pit, one end of each six ribs component are equipped with protrusion, and protrusion outside is equipped with external screw thread, to realize six rib components and support rod
It is detachably connected;Alternatively, six rib components are bolted with the support rod 4, multiple blind holes are arranged in 4 end of support rod,
The one end of six rib components is hollow for cooperating with screw, and threaded hole is arranged in the other end, and such bolt passes through threaded hole insertion branch
Being reliably connected for strut blind hole, six rib components of realization and support rod, can also realize the replacement of six rib components.
Alternatively, six rib component ends are connect with support rod side by welding manner or its other party in another embodiment
Formula makes six rib components and support rod be connected as an entirety jointly.
The length of support rod 4 is 20-30cm.It is preferred that the length of support rod 4 be 28cm, carrying of not only conveniently ascending a height in this way, but also
Rotation of having an effect when being easily installed, support rod surface are equipped with anti-skid chequer, further effectively prevent quilt during climbing of support rod 4
It slides.
In addition, because being carried for convenience of staff, as shown in figure 3, support rod 4 is equipped with locking hook 5, by locking hook 5
It set on support rod 4 close to the side of six rib components, is specifically reliably connected in support rod 4 and locking hook, because locking hook 5 is set
There is connecting hole (locking hook is commercial product, is repeated no more), support rod 4 can hingedly be arranged with the connecting hole or support rod 4
It is bolted with the connecting hole, locking hook 5 is openable to be on the outside of support rod 4, because safety belt is equipped with hanging ring, passes through lock
Tight hook 5 cooperates with hanging ring, facilitates staff to climb steel tower, will not counteract to staff.
For overcome the deficiencies in the prior art, the present invention also provides a kind of 10 kilovolts of insulator installation methods, using institute
The 10 kilovolts of fittings stated.
Specifically used method is as follows:
1) staff fixes support rod 4 with staff, specific prominent referring now to support rod because of six rib components, passes through
Highlight is set with safety belt card, can be set to the back of staff, in addition, passing through locking hook and safety belt to guarantee safety
Hanging ring connection, further avoid climbing process tool and inadvertently fall off, staff's pole-climbing is simultaneously climbed at insulator setting;
2) after insulator being installed, select various sizes of six ribs component that screw to be installed according to the model of screw, it will
Six rib components are placed on the screw for needing to screw, and hold support rod and carry out rotation to lock screw, after the completion of fastening, six rib components
It is detached from screw, rotates support rod to be cooperated with another six ribs component and screw, to realize the assembly of various different model screws.
It is wherein provided projectingly because of six rib components relative to support rod, because staff wears safety belt, supports rod end in this way
The six rib components in portion facilitate is limited by safety belt, and surface support rod during climbing shaft tower is inadvertently fallen off.
The foregoing is merely preferred embodiment of the present application, are not intended to limit this application, for the skill of this field
For art personnel, various changes and changes are possible in this application.Within the spirit and principles of this application, made any to repair
Change, equivalent replacement, improvement etc., should be included within the scope of protection of this application.
Claims (10)
1. a kind of 10 kilovolts of fittings, which is characterized in that including support rod, one end of support rod is equipped with multiple sizes
Six different rib components, to cooperate various sizes of screw, six rib components and support rod hang down the hollow setting of six rib component one ends
Directly or in set angle it is arranged.
2. 10 kilovolts of fittings according to claim 1, which is characterized in that there are three the six ribs components, and 3
The size of a six ribs component is respectively 30mm, 17mm and 14mm.
3. 10 kilovolts of fittings according to claim 1, which is characterized in that multiple six ribs components are set to
Mounting head, mounting head and the support boom end and connect with support rod.
4. 10 kilovolts of fittings according to claim 1, which is characterized in that part of adjacent two six
Angle between rib component is 90 °, is arranged there are two six rib components in same straight line.
5. 10 kilovolts of fittings according to claim 1, which is characterized in that the six ribs component and described
Support rod is detachably arranged.
6. 10 kilovolts of fittings according to claim 1, which is characterized in that the six ribs component ends and institute
The support rod stated is connected by a snap, alternatively, six rib components are bolted with the support rod.
7. 10 kilovolts of fittings according to claim 1, which is characterized in that the length of the support rod is
20-30cm;
The six ribs component has the length of setting, and the length of multiple six ribs components is different.
8. 10 kilovolts of fittings according to claim 1, which is characterized in that the support rod is equipped with locking and hangs
Hook.
9. a kind of 10 kilovolts of insulator installation methods, which is characterized in that use 10 kilovolts of any of claims 1-8
Fittings.
10. 10 kilovolts of insulator installation methods according to claim 9, specifically used method are as follows:
1) staff fixes support rod and staff, and pole-climbing is simultaneously climbed at insulator setting;
2) after insulator being installed, select various sizes of six ribs component that screw to be installed according to the model of screw, rotation branch
Strut, to realize the assembly of various different model screws.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910399187.XA CN110142596A (en) | 2019-05-14 | 2019-05-14 | 10 kilovolts of fittings of one kind and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910399187.XA CN110142596A (en) | 2019-05-14 | 2019-05-14 | 10 kilovolts of fittings of one kind and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110142596A true CN110142596A (en) | 2019-08-20 |
Family
ID=67595400
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910399187.XA Pending CN110142596A (en) | 2019-05-14 | 2019-05-14 | 10 kilovolts of fittings of one kind and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110142596A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87203582U (en) * | 1987-03-11 | 1987-12-02 | 朱兆坤 | Compound type inner hexagon wrench |
CN201385273Y (en) * | 2009-04-23 | 2010-01-20 | 孙清夷 | Hand wheel safety wrench of multifunctional household bottled liquefied gas pressure regulator |
CN201537887U (en) * | 2009-04-22 | 2010-08-04 | 陈鲁强 | Combined type hexagon wrench |
CN201573143U (en) * | 2009-12-24 | 2010-09-08 | 上海昆杰五金工具有限公司 | Combined type socket ratchet wrench |
CN204505118U (en) * | 2015-03-04 | 2015-07-29 | 上汽通用五菱汽车股份有限公司 | A kind of spanner |
CN205008715U (en) * | 2015-10-09 | 2016-02-03 | 陈辉 | Multi -purpose adjustable spanner of portable gas welding |
CN205630441U (en) * | 2016-03-21 | 2016-10-12 | 毛永弟 | Multifunctional key spanner |
CN106112892A (en) * | 2016-08-24 | 2016-11-16 | 安徽机电职业技术学院 | A kind of motor vehicle repair multifunctional combination wrench |
-
2019
- 2019-05-14 CN CN201910399187.XA patent/CN110142596A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87203582U (en) * | 1987-03-11 | 1987-12-02 | 朱兆坤 | Compound type inner hexagon wrench |
CN201537887U (en) * | 2009-04-22 | 2010-08-04 | 陈鲁强 | Combined type hexagon wrench |
CN201385273Y (en) * | 2009-04-23 | 2010-01-20 | 孙清夷 | Hand wheel safety wrench of multifunctional household bottled liquefied gas pressure regulator |
CN201573143U (en) * | 2009-12-24 | 2010-09-08 | 上海昆杰五金工具有限公司 | Combined type socket ratchet wrench |
CN204505118U (en) * | 2015-03-04 | 2015-07-29 | 上汽通用五菱汽车股份有限公司 | A kind of spanner |
CN205008715U (en) * | 2015-10-09 | 2016-02-03 | 陈辉 | Multi -purpose adjustable spanner of portable gas welding |
CN205630441U (en) * | 2016-03-21 | 2016-10-12 | 毛永弟 | Multifunctional key spanner |
CN106112892A (en) * | 2016-08-24 | 2016-11-16 | 安徽机电职业技术学院 | A kind of motor vehicle repair multifunctional combination wrench |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103663131B (en) | For safeguarding the fixing device of wind turbine gear-box, safeguarding component and method | |
CN204464868U (en) | A kind of insulation position limitation protection umbrella | |
CN204171987U (en) | Valve adjusting tool | |
CN106786138B (en) | High-voltage power transmission tower overhead ground wire rotates arm elevator apparatus | |
DE102017128143B3 (en) | Maintenance platform for maintenance of installations in a tower for a wind turbine and arrangement of a maintenance platform | |
CN207353753U (en) | Phase transfer current potential power tool in dry font anchor support | |
CN110142596A (en) | 10 kilovolts of fittings of one kind and method | |
CN109193454A (en) | Replace the operational method and its closed fixture yoke plate device of 500kV aerodynamic type insulator | |
CN107809091A (en) | A kind of double bundle conductor conductor spacer installs auxiliary rod | |
KR20230147582A (en) | Work ladder for suspend insulator of power-transmission line | |
CN208702436U (en) | Top plate high altitude operation Anchor Agent conveyer | |
CN106246094A (en) | A kind of novel mounting attachment and using method thereof | |
CN205159924U (en) | Screen of trees is pruned auxiliary conductor and is shielded cover | |
CN207346969U (en) | Fan blade, which is put down, hangs and replaces suspender | |
CN215884892U (en) | Automatic cover-turning reset device for material tower | |
CN108568777A (en) | Provision for disengagement and method for dismounting | |
CN110924850B (en) | Working method of climbing equipment for high-altitude construction of bridge | |
CN209844373U (en) | 66KV transformer substation grounding wire high-altitude hanging device | |
CN212295856U (en) | Portable electric power concrete pole support | |
CN212249301U (en) | Newly-built power line bare rod suspension safety backup rope device | |
CN206323066U (en) | High-voltage power transmission tower overhead ground wire rotates arm elevator apparatus | |
CN209900472U (en) | Electric power construction safety device on pole | |
CN208396641U (en) | Hanging ladder | |
CN206309635U (en) | Centrifugal pump shaft coupling guard shield | |
CN207572853U (en) | A kind of shaft tower insulator chain electrification replacing tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190820 |
|
RJ01 | Rejection of invention patent application after publication |