CN110142383A - A kind of molten aluminum chute - Google Patents

A kind of molten aluminum chute Download PDF

Info

Publication number
CN110142383A
CN110142383A CN201910442153.4A CN201910442153A CN110142383A CN 110142383 A CN110142383 A CN 110142383A CN 201910442153 A CN201910442153 A CN 201910442153A CN 110142383 A CN110142383 A CN 110142383A
Authority
CN
China
Prior art keywords
chute
builds
main body
molten aluminum
build
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910442153.4A
Other languages
Chinese (zh)
Inventor
李金桥
杨嘉俊
王树成
祝必华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ruyuan Yao Autonomous County Dongguang High Purity New Materials Co Ltd
Original Assignee
Ruyuan Yao Autonomous County Dongguang High Purity New Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ruyuan Yao Autonomous County Dongguang High Purity New Materials Co Ltd filed Critical Ruyuan Yao Autonomous County Dongguang High Purity New Materials Co Ltd
Priority to CN201910442153.4A priority Critical patent/CN110142383A/en
Publication of CN110142383A publication Critical patent/CN110142383A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D1/00Treatment of fused masses in the ladle or the supply runners before casting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D35/00Equipment for conveying molten metal into beds or moulds
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D3/14Charging or discharging liquid or molten material
    • F27D3/145Runners therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Treatment Of Steel In Its Molten State (AREA)

Abstract

The invention discloses a kind of molten aluminum chutes, build part and second including first for being spliced into chute main body and build part, and the chute fixing piece for fixing the chute main body;Described first, which builds part, is equipped with protrusion for splicing the Mosaic face that second builds part, and described second builds part equipped with the groove with the male cooperation;Described first build part and second build between part splicing seams be located at chute main body inner wall bottom, described first, which builds part and second, builds in splicing seams between part and is equipped with plugging part.Molten aluminum chute provided by the invention eliminates the stress concentration portion position when expansion of existing prefabricated section chute local heating in structure design, the problem of cracking, deformation can effectively be avoided the occurrence of, chute bottom crack is avoided to cause to inhale hydrogen and impurity pollution to melt quality, to raising product quality important in inhibiting.

Description

A kind of molten aluminum chute
Technical field
The present invention relates to casting fusant container technical fields, more particularly, to a kind of molten aluminum chute.
Background technique
In aluminum melt production industry, chute is the indispensable infrastructure device of production, for the molten aluminum transfer between equipment and is removed Molten aluminum transmitting, supply between the process flows such as gas, filtering, casting.Current chute generally uses II type Brown Alundum of RSK- to be poured Material segmentation pours, and shape is wide at the top and narrow at the bottom, and inner wall is regular half-oval shaped.
Relative to traditional molding molten aluminum chute of one-piece casting, the appearance of prefabricated section chute is in chute development process One much progress.What is generally used now is exactly prefabricated section chute, as shown in Figure 1, splicing installation after segmentation pouring molding.It is this Flexibly for easy to maintenance, replacement, cost of manufacture is lower for the main relative advantage of chute, but greatest problem existing for discovery in use It is still and a series of defects such as cracking, deformation is caused by stress concentration, generally using cracking, deformation, such as Fig. 2 after 15~20 days Shown in~3.The crackle that prefabricated section chute bottom generates is the most serious, and crack lines irregular and the penetration of fracture pass through whole thick There is leakage aluminium risk in degree.When safeguarding repairing, it cannot fit like a glove, can repair between material for repairing and chute crack inner wall Depth about 10mm can be fallen off again after using 3~5 times.The heavy workload of repairing and the material for repairing to fall off and exposed crack There are the risks of contaminated melt.
Therefore, it is necessary to develop the molten aluminum chute that can be avoided cracking, deformation.
Summary of the invention
The present invention is to overcome the defect of easy cracking, deformation described in the above-mentioned prior art, provides a kind of molten aluminum chute, mentions The problem of molten aluminum chute of confession uses Novel splicing structure, can effectively avoid the occurrence of cracking, deformation, avoids chute bottom crack Melt quality is caused to inhale hydrogen and impurity pollution, to raising product quality important in inhibiting.
In order to solve the above technical problems, the technical solution adopted by the present invention is that:
A kind of molten aluminum chute builds part and second including first for being spliced into chute main body and builds part, and for fixing The chute fixing piece of the chute main body;
Described first build part for splice second build part Mosaic face be equipped with protrusion, described second build part equipped with it is described convex Play the groove of cooperation;Described first builds part and the second splicing seams for building between part are located at chute main body inner wall bottom, described First, which builds part and second, builds and is equipped with plugging part in splicing seams between part.
Inventor is in actual use to the prefabricated section chute discovery for statistical analysis of the prior art: cracking position It is concentrated mainly on chute bottom, i.e. center of arc position;Secondly chute both ends position is caused due to expanding with heat and contract with cold in the longitudinal direction It sets warpage, be uneven.When aluminum melt flows in chute, the melt pressure of chute bottom carrying and washing away undoubtedly for aluminum melt Be the largest, scratch of the slag knife to chute bottom when manual operation in addition, chute bottom occur at first surface fall off, the marks such as slot scraping As.More importantly the design of former prefabricated section chute model determines that chute bottom is most significant stress concentration point.Chute The castable thickness change of cross section is big, castable absorb melt heat expand or cool down shrink when, cross section no matter Deformation occurs in which direction can all cause chute bottom to be cracked, and serious cracking position fracture width can reach 10~12mm, exist Greatly leakage aluminium risk, and melt hydrogen content is easily caused to rise, influence product quality.Since crack is irregular, patcher feels embarrassed With carry out, and repairing quality it is difficult to ensure that.Most crackles are using 3~5 crackings that just fall off again after repairing, and repairing increases repeatedly Add workload, influence production efficiency, is also unfavorable for the stabilization of product quality.
Different from existing prefabricated section chute, molten aluminum chute of the invention is built part and second using cooperation close first and is built Part is spliced into chute main body and is fixed by chute fixing piece, and splicing seams are located at chute interior walls bottom and using plugging part It is blocked.The molten aluminum chute eliminates the stress concentration portion when expansion of existing prefabricated section chute local heating in structure design Position, to solve the problems, such as chute cracking, deformation, using after a certain period of time, inner wall keeps good finish, bottom not to occur Crackle, only splicing seams slightly increase needs and are simply repaired, do not occur molten aluminum diafiltration.
To sum up, molten aluminum chute of the invention avoids chute bottom from splitting the problem of capable of effectively avoiding the occurrence of cracking, deform Line causes to inhale hydrogen to melt quality and impurity pollutes, to raising product quality important in inhibiting.
Preferably, the splicing seams are less than or equal to 3mm.
Preferably, the protrusion is semi-cylindrical, and the axis of the protrusion is parallel with the extending direction of the chute main body; Described second builds the groove of part as the semi-cylindrical shaped with the male cooperation.
Preferably, the groove fits like a glove with protrusion.
Preferably, described first part is built and second to build splicing seams between part be straight line.At this point, splicing seams are straight line, side Just filling and repairing material is as plugging part, and material for repairing builds part and second with first and builds part and be firmly combined, and further decreases repairing Workload.
Preferably, the chute fixing piece includes for accommodating the spout enclosure of chute main body, being located at the spout enclosure It is interior to build part and second for clamping described first and build at least two pieces of limited blocks and the chute pressing plate of part.The chute pressing plate is for pressing The firmly upper end of chute main body.
Preferably, the limited block is located at two side bottoms in the spout enclosure.
Preferably, dry type impervious material insulating layer is equipped between the chute main body and spout enclosure.Chute main body and chute It is filled and is consolidated with dry type impervious material between shell, form dry type impervious material insulating layer, preventing first to build part, with second to build part scattered It opens, and has the function of heat preservation.
Preferably, the spout enclosure, which is adopted, is made of a steel.
Preferably, the chute main body inner wall section vertical with chute main body extending direction is half elliptic.
The plugging part is made of calcium silicate board with microporous and/or asbestos wool.
Described first, which builds part and second, builds part and can construct to obtain with reference to the prior art by those skilled in the art.Specifically, Following method can be used:
In view of mold machining accuracy and dry drainage performance requirement, first, which builds part and second, builds the casting of part using wooden Mold.Mold Making desired size is accurate, surface is smooth, curved surface is excessive naturally, especially first builds the protrusion of part and second and build The groove location of part wants size accurate, guarantees that the two can fit like a glove, the position that die surface is contacted with castable will be applied Layer processing.
Castable is mixed with industrial pure water according to 8:1, inserts mold after being sufficiently stirred.Then it is smash with vibration tool Real, until the slurries in castable overflow, extra castable tool removes and equating is suitable for reading;Standing 36 hours, (winter must fit When extend the time) after demould, demoulding build part spontaneously dry one week;Part will be built after natural drying is placed on preheating furnace together In, 150 DEG C are slowly increased to 15 DEG C/h by room temperature and keeps the temperature 3~5 hours, keep the temperature 3~5 hours being continuously heating to 350 DEG C, finally It is warming up to 550 DEG C and keeps the temperature 3 hours, then slow cooling is to being lower than after 100 DEG C cooled to room temperature of coming out of the stove.
Compared with prior art, the beneficial effects of the present invention are:
Molten aluminum chute of the invention builds part and second using cooperation close first and builds part and be spliced into chute main body and pass through Chute fixing piece is fixed, and splicing seams are located at chute interior walls bottom and are blocked using plugging part.The molten aluminum chute exists The stress concentration portion position when expansion of existing prefabricated section chute local heating is eliminated in structure design, can effectively be avoided the occurrence of out The problem of splitting, deforming avoids chute bottom crack from causing to inhale hydrogen and impurity pollution to melt quality, has to product quality is improved Significance.
Detailed description of the invention
Fig. 1 is the end view of the prefabricated section chute of the prior art.
Fig. 2 is the crack picture of the prefabricated section chute of the prior art.
Fig. 3 is the crack picture of the prefabricated section chute of the prior art.
Fig. 4 builds part and second in the molten aluminum chute of the embodiment of the present invention 1 first and builds the schematic diagram of part.
Fig. 5 builds part and second in the molten aluminum chute of the embodiment of the present invention 1 first and builds the signal that part is spliced into chute main body Figure.
Fig. 6 is the structural schematic diagram of the molten aluminum chute of the embodiment of the present invention 1.
Specific embodiment
The present invention is further illustrated With reference to embodiment.
The same or similar label correspond to the same or similar components in the attached drawing of the embodiment of the present invention;It is retouched in of the invention In stating, it is to be understood that if there is the orientation of the instructions such as term " on ", "lower", "left", "right", "top", "bottom", "inner", "outside" Or positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description of the present invention and simplification of the description, and It is not that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore The terms describing the positional relationship in the drawings are only for illustration, should not be understood as the limitation to this patent.
In addition, if there is the terms such as " first ", " second " to be used for description purposes only, be mainly used for distinguishing different devices, Element or component (specific type and construction may identical may also be different), is not intended to show or implies indicated fill It sets, the relative importance and quantity of element or component, and should not be understood as indicating or implying relative importance.
Embodiment 1
A kind of molten aluminum chute is built part 11 and second including first for being spliced into chute main body 1 and is built as shown in figures 4-6 Part 12, and the chute fixing piece 2 for fixed chute main body 1.
First build part 11 for splice second build part 12 Mosaic face 111 be equipped with protrusion 112, second build part 12 equipped with it is convex Play the groove 113 of 112 cooperations.First builds part 11 and the second splicing seams 13 for building between part 12 are located at 1 inner wall bottom of chute main body, First, which builds part 11 and second, builds and is equipped with plugging part in splicing seams 13 between part 12.Protrusion 112 is semi-cylindrical, protrusion 112 Axis it is parallel with the extending direction of chute main body 1.Second groove 113 for building part 12 is the semi-cylindrical shaped cooperated with protrusion 112. Splicing seams 13 positioned at 1 inner wall bottom of chute main body are straight line.Splicing seams 13 are less than or equal to 3mm.Plugging part by calcium silicate board with microporous or Asbestos wool is made.1 inner wall of the chute main body section vertical with 1 extending direction of chute main body is half elliptic.
Chute fixing piece 2 includes for accommodating the spout enclosure 21 of chute main body 1, is used to clamp in spout enclosure 21 First, which builds part 11 and second, builds at least two pieces of limited blocks 22 and the chute pressing plate 23 of part 12.Limited block 22 is located in spout enclosure 21 Two side bottoms.Chute pressing plate 23 is used to push down the upper end of chute main body 1.Dry type is equipped between chute main body 1 and spout enclosure 21 Impervious Materials insulating layer 24.
The first of the molten aluminum chute of the present embodiment builds part 11 and second and builds part 12 and can be prepared as follows:
In view of mold machining accuracy and dry drainage performance requirement, first, which builds part and second, builds the casting of part using wooden Mold.Mold Making desired size is accurate, surface is smooth, curved surface is excessive naturally, especially first builds the protrusion of part and second and build The groove location of part wants size accurate, guarantees that the two can fit like a glove, the pvc pipe that diameter 35mm can be used splits rear mating die Tool;The position that die surface is contacted with castable will carry out coating treatment.
Castable is mixed with industrial pure water according to 8:1, inserts mold after being sufficiently stirred.Then it is smash with vibration tool Real, until the slurries in castable overflow, extra castable tool removes and equating is suitable for reading;Standing 36 hours, (winter must fit When extend the time) after demould, demoulding build part spontaneously dry one week;Part will be built after natural drying is placed on preheating furnace together In, 150 DEG C are slowly increased to 15 DEG C/h by room temperature and keeps the temperature 3~5 hours, keep the temperature 3~5 hours being continuously heating to 350 DEG C, finally It is warming up to 550 DEG C and keeps the temperature 3 hours, then slow cooling is to being lower than after 100 DEG C cooled to room temperature of coming out of the stove.
For the molten aluminum chute of the present embodiment after use in 90 days, chute interior walls keep relatively good finish, and bottom does not go out Existing crackle does not occur chute and upwarps except splicing seams locally have 1~2mm of increase, illustrates that chute bottom does not occur molten aluminum leakage.Increase Big splicing seams are the straight lines of rule, are easy to fill with material for repairing and chute is firmly combined, eliminate chute bottom crack, are dropped Low patch work amount.It avoids chute bottom crack from causing to inhale hydrogen and impurity pollution to melt quality, has to product quality is improved Significance.
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this Made any modifications, equivalent replacements, and improvements etc., should be included in the claims in the present invention within the spirit and principle of invention Protection scope within.

Claims (6)

1. a kind of molten aluminum chute, which is characterized in that built including building part (11) and second for being spliced into the first of chute main body (1) Part (12), and the chute fixing piece (2) for fixing the chute main body (1);
Described first, which builds part (11), is equipped with raised (112) for splicing the Mosaic face (111) that second builds part (12), and described second builds Part (12) is equipped with the groove (113) with raised (112) cooperation;Described first, which builds part (11) and second, builds between part (12) Splicing seams (13) are located at chute main body (1) the inner wall bottom, and described first builds part (11) and second builds spelling between part (12) Plugging part is equipped in seam (13).
2. molten aluminum chute according to claim 1, which is characterized in that the protrusion (112) is semi-cylindrical, the protrusion (112) axis is parallel with the extending direction of the chute main body (1);
Described second groove (113) for building part (12) is the semi-cylindrical shaped cooperated with described raised (112).
3. molten aluminum chute according to claim 1, which is characterized in that be located at the spelling of chute main body (1) the inner wall bottom Seam (13) is straight line.
4. molten aluminum chute according to claim 1, which is characterized in that the chute fixing piece (2) includes slipping for accommodating The spout enclosure (21) of groove body (1) is located in the spout enclosure (21) and builds part (11) and second for clamping described first Build at least two pieces of limited blocks (22) and the chute pressing plate (23) of part (12).
5. molten aluminum chute according to claim 4, which is characterized in that the chute main body (1) and spout enclosure (21) it Between be equipped with dry type impervious material insulating layer (24).
6. molten aluminum chute according to claim 1, which is characterized in that chute main body (1) inner wall and chute main body (1) The vertical section of extending direction is half elliptic.
CN201910442153.4A 2019-05-24 2019-05-24 A kind of molten aluminum chute Pending CN110142383A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910442153.4A CN110142383A (en) 2019-05-24 2019-05-24 A kind of molten aluminum chute

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910442153.4A CN110142383A (en) 2019-05-24 2019-05-24 A kind of molten aluminum chute

Publications (1)

Publication Number Publication Date
CN110142383A true CN110142383A (en) 2019-08-20

Family

ID=67593282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910442153.4A Pending CN110142383A (en) 2019-05-24 2019-05-24 A kind of molten aluminum chute

Country Status (1)

Country Link
CN (1) CN110142383A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201407910Y (en) * 2009-05-08 2010-02-17 朱强龙 Novel kiln tail chute with long service life
US20110139799A1 (en) * 2009-12-10 2011-06-16 Boorman James E Method of forming sealed refractory joints in metal-containment vessels, and vessels containing sealed joints
WO2011101313A1 (en) * 2010-02-19 2011-08-25 Paul Wurth S.A. Distribution chute for a charging device of a metallurgical reactor
CN102812319A (en) * 2009-12-10 2012-12-05 诺维尔里斯公司 Molten Metal Containment Structure Having Flow Through Ventilation
CN202898442U (en) * 2012-11-07 2013-04-24 秦皇岛格瑞得节能技术服务有限公司 Compositely-strengthened blast furnace top cloth chute
CN103292081A (en) * 2013-06-04 2013-09-11 无锡金顶石油管材配件制造有限公司 Embedded sealing port structure for high-pressure delivery pipelines
CN103639376A (en) * 2013-12-24 2014-03-19 金隆铜业有限公司 Copper smelting insulation chute device
JP2014077168A (en) * 2012-10-10 2014-05-01 Tokyo Yogyo Co Ltd Refractory block for forming molten metal passage
CN106440823A (en) * 2016-08-18 2017-02-22 富通昭和线缆(天津)有限公司 Chute structure used for copper rod production and copper rod manufacturing method
CN205996129U (en) * 2016-08-26 2017-03-08 西南铝业(集团)有限责任公司 A kind of aluminium liquid chute and prefabricated component
CN106825457A (en) * 2017-03-14 2017-06-13 派罗特克(广西南宁)高温材料有限公司 A kind of built-in type electrical heating chute
CN210435330U (en) * 2019-05-24 2020-05-01 乳源瑶族自治县东阳光高纯新材料有限公司 Aluminium liquid chute

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201407910Y (en) * 2009-05-08 2010-02-17 朱强龙 Novel kiln tail chute with long service life
US20110139799A1 (en) * 2009-12-10 2011-06-16 Boorman James E Method of forming sealed refractory joints in metal-containment vessels, and vessels containing sealed joints
CN102812319A (en) * 2009-12-10 2012-12-05 诺维尔里斯公司 Molten Metal Containment Structure Having Flow Through Ventilation
WO2011101313A1 (en) * 2010-02-19 2011-08-25 Paul Wurth S.A. Distribution chute for a charging device of a metallurgical reactor
JP2014077168A (en) * 2012-10-10 2014-05-01 Tokyo Yogyo Co Ltd Refractory block for forming molten metal passage
CN202898442U (en) * 2012-11-07 2013-04-24 秦皇岛格瑞得节能技术服务有限公司 Compositely-strengthened blast furnace top cloth chute
CN103292081A (en) * 2013-06-04 2013-09-11 无锡金顶石油管材配件制造有限公司 Embedded sealing port structure for high-pressure delivery pipelines
CN103639376A (en) * 2013-12-24 2014-03-19 金隆铜业有限公司 Copper smelting insulation chute device
CN106440823A (en) * 2016-08-18 2017-02-22 富通昭和线缆(天津)有限公司 Chute structure used for copper rod production and copper rod manufacturing method
CN205996129U (en) * 2016-08-26 2017-03-08 西南铝业(集团)有限责任公司 A kind of aluminium liquid chute and prefabricated component
CN106825457A (en) * 2017-03-14 2017-06-13 派罗特克(广西南宁)高温材料有限公司 A kind of built-in type electrical heating chute
CN210435330U (en) * 2019-05-24 2020-05-01 乳源瑶族自治县东阳光高纯新材料有限公司 Aluminium liquid chute

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
汤蕙芬,范季贤: "热能工程设计手册", vol. 1, 31 March 1993, 机械工业出版社, pages: 640 *
牟典江;迟茹强;: "链篦机-回转窑窑尾溜槽的改造与应用", 新疆有色金属, no. 2, 15 July 2011 (2011-07-15), pages 153 - 154 *

Similar Documents

Publication Publication Date Title
CN100575504C (en) Iron runner exempts to toast mould material and lining technology is made in the cast of single iron mouth blast furnace iron outlet groove
CN106435073B (en) A kind of blast furnace lining monolithic casting construction method for substituting spray paint and refractory brick
CN210435330U (en) Aluminium liquid chute
CN107344860A (en) Mould material and pouring procedure for hot-metal bottle
CN110918967A (en) Repairing method for inner liner of torpedo hot metal mixer car
CN110142383A (en) A kind of molten aluminum chute
CN206425545U (en) A kind of ladle wall working lining
CN107321926A (en) The casting system of injection machine class template casting and utilize its casting method
CN108971471B (en) Construction process for carbon-free steel ladle composite ladle bottom
CN110487076A (en) A kind of torpedo tank liner repairing method
CN113337657B (en) Blast furnace iron tapping channel operation and maintenance method and iron tapping channel
CN109439825A (en) A method of extending blast furnace main channel service life
CN111269018B (en) Long-life steel flowing groove and manufacturing mold and manufacturing method thereof
CN205183761U (en) Ladle package end pouring structure
CN108612304A (en) Hang modular system in toilet
CN105135888B (en) A kind of heating furnace burner spout pours forming method online
CN208998529U (en) Burner dedicated templates
CN207043277U (en) The casting system of injection machine class template casting
CN109628704A (en) A kind of RH vacuum refining furnace and its building method
CN219520462U (en) Anti-offset tool for ladle upper port material clamping fixture
CN110170624A (en) A kind of steel pawl crystallizer and its manufacturing method
CN219569204U (en) Novel mortar rod
CN204035474U (en) Precision castings wax pattern mechanic station
CN212945327U (en) Aluminum ingot melting forming device
CN201488548U (en) Mouth-locking type warehouse dividing seam structure for furnace lining made of unshaped refractory materials

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination