CN1101392A - Pouring process for reinforced concrete piles - Google Patents

Pouring process for reinforced concrete piles Download PDF

Info

Publication number
CN1101392A
CN1101392A CN 93115834 CN93115834A CN1101392A CN 1101392 A CN1101392 A CN 1101392A CN 93115834 CN93115834 CN 93115834 CN 93115834 A CN93115834 A CN 93115834A CN 1101392 A CN1101392 A CN 1101392A
Authority
CN
China
Prior art keywords
hole
reinforced concrete
concrete
pile
perfusion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 93115834
Other languages
Chinese (zh)
Inventor
刘孝先
刘润郊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 93115834 priority Critical patent/CN1101392A/en
Publication of CN1101392A publication Critical patent/CN1101392A/en
Pending legal-status Critical Current

Links

Abstract

The technology for pouring reinforced concrete pile under unfavourable geologic condition of running sand, underground water, slurry and gritstone includes suchs teps as drilling to predetermined depth, spraying cement mortar in ratio of 0.5-0.7 (water to cement) via nozzles in drill bit, putting reinforcing bar cage in hole, pouring concrete 2-3m high each time untill up to the top of the pole. It features close combination of pile with earth, saving raw material and high bearing capacity.

Description

Pouring process for reinforced concrete piles
The present invention relates to a kind of process of pouring into reinforced concrete pile.
At present, the method of pouring concrete pile is a lot of in the world, a kind of bore slurry pressuring pile-forming that provides as Chinese patent CN86100705, be to hole to desired depth, when carrying brill, extremely there is not the hole danger position that collapses by being located at drill bit nozzle high pressure hydrojet, after placing reinforcing cage and filling up pellet, make second pulp feeding by at least one slip casting sebific duct at the bottom of the hole again, reach the aperture to slurries.This kind method is carried out second pulp feeding, a part of slurries have been consumed, mend in the slurry process and overflow a part of slurries again from the aperture, because technical indicator restriction, can not utilize again, therefore lost some slurries again, and the machine of the pile body of perfusion is joined for there not being husky concrete pile, at the husky concrete pile that has that is lower than on the intensity under the same terms.
The purpose of this invention is to provide a kind of cement paste dado of using, and stir to form a kind of method for filling of reinforced concrete pile of new machine proportioning with concrete secondary.
The object of the present invention is achieved like this: hole to desired depth, 's 0.5~0.7 cement grout by the nozzle in the drill bit to hole inner high voltage spray water/binder ratio, carry boring height and injecting the cement grout height at every turn and be directly proportional, drill bit is embedded in 1.5~2m place in the cement grout all the time, after cement paste can found wall, prefabricated reinforcing cage is put into the hole, in the hole, throw in the concrete that stirs then, its label is 50~200#, the concrete of throwing in per 2~3 meters dark be one deck, vibrate once, till being filled into absolute altitude.
According to the difference of geological conditions, the cement grout pressure of injection is at 1~25MPa/cm 2In the scope, if find the pile crown of perfusion just husky suspension is arranged, but throw-in part divides rubble, smash the back pile again.Stake aperture place has passage, this passage with hold stock tank and be communicated with, throw in cement grout that rubble overflows in secondary depositing concrete and back and can flow into along the passage that open in the aperture and hold stock tank, this reclaims the concrete that slurries can be used to stir the input of production secondary.
The process of the perfusion reinforced concrete pile that the present invention proposes adopts boring back high pressure spray cement grout retaining wall at the bottom of the hole, to around soil a very strong osmosis is arranged, make hole wall intact.Secondary depositing concrete and reclaim excessive cement grout and utilize again on this basis, this is than adopting the difference of cement grout second pulp feeding to be: the cement grout of having saved second pulp feeding, having reclaimed excessive cement grout utilizes again, two totals account for always with 30~40% of slurry amount, pile body machine proportioning is more perfect, for husky concrete pile is arranged, improved strength of the mixing pile.Compare with common stake shape, the stake shape of pouring into the present invention is improved 1.5~1.8 times of bearing capacities.
Fig. 1 is the process flow diagram of cement rendering dado "forming column.
Embodiment:
600 millimeters of perfusion φ, long 10 meters lagging pile.Geological conditions: light loam, natural aqueous rate 3.5%, 1 meter of underground water.Earth bearing strength R value: 14 tons.Long screw auger 1 is holed to designing requirement, and the cement grout 7 that high pressure pouring modulates, pressure are 10MPa/cm 2, cement injection slurries 7 are to the place of not collapsing, and place reinforcing cage 2 in the hole, throw in the concrete 3 that stirs then, feed intake 3 meters the time, vibrate once with vibrator 6, throw into a top pile always.Technological process as shown in Figure 1 divides A, B, four steps of C, D, A: boring; B: propose brill slip casting; C: descending reinforcing cage; D: layering is vibrated.The cement grout that overflows enters through passage 4 and holds stock tank 5.The cement grout that is poured into, water/binder ratio are 0.6, adopt No. 425 ordinary Portland cement, concrete grade: 80#, and slump is 2, its stone, sand, slurry ratio are 1: 0.3: 0.6.Method of testing is pressed the operation of JGJ4-80 rules, and the vertical static load lotus reaches design standard, is 80 tons, and the former design strength of pile body is 200#100%, now reaches 124~146%.

Claims (3)

1, a kind of process of pouring into reinforced concrete pile, hole to desired depth, prefabricated reinforcing cage is positioned in the hole to not collapsing the hole site by the spray high pressure slurries in the hole of the nozzle in the drill bit, it is characterized in that: the slurry water gray scale of spray is 0.5~0.7 cement grout, after reinforcing cage places, throw in the concrete stir in the hole, its label is 50~200#, the concrete of input per 2~3 meters dark be one deck, vibrate once, till being filled into absolute altitude.
2, the process of perfusion reinforced concrete pile according to claim 1 is characterized in that: behind the concrete perfusion, the pile crown for sand suspends can drop into part rubble in the hole, vibrates again.
3, the process of perfusion reinforced concrete pile according to claim 1 is characterized in that: have passage 4 at aperture place, this passage with hold stock tank 5 and be communicated with.
CN 93115834 1993-10-06 1993-10-06 Pouring process for reinforced concrete piles Pending CN1101392A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 93115834 CN1101392A (en) 1993-10-06 1993-10-06 Pouring process for reinforced concrete piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 93115834 CN1101392A (en) 1993-10-06 1993-10-06 Pouring process for reinforced concrete piles

Publications (1)

Publication Number Publication Date
CN1101392A true CN1101392A (en) 1995-04-12

Family

ID=4991366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 93115834 Pending CN1101392A (en) 1993-10-06 1993-10-06 Pouring process for reinforced concrete piles

Country Status (1)

Country Link
CN (1) CN1101392A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1306121C (en) * 2004-08-05 2007-03-21 陈佳训 Method for pile foundation construction of geologic structure with flow plastic half-flow plastic and its application apparatus
CN100453744C (en) * 2005-11-17 2009-01-21 郑雄 Underwater compact concrete construction method
CN101876171A (en) * 2010-04-29 2010-11-03 中交隧道工程局有限公司 New method for water washing and decomposing to break pile head of bridge pile foundation
CN102704466A (en) * 2012-05-16 2012-10-03 苏州市伦琴工业设计有限公司 Pile manufacturing method in buildings
CN103174130A (en) * 2011-12-21 2013-06-26 中国建筑第四工程局有限公司 Anti-sloughing method of sand layer of impact-cone concrete pile
CN106812473A (en) * 2017-02-10 2017-06-09 上海强劲地基工程股份有限公司 Churning drilling tool with helical blade and pressure injection displacement stiffening pile anchor construction method
CN110847161A (en) * 2019-09-27 2020-02-28 河北工程大学 Supporting disc pile device suitable for muddy soft soil and construction process thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1306121C (en) * 2004-08-05 2007-03-21 陈佳训 Method for pile foundation construction of geologic structure with flow plastic half-flow plastic and its application apparatus
CN100453744C (en) * 2005-11-17 2009-01-21 郑雄 Underwater compact concrete construction method
CN101876171A (en) * 2010-04-29 2010-11-03 中交隧道工程局有限公司 New method for water washing and decomposing to break pile head of bridge pile foundation
CN101876171B (en) * 2010-04-29 2014-10-22 中交隧道工程局有限公司 New method for water washing and decomposing to break pile head of bridge pile foundation
CN103174130A (en) * 2011-12-21 2013-06-26 中国建筑第四工程局有限公司 Anti-sloughing method of sand layer of impact-cone concrete pile
CN103174130B (en) * 2011-12-21 2016-06-22 中国建筑第四工程局有限公司 A kind of layer of sand anti-collapse method of Punching Borehole Cast-in-place Concrete Pile
CN102704466A (en) * 2012-05-16 2012-10-03 苏州市伦琴工业设计有限公司 Pile manufacturing method in buildings
CN102704466B (en) * 2012-05-16 2014-07-30 四川鑫圆建设集团有限公司 Pile manufacturing method in buildings
CN106812473A (en) * 2017-02-10 2017-06-09 上海强劲地基工程股份有限公司 Churning drilling tool with helical blade and pressure injection displacement stiffening pile anchor construction method
CN110847161A (en) * 2019-09-27 2020-02-28 河北工程大学 Supporting disc pile device suitable for muddy soft soil and construction process thereof

Similar Documents

Publication Publication Date Title
CN102322058B (en) Construction process and equipment for downhole impacting high-pressure jet grouting pile
CN109208625B (en) An a kind of underground pile foundation cavity reinforcement reinforcing kind mountain construction method
AU2020376449B2 (en) Construction method of pressurized grouting pile based on reinforcing fiber and metakaolin
CN101806059B (en) Drilling, grouting and sand-throwing process of ground surface of mined-out region under highway
CN110130936B (en) Construction method for sudden encountering untreated karst cave or crack in shield tunneling process
CN107012861B (en) A kind of discrete material core expansive concrete stake and its construction method
CN104831705A (en) Ultra-deep hole grouting method during underground excavation of tunnel
CN109457694A (en) A kind of variable diameters steel reinforcement cage enlarged footing anti-floating or pressure bearing pile and construction in conjunction with mixing pile or rotary churning pile
CN109518677A (en) Punching Borehole Cast-in-place Concrete Pile karst cave treatment method
CN103806433A (en) Foundation backfill reinforcement method
CN101532291B (en) Variable diameter plastic sleeve mixed pile for reinforcing thick-covering and deep-burying soft soil layer and piling method
CN106996104A (en) Injection forming club-footed pile and its construction method
CN1101392A (en) Pouring process for reinforced concrete piles
CN205348160U (en) Novel cement flour spouts two -way stirring stake machine construction equipment
CN104790982A (en) Enclosed mud for underground excavation tunnel ultra-deep hole grouting
CN106284311A (en) A kind of rotary drilling rig dry pore-forming efficient construction technology of cast-in-place concrete pile
CN101713189B (en) Construction process of floral tube dry filling piles
CN204112318U (en) A kind of technique device improving CFG guncreting pile bearing capacity
CN104047285A (en) Technical device and construction method for improving bearing capacity of CFG pressure pouring piles
CN204827465U (en) Undercut tunnel ultra -deep hole slip casting structure
CN202644518U (en) Post-inserted reinforcement cage cement fly ash gravel pile
CN1089587A (en) Superfluid state concrete and placing pile making method thereof and the used rig of this method
CN202672132U (en) Reinforcing structure for basement backfilling
CN209669857U (en) A kind of variable diameters steel reinforcement cage enlarged footing anchor pole anti-floating or pressure bearing pile
CN105484259B (en) Backfilled Stone Layer tube pile structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication