CN110132495B - Method for detecting leakage of abalone culture platform - Google Patents

Method for detecting leakage of abalone culture platform Download PDF

Info

Publication number
CN110132495B
CN110132495B CN201910427466.2A CN201910427466A CN110132495B CN 110132495 B CN110132495 B CN 110132495B CN 201910427466 A CN201910427466 A CN 201910427466A CN 110132495 B CN110132495 B CN 110132495B
Authority
CN
China
Prior art keywords
culture platform
abalone culture
lifting
platform
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910427466.2A
Other languages
Chinese (zh)
Other versions
CN110132495A (en
Inventor
葛勇
王彪
夏胜登
袁辉
周峻峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhenhua Port Machinery Heavy Industries Co
Original Assignee
Shanghai Zhenhua Port Machinery Heavy Industries Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhenhua Port Machinery Heavy Industries Co filed Critical Shanghai Zhenhua Port Machinery Heavy Industries Co
Priority to CN201910427466.2A priority Critical patent/CN110132495B/en
Publication of CN110132495A publication Critical patent/CN110132495A/en
Application granted granted Critical
Publication of CN110132495B publication Critical patent/CN110132495B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M3/00Investigating fluid-tightness of structures
    • G01M3/02Investigating fluid-tightness of structures by using fluid or vacuum

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Farming Of Fish And Shellfish (AREA)

Abstract

The invention provides a method for detecting leakage of an abalone culture platform, which comprises the steps of integrally hoisting the abalone culture platform by using a floating crane, immersing a part to be detected in water, and after a specified time is reached, allowing inspectors to enter various cabins through channels in the platform to perform cabin leakage detection. The invention can effectively solve the problems of low efficiency and water resource waste caused by the prior art.

Description

Method for detecting leakage of abalone culture platform
Technical Field
The invention relates to a ship building leakage inspection method, in particular to a method for inspecting leakage of an abalone culture platform.
Background
In recent years, along with the rapid development of the offshore sea area abalone aquaculture industry, the offshore sea area does not have enough space to meet the increasing abalone aquaculture demand, and the abalone aquaculture platform can effectively alleviate this current situation as a steel structure device that can carry out abalone aquaculture in the deep and open sea area, therefore abalone aquaculture platform has huge development potential and market prospect.
As a steel structure device capable of culturing abalones in deep and open sea areas, the structure of the steel structure device needs to ensure the sealing performance of each watertight cabin, and the problems of water leakage, sinking and the like can be avoided when the steel structure device is operated on the sea. Therefore, leakage tests must be performed on each watertight compartment of the abalone culture platform before the platform is actually launched.
At present, for the leakage inspection of an abalone culture platform, the common method is that fresh water is filled into each cabin in the culture platform after the structural integrity of the culture platform is completed in the stage of building on a flat ground, and professional inspectors perform visual inspection on each exposed welding line of the culture platform outside the platform. The method is time-consuming, labor-consuming and low in efficiency, and simultaneously causes great waste of fresh water resources.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide a method for detecting leakage of an abalone culture platform, which can effectively solve the problems of low efficiency and water resource waste caused by the prior art.
In order to achieve the purpose, the invention adopts the following technical scheme:
a method for testing for leakage on an abalone culture platform, comprising the steps of:
s1, driving a floating crane into a designated area, and putting down a lifting hook;
s2, connecting a lifting hook with a balance beam by using an upper lifting steel wire rope, wherein the balance beam is also connected with a lower lifting steel wire rope;
s3, connecting the balance beam with the abalone culture platform by using a lower lifting steel wire rope;
s4, starting the floating crane, lifting the abalone culture platform by the lifting hook, lifting the abalone culture platform to the upper part of the water area, lowering the lifting hook, and immersing the area to be detected on the abalone culture platform into water;
s5, after the immersion time reaches the time specified by the technical file, the abalone culture platform keeps an immersion state, a professional inspector enters the platform through an upper inlet of the abalone culture platform, and internal visual leakage inspection is carried out on welding lines of all watertight cabins through internal channels of the platform;
s6, after the leakage detection is finished, starting the floating crane again, and hoisting and transporting the abalone culture platform to a specified position of a shipping barge;
and S7, finally, sequentially dismantling the connection between the lower steel wire rope and the abalone culture platform and the balance beam, and the connection between the upper steel wire rope and the lifting hook and the balance beam, and completing the leakage detection, shipping and shipping operations of the whole abalone culture platform.
The length of the balance beam is greater than the maximum width of the section of the abalone culture platform.
And immersing the area to be detected on the abalone culture platform into water for more than 2 hours.
In the technical scheme, the method for detecting the leakage of the abalone culture platform provided by the invention has the advantages that the leakage test is innovatively adjusted to be carried out simultaneously with the hoisting, transporting and shipping operations of the abalone culture platform through the improvement of the process procedures, the operation efficiency is improved, the waste of water resources caused by adding/discharging water into/from the cabin is avoided, and meanwhile, the construction operation cost is greatly reduced.
Drawings
Fig. 1 is a schematic diagram of the field arrangement of the leakage detection method for the abalone culture platform.
Detailed Description
The technical scheme of the invention is further explained by combining the drawings and the embodiment.
Referring to fig. 1, the method for detecting leakage of an abalone culture platform provided by the present invention includes the following steps:
s1, driving a floating crane 1 into a designated area, and putting down a lifting hook on the floating crane 1;
s2, connecting a lifting hook with a balance beam 4 by using an upper lifting steel wire rope 3, and connecting a lower lifting steel wire rope 5 to the balance beam 4;
s3, lifting a lower lifting steel wire rope 5 to the position above the abalone culture platform 2 by using the floating crane 1, and connecting the balance beam 4 with a lifting lug on the abalone culture platform 2 through the lower lifting steel wire rope 5;
s4, starting the floating crane 1, hoisting the abalone culture platform 2 by using the hoisting hook, hoisting the abalone culture platform to the upper part of the water area, lowering the hoisting hook, and immersing the area to be detected on the abalone culture platform 2 into water;
s5, after the abalone culture platform is immersed for more than 2 hours, the abalone culture platform 2 is kept in an immersed state, professional inspectors enter the interior of the platform through an upper inlet of the abalone culture platform 2, and internal visual leakage inspection is carried out on the welding line positions of the watertight compartments through internal channels of the platform;
s6, after the leakage detection is finished, starting the floating crane 1 again, and hoisting the abalone culture platform 2 to the specified position of the shipping barge;
and S7, finally, sequentially dismantling the connection between the lower steel wire rope 5 and the abalone culture platform 2 and the balance beam 4 and the connection between the upper steel wire rope 3 and the lifting hook and the balance beam 4, and completing the leakage detection, shipping and shipping operations of the whole abalone culture platform 2.
Preferably, the crane characteristic curve of the floating crane 1 needs to meet the integral hoisting requirement of the abalone culture platform 2 and the balance beam 4. The abalone culture platform 2 is a main body to be tested in the method, lifting lugs which are reliably connected need to be arranged, the number of the lifting lugs is integral multiple of four or four, the lifting lugs need to be symmetrically and uniformly arranged according to a longitudinal axis and a transverse axis where the center of gravity of the abalone culture platform 2 is located, and the distance between the lifting lugs and the vertical line of the longitudinal axis and the transverse axis needs to be more than 2 m. The rated load of the upper hoisting steel wire rope 3 needs to meet the integral hoisting requirement of the abalone culture platform 2 and the balance beam 4, when the device is used, the upper end of the upper hoisting steel wire rope 3 is connected with the hoisting hook on the floating crane 1, and the lower end of the upper hoisting steel wire rope is connected with the balance beam 4. The length of the balance beam 4 needs to be larger than the maximum width of the hanging section of the abalone culture platform 2, and meanwhile, enough rigidity is guaranteed. The rated load of the lower steel wire rope 5 needs to meet the requirement of integral hoisting of the abalone culture platform 2, when the abalone culture platform is used, the upper end of the lower steel wire rope 5 is connected with the balance beam 4, and the lower end of the lower steel wire rope is connected with the hoisting lug on the abalone culture platform 2.
Preferably, the crane characteristic curve mainly means that each crane has a crane characteristic curve table, and the maximum rated load capacity corresponding to different boom lengths can be quickly inquired according to the table, so that whether the rated load capacity of the crane meets the hoisting requirement under different working conditions can be judged.
Preferably, the upper hoisting steel wire rope 3 and the lower hoisting steel wire rope 5 are generally configured according to actual hoisting weight and length requirements to meet hoisting load requirements.
Preferably, the balance beam 4 generally does not involve the requirement of material, and the requirements of strength and rigidity are achieved only through the design of the structural form and the adjustment of the thickness.
It should be understood by those skilled in the art that the above embodiments are only for illustrating the present invention and are not to be used as a limitation of the present invention, and that changes and modifications to the above described embodiments are within the scope of the claims of the present invention as long as they are within the spirit and scope of the present invention.

Claims (3)

1. A method for detecting leakage of an abalone culture platform is characterized by comprising the following steps:
s1, driving a floating crane into a designated area, and putting down a lifting hook;
s2, connecting a lifting hook with a balance beam by using an upper lifting steel wire rope, wherein the balance beam is also connected with a lower lifting steel wire rope;
s3, connecting the balance beam with the abalone culture platform by using a lower lifting steel wire rope;
s4, starting the floating crane, lifting the abalone culture platform by the lifting hook, lifting the abalone culture platform to the upper part of the water area, lowering the lifting hook, and immersing the area to be detected on the abalone culture platform into water;
s5, after the immersion time reaches the time specified by the technical file, the abalone culture platform keeps an immersion state, a professional inspector enters the platform through an upper inlet of the abalone culture platform, and internal visual leakage inspection is carried out on welding lines of all watertight cabins through internal channels of the platform;
s6, after the leakage detection is finished, starting the floating crane again, and hoisting and transporting the abalone culture platform to a specified position of a shipping barge;
s7, finally, the connection between the lower steel wire rope and the abalone culture platform and the balance beam and the connection between the upper steel wire rope and the lifting hook and the balance beam are sequentially dismantled, the leakage detection and shipping operations of the whole abalone culture platform are completed,
the length of the balance beam is larger than the maximum width of the section of the abalone culture platform,
even there is the lug of lifting by crane on the abalone culture platform, lifts by crane the lug and need according to the symmetry of the horizontal and vertical axis at abalone culture platform focus place, evenly arrange, lifts by crane the lug and is greater than 2m with the perpendicular line distance of horizontal and vertical axis.
2. A method for testing for leaks in an abalone culture platform as claimed in claim 1 wherein: and immersing the area to be detected on the abalone culture platform into water for more than 2 hours.
3. A method for testing for leaks in an abalone culture platform as claimed in claim 1 wherein: even there is the lug of lifting by crane on the abalone culture platform, the quantity of lifting by crane the lug is four, or four integral multiples.
CN201910427466.2A 2019-05-22 2019-05-22 Method for detecting leakage of abalone culture platform Active CN110132495B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910427466.2A CN110132495B (en) 2019-05-22 2019-05-22 Method for detecting leakage of abalone culture platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910427466.2A CN110132495B (en) 2019-05-22 2019-05-22 Method for detecting leakage of abalone culture platform

Publications (2)

Publication Number Publication Date
CN110132495A CN110132495A (en) 2019-08-16
CN110132495B true CN110132495B (en) 2020-10-16

Family

ID=67572212

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910427466.2A Active CN110132495B (en) 2019-05-22 2019-05-22 Method for detecting leakage of abalone culture platform

Country Status (1)

Country Link
CN (1) CN110132495B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107089584A (en) * 2017-03-01 2017-08-25 南通蓝岛海洋工程有限公司 A kind of jacket lifts technology for binding
CN108534959A (en) * 2018-06-27 2018-09-14 滁州市康达叉车零部件制造有限公司 A kind of driving axle of forklift performing leak test platform

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101411537B1 (en) * 2012-09-07 2014-06-24 삼성중공업 주식회사 Hook block
CN104596704B (en) * 2015-03-02 2017-09-22 启东丰顺船舶重工有限公司 A kind of LNG tank body test method
CN106017807A (en) * 2016-07-18 2016-10-12 黄山鼎瑞新壳体有限公司 Waterproof detection apparatus
CN106813867A (en) * 2017-01-04 2017-06-09 北京臻迪科技股份有限公司 A kind of unmanned boat hermetization testing method, device and its unmanned boat
CN207730915U (en) * 2018-01-22 2018-08-14 上海捷新动力电池系统有限公司 A kind of automatic submerging test equipment of power battery pack
CN108562817A (en) * 2018-07-16 2018-09-21 青岛海洋电气设备检测有限公司 A kind of underwater equipment electric property detecting system and test method
CN108726351A (en) * 2018-08-08 2018-11-02 上海振华重工(集团)股份有限公司 A kind of hanging method and Lift-on/Lift-off System of Large-diameter Steel cylinder

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107089584A (en) * 2017-03-01 2017-08-25 南通蓝岛海洋工程有限公司 A kind of jacket lifts technology for binding
CN108534959A (en) * 2018-06-27 2018-09-14 滁州市康达叉车零部件制造有限公司 A kind of driving axle of forklift performing leak test platform

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Engineering analysis of a submersible abalone aquaculture cagesystem for deployment in exposed marine environments;Taeho Kim;《Aquacultural Engineering》;20141030;第72-88页 *

Also Published As

Publication number Publication date
CN110132495A (en) 2019-08-16

Similar Documents

Publication Publication Date Title
CN100537348C (en) Offshore platform integral constructing and hoisting method and special-purpose hoisting machine for the same
CN201756173U (en) Water surface hoisting construction ship with buoyant boxes
CN101804849B (en) Construction program of semi-submersible platform for offshore oil and gas development
CN102019998B (en) Erection embarking method of upper and lower water side cabins
CN101337574A (en) Mounting method of large ship stern-door transmission system
CN106247011B (en) A kind of splicing of major diameter Long-distance Pipeline for Water Conveyance, sinking system and method
CN108455451B (en) A kind of 600 tons of gantry cranes hold the method for hanging installation superelevation flare tower
CN102190065B (en) Construction method for ocean platform
CN110132495B (en) Method for detecting leakage of abalone culture platform
CN106290128A (en) A kind of big volume containing the sample multi-functional abyssal environment sample framework, assay device and test method
CN104340336B (en) A kind of overweight sectional turn-over method of ship
CN102145734B (en) Method for integrally folding semi-submersible drilling platform
CN103569311A (en) Propeller installing and positioning device and propeller underwater installing method
CN108930260A (en) The installation method of jack-up unit spud leg
CN215851806U (en) Underwater suspension working platform
CN114718479A (en) Testing method for drilling system hook
KR20110038226A (en) Method for performing light weight in a dock(on the ground) before launching a ship
CN212133995U (en) Sealing performance detection device of cylindrical underwater vehicle
CN108862010A (en) A kind of Large Steel cylinder hoisting fixture and its hanging method
KR20150109728A (en) Method for loading large block of ship
KR101566522B1 (en) Method for loading large block of ship
CN208379463U (en) A kind of apparatus for examination and repair of bridge bearing platform and its casing
CN113184118B (en) Marine retraction device and retraction method for underwater explosion test equipment
KR101183740B1 (en) Tandem construction method using magnetic device
CN209432376U (en) Acetylene gas bottle air leakage detecting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant