CN110111913A - 六边形套管型燃料堆芯中子注量率测量的试验堆芯及方法 - Google Patents
六边形套管型燃料堆芯中子注量率测量的试验堆芯及方法 Download PDFInfo
- Publication number
- CN110111913A CN110111913A CN201811068173.1A CN201811068173A CN110111913A CN 110111913 A CN110111913 A CN 110111913A CN 201811068173 A CN201811068173 A CN 201811068173A CN 110111913 A CN110111913 A CN 110111913A
- Authority
- CN
- China
- Prior art keywords
- reactor core
- fluence rate
- neutron fluence
- component
- box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C17/00—Monitoring; Testing ; Maintaining
- G21C17/10—Structural combination of fuel element, control rod, reactor core, or moderator structure with sensitive instruments, e.g. for measuring radioactivity, strain
- G21C17/12—Sensitive element forming part of control element
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C5/00—Moderator or core structure; Selection of materials for use as moderator
- G21C5/02—Details
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Plasma & Fusion (AREA)
- General Engineering & Computer Science (AREA)
- High Energy & Nuclear Physics (AREA)
- Monitoring And Testing Of Nuclear Reactors (AREA)
Abstract
本发明公开了六边形套管型燃料堆芯中子注量率测量的试验堆芯及方法,所述试验堆芯包括燃料组件、铍组件、铝组件、控制棒组件、和水栅元,所述堆芯共布置265个位置,分别为20盒燃料组件、47盒铍组件、71盒铝组件、12个控制棒组件和115个水栅元,20盒燃料组件集中布置在以L12为中心位置的堆芯的中央区域,47盒铍组件围绕燃料组件布置在燃料组件的内侧和外侧,71盒铝组件围绕铍组件布置,12个控制棒组件间隔布置于铍组件和燃料组件之间,每个燃料组件、铍组件、铝组件、控制棒组件和水栅元各占1个位置。本发明能够满足检验核设计程序对六边形套管型燃料堆芯中子注量率计算可靠性的需求。
Description
技术领域
本发明涉及核反应堆设计技术领域,具体涉及六边形套管型燃料堆芯中子注量率测量的试验堆芯及方法。
背景技术
核反应堆的发展离不开试验堆,试验堆对各种反应堆堆型的开发有非常重要的作用。先进试验堆的发展趋势是具有高的热中子或快中子注量率,数目多的实验孔道,包括一定数量的大尺寸孔道。
对比文献1(发明专利:高热中子注量率堆芯,专利号201210183206.3)公开了一种高热中子注量率堆芯,该堆芯包括燃料组件、控制棒组件和铍组件;燃料组件为六边形套管型燃料组件,若干个燃料组件呈环形紧凑布置,在燃料组件环形区域的内侧形成热中子阱;紧挨燃料组件环形区域的外侧布置有若干个六边形铍组件,形成倒中子阱;若干根控制棒组件按两行两列呈“井”字型间隔布置在燃料组件之间。所述高热中子注量率堆芯,在保证安全及结构可行的前提下,有利于提高辐照孔道内热中子注量率,增强和拓宽试验堆的辐照能力和应用范围。
对比文献2(发明专利:高快中子注量率堆芯,专利号201210182828.4)公开了一种高快中子注量率堆芯,该堆芯包括燃料组件、控制棒组件和铍组件;燃料组件为六边形套管型燃料组件,若干个燃料组件呈环形紧凑布置,最内层环上有6个燃料组件,在其环形区域的中心处形成快中子阱;紧挨燃料组件环形区域的外侧布置有若干个六边形铍组件,形成倒中子阱;若干根控制棒组件按两行两列呈“井”字型间隔布置在燃料组件之间。所述高快中子注量率堆芯,满足国际限制的U-235富集度水平和国内的燃料芯体制造及冷却剂流速设计水平的要求,可获得较高的辐照孔道内快中子注量率水平,增强和拓宽试验堆的辐照能力和应用范围。
对比文献1和对比文献2分别公开了一种高热、高快中子注量率堆芯,其燃料组件均采用六边形套管型燃料组件,堆芯包括燃料组件、控制棒组件、铍组件等堆芯部件。中子注量率水平是试验堆堆芯最重要的技术指标,准确计算中子注量率水平是试验堆堆芯核设计程序必须具备的功能。因此,有必要针对六边形套管型燃料组件堆芯,开展临界物理试验,以检验堆芯核设计程序对中子注量率的计算精度和可靠性。
发明内容
本发明的目的在于提供六边形套管型燃料堆芯中子注量率测量的试验堆芯,以满足检验核设计程序对中子注量率计算可靠性的需求,依据本发明所述堆芯布置开展临界物理试验,可有效检验核设计程序对六边形套管型燃料堆芯内中子注量率计算的精度和可靠性。
此外,本发明还涉及上述试验堆芯的试验方法。
本发明通过下述技术方案实现:
六边形套管型燃料堆芯中子注量率测量的试验堆芯,所述堆芯包括燃料组件、铍组件、铝组件、控制棒组件、和水栅元,所述燃料组件为六边形套管型燃料组件,所述铍组件为六边形铍组件,铝组件为六边形铝组件,所述控制棒组件由圆柱形控制棒和外六角内圆形导向管组成,所述水栅元为六边形水栅元,所述堆芯共布置265个位置,分别为20盒燃料组件、47盒铍组件、71盒铝组件、12个控制棒组件和115个水栅元,20盒燃料组件集中布置在以L12为中心位置的堆芯的中央区域,47盒铍组件围绕燃料组件布置在燃料组件的内侧和外侧,71盒铝组件围绕铍组件布置,12个控制棒组件间隔布置于铍组件和燃料组件之间,每个燃料组件、铍组件、铝组件、控制棒组件和水栅元各占1个位置。
本发明所述用于六边形套管型燃料堆芯中子注量率测量的试验堆芯,安全棒价值大于1000pcm,满足试验堆芯临界安全对安全棒价值的要求。依据本发明所述用于六边形套管型燃料堆芯中子注量率测量的试验堆芯,开展临界物理试验,可有效检验核设计程序对中子注量率计算的精度和可靠性。通过对比临界物理试验中子注量率实测值与核设计程序中子注量率计算值,可判断是否需要对堆芯计算模型进行调整;如实测值与计算值存在偏差,则需调整堆芯计算模型,以保证调整后核设计程序计算值与临界试验实测值一致。
进一步地,20盒燃料组件分别布置在J10、J12、K9、K10、K11、K12、K13、K14、L9、L11、L13、L15、M10、M11、M12、M13、M14、M15、N12、N14位置。
进一步地,47盒铍组件分别布置在H7、H8、H9、H10、H11、H12、H13、I7、I8、I9、I10、I11、I12、I13、I14、J8、J14、K7、K8、K15、K16、L7、L8、L12、L16、L17、M8、M9、M16、M17、N10、N16、P10、P11、P12、P13、P14、P15、P16、P17、Q11、Q12、Q13、Q14、Q15、Q16、Q17位置。
进一步地,71盒铝组件分别布置在F5、F6、F7、F8、F9、F10、F11、F12、F13、G5、G6、G7、G8、G9、G10、G11、G12、G13、G14、H5、H6、H14、H15、I5、I6、I15、I16、J5、J16、K5、K6、K17、K18、L5、L6、L18、L19、M6、M7、M18、M19、N7、N8、N18、N19、P8、P9、P18、P19、Q9、Q10、Q18、Q19、R10、R12、R13、R14、R15、R16、R17、R18、R19、S11、S12、S13、S14、S15、S16、S17、S18、S19位置。
进一步地,12个控制棒组件由4根A棒组安全棒、2根B棒组补偿棒、2根C棒组补偿棒、2根D棒组补偿棒、2根E棒组调节棒组成,4根A棒组安全棒分别布置于J9、J13、N11、N15位置,2根B棒组补偿棒分别布置于J11、N13位置,2根C棒组补偿棒分别布置于L10、L14位置,2根D棒组补偿棒分别布置于J7、N17位置,2根E棒组调节棒分别布置于J15、N9位置。
一种如上述试验堆芯的试验方法,包括以下步骤:
1)、按照如下顺序依次提出控制棒,直至堆芯达到临界状态:先将A棒组安全棒由堆芯底部提至堆芯顶部,再将E棒组调节棒由堆芯底部提至堆芯半高度,然后依次将D棒组补偿棒、C棒组补偿棒和B棒组补偿棒由堆芯底部提至堆芯顶部;
2)、对比实测中子注量率与利用核设计程序预示计算获得的中子注量率,若实测中子注量率与计算中子注量率一致,则说明核设计程序对中子注量率计算准确可靠,不需要对堆芯计算模型进行调整;若实测中子注量率与计算中子注量率不一致,则说明核设计程序对中子注量率计算精度不满足设计要求,需要对堆芯计算模型进行调整。
本发明与现有技术相比,具有如下的优点和有益效果:
依据本发明所述用于六边形套管型燃料堆芯中子注量率测量的试验堆芯,开展临界物理试验,可有效检验核设计程序对中子注量率计算的精度和可靠性。通过对比临界物理试验中子注量率实测值与核设计程序中子注量率计算值,可判断是否需要对堆芯计算模型进行调整;如实测值与计算值存在偏差,则需调整堆芯计算模型,以保证调整后核设计程序计算值与临界试验实测值一致。
附图说明
此处所说明的附图用来提供对本发明实施例的进一步理解,构成本申请的一部分,并不构成对本发明实施例的限定。在附图中:
图1为六边形套管型燃料堆芯中子注量率测量的试验堆芯布置示意图;
图2为六边形套管型燃料堆芯中子注量率测量的试验堆芯控制棒布置示意图。
附图中标记及对应的零部件名称:
31-燃料组件,32-铍组件,33-铝组件,34-控制棒组件,35-水栅元,36-A棒组安全棒,37-B棒组补偿棒,38-C棒组补偿棒,39-D棒组补偿棒,310-E棒组调节棒。
其中,附图1中其余数字标号表示堆芯的位置。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚明白,下面结合实施例和附图,对本发明作进一步的详细说明,本发明的示意性实施方式及其说明仅用于解释本发明,并不作为对本发明的限定。
实施例:
如图1、图2所示,本发明涉及六边形套管型燃料堆芯中子注量率测量的试验堆芯及方法,所述试验堆芯包括燃料组件31、铍组件32、铝组件33、控制棒组件34、水栅元35。燃料组件31为六边形套管型燃料组件,铍组件32为六边形铍组件,铝组件33为六边形铍组件,控制棒组件34由圆柱形控制棒和外六角内圆形导向管组成,水栅元35为六边形水栅元。堆芯共布置265个六边形栅元位置。所述堆芯中装载20盒六边形套管型燃料组件31,集中布置在以L12为中心位置的堆芯的中央区域,分别布置在J10、J12、K9、K10、K11、K12、K13、K14、L9、L11、L13、L15、M10、M11、M12、M13、M14、M15、N12、N14位置。所述堆芯中装载47盒铍组件32,围绕燃料组件31内外布置,分别布置在H7、H8、H9、H10、H11、H12、H13、I7、I8、I9、I10、I11、I12、I13、I14、J8、J14、K7、K8、K15、K16、L7、L8、L12、L16、L17、M8、M9、M16、M17、N10、N16、P10、P11、P12、P13、P14、P15、P16、P17、Q11、Q12、Q13、Q14、Q15、Q16、Q17位置。所述堆芯中装载71盒铝组件33,围绕铍组件32外布置,分别布置在F5、F6、F7、F8、F9、F10、F11、F12、F13、G5、G6、G7、G8、G9、G10、G11、G12、G13、G14、H5、H6、H14、H15、I5、I6、I15、I16、J5、J16、K5、K6、K17、K18、L5、L6、L18、L19、M6、M7、M18、M19、N7、N8、N18、N19、P8、P9、P18、P19、Q9、Q10、Q18、Q19、R10、R12、R13、R14、R15、R16、R17、R18、R19、S11、S12、S13、S14、S15、S16、S17、S18、S19位置。所述堆芯中布置12个控制棒组件34,布置于铍组件32和燃料组件31之间,分别布置在J7、J9、J11、J13、J15、L10、L14、N9、N11、N13、N15、N17位置。所述堆芯中除燃料组件31、铍组件32、铝组件33、控制棒组件34各占一个位置外,其余位置均布置为水栅元35,全堆芯共布置115个水栅元35。
如图2所示,发明所述用于六边形套管型燃料堆芯中子注量率测量的试验堆芯中布置12个控制棒组件34,包括A棒组安全棒36、B棒组补偿棒37、C棒组补偿棒38、D棒组补偿棒39和E棒组调节棒310。A棒组安全棒36共4根,布置于J9、J13、N11、N15位置;B棒组补偿棒37共2根,布置于J11、N13位置;C棒组补偿棒38共2根,布置于L10、L14位置;D棒组补偿棒39共2根,布置于J7、N17位置;E棒组调节棒310共2根,布置于J15、N9位置。
如图1所示用于六边形套管型燃料堆芯中子注量率测量的试验堆芯及如图2所示用于六边形套管型燃料堆芯中子注量率测量的试验堆芯控制棒布置,A棒组安全棒36冷态反应性价值为11421pcm,大于1000pcm,满足试验堆芯临界安全对安全棒价值的要求。
所述堆芯布置,在控制棒全部提出堆芯状态下,堆芯有效增殖系数核设计程序计算值为1.2137,在控制棒全部插入堆芯状态下,堆芯有效增殖系数核设计程序计算值为0.8836。按照提棒程序先将A棒组安全棒36由堆芯底部提至堆芯顶部,再将E棒组调节棒310由堆芯底部提至堆芯半高度,然后依次将D棒组补偿棒39、C棒组补偿棒38和B棒组补偿棒37由堆芯底部提至堆芯顶部。依据所述堆芯布置与提棒程序开展临界物理试验,测量堆芯有代表性的铍组件32、燃料组件31及其他栅元位置的中子注量率及其轴向分布,得到堆芯实测中子注量率。对比实测中子注量率与利用核设计程序预示计算获得的中子注量率(简称计算中子注量率),若实测中子注量率与计算中子注量率一致,则说明核设计程序对中子注量率计算准确可靠,不需要对堆芯计算模型进行调整;若实测中子注量率与计算中子注量率不一致,则说明核设计程序对中子注量率计算精度不满足设计要求,需要对堆芯计算模型进行调整。
以上所述的具体实施方式,对本发明的目的、技术方案和有益效果进行了进一步详细说明,所应理解的是,以上所述仅为本发明的具体实施方式而已,并不用于限定本发明的保护范围,凡在本发明的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (6)
1.六边形套管型燃料堆芯中子注量率测量的试验堆芯,其特征在于,所述堆芯包括燃料组件(31)、铍组件(32)、铝组件(33)、控制棒组件(34)、和水栅元(35),所述燃料组件(31)为六边形套管型燃料组件,所述铍组件(32)为六边形铍组件,铝组件(33)为六边形铝组件,所述控制棒组件(34)由圆柱形控制棒和外六角内圆形导向管组成,所述水栅元(35)为六边形水栅元,所述堆芯共布置265个位置,分别为20盒燃料组件(31)、47盒铍组件(32)、71盒铝组件(33)、12个控制棒组件(34)和115个水栅元(35),20盒燃料组件(31)集中布置在以L12为中心位置的堆芯的中央区域,47盒铍组件(32)围绕燃料组件(31)布置在燃料组件(31)的内侧和外侧,71盒铝组件(33)围绕铍组件(32)布置,12个控制棒组件(34)间隔布置于铍组件(32)和燃料组件(31)之间,每个燃料组件(31)、铍组件(32)、铝组件(33)、控制棒组件(34)和水栅元(35)各占1个位置。
2.根据权利要求1所述的六边形套管型燃料堆芯中子注量率测量的试验堆芯,其特征在于,所述20盒燃料组件(31)分别布置在J10、J12、K9、K10、K11、K12、K13、K14、L9、L11、L13、L15、M10、M11、M12、M13、M14、M15、N12、N14位置。
3.根据权利要求1所述的六边形套管型燃料堆芯中子注量率测量的试验堆芯,其特征在于,所述47盒铍组件(32)分别布置在H7、H8、H9、H10、H11、H12、H13、I7、I8、I9、I10、I11、I12、I13、I14、J8、J14、K7、K8、K15、K16、L7、L8、L12、L16、L17、M8、M9、M16、M17、N10、N16、P10、P11、P12、P13、P14、P15、P16、P17、Q11、Q12、Q13、Q14、Q15、Q16、Q17位置。
4.根据权利要求1所述的六边形套管型燃料堆芯中子注量率测量的试验堆芯,其特征在于,所述71盒铝组件(33)分别布置在F5、F6、F7、F8、F9、F10、F11、F12、F13、G5、G6、G7、G8、G9、G10、G11、G12、G13、G14、H5、H6、H14、H15、I5、I6、I15、I16、J5、J16、K5、K6、K17、K18、L5、L6、L18、L19、M6、M7、M18、M19、N7、N8、N18、N19、P8、P9、P18、P19、Q9、Q10、Q18、Q19、R10、R12、R13、R14、R15、R16、R17、R18、R19、S11、S12、S13、S14、S15、S16、S17、S18、S19位置。
5.根据权利要求1所述的六边形套管型燃料堆芯中子注量率测量的试验堆芯,其特征在于,所述12个控制棒组件(34)由4根A棒组安全棒(36)、2根B棒组补偿棒(37)、2根C棒组补偿棒(38)、2根D棒组补偿棒(39)、2根E棒组调节棒(310)组成,4根A棒组安全棒(36)分别布置于J9、J13、N11、N15位置,2根B棒组补偿棒(37)分别布置于J11、N13位置,2根C棒组补偿棒(38)分别布置于L10、L14位置,2根D棒组补偿棒(39)分别布置于J7、N17位置,2根E棒组调节棒(310)分别布置于J15、N9位置。
6.一种如权利要求1-5任一项所述试验堆芯的试验方法,其特征在于,包括以下步骤:
1)、按照如下顺序依次提出控制棒,直至堆芯达到临界状态:先将A棒组安全棒(36)由堆芯底部提至堆芯顶部,再将E棒组调节棒(310)由堆芯底部提至堆芯半高度,然后依次将D棒组补偿棒(39)、C棒组补偿棒(38)和B棒组补偿棒(37)由堆芯底部提至堆芯顶部;
2)、对比实测中子注量率与利用核设计程序预示计算获得的中子注量率,若实测中子注量率与计算中子注量率一致,则说明核设计程序对中子注量率计算准确可靠,不需要对堆芯计算模型进行调整;若实测中子注量率与计算中子注量率不一致,则说明核设计程序对中子注量率计算精度不满足设计要求,需要对堆芯计算模型进行调整。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811068173.1A CN110111913B (zh) | 2018-09-13 | 2018-09-13 | 六边形套管型燃料堆芯中子注量率测量的试验堆芯及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811068173.1A CN110111913B (zh) | 2018-09-13 | 2018-09-13 | 六边形套管型燃料堆芯中子注量率测量的试验堆芯及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110111913A true CN110111913A (zh) | 2019-08-09 |
CN110111913B CN110111913B (zh) | 2022-02-11 |
Family
ID=67483414
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811068173.1A Active CN110111913B (zh) | 2018-09-13 | 2018-09-13 | 六边形套管型燃料堆芯中子注量率测量的试验堆芯及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110111913B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111477355A (zh) * | 2020-04-16 | 2020-07-31 | 中国原子能科学研究院 | 堆芯燃料组件及其布置方法、微型中子源反应堆及其堆芯 |
Citations (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2936273A (en) * | 1955-06-28 | 1960-05-10 | Untermyer Samuel | Steam forming neutronic reactor and method of operating it |
GB882651A (en) * | 1957-11-25 | 1961-11-15 | Atomic Energy Authority Uk | Improvements in or relating to nuclear reactors |
US3206370A (en) * | 1962-06-04 | 1965-09-14 | Atomic Energy Authority Uk | Nuclear reactor core |
US3346459A (en) * | 1963-12-02 | 1967-10-10 | Atomic Energy Authority Uk | Nuclear reactors |
US3366549A (en) * | 1966-06-30 | 1968-01-30 | Atomic Energy Commission Usa | Gas-cooled nuclear reactor |
JPH04301792A (ja) * | 1991-03-29 | 1992-10-26 | Toshiba Corp | 原子炉の炉心 |
EP0677915A1 (en) * | 1994-04-15 | 1995-10-18 | Kollmorgen Corporation | Axial air gap DC motor |
EP0691657A1 (en) * | 1994-07-08 | 1996-01-10 | Hitachi, Ltd. | Reactor core for a light water cooled reactor, fuel assembly and control rod |
EP1085525A1 (en) * | 1999-09-14 | 2001-03-21 | Hitachi, Ltd. | Light water reactor core and fuel assembly |
CN101447238A (zh) * | 2007-11-27 | 2009-06-03 | 中国核动力研究设计院 | 可提高中子注量率的核反应堆堆芯 |
CN101719384A (zh) * | 2009-12-03 | 2010-06-02 | 中国核动力研究设计院 | 具有快中子转换区的核反应堆堆芯 |
CN102117664A (zh) * | 2010-12-24 | 2011-07-06 | 中国核动力研究设计院 | 应用于超临界水冷堆的双排六边形燃料组件 |
US20120085447A1 (en) * | 2010-10-06 | 2012-04-12 | Searete Llc, A Limited Liability Corporation Of The State Of Delaware | Electromagnetic flow regulator, system and methods for regulating flow of an electrically conductive fluid |
US20120085419A1 (en) * | 2010-10-06 | 2012-04-12 | Searete Llc, A Limited Liability Corporation Of The State Of Delaware | Electromagnetic flow regulator, system, and methods for regulating flow of an electrically conductive fluid |
JP2012225761A (ja) * | 2011-04-19 | 2012-11-15 | Toshiba Corp | 高速炉の炉心 |
CN103474097A (zh) * | 2012-06-06 | 2013-12-25 | 中国核动力研究设计院 | 高快中子注量率堆芯 |
CN103474100A (zh) * | 2012-06-06 | 2013-12-25 | 中国核动力研究设计院 | 采用机械控制棒作为第二套停堆系统的堆芯 |
CN104183279A (zh) * | 2014-08-26 | 2014-12-03 | 南华大学 | 一种内冷式压水反应堆堆芯 |
CN105139908A (zh) * | 2015-06-30 | 2015-12-09 | 中国核动力研究设计院 | 一种压水堆核电厂堆芯的控制模式 |
US20150357056A1 (en) * | 2014-04-09 | 2015-12-10 | Colorado School Of Mines | Reactor unit control system for space and terrestrial applications |
CN106128516A (zh) * | 2016-07-15 | 2016-11-16 | 中国核动力研究设计院 | 一种钍基燃料组件及小型压水堆 |
CN106782686A (zh) * | 2015-11-20 | 2017-05-31 | 国核(北京)科学技术研究院有限公司 | 装载185盒燃料组件的堆芯的探测器布置方法及其堆芯 |
JP2017106836A (ja) * | 2015-12-10 | 2017-06-15 | 日立Geニュークリア・エナジー株式会社 | 沸騰水型原子炉 |
CN107731317A (zh) * | 2017-09-07 | 2018-02-23 | 中广核研究院有限公司 | 一种无可溶硼冷却剂的压水反应堆及其燃料组件 |
CN107863166A (zh) * | 2017-12-08 | 2018-03-30 | 中国核动力研究设计院 | 一种压水堆首循环含硼堆芯的18个月换料装载方法 |
CN108364696A (zh) * | 2018-02-13 | 2018-08-03 | 中国核动力研究设计院 | 一种十万千瓦级反应堆堆芯反应性控制方法 |
-
2018
- 2018-09-13 CN CN201811068173.1A patent/CN110111913B/zh active Active
Patent Citations (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2936273A (en) * | 1955-06-28 | 1960-05-10 | Untermyer Samuel | Steam forming neutronic reactor and method of operating it |
GB882651A (en) * | 1957-11-25 | 1961-11-15 | Atomic Energy Authority Uk | Improvements in or relating to nuclear reactors |
US3206370A (en) * | 1962-06-04 | 1965-09-14 | Atomic Energy Authority Uk | Nuclear reactor core |
US3346459A (en) * | 1963-12-02 | 1967-10-10 | Atomic Energy Authority Uk | Nuclear reactors |
US3366549A (en) * | 1966-06-30 | 1968-01-30 | Atomic Energy Commission Usa | Gas-cooled nuclear reactor |
JPH04301792A (ja) * | 1991-03-29 | 1992-10-26 | Toshiba Corp | 原子炉の炉心 |
EP0677915A1 (en) * | 1994-04-15 | 1995-10-18 | Kollmorgen Corporation | Axial air gap DC motor |
EP0691657A1 (en) * | 1994-07-08 | 1996-01-10 | Hitachi, Ltd. | Reactor core for a light water cooled reactor, fuel assembly and control rod |
EP1085525A1 (en) * | 1999-09-14 | 2001-03-21 | Hitachi, Ltd. | Light water reactor core and fuel assembly |
CN101447238A (zh) * | 2007-11-27 | 2009-06-03 | 中国核动力研究设计院 | 可提高中子注量率的核反应堆堆芯 |
CN101719384A (zh) * | 2009-12-03 | 2010-06-02 | 中国核动力研究设计院 | 具有快中子转换区的核反应堆堆芯 |
US20120085447A1 (en) * | 2010-10-06 | 2012-04-12 | Searete Llc, A Limited Liability Corporation Of The State Of Delaware | Electromagnetic flow regulator, system and methods for regulating flow of an electrically conductive fluid |
US20120085419A1 (en) * | 2010-10-06 | 2012-04-12 | Searete Llc, A Limited Liability Corporation Of The State Of Delaware | Electromagnetic flow regulator, system, and methods for regulating flow of an electrically conductive fluid |
CN102117664A (zh) * | 2010-12-24 | 2011-07-06 | 中国核动力研究设计院 | 应用于超临界水冷堆的双排六边形燃料组件 |
JP2012225761A (ja) * | 2011-04-19 | 2012-11-15 | Toshiba Corp | 高速炉の炉心 |
CN103474097A (zh) * | 2012-06-06 | 2013-12-25 | 中国核动力研究设计院 | 高快中子注量率堆芯 |
CN103474100A (zh) * | 2012-06-06 | 2013-12-25 | 中国核动力研究设计院 | 采用机械控制棒作为第二套停堆系统的堆芯 |
US20150357056A1 (en) * | 2014-04-09 | 2015-12-10 | Colorado School Of Mines | Reactor unit control system for space and terrestrial applications |
CN104183279A (zh) * | 2014-08-26 | 2014-12-03 | 南华大学 | 一种内冷式压水反应堆堆芯 |
CN105139908A (zh) * | 2015-06-30 | 2015-12-09 | 中国核动力研究设计院 | 一种压水堆核电厂堆芯的控制模式 |
CN106782686A (zh) * | 2015-11-20 | 2017-05-31 | 国核(北京)科学技术研究院有限公司 | 装载185盒燃料组件的堆芯的探测器布置方法及其堆芯 |
JP2017106836A (ja) * | 2015-12-10 | 2017-06-15 | 日立Geニュークリア・エナジー株式会社 | 沸騰水型原子炉 |
CN106128516A (zh) * | 2016-07-15 | 2016-11-16 | 中国核动力研究设计院 | 一种钍基燃料组件及小型压水堆 |
CN107731317A (zh) * | 2017-09-07 | 2018-02-23 | 中广核研究院有限公司 | 一种无可溶硼冷却剂的压水反应堆及其燃料组件 |
CN107863166A (zh) * | 2017-12-08 | 2018-03-30 | 中国核动力研究设计院 | 一种压水堆首循环含硼堆芯的18个月换料装载方法 |
CN108364696A (zh) * | 2018-02-13 | 2018-08-03 | 中国核动力研究设计院 | 一种十万千瓦级反应堆堆芯反应性控制方法 |
Non-Patent Citations (5)
Title |
---|
GIANG PHAN.ET: "Comparative Analysis of the Dalat Nuclear Research Reactor with HEU Fuel Using SRAC and MCNP5", 《SCIENCE AND TECHNOLOGY OF NUCLEAR INSTALLATIONS》 * |
T.S. NGUYEN.ET: "monte carlo calculations applied to slowpoke full-reactor analysis", 《AECL NUCLEAR REVIEW》 * |
吉宇等: "核热推进系统热工过程及堆芯关键技术分析", 《原子能科学技术 》 * |
孙寿华等: "HFETR堆芯不锈钢反射层的研究", 《核动力工程》 * |
魏书华: "板型先进高温堆的可燃毒物优化设计研究", 《中国优秀硕士学位论文全文数据库 (工程科技Ⅱ辑)》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111477355A (zh) * | 2020-04-16 | 2020-07-31 | 中国原子能科学研究院 | 堆芯燃料组件及其布置方法、微型中子源反应堆及其堆芯 |
CN111477355B (zh) * | 2020-04-16 | 2022-07-01 | 中国原子能科学研究院 | 堆芯燃料组件及其布置方法、微型中子源反应堆及其堆芯 |
Also Published As
Publication number | Publication date |
---|---|
CN110111913B (zh) | 2022-02-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109192332A (zh) | 六边形套管型燃料堆芯钴靶组件核设计检验堆芯及方法 | |
CN109273107A (zh) | 六边形套管型燃料铍组件核设计可靠性检验堆芯及方法 | |
Mele et al. | TRIGA MARK II benchmark experiment, Part I: Steady-state operation | |
CN110111913A (zh) | 六边形套管型燃料堆芯中子注量率测量的试验堆芯及方法 | |
CN109215811A (zh) | 六边形铍组件和铝组件核设计可靠性检验堆芯及调整方法 | |
CN109273108A (zh) | 六边形套管型燃料堆芯孔道核设计检验堆芯及试验方法 | |
CN109192333A (zh) | 六边形套管型燃料组件核设计可靠性检验堆芯及验证方法 | |
CN109192331A (zh) | 六边形套管型燃料组件核设计可靠性检验堆芯及调整方法 | |
CN109215812A (zh) | 六边形套管型燃料铝组件核设计可靠性检验堆芯及方法 | |
CN110749919A (zh) | 一种标定核反应堆堆外探测器的方法及装置 | |
Gauthier et al. | Measurement and predictions of control rod worth | |
Peršič et al. | TRIGA Mark II criticality Benchmark experiment with burned fuel | |
Smith et al. | Recent developments in the small-sample reactivity discrepancy | |
Selengut | Thermal neutron flux in a cell with temperature discontinuities | |
Becker | 30 years of reactor characterization on the NBSR | |
Hong et al. | Measurement of coolant flow in a nuclear fuel test rig | |
Argaud et al. | Determination of the reflector paramter through data assimiation with the COCAGNE calculation code using a TRIPOLI4 reference simulation on KAIST benchmark | |
Tsyganov et al. | Critical Experiments for Investigation of VVER Type Uranium-Water Lattices with Relatively Highly Enriched Fuel and Erbium Oxide Absorbers | |
Davey | An Analysis of the Neutron Capture Cross Section of 238U Between 1 keV and 15 MeV | |
CN117849850A (zh) | 一种核电厂一回路冷却剂取样分析伽马谱的方法 | |
Gauthier | Reactivity balance meter: feed-back effects measurements at Phenix | |
Hart et al. | A Comparison of Methods of Determining Burnup on Uranium Dioxide Fuel Test Specimens | |
Ravnik et al. | Reactor physics tests of TRIGA Mark-II Reactor in Ljubljana | |
Brown | Startup test techniques for HTGRS | |
Henry et al. | Experimental determination and calculation of the temperature reactivity coefficients for TRIGA MARK II reactor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |