Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910422735.6A
Other languages
Chinese (zh)
Other versions
CN110106981A (en
Inventor
汪金祥
欧阳超
张耀林
姜官森
刘曙
周瑜
朱德桥
胡旭利
刘勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201910422735.6A priority Critical patent/CN110106981B/en
Publication of CN110106981A publication Critical patent/CN110106981A/en
Priority to DE212019000503.9U priority patent/DE212019000503U1/en
Priority to PCT/CN2019/102100 priority patent/WO2020232858A1/en
Application granted granted Critical
Publication of CN110106981B publication Critical patent/CN110106981B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides an assembled steel structure building and a construction process thereof, and belongs to the field of building construction. The assembled steel structure building comprises a steel frame supporting structure, a steel bar truss building supporting plate, a wall body and a peripheral guard, wherein any layer of steel frame supporting structure comprises a plurality of columns, a plurality of beams and a plurality of diagonal braces which are arranged at intervals. One end of each of the plurality of columns is fixed, a beam is arranged between the other ends of the plurality of columns, and the diagonal bracing is arranged between the columns and the beam. The steel bar truss floor support plate comprises a plate body and a bottom die, wherein the plate body is detachably connected with the bottom die, and a plurality of beams are connected with the plate body. The wall body includes the ALC board, and the ALC board is enclosed on the post. The outer protection comprises a keel and a heat-insulating and decorating integrated plate, and the heat-insulating and decorating integrated plate is connected with the keel; the keels are connected with the steel frame support structure or with the ALC plate. The construction process comprises the following steps: the construction of the first layer steel frame supporting structure, the construction of the rest layer steel frame supporting structure, the construction of the wall body and the construction of the outer protection. The invention solves the problem that the prior art is not beneficial to popularization.

Description

Assembled steel structure building and construction process thereof
Technical Field
The invention relates to the technical field of building construction, in particular to an assembled steel structure building and a construction process thereof.
Background
At present, the country is greatly expanding the assembled steel structure building, the residential field has large demand and wide market range, and belongs to the field of important attention and research and development of the assembled steel structure building. In the residential field, the current research and development direction is mainly based on a structural system, so that the indoor attractiveness and the construction convenience are facilitated as much as possible on the basis of ensuring the structural safety, and the assembled steel structure residential building is rarely subjected to systematic carding and research and development.
The safety aspect of the structural system of the fabricated steel structure residential building can be ensured. However, the selection of various structures such as supporting structures, walls, steel bar truss building carrier plates and the like for assembling residential buildings is a difficulty in the current construction, the selection of various structures in the assembled steel structure residential buildings directly affects the quality of the building, and the prior assembled steel structure residential buildings are not beneficial to popularization because the assembled steel structure residential buildings are not subjected to systematic carding and research and development.
Disclosure of Invention
The invention aims to provide an assembled steel structure building and a construction process thereof, which are used for solving the technical problems that the selection of various structures of an assembled residential building in the prior art lacks guidance and is not beneficial to popularization.
The invention provides an assembled steel structure building, which comprises a steel frame supporting structure, a steel bar truss building supporting plate, a wall body and an outer enclosure;
The steel frame supporting structure is divided into a plurality of layers, and any layer of steel frame supporting structure comprises a plurality of columns, a plurality of beams and a plurality of diagonal braces which are arranged at intervals;
one end of each of the plurality of columns is fixed, the other end of any one column is higher than one end of the column, a beam is arranged between the other ends of the plurality of columns, and an inclined strut is arranged between the column and the beam;
the steel bar truss floor support plate comprises a plate body and a bottom die, wherein the plate body and the bottom die are detachably connected, and a plurality of beams in any layer of steel frame support structure are connected with the plate body;
the wall body comprises an ALC plate, and the ALC plate is enclosed on the column;
The outer protection comprises a keel and a heat-insulating and decorating integrated plate, and the heat-insulating and decorating integrated plate is connected with the keel; the keels are connected with the steel frame support structure or with the ALC plate.
Further, the column is a box-shaped steel column, and the box-shaped steel column is filled with concrete.
Further, the beam is an I-beam.
Further, the diagonal bracing is a box-shaped steel diagonal bracing.
Further, the wall body also comprises an air adding block and an autoclaved sand-lime brick;
the air adding block is enclosed at a position corresponding to the diagonal bracing on the steel frame supporting structure;
the autoclaved sand-lime brick is enclosed on the steel frame supporting structure at the area corresponding to the toilet in the building.
Further, a polyethylene rod and sealant are filled between two adjacent heat-insulating and decorating integrated plates.
Further, the height of the steel frame support structure is less than 100 meters.
The invention provides a construction process for constructing the assembled steel structure building, which comprises the following steps:
construction of a first-layer steel frame supporting structure: mounting columns in a first-layer steel frame supporting structure on the ground, mounting beams on the columns, and mounting diagonal braces between the columns and the beams;
And (3) constructing a supporting structure of the rest layer of steel frame: connecting the columns in two adjacent layers of steel frame supporting structures, installing beams on the columns in each layer of steel frame supporting structure, and installing diagonal braces between the columns and the beams;
construction of a steel bar truss floor support plate: when the steel frame supporting structure is constructed to a preset floor, installing steel bar truss floor supporting plates on beams in each layer of steel frame supporting structure sequentially from bottom to top;
and (3) wall construction: after the steel bar truss floor support plate is installed, installing an ALC plate on the column;
and (3) peripheral protection construction: the keel is connected with a steel frame supporting structure or an ALC plate, and then the heat preservation and decoration integrated plate is connected with the keel.
Further, in the construction of the first layer of steel frame supporting structure and the construction of the rest layers of steel frame supporting structures, the outer sides of the beams positioned at the side edges of the steel frame supporting structure are protruded outwards relative to the wall body at the side edges of the steel frame supporting structure, so that the beams occupy the indoor space of the building.
Further, in the wall construction, a flexible connection mode is adopted between the column and the side face of the ALC plate;
The beams and the steel bar truss floor bearing plates above the ALC plates are respectively connected with the ALC plates in a flexible connection mode.
The assembled steel structure building and the construction process thereof provided by the invention have the following beneficial effects:
The assembled steel structure building provided by the invention comprises a steel frame supporting structure, a steel bar truss building supporting plate, a wall body and an outer enclosure, wherein the steel frame supporting structure is divided into multiple layers, and any layer of steel frame supporting structure comprises a plurality of columns, a plurality of beams and a plurality of diagonal braces. The columns are arranged at intervals, one ends of the columns are fixed, the other ends of the columns are higher than one ends of the columns, the beams are arranged at the other ends of the columns, and the diagonal braces are arranged between the columns and the beams. And a plurality of beams in any layer of steel frame supporting structure are connected with the steel bar truss floor supporting plate. The wall body includes the ALC board, and the ALC board is enclosed on steel frame bearing structure. The outer guard comprises a keel and a heat-insulating and decorating integrated plate, and the keel is connected with a steel frame supporting structure or an ALC plate; the heat preservation and decoration integrated plate is connected with the keel.
Compared with the prior art, the steel frame support structure, the steel bar truss building support plate, the ALC plate, the keel and the heat preservation and decoration integrated plate are combined to be assembled into the steel structure building, and the invention provides clear guidance on the selection of each structure in the assembled steel structure residential building. The invention can be seen to solve the technical problems that the selection of each structure in the assembled steel structure building in the prior art lacks guidance and is not beneficial to popularization.
The construction process for constructing the fabricated steel structure building comprises the steps of first-layer steel frame supporting structure construction, other-layer steel frame supporting structure construction, steel bar truss building carrier plate construction, wall construction and peripheral protection construction.
The construction process for constructing the assembled steel structure building disclosed by the invention has the advantages that each structure in the assembled steel structure building is definitely selected, so that the construction process for constructing the assembled steel structure building disclosed by the invention also improves the technical problems that the selection of each structure in the assembled steel structure building in the prior art lacks guidance and is not beneficial to popularization.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings that are needed in the description of the embodiments or the prior art will be briefly described, and it is obvious that the drawings in the description below are some embodiments of the present invention, and other drawings can be obtained according to the drawings without inventive effort for a person skilled in the art.
Fig. 1 is a schematic structural view of an assembled steel structure building according to a first embodiment of the present invention;
fig. 2 is a schematic view of a connection node between a beam and a steel bar truss floor deck according to a first embodiment of the present invention;
Fig. 3 is a schematic view of a connection node between two adjacent steel bar truss building carrier plates according to the first embodiment of the present invention;
FIG. 4 is a schematic view of a connection node between an ALC board and a beam provided in accordance with one embodiment of the present invention;
FIG. 5 is a schematic view of a connection node between an ALC plate and a steel bar truss floor deck according to an embodiment of the present invention;
FIG. 6 is a schematic diagram of a connection node between an ALC board and a column provided in accordance with one embodiment of the present invention;
FIG. 7 is a schematic view of another connection node between the ALC board and the beams provided in accordance with the first embodiment of the present invention;
FIG. 8 is a schematic diagram of a connection node between two adjacent ALC boards according to the first embodiment of the present invention;
FIG. 9 is a schematic diagram of another connection node between an ALC board and a steel bar truss floor carrier provided in accordance with an embodiment of the present invention;
Fig. 10 is a schematic structural diagram of an integrated heat insulation and decoration board and an ALC board according to an embodiment of the present invention.
In the figure:
1-a steel frame support structure; 10-column; 11-beams; 12-diagonal bracing; 2-a steel bar truss floor support plate; 20-end vertical ribs; 21-truss steel bars; 22-plastic fasteners; 23-a bottom template; 24-iron sheet; 3-ALC plate; 30-alkali-resistant glass fiber mesh cloth; 31-pipe clamps; 4-keels; 5-a heat-insulating and decorating integrated plate; 6-angle steel; 7-a sliding plate; 8-steel pipe anchors; 9-U type card.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is apparent that the described embodiments are only some embodiments of the present invention, not all embodiments. The components of the embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations. Thus, the following detailed description of the embodiments of the invention, as presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, which can be made by a person skilled in the art without making any inventive effort, are intended to be within the scope of the present invention.
In the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In addition, in the description of the present invention, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present invention will be understood in specific cases by those of ordinary skill in the art.
The invention provides an assembled steel structure building and a construction process thereof, wherein the assembled steel structure building and the construction process thereof provided by the invention are described in detail below with reference to the accompanying drawings:
Embodiment one:
As shown in fig. 1, the fabricated steel structure building provided in this embodiment includes a steel frame support structure 1, a steel bar truss floor support plate 2, a wall body, and a periphery. The steel frame support structure 1 is divided into a plurality of layers, and any one layer of the steel frame support structure 1 includes a plurality of columns 10, a plurality of beams 11 and a plurality of diagonal braces 12 which are arranged at intervals. One end of each of the plurality of columns 10 is fixed, the other end of any one of the columns 10 is higher than one end of the column 10, a beam 11 is installed between the other ends of the plurality of columns 10, and a diagonal brace 12 is installed between the column 10 and the beam 11.
The steel bar truss floor support plate 2 comprises a plate body and a bottom die, and the plate body is detachably connected with the bottom die. Wherein, a plurality of beams 11 in any layer of steel frame supporting structure 1 are connected with the plate body. The wall includes an ALC board 3, and the ALC board 3 is enclosed on a column 10. The outer periphery protection comprises a keel 4 and a heat-insulation and decoration integrated plate 5, and the heat-insulation and decoration integrated plate 5 is connected with the keel 4; the keel 4 is connected to the steel frame support structure 1 or to the ALC board 3.
Compared with the prior art, the steel frame support structure 1, the steel bar truss building support plate 2, the ALC plate 3, the keel 4 and the heat preservation and decoration integrated plate 5 are combined to be used to assemble the steel structure building, and the selection of various structures in the assembled steel structure residential building is guided. Therefore, the technical problems that in the prior art, the selection of each structure in the assembled steel structure building lacks guidance and is not beneficial to popularization are solved.
The steel frame supporting structure 1 is a main structure of the assembled steel structure building, force transmission among the beams 11, the columns 10 and the inclined supports in the steel frame supporting structure 1 is clear, the construction process of the steel frame supporting structure 1 is mature, and the main structure rigidity of the assembled steel structure building can be higher while the steel consumption is ensured to be less. In practical applications, reference may be made to construction specifications, such as the steel construction engineering construction specification, for the design and construction of the steel frame support structure 1.
Wherein, the steel bar truss building carrier plate 2 can realize exempting from formwork construction floor, simultaneously, and the die block in the steel bar truss building carrier plate 2 can be dismantled and can cyclic utilization, and after the die block was demolishd to steel bar truss building carrier plate 2, its bottom molding face is better, need not the later stage and carries out top fitment like the furred ceiling to prevent the indoor height of this assembled steel structure building of loss.
It can be seen that the steel bar truss floor carrier plate 2 not only can improve the construction quality, but also can make the indoor height of the assembled steel structure building higher, and increase the indoor space.
The design and construction of the steel bar truss floor support plate 2 can refer to construction specifications such as 'steel bar truss floor support plate' and 'composite floor slab design and construction specification'.
As shown in fig. 2, the steel bar truss floor support plate 2 comprises end vertical ribs 20, truss steel bars 21 and a bottom template 23, and the bottom template 23 and the truss steel bars 21 are detachably connected together through plastic fasteners 22. Wherein the plastic fastener 22 is a fastener commonly used in construction.
As shown in fig. 2, the steel bar truss deck 2 and the beams 11 in the steel frame support structure 1 may be connected together by welding the end studs 20 to the beams 11.
As shown in fig. 2, when the gap between the bottom formwork 23 and the steel beam 11 is greater than 1 mm, the gap between the bottom formwork 23 and the beam 11 should be blocked by an iron sheet 24 in order to prevent slurry leakage during construction.
As shown in fig. 3, when two adjacent steel bar truss floor support plates 2 are connected together, if the gap between the bottom templates 23 in two adjacent steel bar truss floor support plates 2 is greater than 1 mm, the gap between the bottom templates 23 and the bottom templates 23 should be plugged by an iron sheet 24 in order to prevent slurry leakage during construction.
Further, as shown in fig. 3, the plastic fasteners 22 in the steel bar truss floor support plate 2 may be connected between the bottom formwork 23 and the truss steel bars 21 by metal self-tapping screws.
Further, the wall includes ALC plate 3. Wherein ALC is autoclaved lightweight concrete (Autoclaved Lightweight Concrete, abbreviated as ALC), and the ALC plate 3 belongs to a finished large-scale plate and meets the requirement of industrialized interior installation in the current country.
The design and construction of the ALC plate 3 can refer to construction atlas such as autoclaved aerated concrete blocks, plate structures, autoclaved aerated concrete plates and the like.
In actual construction, when the peripheral base wall of the fabricated steel structure building is made of the ALC plate 3, because the ALC plate 3 is made of a rigid material, and a large amount of steel materials adopted by the fabricated steel structure building have lower rigidity and higher flexibility than the ALC plate 3, the connection between the ALC plate 3 and the steel frame supporting structure 1 of the fabricated steel structure building should be connected by adopting the steel pipe anchors 8, as shown in fig. 4, the steel pipe anchors 8 can ensure the connection strength and simultaneously can enable the wall and the steel frame supporting structure 1 to generate coordinated deformation so as to prevent the fabricated steel structure building from being damaged due to rigid extrusion.
Further, the connection between the ALC board 3 at the periphery of the fabricated steel structure building, i.e., the ALC board 3 at the exterior wall, and the beams 11 in the steel frame support structure 1 may be connected together by steel pipe anchors 8. Specifically, as shown in fig. 4, the beam 11 may be welded with angle steel 6, between the angle steel 6 and the ALC plate 3, the angle steel 6 is connected with a steel pipe anchor 8 through a sliding plate 7 and an anchor bolt, and a gap between the ALC plate 3 and the beam 11 at the outer wall may be filled with a foaming agent, a polyethylene rod and a sealant.
The connection between the ALC plate 3 and the steel bar truss deck 2 at the periphery of the fabricated steel structure building, i.e., the connection between the ALC plate 3 and the steel bar truss deck 2 at the exterior wall may be similar to the connection between the beams 11 and the ALC plate 3 at the exterior wall. Specifically, as shown in fig. 5, the angle steel 6 can be fixed on the steel bar truss building carrier plate 2, and then the angle steel 6 and the ALC plate 3 are connected together through the sliding plate 7 and the anchor bolts and the steel pipe anchors 8, so that the gap between the steel bar truss building carrier plate 2 and the ALC plate 3 is filled with cement mortar and sealant.
As shown in fig. 6, a gap of 10-20 mm may be reserved between the column 10 and the ALC plate 3 in the steel frame support structure 1, and then a caulking agent, a foaming agent and a polyethylene rod may be filled in the gap, and the caulking agent, the foaming agent and the polyethylene rod may connect the column 10 and the ALC plate 3 together. Wherein, caulking agent, foaming agent and polyethylene stick are all commonly used construction materials in construction.
The connection between the ALC plate 3 positioned inside the fabricated steel structure building, i.e. the ALC plate 3 positioned at the inner wall and the beam 11 in the steel frame supporting structure 1 is shown in fig. 7, the beam 11 is welded with the U-shaped clamp 9,U type clamp 9 attached to the top end of the ALC plate 3, and flexible materials are filled between the U-shaped clamp 9 and the top end of the ALC plate 3.
As shown in fig. 8, the adjacent two ALC plates 3 can be connected together by a caulking agent and a polyethylene rod, and an alkali-resistant glass fiber mesh cloth 30 can be attached to the splice seam of the side surfaces of the adjacent two ALC plates 3.
The connection between the ALC plate 3 positioned at the inner wall and the steel bar truss floor support plate 2 is shown in fig. 9, the bottom end of the ALC plate 3 positioned at the inner wall is fixedly connected with a pipe clamp 31, and the pipe clamp 31 at the bottom end of the ALC plate 3 is fixed on the steel bar truss floor support plate 2 through an anchor bolt.
When the height of the ALC plate 3 is greater than 24 meters, the connection mode of the ALC plate 3 can be designed singly according to a construction chart set in order to realize coordinated deformation while the assembled steel structure building meets the strength requirement.
When the assembled steel structure building is subjected to lateral force, the lateral displacement of the steel frame supporting structure 1 and the lateral displacement of the steel bar truss floor supporting plate 2 are large. Because the steel frame supporting structure 1 is connected with the wall body, the steel bar truss floor supporting plate 2 is also connected with the wall body, and the rigidity of the ALC plate 3 in the wall body is high, the wall body and the steel frame supporting structure 1 and the wall body and the steel bar truss floor supporting plate 2 can be coordinated and deformed in order to prevent the wall body from being damaged when being subjected to lateral force, and the steel frame supporting structure 1 and the steel bar truss floor supporting plate 2 can not be extruded to damage the wall body in the lateral displacement process.
Further, in order to make the wall body and the steel frame support structure 1 and the wall body and the steel bar truss floor support plate 2 capable of being deformed in a coordinated manner, the connection mode between the rest part of the ALC plate 3 except the bottom part in the wall body and the steel frame support structure 1 can be flexible connection, and the connection mode between the ALC plate 3 in the wall body and the steel bar truss floor support plate 2 positioned on the steel frame support structure 1 can be flexible connection. Flexible connections such as with steel pipe anchors 8.
The column 10 in the steel frame support structure 1 is a box-shaped steel column 10, and the box-shaped steel column 10 is filled with concrete.
Further, the beams 11 in the steel frame support structure 1 are steel i-beams 11.
When the beam 11 in the steel frame supporting structure 1 is constructed, the side beam positioned at the periphery of the assembled steel structure building can be externally arranged, namely, the outer side of the side beam positioned at the periphery of the assembled steel structure building can be outwards protruded relative to a wall body at the position, so that the assembled steel structure building is prevented from being indoor head beam.
In the present embodiment, the diagonal braces 12 in the steel frame support structure 1 are box-shaped steel diagonal braces 12.
In the actual construction process, the box-shaped steel diagonal bracing 12 should be coordinated with the assembled steel structure building to prevent the box-shaped steel diagonal bracing 12 from being arranged at the door and window opening position.
The wall body further comprises an air adding block and an autoclaved sand-lime brick, and the air adding block is enclosed at a position corresponding to the diagonal bracing 12 on the steel frame supporting structure 1. Autoclaved sand-lime bricks are enclosed on the steel frame supporting structure 1 at the area corresponding to the toilet in the building.
The design and construction of the aerated block and the autoclaved sand-lime brick can also refer to construction atlas such as autoclaved aerated concrete block, plate structure, autoclaved aerated concrete slab and the like.
Further, a polyethylene rod and sealant are filled between two adjacent heat-insulating and decorating integrated plates 5.
Wherein, the heat preservation and decoration integrated board 5 belongs to a novel material integrating heat preservation and decoration, and the keel 4 is a building material for supporting a modeling and fixing structure.
As shown in fig. 10, when the heat-insulating and decorating integrated board 5 is constructed on the construction site, the keel 4 and the steel frame supporting structure 1 can be connected together, according to practical situations, the keel 4 and the ALC board 3 can be connected together at the part of the assembled steel structure building, and after the keel 4 is installed, the heat-insulating and decorating integrated board 5 and the keel 4 are connected together.
In order to further play a role in heat preservation and make the whole building system more beautiful, a polyethylene rod and sealant can be filled between two adjacent heat preservation and decoration integrated plates 5.
The design and construction between the keel 4 and the heat-insulating and decorating integrated plate 5 can refer to a construction drawing set such as an external wall decoration and heat-insulating integrated system building structure.
In practical application, the height of the steel frame support structure 1 provided in this embodiment is less than 100 meters. Namely, the fabricated steel structure building provided by the embodiment is suitable for high-rise buildings smaller than 100 meters.
In summary, the fabricated steel structure residential building provided in this embodiment can ensure higher construction quality while meeting strength requirements, and because the selection of each structure in the fabricated steel structure building and the connection between each structure all have clear requirements, the fabricated steel structure building is integrally carded in this embodiment, and the fabricated steel structure building provided in this embodiment has better popularization.
Through field construction verification, the fabricated steel structure building provided by the embodiment meets the related requirements of the fabricated building evaluation standard, can greatly reduce field wet operation, can well protect the surrounding environment of projects, and meets the related requirements of the current country on construction environments.
Each structure and most in the assembled steel structure building that this embodiment provided can be manufactured in the mill and accomplish, install at the job site again, therefore the construction progress is faster, and constructor demand is less, can accelerate the construction progress when practicing thrift construction cost.
Embodiment two:
the present embodiment provides a construction process for constructing an assembled steel structure building as in the first embodiment, including:
construction of a first-layer steel frame supporting structure: mounting columns in a first-layer steel frame supporting structure on the ground, mounting beams on the columns, and mounting diagonal braces between the columns and the beams;
And (3) constructing a supporting structure of the rest layer of steel frame: connecting the columns in two adjacent layers of steel frame supporting structures, installing beams on the columns in each layer of steel frame supporting structure, and installing diagonal braces between the columns and the beams;
construction of a steel bar truss floor support plate: when the steel frame supporting structure is constructed to a preset floor, installing steel bar truss floor supporting plates on beams in each layer of steel frame supporting structure sequentially from bottom to top;
and (3) wall construction: after the steel bar truss floor support plate is installed, an ALC plate is installed on the column;
and (3) peripheral protection construction: the keel is connected with a steel frame supporting structure or an ALC plate, and then the heat preservation and decoration integrated plate is connected with the keel.
In the construction of the first layer of steel frame supporting structure and the construction of the rest layers of steel frame supporting structures, the outer sides of the beams positioned at the side edges of the steel frame supporting structure are protruded outwards relative to the wall body at the side edges of the steel frame supporting structure, so that the beams occupy the indoor space of the building.
Further, in the wall construction, a flexible connection mode is adopted between the column and the side face of the ALC plate; the beams and the steel bar truss floor bearing plates above the ALC plates are respectively connected with the ALC plates in a flexible connection mode.
The flexible connection mode can enable the wall body and the steel frame supporting structure and the wall body and the steel bar truss building supporting plate to be in coordinated deformation, and the wall body is prevented from being extruded and damaged when the assembled steel structure building is stressed.
The construction process for constructing the fabricated steel structure building provided by the embodiment definitely selects each structure in the fabricated steel structure building, so that the construction process for constructing the fabricated steel structure building provided by the invention also improves the technical problems that the selection of each structure in the fabricated steel structure building in the prior art lacks guidance and is not beneficial to popularization.
Finally, it should be noted that: the above examples are only specific embodiments of the present invention, and are not intended to limit the scope of the present invention, but it should be understood by those skilled in the art that the present invention is not limited thereto, and that the present invention is described in detail with reference to the foregoing examples: any person skilled in the art may modify or easily conceive of the technical solution described in the foregoing embodiments, or perform equivalent substitution of some of the technical features, while remaining within the technical scope of the present disclosure; such modifications, changes or substitutions do not depart from the spirit and scope of the technical solutions of the embodiments of the present invention, and are intended to be included in the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (8)

1. The assembled steel structure building is characterized by comprising a steel frame supporting structure, a steel bar truss building supporting plate, a wall body and an outer enclosure;
The steel frame supporting structure is divided into multiple layers, and any layer of the steel frame supporting structure comprises a plurality of columns, a plurality of beams and a plurality of diagonal braces which are arranged at intervals;
One end of each of the plurality of columns is fixed, the other end of any one of the columns is higher than one end of the column, the beams are arranged between the other ends of the plurality of columns, and the diagonal braces are arranged between the columns and the beams;
The steel bar truss floor support plate comprises a plate body and a bottom die, wherein the plate body is detachably connected with the bottom die, and a plurality of beams in any layer of steel frame support structure are connected with the plate body;
the wall body comprises an ALC plate, and the ALC plate is surrounded on the column;
the outer guard comprises a keel and a heat-insulating and decorating integrated plate, and the heat-insulating and decorating integrated plate is connected with the keel; the keels are connected with the steel frame support structure or the ALC plate;
the column is a box-shaped steel column, and concrete is filled in the box-shaped steel column;
The wall body also comprises an air adding block and an autoclaved sand-lime brick;
the air entrainment block is enclosed at a position corresponding to the diagonal bracing on the steel frame supporting structure;
The autoclaved sand-lime brick is enclosed on the steel frame supporting structure at the area corresponding to the toilet in the building.
2. The fabricated steel structure building of claim 1, wherein the beams are i-beams.
3. The fabricated steel structure building of claim 2, wherein the diagonal braces are box-shaped steel diagonal braces.
4. The fabricated steel structure building according to claim 1, wherein a polyethylene rod and a sealant are filled between two adjacent heat-insulating and decorating integrated plates.
5. The fabricated steel structure building according to any one of claims 1 to 4, wherein the height of the steel frame support structure is less than 100 meters.
6. A construction process for constructing the fabricated steel structure building according to claim 1, comprising:
construction of a first-layer steel frame supporting structure: installing the columns in the first layer of the steel frame support structure on the ground, installing the beams on the columns, and installing the diagonal braces between the columns and the beams;
And (3) constructing a supporting structure of the rest layer of steel frame: connecting the columns in two adjacent layers of the steel frame support structures, mounting the beams on the columns in each layer of the steel frame support structures, and mounting the diagonal braces between the columns and the beams;
construction of a steel bar truss floor support plate: when the steel frame supporting structure is constructed to a preset floor, installing the steel bar truss floor support plates on the beams in each layer of the steel frame supporting structure sequentially from bottom to top;
And (3) wall construction: after the steel bar truss floor support plate is installed, installing the ALC plate on the column;
and (3) peripheral protection construction: and connecting the keel with the steel frame supporting structure or the ALC plate, and connecting the heat-insulating and decorating integrated plate with the keel.
7. The construction process of the fabricated steel structure building according to claim 6, wherein in the first layer of the steel frame support structure construction and the remaining layers of the steel frame support structure construction, the outer sides of the beams at the sides of the steel frame support structure are protruded with respect to the wall body thereat to reduce the occupation of the indoor space of the building by the beams.
8. The construction process of the fabricated steel structure building according to claim 6, wherein in the wall construction, a connection mode of flexible connection is adopted between the column and the side face of the ALC plate;
And the beams and the steel bar truss floor bearing plates positioned above the ALC plates are respectively connected with the ALC plates in a flexible connection mode.
CN201910422735.6A 2019-05-20 2019-05-20 Assembled steel structure building and construction process thereof Active CN110106981B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201910422735.6A CN110106981B (en) 2019-05-20 Assembled steel structure building and construction process thereof
DE212019000503.9U DE212019000503U1 (en) 2019-05-20 2019-08-23 Prefabricated steel structure building
PCT/CN2019/102100 WO2020232858A1 (en) 2019-05-20 2019-08-23 Prefabricated steel structure building and construction process therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910422735.6A CN110106981B (en) 2019-05-20 Assembled steel structure building and construction process thereof

Publications (2)

Publication Number Publication Date
CN110106981A CN110106981A (en) 2019-08-09
CN110106981B true CN110106981B (en) 2024-06-04

Family

ID=

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998031884A1 (en) * 1997-01-15 1998-07-23 Gordon Stanley Turner Improved building structures
CN1796706A (en) * 2004-12-24 2006-07-05 张东川 Box shaped house model of construction and fabricating method
CN103898975A (en) * 2014-03-20 2014-07-02 北京工业大学 Modularized multi-high-layer assembly type steel-structure framework eccentric supporting system
CN104612249A (en) * 2014-12-16 2015-05-13 内蒙古杭萧钢构有限公司 Multi-high-rise-steel-structure house integrated system
CN105317110A (en) * 2015-11-06 2016-02-10 中建钢构有限公司 Integrated assembly type steel structure building
CN205296893U (en) * 2015-12-08 2016-06-08 徐州中煤百甲重钢科技股份有限公司 Embedded steel construction assembly house
CN106149866A (en) * 2015-04-28 2016-11-23 谷玉花 Steel reinforced concrete assembled energy-saving residential building system
CN210421424U (en) * 2019-05-20 2020-04-28 中建钢构有限公司 Assembled steel structure building

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998031884A1 (en) * 1997-01-15 1998-07-23 Gordon Stanley Turner Improved building structures
CN1796706A (en) * 2004-12-24 2006-07-05 张东川 Box shaped house model of construction and fabricating method
CN103898975A (en) * 2014-03-20 2014-07-02 北京工业大学 Modularized multi-high-layer assembly type steel-structure framework eccentric supporting system
CN104612249A (en) * 2014-12-16 2015-05-13 内蒙古杭萧钢构有限公司 Multi-high-rise-steel-structure house integrated system
CN106149866A (en) * 2015-04-28 2016-11-23 谷玉花 Steel reinforced concrete assembled energy-saving residential building system
CN105317110A (en) * 2015-11-06 2016-02-10 中建钢构有限公司 Integrated assembly type steel structure building
CN205296893U (en) * 2015-12-08 2016-06-08 徐州中煤百甲重钢科技股份有限公司 Embedded steel construction assembly house
CN210421424U (en) * 2019-05-20 2020-04-28 中建钢构有限公司 Assembled steel structure building

Similar Documents

Publication Publication Date Title
US9797137B2 (en) Fully assembled, fully cast-in-place, composite-type house and construction method thereof
CN107740530B (en) High-temperature autoclaved lightweight aerated concrete integral external wall panel and construction method thereof
CN109083308B (en) Anti-seismic prefabricated assembly type wall and construction method thereof
CN111155681B (en) Steel concrete composite connection multilayer prefabricated section steel concrete shear wall structure and preparation and construction method thereof
CN206655314U (en) The board-like assembling building systems of DGC
CN209227776U (en) A kind of three-dimensional building module
CN210421424U (en) Assembled steel structure building
CN216276295U (en) Assembled lightweight steel-foam concrete load-bearing composite wall
CN111305372A (en) Fabricated steel reinforced concrete structure and construction method thereof
CN111155680A (en) All-bolt connection multilayer prefabricated section steel concrete shear wall structure and preparation and construction method thereof
CN211172527U (en) Fire prevention and decoration structure of steel plate shear wall
CN110106981B (en) Assembled steel structure building and construction process thereof
CN111749343A (en) Mounting method of detachable assembled steel structure house
KR100383152B1 (en) A execution methode and structure for steel frame house and the framework
CN109610703A (en) A kind of assembled wallboard
WO1981002175A1 (en) Procedure to raise a building and an arrangement carrying out the procedure
CN211143849U (en) Hidden frame and steel plate wall combined damping steel house system
CN113898093A (en) Assembled light steel-foam concrete load-bearing composite wall and construction method thereof
RU2663857C1 (en) Set of building profiles for construction of frame structure of building or structure and frame structure of building or structure using a set of building profiles
CN106638978A (en) Joint structure of assembly type PC precast load-bearing wall plate combined with light steel frame
CN110578406A (en) hidden frame and steel plate wall combined damping steel house system
RU94601U1 (en) BLOCK FORMWORK
CA2639339A1 (en) Method of constructing a multi-storey building using prefabricated modular panels
RU2215103C1 (en) Multistory building
CN216949307U (en) Structure structure of tall air shaft