CN110090462A - A kind of dedicated spraying tower apparatus of production Ceramic Tiles - Google Patents

A kind of dedicated spraying tower apparatus of production Ceramic Tiles Download PDF

Info

Publication number
CN110090462A
CN110090462A CN201910485210.7A CN201910485210A CN110090462A CN 110090462 A CN110090462 A CN 110090462A CN 201910485210 A CN201910485210 A CN 201910485210A CN 110090462 A CN110090462 A CN 110090462A
Authority
CN
China
Prior art keywords
cyclone dust
dust collectors
spray tower
tower
ceramic tiles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910485210.7A
Other languages
Chinese (zh)
Inventor
王军
丁智勇
朱云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan City Nanhai Zhixin Industrial Furnace Co Ltd
Original Assignee
Foshan City Nanhai Zhixin Industrial Furnace Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan City Nanhai Zhixin Industrial Furnace Co Ltd filed Critical Foshan City Nanhai Zhixin Industrial Furnace Co Ltd
Priority to CN201910485210.7A priority Critical patent/CN110090462A/en
Publication of CN110090462A publication Critical patent/CN110090462A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D1/00Evaporating
    • B01D1/16Evaporating by spraying
    • B01D1/18Evaporating by spraying to obtain dry solids

Abstract

The invention discloses a kind of dedicated spraying tower apparatus of production Ceramic Tiles, belong to ceramic production device field, solve the problems, such as that current spray tower heat is easy to be lost and cause drying effect bad.The spraying tower apparatus includes spray tower, it further include coal water slurry boiler, first cyclone dust collectors and the second cyclone dust collectors, between the coal water slurry boiler and the first cyclone dust collectors, it is connected to by hot air pipe between first cyclone dust collectors and spray tower, the hot air pipe, first cyclone dust collectors, spraying inner wall of tower is equipped with thermal insulation layer, several nozzles are equipped in the middle part of the spray tower, the spraying tower bottom is equipped with drainage conduit, second cyclone dust collectors are connected to by aspiration channel with spray tower, the second cyclone dust collectors side is connected with exhaust fan by aspiration channel.The present invention produces the dedicated spraying tower apparatus of Ceramic Tiles, can reduce heat losses, improve drying efficiency, achieve the purpose that energy conservation and environmental protection produces.

Description

A kind of dedicated spraying tower apparatus of production Ceramic Tiles
Technical field
The present invention relates to ceramic production device fields, more specifically, it relates to which a kind of production Ceramic Tiles are dedicated spraying Tower apparatus.
Background technique
During Production of Ceramics, it usually needs ground mud drying is formed powder.Spraying tower apparatus is raw The equipment dry for mud in production ceramics is by introducing hot-air in spray tower, and mud then passes through nozzle from by spraying Tower bottom sprays upwards, using the hot-air and mud contacts of high temperature, so that mud is dried to powder.Traditional mud is dry Spray tower is a shelly-shaped furnace body mostly, and during actual drying, the intracorporal heat of furnace is easy to distribute, to lead The problem for causing drying effect bad.
Summary of the invention
The technical problem to be solved by the present invention is to be directed to the above-mentioned deficiency of the prior art, it is dedicated to provide a kind of production Ceramic Tiles Spraying tower apparatus, can reduce heat losses, improve drying efficiency, achieve the purpose that energy conservation and environmental protection produces.
The technical scheme is that such: a kind of dedicated spraying tower apparatus of production Ceramic Tiles, including spray tower, also Including coal water slurry boiler, the first cyclone dust collectors and the second cyclone dust collectors, the coal water slurry boiler and the first cyclone dust removal It is connected to by hot air pipe between device, between the first cyclone dust collectors and spray tower, the hot air pipe, the first cyclone dust removal Device, spraying inner wall of tower are equipped with thermal insulation layer, and several nozzles are equipped in the middle part of the spray tower, and the spraying tower bottom is equipped with row Expects pipe, second cyclone dust collectors are connected to by aspiration channel with spray tower, and the second cyclone dust collectors side passes through Aspiration channel is connected with exhaust fan.
Further, the coal water slurry boiler intracavity bottom is equipped with air guiding base, is equipped with oxygen stream in the air guiding base Chamber is additionally provided with several air inlets being connected to oxygen stream chamber in the air guiding base, and the coal water slurry boiler side is additionally provided with The oxygen adapter tube being connected to oxygen stream chamber.
Further, the coal water slurry boiler top side is equipped with into slurry pipe, and the coal water slurry boiler lower part is another Side is equipped with slag-drip opening, and the air guiding base top surface is inclined surface, and the bottom surface phase of minimum one end of the inclined surface and slag-drip opening It is connected, hermatic door is hinged on the coal water slurry boiler on the outside of the slag-drip opening, the hermatic door is equipped with handle.
Further, close to the tangentially connected top in the first cyclone dust collectors of hot air pipe of the coal water slurry boiler side Side, the hot air pipe close to the spray tower side are plugged on the top center of the first cyclone dust collectors, and first whirlwind Filter screen is provided in hot air pipe between deduster and spray tower.
Further, the air devider being connected to hot air pipe, the air devider bottom are equipped at the top of the inner wall of the spray tower Face is equipped with several ventholes.
Further, the nozzle tilts upward arrangement, and jet stream baffle is equipped in the spray tower above nozzle, The jet stream baffle is connected by the inner wall of several connecting rods and spray tower.
Further, conical baffle is equipped with above the aspiration channel in the spray tower.
Further, the spray tower internal clearance above the drainage conduit is plugged with taper collision block, and the taper collision block is logical Several support rods are crossed to connect with spray tower.
Further, the spray tower outer wall above the drainage conduit is equipped with cooling ring, is equipped with annular in the cooling ring Cooling chamber.
Further, it is additionally provided with belt conveyor below the drainage conduit, described drainage conduit face belt is defeated Send conveyer belt one end of mechanism.
Beneficial effect
Compared with prior art, the present invention having the advantage that
1, the dedicated spraying tower apparatus of production Ceramic Tiles of the invention, by spray tower, hot air pipe and the first cyclone dust removal It is respectively provided with thermal insulation layer in device, heat losses can be reduced, improves drying efficiency, achievees the purpose that energy conservation and environmental protection produces, and make It is comfortable to obtain spray tower outside wall temperature, it is ensured that the safety of production.
2, the dedicated spraying tower apparatus of production Ceramic Tiles of the invention, produces thermal current using coal water slurry boiler, change coal, The traditional combustions mode such as timber, the more feature of environmental protection, and setting by air guiding base, oxygen stream chamber, air inlet and oxygen adapter tube It sets, using oxygen as combustion medium, realizes oxygen-enriched combusting, compared with traditional structure, energy-saving effect is more preferable.
3, the dedicated spraying tower apparatus of production Ceramic Tiles of the invention, passes through the arrangement side for being set as tilting upward by nozzle Formula, and jet stream baffle is set above nozzle, mud can effectively be dispersed, increase the contact area of mud and thermal current, into One step improves drying efficiency.
4, the dedicated spraying tower apparatus of production Ceramic Tiles of the invention is by being arranged taper collision block, ceramic powder in spraying tower bottom When grain is fallen, part agglomeration can be broken up, ceramic powder particle is effectively prevent to agglomerate;And pass through setting for cooling ring and annular cooling chamber It sets, can suitably cool down to ceramic powder particle, prevent the ceramic powder particle temperature of discharge excessively high and generate security risk.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the cross-section structure enlarged diagram of coal water slurry boiler in the present invention;
Fig. 3 is the cross-section structure enlarged diagram of the first cyclone dust collectors in the present invention;
Fig. 4 is the cross-section structure enlarged diagram of spray tower in the present invention;
Fig. 5 is the structure enlargement diagram in Fig. 4 at A;
Fig. 6 is that air devider looks up structure enlargement diagram in the present invention;
Fig. 7 is the plan structure enlarged diagram of jet stream block in the present invention;
Fig. 8 is the side view structure enlarged diagram of conical baffle in the present invention.
Wherein: 1- spray tower, 2- coal water slurry boiler, the first cyclone dust collectors of 3-, the second cyclone dust collectors of 4-, 5- hot wind Pipe, 6- thermal insulation layer, 7- nozzle, 8- drainage conduit, 9- aspiration channel, 10- exhaust fan, 11- air guiding base, 12- oxygen stream chamber, 13- air inlet Hole, 14- oxygen adapter tube, 15- into slurry pipe, 16- slag-drip opening, 17- hermatic door, 18- handle, 19- filter screen, 20- air devider, 21- venthole, 22- jet stream baffle, 23- connecting rod, 24- conical baffle, 25- taper collision block, 26- support rod, 27- are cooling Ring, 28- annular cooling chamber, 29- belt conveyor.
Specific embodiment
The present invention is described further for specific embodiment in reference to the accompanying drawing.
Refering to fig. 1-8, the dedicated spraying tower apparatus of a kind of production Ceramic Tiles of the invention, including spray tower 1, further include water Fluid-fired boiler 2, the first cyclone dust collectors 3 and the second cyclone dust collectors 4, wherein coal water slurry boiler 2 and the first cyclone dust collectors 3 Between, be connected to by hot air pipe 5 between the first cyclone dust collectors 3 and spray tower 1, hot air pipe 5, the first cyclone dust collectors 3, spray 1 inner wall of mist tower is equipped with thermal insulation layer 6, which can be layer of nanomaterial, and heat insulation is more preferably;It is set in the middle part of spray tower 1 There are several nozzles 7, is equipped with drainage conduit 8 in 1 bottom of spray tower, the second cyclone dust collectors 4 are connected to by aspiration channel 9 with spray tower 1, Second cyclone dust collectors, 4 side is connected with exhaust fan 10 by aspiration channel 9, wherein there are three the second cyclone dust collectors 4 are total, and It is connected to by aspiration channel 9 between them, further increases dust removing effects.
Preferably, it is equipped with air guiding base 11 in 2 intracavity bottom of coal water slurry boiler, oxygen stream chamber 12 is equipped in air guiding base 11, It is additionally provided with several air inlets 13 being connected to oxygen stream chamber 12 in air guiding base 11, is additionally provided with and oxygen in 2 side of coal water slurry boiler Flow the oxygen adapter tube 14 that chamber 12 is connected to, the setting taken over by air guiding base, oxygen stream chamber, air inlet and oxygen, using oxygen As combustion medium, oxygen-enriched combusting is realized, compared with traditional structure, energy-saving effect is more preferable.On 2 top one of coal water slurry boiler Side is equipped with into slurry pipe 15, for inputting water-coal-slurry liquid, slag-drip opening 16 is equipped in the 2 lower part other side of coal water slurry boiler, for clear Residue after reason burning, 11 top surface of air guiding base is inclined surface, and minimum one end of the inclined surface and the bottom surface of slag-drip opening 16 are mutually held in the mouth It connects, is convenient for residue automatic stream slag-drip opening 16, be hinged with hermatic door 17 on the coal water slurry boiler 2 in 16 outside of slag-drip opening, seal Door 17 is equipped with handle 18, convenient for operation.
First cyclone dust collectors 3 and the second cyclone dust collectors 4 are conical shell, the heat close to 2 side of coal water slurry boiler The tangentially connected top side in the first cyclone dust collectors 3 of air hose 5, the hot air pipe 5 close to 1 side of spray tower are plugged on the first rotation The top center of wind deduster 3 produces thermal current using the thermal current of rotation along the tangential entrance of the first cyclone dust collectors 3 Raw centrifugal force separates granule foreign from gas, realizes dedusting;And first between cyclone dust collectors 3 and spray tower 1 Hot air pipe 5 in be provided with filter screen 19, lighter some miscellaneous bits can be removed, further increase filter effect;Correspondingly, Second cyclone dust collectors 4 are identical as the working principle of the first cyclone dust collectors 3, the ceramic powder of carrying in the gas flow can be removed It goes, achievees the purpose that energy conservation and environmental protection is discharged.
The air devider 20 being connected to hot air pipe 5 is equipped at the top of the inner wall of spray tower 1,20 bottom surface of air devider is equipped with several logical Stomata 21, the thermal current that hot air pipe 5 introduces are branched to around spray tower 1 by venthole 21.Nozzle 7 tilts upward cloth It sets, and is equipped with jet stream baffle 22 in the spray tower 1 above nozzle 7, the jet stream baffle 22 is by several connecting rods 23 and by spraying The inner wall of tower 1 connects, and by the arrangement for being set as tilting upward by nozzle, and jet stream baffle, energy is arranged above nozzle It is enough effectively to disperse mud, increase the contact area of mud and thermal current, further increases drying efficiency.
It is equipped with conical baffle 24 above the aspiration channel 9 in spray tower 1, powdered granule is avoided to fall on aspiration channel 9.? 1 internal clearance of spray tower of 8 top of drainage conduit is plugged with taper collision block 25, and the taper collision block 25 is by several support rods 26 and by spraying Tower 1 connects, and when ceramic powder particle is fallen, can break up part agglomeration, ceramic powder particle is effectively prevent to agglomerate;Above drainage conduit 8 1 outer wall of spray tower be equipped with cooling ring 27, annular cooling chamber 28 is equipped in cooling ring 27, is injected with circulation in annular cooling chamber 28 Cold air or circulating water can suitably cool down to ceramic powder particle, prevent the ceramic powder particle temperature of discharge excessively high and generate security risk.
Belt conveyor 29, the conveyer belt of 8 face of the drainage conduit belt conveyor 29 are additionally provided with below drainage conduit 8 Ceramic powder particle can be delivered to designated position by belt conveyor 29, facilitate production Ceramic Tiles by one end.
The dedicated spraying tower apparatus of the production Ceramic Tiles of the present embodiment, when in use, coal water slurry boiler 2 works, and oxygen is logical It crosses oxygen adapter tube 14, oxygen stream chamber 12, air inlet 13 to enter in boiler burning waterpgas as fuel 2, realization is burnt by the way of oxygen-enriched combusting Water-coal-slurry, to produce thermal current;Thermal current passes sequentially through hot air pipe 5, the first cyclone dust collectors 3, hot air pipe 5 and enters spray tower In 1, during which, thermal current keeps temperature flowing under the protective effect of thermal insulation layer 6;Spray tower 1 works, and thermal current enters spraying After tower 1, contact drying is carried out with the mud that nozzle 7 sprays, so that mud is dry to become ceramic powder particle, during which, thermal current is spraying In mist tower 1, by under the protective effect of thermal insulation layer 6, continuous high temperature is dry, and mud impinges upon on jet stream baffle 22, effectively breaks up mud Slurry, to improve drying effect;Ceramic powder particle after drying is fallen on taper collision block 25 so that doped with agglomeration beaten It dissipates, improves the quality of product, and under the cooling effect of cooling ring 27 and annular cooling chamber 28, ceramic powder particle is effectively reduced Temperature, it is ensured that safety in production, during which, the gas in spray tower 1 are taken out by exhaust fan 10 through aspiration channel 9, the second cyclone dust collectors 4 Out, the problem of effectivelying prevent gas to carry dust and pollute air.The dedicated spraying tower apparatus of production Ceramic Tiles of the invention, passes through It is respectively provided with thermal insulation layer in spray tower, hot air pipe and the first cyclone dust collectors, heat losses can be reduced, improves drying efficiency, Achieve the purpose that energy conservation and environmental protection produces, and make spray tower outside wall temperature comfortable, it is ensured that the safety of production
What has been described above is only a preferred embodiment of the present invention, it should be pointed out that for those skilled in the art, Without departing from the structure of the invention, several modifications and improvements can also be made, these all will not influence implementation of the present invention Effect and patent practicability.

Claims (10)

1. a kind of dedicated spraying tower apparatus of production Ceramic Tiles, including spray tower (1), which is characterized in that further include water-coal-slurry pot Furnace (2), the first cyclone dust collectors (3) and the second cyclone dust collectors (4), the coal water slurry boiler (2) and the first cyclone dust removal It is connected to by hot air pipe (5) between device (3), between the first cyclone dust collectors (3) and spray tower (1), the hot air pipe (5), the first cyclone dust collectors (3), spray tower (1) inner wall are equipped with thermal insulation layer (6), and the spray tower (1) is if middle part is equipped with Dry nozzle (7), the spray tower (1) bottom are equipped with drainage conduit (8), and second cyclone dust collectors (4) pass through aspiration channel (9) it is connected to spray tower (1), the second cyclone dust collectors (4) side is connected with exhaust fan (10) by aspiration channel (9).
2. a kind of dedicated spraying tower apparatus of production Ceramic Tiles according to claim 1, which is characterized in that the water coal Slurry boiler (2) intracavity bottom is equipped with air guiding base (11), is equipped with oxygen stream chamber (12) in the air guiding base (11), the air guide Several air inlets (13) being connected to oxygen stream chamber (12) are additionally provided in seat (11), the coal water slurry boiler (2) side is also set There is the oxygen being connected to oxygen stream chamber (12) to take over (14).
3. a kind of dedicated spraying tower apparatus of production Ceramic Tiles according to claim 2, which is characterized in that the water coal Slurry boiler (2) top side is equipped with into slurry pipe (15), and the coal water slurry boiler (2) the lower part other side is equipped with slag-drip opening (16), the air guiding base (11) top surface is inclined surface, and minimum one end of the inclined surface and the bottom surface of slag-drip opening (16) are mutually held in the mouth It connects, is hinged with hermatic door (17) on the coal water slurry boiler (2) on the outside of the slag-drip opening (16), the hermatic door (17) is equipped with Handle (18).
4. a kind of dedicated spraying tower apparatus of production Ceramic Tiles according to claim 1, which is characterized in that close to the water The tangentially connected top side in the first cyclone dust collectors (3) of the hot air pipe (5) of fluid-fired boiler (2) side, close to described spraying The hot air pipe (5) of tower (1) side is plugged on the top center of the first cyclone dust collectors (3), and first cyclone dust collectors (3) Filter screen (19) are provided in hot air pipe (5) between spray tower (1).
5. a kind of dedicated spraying tower apparatus of production Ceramic Tiles according to claim 1, which is characterized in that the spray tower (1) air devider (20) being connected to hot air pipe (5) is equipped at the top of inner wall, the air devider (20) bottom surface is equipped with several ventilations Hole (21).
6. a kind of dedicated spraying tower apparatus of production Ceramic Tiles according to claim 1, which is characterized in that the nozzle (7) arrangement is tilted upward, and is equipped with jet stream baffle (22) in the spray tower (1) above nozzle (7), the jet stream baffle (22) it is connect by several connecting rods (23) with the inner wall of spray tower (1).
7. a kind of dedicated spraying tower apparatus of production Ceramic Tiles according to claim 1, which is characterized in that the spray tower (1) conical baffle (24) are equipped with above the aspiration channel (9) in.
8. a kind of dedicated spraying tower apparatus of production Ceramic Tiles according to any one of claims 1-7, feature exist In spray tower (1) internal clearance above the drainage conduit (8) is plugged with taper collision block (25), and the taper collision block (25) is logical Several support rods (26) are crossed to connect with spray tower (1).
9. a kind of dedicated spraying tower apparatus of production Ceramic Tiles according to any one of claims 1-7, feature exist In spray tower (1) outer wall above the drainage conduit (8) is equipped with cooling ring (27), and annular is equipped in the cooling ring (27) Cooling chamber (28).
10. a kind of dedicated spraying tower apparatus of production Ceramic Tiles according to any one of claims 1-7, feature exist In the drainage conduit (8) lower section is additionally provided with belt conveyor (29), the drainage conduit (8) the face belt conveyor Conveyer belt one end of structure (29).
CN201910485210.7A 2019-06-05 2019-06-05 A kind of dedicated spraying tower apparatus of production Ceramic Tiles Pending CN110090462A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910485210.7A CN110090462A (en) 2019-06-05 2019-06-05 A kind of dedicated spraying tower apparatus of production Ceramic Tiles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910485210.7A CN110090462A (en) 2019-06-05 2019-06-05 A kind of dedicated spraying tower apparatus of production Ceramic Tiles

Publications (1)

Publication Number Publication Date
CN110090462A true CN110090462A (en) 2019-08-06

Family

ID=67450273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910485210.7A Pending CN110090462A (en) 2019-06-05 2019-06-05 A kind of dedicated spraying tower apparatus of production Ceramic Tiles

Country Status (1)

Country Link
CN (1) CN110090462A (en)

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2342338Y (en) * 1998-08-14 1999-10-06 王志峰 Energy saving, dust removing,spraying and drying device
WO2008074205A1 (en) * 2006-12-20 2008-06-26 Youxin Rao A waste heat recovery and utilization apparatus for a rapid cooling zone of a ceramic production line furnace
CN201387005Y (en) * 2008-10-03 2010-01-20 向立和 Dust-removing fluidized-bed furnace
CN201823619U (en) * 2009-06-30 2011-05-11 韩景文 Multi-pipe cyclone dust collector in water-coal-slurry hot blast stove
CN102350066A (en) * 2011-07-30 2012-02-15 淮北市惠尔普建筑陶瓷有限公司 Efficient energy-saving environmentally-friendly spraying drying tower
CN102584252A (en) * 2012-02-24 2012-07-18 广东中窑窑业股份有限公司 Ceramic powder cooling device
CN102705854A (en) * 2012-05-23 2012-10-03 中材高新材料股份有限公司 Energy conversation and environment friendly combustion heating system
CN103551077A (en) * 2013-10-24 2014-02-05 广东中鹏热能科技有限公司 Energy-saving novel ceramic slurry granulation process and equipment for same
CN205655647U (en) * 2016-04-05 2016-10-19 重庆双渝工业陶瓷有限公司 Spray drying tower for industrial ceramics
CN206556398U (en) * 2017-01-05 2017-10-13 湖北鄂中生态工程股份有限公司 A kind of complete water-soluble MAP spray-drying installation
CN206600796U (en) * 2017-04-07 2017-10-31 广东汉德诺机械有限公司 A kind of coal-water-slurry combustion system
CN207254091U (en) * 2017-08-15 2018-04-20 佛山市三水华纳陶瓷有限公司 A kind of spray tower desulphurization system
CN108105798A (en) * 2017-12-15 2018-06-01 宁夏科豪陶瓷有限公司 A kind of spray drying Tower System
CN208011692U (en) * 2018-03-29 2018-10-26 山西高碳能源低碳化利用研究设计院有限公司 Energy-efficient coal water slurry boiler
CN109603182A (en) * 2019-01-23 2019-04-12 广东欧文莱陶瓷有限公司 A kind of energy conservation and environmental protection is sprayed Tower System
CN210009638U (en) * 2019-06-05 2020-02-04 佛山市南海智信工业窑炉有限公司 Dedicated spraying tower device of production ceramic brick

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2342338Y (en) * 1998-08-14 1999-10-06 王志峰 Energy saving, dust removing,spraying and drying device
WO2008074205A1 (en) * 2006-12-20 2008-06-26 Youxin Rao A waste heat recovery and utilization apparatus for a rapid cooling zone of a ceramic production line furnace
CN201387005Y (en) * 2008-10-03 2010-01-20 向立和 Dust-removing fluidized-bed furnace
CN201823619U (en) * 2009-06-30 2011-05-11 韩景文 Multi-pipe cyclone dust collector in water-coal-slurry hot blast stove
CN102350066A (en) * 2011-07-30 2012-02-15 淮北市惠尔普建筑陶瓷有限公司 Efficient energy-saving environmentally-friendly spraying drying tower
CN102584252A (en) * 2012-02-24 2012-07-18 广东中窑窑业股份有限公司 Ceramic powder cooling device
CN102705854A (en) * 2012-05-23 2012-10-03 中材高新材料股份有限公司 Energy conversation and environment friendly combustion heating system
CN103551077A (en) * 2013-10-24 2014-02-05 广东中鹏热能科技有限公司 Energy-saving novel ceramic slurry granulation process and equipment for same
CN205655647U (en) * 2016-04-05 2016-10-19 重庆双渝工业陶瓷有限公司 Spray drying tower for industrial ceramics
CN206556398U (en) * 2017-01-05 2017-10-13 湖北鄂中生态工程股份有限公司 A kind of complete water-soluble MAP spray-drying installation
CN206600796U (en) * 2017-04-07 2017-10-31 广东汉德诺机械有限公司 A kind of coal-water-slurry combustion system
CN207254091U (en) * 2017-08-15 2018-04-20 佛山市三水华纳陶瓷有限公司 A kind of spray tower desulphurization system
CN108105798A (en) * 2017-12-15 2018-06-01 宁夏科豪陶瓷有限公司 A kind of spray drying Tower System
CN208011692U (en) * 2018-03-29 2018-10-26 山西高碳能源低碳化利用研究设计院有限公司 Energy-efficient coal water slurry boiler
CN109603182A (en) * 2019-01-23 2019-04-12 广东欧文莱陶瓷有限公司 A kind of energy conservation and environmental protection is sprayed Tower System
CN210009638U (en) * 2019-06-05 2020-02-04 佛山市南海智信工业窑炉有限公司 Dedicated spraying tower device of production ceramic brick

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
夏维煌;: "水煤浆在高档抛光砖制粉生产中的应用", 佛山陶瓷, no. 01, 15 January 2009 (2009-01-15) *

Similar Documents

Publication Publication Date Title
CN100404991C (en) Macrotype cement kiln flue gas managing technique and device thereof
CN110090462A (en) A kind of dedicated spraying tower apparatus of production Ceramic Tiles
CN210009638U (en) Dedicated spraying tower device of production ceramic brick
CN207760376U (en) Coal gas of converter dry cleaning recovery system
CN102913271B (en) Pulp shooting machine dust pelletizing system
CN207121620U (en) The ultra-clean drain cooler of coal gas of converter
CN110645705B (en) Double-stage direct-current dedusting heat exchange-free hot blast stove
CN206069901U (en) A kind of high-temperature liquid state slag granulating system
CN106435062A (en) High-temperature molten slag granulation system
CN204555642U (en) A kind of energy-conserving and environment-protective furnace cupola
CN103127796B (en) In titanium tetrachloride production, tail gas negative pressure absorbing reduces discharging place system
CN208115343U (en) Powder active regeneration and blowing integrated apparatus is preliminarily sprayed
CN111991962A (en) Cyclone dust removal equipment and cracking system
CN208437053U (en) A kind of novel cyclone separating device
CN112815336B (en) Low-emission method for powder combustion
CN209872877U (en) Coal powder vortex slag coal gasifier
CN110057202A (en) Mineral heating furnace flue recovery of micro silicon powder system is not shut down
CN209726755U (en) A kind of dehumidifying supply air system cyclone
CN207087106U (en) New steel mill's flame cutting machine clarifying smoke system architecture
CN214167746U (en) Low-temperature drying equipment for drying dealkalized red mud by using waste heat of industrial waste flue gas
CN211753275U (en) Improved energy-saving short venturi nozzle for long bag dust remover
CN107116282A (en) New steel mill's flame cutting machine clarifying smoke system architecture
CN217340631U (en) Flue gas treatment system for preheating furnace
SU744208A1 (en) Plant for firing loose material
CN210624537U (en) Sludge cyclone incinerator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination