CN110080797A - 适于护盾式tbm的全包钢板式钢组合管片制造方法 - Google Patents

适于护盾式tbm的全包钢板式钢组合管片制造方法 Download PDF

Info

Publication number
CN110080797A
CN110080797A CN201910382473.5A CN201910382473A CN110080797A CN 110080797 A CN110080797 A CN 110080797A CN 201910382473 A CN201910382473 A CN 201910382473A CN 110080797 A CN110080797 A CN 110080797A
Authority
CN
China
Prior art keywords
cover plate
sealing plate
plate
board
lower cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910382473.5A
Other languages
English (en)
Inventor
张金良
汪雪英
杨晓箐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201910382473.5A priority Critical patent/CN110080797A/zh
Publication of CN110080797A publication Critical patent/CN110080797A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • E21D11/083Methods or devices for joining adjacent concrete segments
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • E21D11/086Methods of making concrete lining segments

Abstract

本发明公开了一种适于护盾式TBM的全包钢板式钢组合管片制造方法,按照设计管片尺寸制作上盖板、下盖板、左封板、右封板、前封板和后封板,在上盖板上开设用于浇筑混凝土的灌注孔;在上盖板下表面、下盖板上表面和左、右、前、后封板内表面分别均布焊接多个栓钉;沿下盖板边缘开设焊缝坡口;将下盖板和左、右、前、后封板焊接为一体构成上开口腔室,在上开口腔室内帮扎管片钢筋,然后将上盖板扣合在上开口腔室上,灌注混凝土,养护后完成全包钢板式钢组合管片的制造。本发明实现了管片承受高内水和高外水及高围岩压力、深埋长隧洞一次衬砌成洞施工,省去了二次加固衬砌、钢管衬砌及高压固结灌浆工序,缩短了隧洞施工工期。

Description

适于护盾式TBM的全包钢板式钢组合管片制造方法
技术领域
本发明涉及隧洞衬砌管片,尤其是涉及适于护盾式TBM的全包钢板式钢组合管片制造方法。
背景技术
护盾TBM施工的深埋长隧洞工程,受地质条件限制或高内外水压力影响,为满足隧洞结构安全,目前现有的钢筋混凝土管片衬砌后,仍需进行二次加强衬砌或钢管衬砌或高压固结灌浆,同时管片之间的连接缝还需要采用微膨胀橡胶+微膨胀水泥砂浆的复合止水形式。采用现有混凝土管片衬砌结构型式的隧洞施工工序复杂,工程不仅造价高,同时延长了隧洞施工工期,使得高效安全的护盾TBM优势难以体现,严重影响了护盾TBM在深埋长隧洞工程中的应用。
发明内容
本发明目的在于提供一种适于护盾式TBM的全包钢板式钢组合管片制造方法,实现缩短隧洞衬砌施工工期、提高施工效率。
为实现上述目的,本发明采取下述技术方案:
本发明所述适于护盾式TBM的全包钢板式钢组合管片制造方法,包括下述步骤:
步骤1,按照设计管片尺寸制作上盖板、下盖板、左封板、右封板、前封板和后封板,在所述上盖板上开设用于浇筑混凝土的灌注孔;
步骤2,在所述上盖板下表面、下盖板上表面和所述左、右、前、后封板内表面分别均布焊接多个栓钉;
步骤3,沿下盖板的边缘开设焊缝坡口;
或,在左、右、前、后封板外表面分别设置拼接槽或/和拼接键;
步骤4,将下盖板和左、右、前、后封板焊接为一体构成上开口腔室,在所述上开口腔室内帮扎管片钢筋,然后将上盖板扣合在上开口腔室上并与左、右、前、后封板焊接构成密闭腔室;
步骤5,采用现有混凝土浇筑方法,通过所述灌注孔向所述密闭腔室内灌注混凝土,养护后完成全包钢板式钢组合管片的制造。
所述拼接键采用抗剪栓钉。
本发明依据大跨度重载楼盖结构、大跨度桥梁结构等领域广泛应用的钢-混凝土组合结构特点,将钢板-混凝土组合结构应用于管片设计中,形成拼装式钢板混凝土组合管片,充分利用混凝土抗压和钢板抗拉的材料性能,实现由钢板混凝土组合管片承受高内水和高外水及高围岩压力,深埋长隧洞一次衬砌成洞施工,省去了因水文地质条件引起的二次加固衬砌、钢管衬砌及高压固结灌浆工序,达到充分发挥护盾TBM一次快速成洞优势,拓宽了护盾TBM在压力洞及大埋深隧洞的应用范围,大大缩短了隧洞施工工期。
附图说明
图1是本发明所述开设有焊缝坡口的全包钢板式钢组合管片的主剖结构示意图。
图2是图1的俯视结构示意图。
图3是图1的A-A向剖面结构示意图。
图4是图3的I部放大结构示意图。
图5是本发明所述设置有拼接槽或/和拼接键的全包钢板式钢组合管片的主视结构示意图。
图6是图5的俯视结构示意图。
图7是图5的B-B向剖面结构示意图。
具体实施方式
如图1-7所示,本发明所述适于护盾式TBM的全包钢板式钢组合管片制造方法,包括下述步骤:
步骤1,按照设计管片尺寸采用钢板制作上盖板1、下盖板2、左封板3、右封板4、前封板5和后封板6,在上盖板1上开设用于浇筑混凝土的灌注孔7;
步骤2,在上盖板1下表面、下盖板2上表面和左、右、前、后封板3、4、5、6内表面分别均布焊接多个栓钉8;
步骤3,沿下盖板2的边缘开设焊缝坡口9,如图4所示;
或,如图5-7所示,在左、右、前、后封板3、4、5、6外表面分别设置拼接槽或/和拼接键;具体说,在用于环间连接的前封板5外表面焊接拼接键10而后封板6外表面开设拼接槽11;同理,在用于同一环管片块间连接的左封板3外表面开设拼接槽12而右封板4外表面焊接拼接键13,拼接键采用抗剪栓钉。
步骤4,将下盖板2和左、右、前、后封板3、4、5、6焊接为一体构成上开口腔室,在上开口腔室内帮扎管片钢筋,然后将上盖板1扣合在上开口腔室上并与左、右、前、后封板3、4、5、6焊接构成密闭腔室;
步骤5,采用现有混凝土浇筑方法,通过灌注孔9向密闭腔室内灌注混凝土14,养护后完成全包钢板式钢组合管片的制造。
本发明用于隧洞衬砌施工时,对于沿下盖板2边缘开设焊缝坡口9结构的全包钢板式钢组合管片,在完成全包钢板式钢组合管片铺设后,采用焊接机器人对全包钢板式钢组合管片所有预留的焊缝坡口9进行快速焊接,之后再进行全包钢板式钢组合管片壁后豆粒石回填、注浆或水泥砂浆,因此省去了普通混凝土管片间的复合止水安装。
本发明用于隧洞衬砌施工时,对于开设有拼接槽11、12和焊接有拼接键10、13的全包钢板式钢组合管片,在完成全包钢板式钢组合管片铺设后,全包钢板式钢组合管片的拼接缝采用无毒防水高性能聚合物一次快速粘接,之后再进行夹层式钢组合管片壁后豆粒石回填注浆或水泥砂浆。

Claims (2)

1.一种适于护盾式TBM的全包钢板式钢组合管片制造方法,其特征在于:包括下述步骤:
步骤1,按照设计管片尺寸制作上盖板、下盖板、左封板、右封板、前封板和后封板,在所述上盖板上开设用于浇筑混凝土的灌注孔;
步骤2,在所述上盖板下表面、下盖板上表面和所述左、右、前、后封板内表面分别均布焊接多个栓钉;
步骤3,沿下盖板的边缘开设焊缝坡口;
或,在左、右、前、后封板外表面分别设置拼接槽或/和拼接键;
步骤4,将下盖板和左、右、前、后封板焊接为一体构成上开口腔室,在所述上开口腔室内帮扎管片钢筋,然后将上盖板扣合在上开口腔室上并与左、右、前、后封板焊接构成密闭腔室;
步骤5,采用现有混凝土浇筑方法,通过所述灌注孔向所述密闭腔室内灌注混凝土,养护后完成全包钢板式钢组合管片的制造。
2.根据权利要求1所述适于护盾式TBM的全包钢板式钢组合管片制造方法,其特征在于:所述拼接键采用抗剪栓钉。
CN201910382473.5A 2019-05-09 2019-05-09 适于护盾式tbm的全包钢板式钢组合管片制造方法 Pending CN110080797A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910382473.5A CN110080797A (zh) 2019-05-09 2019-05-09 适于护盾式tbm的全包钢板式钢组合管片制造方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910382473.5A CN110080797A (zh) 2019-05-09 2019-05-09 适于护盾式tbm的全包钢板式钢组合管片制造方法

Publications (1)

Publication Number Publication Date
CN110080797A true CN110080797A (zh) 2019-08-02

Family

ID=67419383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910382473.5A Pending CN110080797A (zh) 2019-05-09 2019-05-09 适于护盾式tbm的全包钢板式钢组合管片制造方法

Country Status (1)

Country Link
CN (1) CN110080797A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110617081A (zh) * 2019-10-11 2019-12-27 甘肃省交通规划勘察设计院股份有限公司 一种公路隧道装配式预制仰拱结构

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1088984A (ja) * 1996-09-13 1998-04-07 Taisei Corp セグメント
JPH11159293A (ja) * 1997-11-26 1999-06-15 Atsushi Koizumi 合成セグメント
JP2001058308A (ja) * 1999-06-17 2001-03-06 Teihyu Corp 鋼製セグメントの製造方法及びその鋼製セグメント
JP2002129894A (ja) * 2000-10-20 2002-05-09 Nippon Steel Corp 機械式連結構造を有する鋼製セグメント及びそれを用いたトンネル構造
JP2004019178A (ja) * 2002-06-13 2004-01-22 Shimizu Corp トンネルの遮水覆工構造と鋼製箱形セグメント
JP2006249814A (ja) * 2005-03-11 2006-09-21 Ishikawajima Constr Materials Co Ltd 合成セグメント
JP2007270485A (ja) * 2006-03-31 2007-10-18 Ishikawajima Constr Materials Co Ltd 合成セグメント
JP2009257043A (ja) * 2008-04-21 2009-11-05 Jfe Metal Products & Engineering Inc 合成セグメントのコンクリート充填方法
CN104314584A (zh) * 2014-09-30 2015-01-28 上海市政工程设计研究总院(集团)有限公司 一种拼装式顶管管片结构及其拼装方法
JP2018059396A (ja) * 2011-04-12 2018-04-12 鹿島建設株式会社 合成系コンクリート中詰鋼製セグメント
CN108060928A (zh) * 2017-12-15 2018-05-22 中山大学 盾构隧道复合管片环结构、拼装方法及复合管片的制造方法
CN108278421A (zh) * 2018-03-22 2018-07-13 冯光淑 组装式塑料压力管、生产模具、生产方法和塑料板、管廊
CN109057809A (zh) * 2018-08-02 2018-12-21 中交第二航务工程局有限公司 便于更换盾尾刷的滑移管片以及利用其更换盾尾刷的工艺
CN109209432A (zh) * 2018-10-12 2019-01-15 徐州市三成铸业有限公司 一种榫接盾构管片
CN208687143U (zh) * 2018-08-27 2019-04-02 成都国通实业有限责任公司 一种大口径塑料压力管、塑料加强管及塑料管片成型模具

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1088984A (ja) * 1996-09-13 1998-04-07 Taisei Corp セグメント
JPH11159293A (ja) * 1997-11-26 1999-06-15 Atsushi Koizumi 合成セグメント
JP2001058308A (ja) * 1999-06-17 2001-03-06 Teihyu Corp 鋼製セグメントの製造方法及びその鋼製セグメント
JP2002129894A (ja) * 2000-10-20 2002-05-09 Nippon Steel Corp 機械式連結構造を有する鋼製セグメント及びそれを用いたトンネル構造
JP2004019178A (ja) * 2002-06-13 2004-01-22 Shimizu Corp トンネルの遮水覆工構造と鋼製箱形セグメント
JP2006249814A (ja) * 2005-03-11 2006-09-21 Ishikawajima Constr Materials Co Ltd 合成セグメント
JP2007270485A (ja) * 2006-03-31 2007-10-18 Ishikawajima Constr Materials Co Ltd 合成セグメント
JP2009257043A (ja) * 2008-04-21 2009-11-05 Jfe Metal Products & Engineering Inc 合成セグメントのコンクリート充填方法
JP2018059396A (ja) * 2011-04-12 2018-04-12 鹿島建設株式会社 合成系コンクリート中詰鋼製セグメント
CN104314584A (zh) * 2014-09-30 2015-01-28 上海市政工程设计研究总院(集团)有限公司 一种拼装式顶管管片结构及其拼装方法
CN108060928A (zh) * 2017-12-15 2018-05-22 中山大学 盾构隧道复合管片环结构、拼装方法及复合管片的制造方法
CN108278421A (zh) * 2018-03-22 2018-07-13 冯光淑 组装式塑料压力管、生产模具、生产方法和塑料板、管廊
CN109057809A (zh) * 2018-08-02 2018-12-21 中交第二航务工程局有限公司 便于更换盾尾刷的滑移管片以及利用其更换盾尾刷的工艺
CN208687143U (zh) * 2018-08-27 2019-04-02 成都国通实业有限责任公司 一种大口径塑料压力管、塑料加强管及塑料管片成型模具
CN109209432A (zh) * 2018-10-12 2019-01-15 徐州市三成铸业有限公司 一种榫接盾构管片

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110617081A (zh) * 2019-10-11 2019-12-27 甘肃省交通规划勘察设计院股份有限公司 一种公路隧道装配式预制仰拱结构
CN110617081B (zh) * 2019-10-11 2021-01-22 甘肃省交通规划勘察设计院股份有限公司 一种公路隧道装配式预制仰拱结构

Similar Documents

Publication Publication Date Title
CN105781574B (zh) 一种隧道装配式支护体系及其施工方法
CN109404005B (zh) 暗挖隧道小洞进大洞预加固体系及施工方法
WO2021120991A1 (zh) 一种改建盾构隧道进行矿山法施工的方法
SE1750913A1 (en) Method for constructing extra-large variable cross section tunnel
CN104653187B (zh) 富水砂层地质大断面隧道开挖方法
CN112253133B (zh) 上软下硬岩体大断面暗挖隧道安全高效施工方法
CN106761810A (zh) 一种软岩大变形隧道支护结构体系及其施工方法
CN104653197A (zh) 超大变断面隧道施工方法
CN201412163Y (zh) 一种敞开式隧道掘进机施工的圆形隧道衬砌结构
CN104790974A (zh) 一种采用特殊纵向连接件的城市地铁重叠盾构隧道管片结构
CN110424376A (zh) 工字型gfrp—工字型钢接头结构和用于地下连续墙的拼接笼及其施工方法
CN106869963B (zh) 一种曲线管棚施工用盾构隧道预制复合管片
CN109457709A (zh) 一种双排桩结合大角度锚索的支护结构及施工方法
CN106481347B (zh) 一种抗内水压力复合式盾构管片
CN110080798A (zh) 适于护盾式tbm的夹层式钢组合管片制造方法
CN110080797A (zh) 适于护盾式tbm的全包钢板式钢组合管片制造方法
CN108374674B (zh) 六导洞十二步地下空间开挖支护方法
KR100644778B1 (ko) 터널의 방수 공법
CN206917665U (zh) 拼装式联络通道结构
CN109113749A (zh) 软弱围岩四线超大断面铁路隧道施工方法
CN103046765B (zh) 防空洞加固后继续使用的施工工艺
CN205714226U (zh) 一种内设钢管钢架的隧道初期支护构造
CN110080799A (zh) 适于护盾式tbm的边钢内嵌式钢组合管片制造方法
CN205743928U (zh) 浅埋型球铁框架‑钢筋混凝土组合隧道壁板
CN205349377U (zh) 一种盾构或tbm法隧道的多道防水管片结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190802

WD01 Invention patent application deemed withdrawn after publication