CN110080317B - 承压水地层基坑底部土层桩基加固桩距与桩长预测方法 - Google Patents

承压水地层基坑底部土层桩基加固桩距与桩长预测方法 Download PDF

Info

Publication number
CN110080317B
CN110080317B CN201910438003.6A CN201910438003A CN110080317B CN 110080317 B CN110080317 B CN 110080317B CN 201910438003 A CN201910438003 A CN 201910438003A CN 110080317 B CN110080317 B CN 110080317B
Authority
CN
China
Prior art keywords
pile
determining
layer
soil
soil body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910438003.6A
Other languages
English (en)
Other versions
CN110080317A (zh
Inventor
罗才松
陈华艳
叶建峰
王启云
吴琛
郑居焕
刘春亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian University of Technology
Original Assignee
Fujian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian University of Technology filed Critical Fujian University of Technology
Priority to CN201910438003.6A priority Critical patent/CN110080317B/zh
Publication of CN110080317A publication Critical patent/CN110080317A/zh
Application granted granted Critical
Publication of CN110080317B publication Critical patent/CN110080317B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • E02D1/02Investigation of foundation soil in situ before construction work
    • E02D1/022Investigation of foundation soil in situ before construction work by investigating mechanical properties of the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Soil Sciences (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明涉及一种承压水地层基坑底部土层桩基加固桩距与桩长预测方法,适用于基础建设领域,包括以下步骤:确定出场地内的地层分布:在场地内进行地质钻探,揭示出场地地层分布,第层土体的厚度为;确定承压水压力;确定出场地承压水上覆各土层土体的不排水抗剪强度和重度;确定出承压水上覆地层土体按深度上的加权平均不排水抗剪强度、按深度上的加权平均重度,其中,;根据施工条件,确定出打设桩基的直径和桩帽边长;确定出桩距;确定出桩基与承压水土体之间的极限侧摩阻力;确定出桩基长度

Description

承压水地层基坑底部土层桩基加固桩距与桩长预测方法
技术领域
本发明涉及一种承压水地层基坑底部土层桩基加固桩距与桩长预测方法,适用于基础建设领域。
背景技术
承压水是一种常见的地下水赋存类型,在某些地层里,压力往往较大,对上覆不透水层产生较大压力。同时上覆不透水层在自重及上部土体重力作用下,承压水能够保持稳定,一旦上部压力解除或部分解除,承压水可能突破上覆不透水层,导致土层破坏,承压水涌出。在基坑开挖工程中,当坑底存在承压水时,尤其要注意这个问题。但有时为了工程要求,基坑开挖不得不加大,坑底保护土层厚度为此必须得减小,承压水涌出的可能性大大增大。为此,对坑底土体进行加固处理是较好的一种方法,如采用桩基贯穿坑底土体,进入承压水土层内部,桩顶配合桩帽,压住坑底土体,避免在下部承压水压力作用下出现隆起。
而目前,对于桩距、打设的桩长等缺乏相应的理论依据。为此,需要一种承压水地层基坑底部土层桩基加固桩距与桩长预测方法。
发明内容
为解决上述问题,本发明提供一种承压水地层基坑底部土层桩基加固桩距与桩长预测方法。
本发明的技术方案在于:一种承压水地层基坑底部土层桩基加固桩距与桩长预测方法,包括以下步骤:
(1)确定出场地内的地层分布:在场地内进行地质钻探,揭示出场地地层分布,第层土体的厚度为/>,/>
(2)确定承压水压力
(3)确定出场地承压水上覆各土层土体的不排水抗剪强度和重度/>
(4)确定出承压水上覆地层土体按深度上的加权平均不排水抗剪强度、按深度上的加权平均重度/>,其中,/>;/>
(5)根据施工条件,确定出打设桩基的直径和桩帽边长;
(6)确定出桩距,/>
(7)确定出桩基与承压水土体之间的极限侧摩阻力
(8)确定出桩基长度,/>
进一步地,所述步骤(2)中,根据地质钻探结果,确定出不透水层底板的埋深、承压水稳定水头离不透水层底板的距离/>,进而/>,其中,/>为水的重度,取10kN/m3
进一步地,所述步骤(3)中,在钻探时,在各层土体里进行十字板剪切试验,或取土样,运回实验室进行三轴不固结不排水试验,测出各层土体的不排水抗剪强度,其中第/>层土体的不排水抗剪强度为/>,/>;利用环刀法测试出各土层土体的密度,乘以重力加速度得到各土样的重度,其中第i层土体的重度为/>,/>
进一步地,所述步骤(7)中,根据经验或根据桩基静载试验法确定出极限侧摩阻力
与现有技术相比较,本发明具有以下优点:该预测方法具有结构简单、流程性强和实施方便的优点。
具体实施方式
为让本发明的上述特征和优点能更明显易懂,下文特举实施例,作详细说明如下,但本发明并不限于此。
一种承压水地层基坑底部土层桩基加固桩距与桩长预测方法,包括以下步骤:
(1)确定出场地内的地层分布:在场地内进行地质钻探,揭示出场地地层分布,第层土体的厚度为/>,/>
(2)确定承压水压力,根据地质钻探结果,确定出不透水层底板的埋深/>、承压水稳定水头离不透水层底板的距离/>,进而/>,其中,/>为水的重度,取10kN/m3
(3)确定出场地承压水上覆各土层土体的不排水抗剪强度和重度/>:在钻探时,在各层土体里进行十字板剪切试验,或取土样,运回实验室进行三轴不固结不排水试验,测出各层土体的不排水抗剪强度/>,其中第/>层土体的不排水抗剪强度为/>;利用环刀法测试出各土层土体的密度,乘以重力加速度得到各土样的重度,其中第/>层土体的重度为/>,/>
(4)确定出承压水上覆地层土体按深度上的加权平均不排水抗剪强度、按深度上的加权平均重度/>,其中,
(1);
(2);
(5)根据施工条件,确定出打设桩基的直径和桩帽边长;
(6)确定出桩距,/> (3);
(7)确定出桩基与承压水土体之间的极限侧摩阻力:根据经验或根据桩基静载试验法确定出极限侧摩阻力/>
(8)确定出桩基长度,/> (4)。
例如:某场地为山区形成的冲洪积扇,地基内存在承压水,现场实施地质钻探,发现承压水上覆土层分别为粉质粘土和粘土,其厚度分别为0.7m和1.2m;进一步确定出不透水层底板的埋深为1.9m。另外,钻探结果表明,承压水稳定水头离不透水层底板的距离/>为20.8m,进一步计算得到承压水压力/>为208kPa。钻探时,在粉质粘土和粘土层里进行十字板剪切试验,测得其不排水抗剪强度/>为18kPa,/>为21kPa;取土样运回实验室,测得其密度分别为1.77g/cm3和1.81g/cm3,乘以重力加速度,分别得到粉质粘土和粘土的重度,分别为/>为17.7kN/m3,/>为18.1kN/m3;进一步根据式(1)计算出承压水上覆地层土体按深度上的加权平均不排水抗剪强度/>为20kPa,根据式(2)计算出承压水上覆地层土体按深度上的加权平均重度/>为18.0kN/m3;根据现场施工设备和桩基条件,确定采用的桩基直径/>为0.5m,桩帽边长/>为1.5m;根据式(3)计算出桩距/>为2.4m;现场进行桩基静载试验,并在桩基内埋设应力传感器,确定出极限侧摩阻力/>为30kPa;根据式(4)计算出桩基长度/>为5.4m。
以上所述仅为本发明的较佳实施例,对于本领域的普通技术人员而言,根据本发明的教导,设计出不同形式的承压水地层基坑底部土层桩基加固桩距与桩长预测方法并不需要创造性的劳动,在不脱离本发明的原理和精神的情况下凡依本发明申请专利范围所做的均等变化、修改、替换和变型,皆应属本发明的涵盖范围。

Claims (4)

1.一种承压水地层基坑底部土层桩基加固桩距与桩长预测方法,其特征在于,包括以下步骤:
(1)确定出场地内的地层分布:在场地内进行地质钻探,揭示出场地地层分布,第层土体的厚度为/>,/>
(2)确定承压水压力
(3)确定出场地承压水上覆各土层土体的不排水抗剪强度和重度/>
(4)确定出承压水上覆地层土体按深度上的加权平均不排水抗剪强度、按深度上的加权平均重度/>,其中,/>;/>;第/>层土体的不排水抗剪强度为/>,/>;第/>层土体的重度为/>,/>;/>为不透水层底板的埋深;
(5)根据施工条件,确定出打设桩基的直径和桩帽边长;
(6)确定出桩距,/>;/>为桩帽边长;
(7)确定出桩基与承压水土体之间的极限侧摩阻力
(8)确定出桩基长度,/>
2.根据权利要求1所述的承压水地层基坑底部土层桩基加固桩距与桩长预测方法,其特征在于,所述步骤(2)中,根据地质钻探结果,确定出不透水层底板的埋深、承压水稳定水头离不透水层底板的距离/>,进而/>,其中,/>为水的重度,取10kN/m3
3.根据权利要求1或2所述的承压水地层基坑底部土层桩基加固桩距与桩长预测方法,其特征在于,所述步骤(3)中,在钻探时,在各层土体里进行十字板剪切试验,或取土样,运回实验室进行三轴不固结不排水试验,测出各层土体的不排水抗剪强度,利用环刀法测试出各土层土体的密度,乘以重力加速度得到各土样的重度。
4.根据权利要求3所述的承压水地层基坑底部土层桩基加固桩距与桩长预测方法,其特征在于,所述步骤(7)中,根据经验或根据桩基静载试验法确定出极限侧摩阻力
CN201910438003.6A 2019-05-24 2019-05-24 承压水地层基坑底部土层桩基加固桩距与桩长预测方法 Active CN110080317B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910438003.6A CN110080317B (zh) 2019-05-24 2019-05-24 承压水地层基坑底部土层桩基加固桩距与桩长预测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910438003.6A CN110080317B (zh) 2019-05-24 2019-05-24 承压水地层基坑底部土层桩基加固桩距与桩长预测方法

Publications (2)

Publication Number Publication Date
CN110080317A CN110080317A (zh) 2019-08-02
CN110080317B true CN110080317B (zh) 2024-03-15

Family

ID=67421579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910438003.6A Active CN110080317B (zh) 2019-05-24 2019-05-24 承压水地层基坑底部土层桩基加固桩距与桩长预测方法

Country Status (1)

Country Link
CN (1) CN110080317B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112666010B (zh) * 2020-12-25 2022-07-15 辽宁工程技术大学 一种基坑降水条件下粉细砂土非饱和强度参数的确定方法
CN113378275B (zh) * 2021-06-18 2022-06-21 福建工程学院 一种预制桩端部遇孤石时打桩力预测方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4124982A (en) * 1976-09-22 1978-11-14 Raymond International Inc. Method of stabilizing soil in pile bearing regions
US4273475A (en) * 1976-09-22 1981-06-16 Raymond International Inc. Load supporting structure
JP2008134070A (ja) * 2006-11-27 2008-06-12 Tokyo Electric Power Co Inc:The 基礎構造物下に存在する杭の調査方法及びそのための測定装置
CN102587426A (zh) * 2012-04-05 2012-07-18 铁道第三勘察设计院集团有限公司 基于触探技术估算桩基承载力的分析方法
JP2013174096A (ja) * 2012-02-27 2013-09-05 Taisei Corp 杭の載荷試験装置
RU2496944C1 (ru) * 2012-05-24 2013-10-27 Анатолий Никифорович Саурин Способ устройства основания фундаментов сооружений
CN106337446A (zh) * 2016-09-27 2017-01-18 石家庄铁道大学 一种桩基抗拔室内试验装置及其实验方法
CN106337426A (zh) * 2016-09-22 2017-01-18 苏州市轨道交通集团有限公司 一种增加承压水地层基坑抗突涌稳定性的降水方法
CN107476354A (zh) * 2017-08-11 2017-12-15 上海岩土工程勘察设计研究院有限公司 采用等代墩基模式预测超长群桩沉降量的计算方法

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4124982A (en) * 1976-09-22 1978-11-14 Raymond International Inc. Method of stabilizing soil in pile bearing regions
US4273475A (en) * 1976-09-22 1981-06-16 Raymond International Inc. Load supporting structure
JP2008134070A (ja) * 2006-11-27 2008-06-12 Tokyo Electric Power Co Inc:The 基礎構造物下に存在する杭の調査方法及びそのための測定装置
JP2013174096A (ja) * 2012-02-27 2013-09-05 Taisei Corp 杭の載荷試験装置
CN102587426A (zh) * 2012-04-05 2012-07-18 铁道第三勘察设计院集团有限公司 基于触探技术估算桩基承载力的分析方法
RU2496944C1 (ru) * 2012-05-24 2013-10-27 Анатолий Никифорович Саурин Способ устройства основания фундаментов сооружений
CN106337426A (zh) * 2016-09-22 2017-01-18 苏州市轨道交通集团有限公司 一种增加承压水地层基坑抗突涌稳定性的降水方法
CN106337446A (zh) * 2016-09-27 2017-01-18 石家庄铁道大学 一种桩基抗拔室内试验装置及其实验方法
CN107476354A (zh) * 2017-08-11 2017-12-15 上海岩土工程勘察设计研究院有限公司 采用等代墩基模式预测超长群桩沉降量的计算方法

Also Published As

Publication number Publication date
CN110080317A (zh) 2019-08-02

Similar Documents

Publication Publication Date Title
Sørensen et al. Assessment of foundation design for offshore monopiles unprotected against scour
Wang et al. Characteristics of wall deflections and ground surface settlements in Shanghai
Lian et al. Laboratory tests on soil–skirt interaction and penetration resistance of suction caissons during installation in sand
Zhang et al. Experimental study on installation of hybrid bucket foundations for offshore wind turbines in silty clay
Chen et al. Large-scale experimental investigation of the installation of suction caissons in silt sand
Zwanenburg et al. Laboratory, in situ and full-scale load tests to assess flood embankment stability on peat
Lehtonen et al. Full-scale embankment failure test under simulated train loading
CN110080317B (zh) 承压水地层基坑底部土层桩基加固桩距与桩长预测方法
Hossain et al. Soil flow mechanisms around and between stiffeners of caissons during installation in clay
YI Centrifuge model study on spudcan-pile interaction
Bienen et al. Effects of consolidation under a penetrating footing in carbonate silty clay
Tang et al. Groundwater engineering problem and Prevention
CN113312697B (zh) 一种高压注浆对岸边挡土墙抗滑动稳定性预测方法
Meng et al. Research on the calculation method of penetration resistance of bucket foundation for offshore wind turbines
Jostad et al. Potential benefits of using skirted foundations for jackup platforms
Mahdi et al. An experimental study on laterally loaded winged pile in sandy soil
Rahayu et al. Analysis of potential liquefaction using cone penetration test data and grain size distribution test with case study of liquefaction in Lolu Village
CN112432882B (zh) 一种近海水下高压稀释淤泥孔稳定角预测方法
Young et al. Foundation performance of mat-supported jack-up rigs in soft clays
Schulze Influence of pore-water pressure and deformation effects on the long-term stability of cut slopes in overconsolidated clay
Shen et al. Prediction on the Penetration Resistance of Mono-Bucket Foundations in Silty Soil
Henke Investigations of Soil Plugging in Open-Ended Piles with Respect to the Long-Term Behaviour of the Plug
Kim et al. Experimental Observations on a Suction Bucket Foundation Under Vertical Pullout Loading
Arsyad et al. Reconstructing mechanism of large ground movement induced by 2018 Palu Earthquake 7.4 Mw
Kjekstad et al. Soil parameters used for design of gravity platforms in the North Sea

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant