CN102587426A - 基于触探技术估算桩基承载力的分析方法 - Google Patents

基于触探技术估算桩基承载力的分析方法 Download PDF

Info

Publication number
CN102587426A
CN102587426A CN2012100973331A CN201210097333A CN102587426A CN 102587426 A CN102587426 A CN 102587426A CN 2012100973331 A CN2012100973331 A CN 2012100973331A CN 201210097333 A CN201210097333 A CN 201210097333A CN 102587426 A CN102587426 A CN 102587426A
Authority
CN
China
Prior art keywords
soil
pile foundation
bearing capacity
pile
probe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100973331A
Other languages
English (en)
Other versions
CN102587426B (zh
Inventor
李鹏
侯占林
李国和
许再良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Design Corp
Original Assignee
Third Railway Survey and Design Institute Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Railway Survey and Design Institute Group Corp filed Critical Third Railway Survey and Design Institute Group Corp
Priority to CN201210097333.1A priority Critical patent/CN102587426B/zh
Publication of CN102587426A publication Critical patent/CN102587426A/zh
Application granted granted Critical
Publication of CN102587426B publication Critical patent/CN102587426B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明公开了一种基于触探技术估算桩基承载力的分析方法,其包括如下步骤:S1:量测探头与土体之间不同相对变形所对应的锥尖阻力
Figure 2012100973331100004DEST_PATH_IMAGE002
和侧摩阻力
Figure DEST_PATH_IMAGE004
。S2:提取各土性土体不同桩—土相对变形所对应的桩端阻力和桩侧摩阻力。S3:建立各土性桩—土不同相对变形所对应的桩端阻力和桩侧摩阻力分别与相应土性探头—土不同相对变形所对应的锥尖阻力
Figure 183102DEST_PATH_IMAGE002
和侧摩阻力之间经验公式。S4:据步骤S3所得经验公式,反求相应场地的桩基荷载—沉降曲线。S5:分析S4所得桩基荷载—沉降曲线类型,确定桩基承载力。本发明公开了一种基于触探技术估算桩基承载力的新方法,该方法机理明确,应用简单、方便、直观,具有良好的实用性。

Description

基于触探技术估算桩基承载力的分析方法
技术领域
本发明涉及一种基于触探技术估算桩基承载力的分析方法,属于岩土工程原位测试应用研究领域。
背景技术
现有应用触探技术估算桩基承载力方法为采用桩基竖向抗压静载试验测试所得桩端阻力和桩侧摩阻力分别与静力触探测试所得锥尖阻力                                               
Figure 2012100973331100002DEST_PATH_IMAGE002
和侧摩阻力
Figure 2012100973331100002DEST_PATH_IMAGE004
之间建立统计回归公式,根据统计回归所得经验公式直接估算桩基承载力。
静力触探方法测试所得锥尖阻力
Figure 598368DEST_PATH_IMAGE002
和侧摩阻力均为探头匀速贯入过程中周围土体对探头的抗力,不能完整反映周围土体应力—应变关系,得不到探头—土不同相对变形所对应的抗力;且探头与周围土体之间相互作用为动态过程,相应的摩阻力为滑动摩阻力。而实际桩基承载过程中,桩—土不同相对变形对应不同的承载力,且桩—土之间相互作用为准静态过程,相应的摩阻力为静摩阻力或静—动摩阻力转化过程。现有静力触探测试所得锥尖阻力
Figure 610318DEST_PATH_IMAGE002
和侧摩阻力测试机理与桩基承载机理存在上述不同,且现有应用触探技术估算桩基承载力方法建立在统计回归分析基础之上,仅能估算桩基极限承载力,不能反映桩基在不同荷载下的承载特性。
发明内容
本发明为解决上述现有技术中的问题而提供了一种基于改进静力触探试验估算桩基承载力的分析方法,该方法所应用的指标测试机理与桩基承载机理一致,且应用该方法能推求出桩基荷载—沉降曲线,进而能较为直观地反应桩基在不同荷载下的承载特性。
本发明所采取的技术方案是:
一种基于触探技术估算桩基承载力的分析方法,其特征在于包括如下步骤:
S1:利用双桥静力触探设备,开展静力触探试验,当探头贯入到第i层土体中部时暂停贯入,卸载并使探头锥尖部位土体孔隙水压力消散30分钟;此后,以一缓慢的恒定加载速率对探杆施加一从零开始逐渐增加的力,直至探头部位土体出现刺入破坏,测记此条件下探头与土体之间不同相对变形所对应的锥尖阻力和侧摩阻力;继续开展静力触探试验,到下一土层预定深度后继续量测该土层探头与土体之间不同相对变形所对应的锥尖阻力和侧摩阻力
Figure 774692DEST_PATH_IMAGE004
,依次往复,直至静力触探试验达到最终预定深度。
S2:收集桩基竖向抗压静载试验资料,提取各土性土体不同桩—土相对变形所对应的桩端阻力和桩侧摩阻力。
S3:建立各土性桩—土不同相对变形所对应的桩端阻力和桩侧摩阻力分别与相应土性探头—土不同相对变形所对应的锥尖阻力和侧摩阻力
Figure 972773DEST_PATH_IMAGE004
之间经验公式。
S4:据S3所得经验公式,结合相应场地测试所得探头—土不同相对变形所对应的锥尖阻力、侧摩阻力
Figure 335588DEST_PATH_IMAGE004
及桩长、桩径,推求桩基荷载—沉降曲线。
S5:分析S4所得桩基荷载—沉降曲线类型,确定桩基承载力;对于陡降型荷载—沉降曲线,取其发生明显陡降的起始点所对应的荷载值为桩基竖向极限承载力;对于缓变型荷载—沉降曲线,取沉降量为40mm所对应的荷载值为桩基竖向极限承载力。
上述S1步骤中对探杆施加力的恒定加载速率介于10~200 N/s之间。
本发明具有的优点和积极效果是:
本发明提出的基于触探技术估算桩基承载力的分析方法,通过利用双桥静力触探设备量测探头与土体之间不同相对变形所对应的锥尖阻力
Figure 673028DEST_PATH_IMAGE002
和侧摩阻力
Figure 129548DEST_PATH_IMAGE004
,并结合所建立的各土性桩—土不同相对变形所对应的桩端阻力和桩侧摩阻力分别与相应土性探头—土不同相对变形所对应的锥尖阻力
Figure 340081DEST_PATH_IMAGE002
和侧摩阻力
Figure 131319DEST_PATH_IMAGE004
之间经验公式,推求桩基荷载—沉降曲线,据此估算桩基极限承载力。采用本发明所述方法估算桩基承载力无需开展桩基竖向抗压静载试验、钻探取样及室内土工实验,可以节省大量的人力、物力和时间成本;且基于触探技术测试所得探头—土不同相对变形所对应的锥尖阻力和侧摩阻力
Figure 393597DEST_PATH_IMAGE004
测试机理与桩基承载机理完全一致。本发明的基于触探技术估算桩基承载力的分析方法,机理明确,应用简单、方便、直观,具有良好的实用性。
附图说明
图1是按本发明所述方法量测的锥尖阻力与探头—土不同相对变形
Figure 2012100973331100002DEST_PATH_IMAGE006
关系图。
图2是按本发明所述方法量测的侧摩阻力
Figure 40610DEST_PATH_IMAGE004
与探头—土不同相对变形
Figure 866615DEST_PATH_IMAGE006
关系图。
图3陡降型荷载—沉降曲线图。
图4缓降型荷载—沉降曲线图。
具体实施方式
以下结合附图和具体实施例对本发明的基于触探技术估算桩基承载力的分析方法进行说明。
该实施例的基于触探技术估算桩基承载力的分析方法,包括如下步骤:
S1:利用双桥静力触探设备,开展静力触探试验,当探头贯入到第i层土体中部时暂停贯入,卸载并使探头锥尖部位土体孔隙水压力消散30分钟;此后,以一缓慢的恒定加载速率(10~200 N/s)对探杆施加一从零开始逐渐增加的力,直至探头部位土体出现刺入破坏,测记此条件下探头与土体之间不同相对变形所对应的锥尖阻力和侧摩阻力
Figure 811437DEST_PATH_IMAGE004
;继续开展静力触探试验,到下一土层预定深度后继续量测该土层探头与土体之间不同相对变形所对应的锥尖阻力和侧摩阻力
Figure 976970DEST_PATH_IMAGE004
,依次往复,直至静力触探试验达到最终预定深度。
S2:收集桩基竖向抗压静载试验资料,提取各土性土体不同桩—土相对变形所对应的桩端阻力和桩侧摩阻力。
S3:建立各土性桩—土不同相对变形所对应的桩端阻力和桩侧摩阻力分别与相应土性探头—土不同相对变形所对应的锥尖阻力
Figure 809533DEST_PATH_IMAGE002
和侧摩阻力
Figure 309785DEST_PATH_IMAGE004
之间经验公式。
S4:据S3所得经验公式,结合相应场地测试所得探头—土不同相对变形所对应的锥尖阻力
Figure 543451DEST_PATH_IMAGE002
、侧摩阻力
Figure 891387DEST_PATH_IMAGE004
及桩长、桩径,推求桩基荷载—沉降曲线。
S5:分析S4所得桩基荷载—沉降曲线类型,确定桩基承载力;对于陡降型荷载—沉降曲线,取其发生明显陡降的起始点所对应的荷载值为桩基竖向极限承载力;对于缓变型荷载—沉降曲线,取沉降量为40mm所对应的荷载值为桩基竖向极限承载力。
在本实施例中,基于触探技术估算桩基承载力的分析方法是通过改进现有静力触探试验工艺,利用双桥静力触探设备量测探头与土体之间不同相对变形所对应的锥尖阻力和侧摩阻力
Figure 805433DEST_PATH_IMAGE004
,并结合所建立的各土性桩—土不同相对变形所对应的桩端阻力和桩侧摩阻力分别与相应土性探头—土不同相对变形所对应的锥尖阻力和侧摩阻力
Figure 902178DEST_PATH_IMAGE004
之间经验公式,推求桩基荷载—沉降曲线,据此估算桩基极限承载力。图1、图2分别为采用本发明所述方法量测的锥尖阻力
Figure 25992DEST_PATH_IMAGE002
、侧摩阻力
Figure 185709DEST_PATH_IMAGE004
与探头—土不同相对变形
Figure 411285DEST_PATH_IMAGE006
关系图。图3、图4分别为采用本发明所述方法推求所得陡降性和缓变型桩基荷载—沉降曲线。
采用本发明所述方法估算桩基承载力无需开展桩基竖向抗压静载试验、钻探取样及室内土工实验,可以节省大量的人力、物力和时间成本;且该方法机理明确,应用简单、方便、直观,具有良好的实用性。

Claims (2)

1.一种基于触探技术估算桩基承载力的分析方法,其特征在于包括如下步骤:
S1:利用双桥静力触探设备,开展静力触探试验,当探头贯入到第i层土体中部时暂停贯入,卸载并使探头锥尖部位土体孔隙水压力消散30分钟;此后,以一缓慢的恒定加载速率对探杆施加一从零开始逐渐增加的力,直至探头部位土体出现刺入破坏,测记此条件下探头与土体之间不同相对变形所对应的锥尖阻力                                               和侧摩阻力
Figure 2012100973331100001DEST_PATH_IMAGE004
;继续开展静力触探试验,到下一土层预定深度后继续量测该土层探头与土体之间不同相对变形所对应的锥尖阻力
Figure 347068DEST_PATH_IMAGE002
和侧摩阻力,依次往复,直至静力触探试验达到最终预定深度;
S2:收集桩基竖向抗压静载试验资料,提取各土性土体不同桩—土相对变形所对应的桩端阻力和桩侧摩阻力;
S3:建立各土性桩—土不同相对变形所对应的桩端阻力和桩侧摩阻力分别与相应土性探头—土不同相对变形所对应的锥尖阻力
Figure 936925DEST_PATH_IMAGE002
和侧摩阻力之间经验公式;
S4:据S3所得经验公式,结合相应场地测试所得探头—土不同相对变形所对应的锥尖阻力
Figure 84190DEST_PATH_IMAGE002
、侧摩阻力
Figure 719702DEST_PATH_IMAGE004
及桩长、桩径,推求桩基荷载—沉降曲线;
S5:分析S4所得桩基荷载—沉降曲线类型,确定桩基承载力;对于陡降型荷载—沉降曲线,取其发生明显陡降的起始点所对应的荷载值为桩基竖向极限承载力;对于缓变型荷载—沉降曲线,取沉降量为40mm所对应的荷载值为桩基竖向极限承载力。
2.根据权利要求1所述的基于触探技术估算桩基承载力的分析方法,其特征在于:S1步骤中对探杆施加力的恒定加载速率介于10~200 N/s之间。
CN201210097333.1A 2012-04-05 2012-04-05 基于触探技术估算桩基承载力的分析方法 Expired - Fee Related CN102587426B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210097333.1A CN102587426B (zh) 2012-04-05 2012-04-05 基于触探技术估算桩基承载力的分析方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210097333.1A CN102587426B (zh) 2012-04-05 2012-04-05 基于触探技术估算桩基承载力的分析方法

Publications (2)

Publication Number Publication Date
CN102587426A true CN102587426A (zh) 2012-07-18
CN102587426B CN102587426B (zh) 2014-05-28

Family

ID=46476617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210097333.1A Expired - Fee Related CN102587426B (zh) 2012-04-05 2012-04-05 基于触探技术估算桩基承载力的分析方法

Country Status (1)

Country Link
CN (1) CN102587426B (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102660967A (zh) * 2012-04-26 2012-09-12 兰州交通大学 寒区单桩经验流变预报方程的确定方法
CN103266634A (zh) * 2013-01-09 2013-08-28 交通运输部公路科学研究所 一种超长钻孔灌注桩承载力确定方法
CN103938660A (zh) * 2014-04-14 2014-07-23 天津大学 确定溜桩之后桩基承载力的方法
CN104018482A (zh) * 2013-03-02 2014-09-03 王昌益 地基极限承载力的测量方法
CN104314108A (zh) * 2014-10-20 2015-01-28 中冶沈勘工程技术有限公司 一种确定桩基础桩周土强度参数的反分析方法
CN105926687A (zh) * 2016-05-03 2016-09-07 交通运输部公路科学研究所 采用小位移加载确定桩基竖向承载力的方法
CN108166544A (zh) * 2018-01-11 2018-06-15 山东大学 一种试验桩工作机理与工艺效应综合检测系统及方法
CN110029692A (zh) * 2019-04-24 2019-07-19 上海应用技术大学 基于SCPTu探头测试值确定软土中单桩承载力时效性的方法
CN110080317A (zh) * 2019-05-24 2019-08-02 福建工程学院 承压水地层基坑底部土层桩基加固桩距与桩长预测方法
CN110399630A (zh) * 2019-05-30 2019-11-01 上海大学 一种新型静钻根植竹节超长桩的荷载传递函数计算方法
CN111090829A (zh) * 2020-03-21 2020-05-01 西南交通大学 铁路既有线灌浆螺旋钢桩斜向加固路基后沉降量确定方法
CN113175006A (zh) * 2021-04-01 2021-07-27 华侨大学 一种新型桩基竖向荷载沉降曲线预测方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100742777B1 (ko) * 2006-10-11 2007-07-26 고려대학교 산학협력단 탄성변형량을 고려한 양방향 재하시험의 해석방법
CN101979783A (zh) * 2010-09-29 2011-02-23 东南大学 基于多功能孔压静力触探技术的预测桩基承载力的方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100742777B1 (ko) * 2006-10-11 2007-07-26 고려대학교 산학협력단 탄성변형량을 고려한 양방향 재하시험의 해석방법
CN101979783A (zh) * 2010-09-29 2011-02-23 东南大学 基于多功能孔压静力触探技术的预测桩基承载力的方法

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102660967A (zh) * 2012-04-26 2012-09-12 兰州交通大学 寒区单桩经验流变预报方程的确定方法
CN102660967B (zh) * 2012-04-26 2015-01-07 兰州交通大学 寒区单桩经验流变预报方程的确定方法
CN103266634A (zh) * 2013-01-09 2013-08-28 交通运输部公路科学研究所 一种超长钻孔灌注桩承载力确定方法
CN104018482A (zh) * 2013-03-02 2014-09-03 王昌益 地基极限承载力的测量方法
CN104018482B (zh) * 2013-03-02 2015-11-18 王昌益 地基极限承载力的测量方法
CN103938660A (zh) * 2014-04-14 2014-07-23 天津大学 确定溜桩之后桩基承载力的方法
CN103938660B (zh) * 2014-04-14 2015-12-09 天津大学 确定溜桩之后桩基承载力的方法
CN104314108A (zh) * 2014-10-20 2015-01-28 中冶沈勘工程技术有限公司 一种确定桩基础桩周土强度参数的反分析方法
CN105926687A (zh) * 2016-05-03 2016-09-07 交通运输部公路科学研究所 采用小位移加载确定桩基竖向承载力的方法
CN105926687B (zh) * 2016-05-03 2017-12-15 交通运输部公路科学研究所 采用小位移加载确定桩基竖向承载力的方法
CN108166544A (zh) * 2018-01-11 2018-06-15 山东大学 一种试验桩工作机理与工艺效应综合检测系统及方法
CN110029692A (zh) * 2019-04-24 2019-07-19 上海应用技术大学 基于SCPTu探头测试值确定软土中单桩承载力时效性的方法
CN110080317A (zh) * 2019-05-24 2019-08-02 福建工程学院 承压水地层基坑底部土层桩基加固桩距与桩长预测方法
CN110080317B (zh) * 2019-05-24 2024-03-15 福建工程学院 承压水地层基坑底部土层桩基加固桩距与桩长预测方法
CN110399630A (zh) * 2019-05-30 2019-11-01 上海大学 一种新型静钻根植竹节超长桩的荷载传递函数计算方法
CN111090829A (zh) * 2020-03-21 2020-05-01 西南交通大学 铁路既有线灌浆螺旋钢桩斜向加固路基后沉降量确定方法
CN113175006A (zh) * 2021-04-01 2021-07-27 华侨大学 一种新型桩基竖向荷载沉降曲线预测方法

Also Published As

Publication number Publication date
CN102587426B (zh) 2014-05-28

Similar Documents

Publication Publication Date Title
CN102587426A (zh) 基于触探技术估算桩基承载力的分析方法
AU2013246743B2 (en) Method for determining geomechanical parameters of a rock sample
CN102518106B (zh) 基于多功能孔压静力触探探头及土侧压力系数测定方法
Sasahara et al. Development of shear deformation due to the increase of pore pressure in a sandy model slope during rainfall
CN104142388B (zh) 钻孔内原位静力压入试验方法
WO2014008505A8 (en) Method and system for measuring a property of a non-newtonian fluid
CN103174122A (zh) 用于测试土体静止侧压力系数的侧向应力孔压探头
Colreavy et al. Estimating consolidation parameters from field piezoball tests
KR20150137494A (ko) Tdr을 이용한 철도노반 다짐도 평가 시스템 및 그 방법
Chung et al. Relating mobile sensor soil strength to penetrometer cone index
Miller et al. Desiccation crack depth and tensile strength in compacted soil
CN102943458A (zh) 基于电阻率孔压静力触探的装置及饱和砂土剪胀性评价方法
CN202430702U (zh) 基于多功能孔压静力触探探头
Park et al. Instrumented dynamic cone penetrometer incorporated with time domain reflectometry
CN102587427B (zh) 基于触探技术估算桩基沉降变形的分析方法
Pirnazarov et al. Reduced testing and modelling of the bearing capacity of rooted soil for wheeled forestry machines
Minasny Contrasting soil penetration resistance values acquired from dynamic and motor-operated penetrometers
McCALLUM Cone penetration testing (CPT) in Antarctic firn: an introduction to interpretation
Shaban et al. Comparative analyses of granular pavement moduli measured from lightweight deflectometer and miniaturized pressuremeter tests
Kayadelen et al. Critical-state parameters of an unsaturated residual clayey soil from Turkey
Figueiredo et al. An overview on existing dynamic cone penetration test research related to the Central Area of Brazil
Vadim et al. Transition factor between elastic and deformation moduli for dispersive soils
O'Kelly et al. A new method of measuring plastic limit of fine materials V. SIVAKUMAR, D. GLYNN, P. CAIRNS and JA BLACK (2009). Géotechnique 59, No. 10, pp. 813–823
Giwelli et al. Shear behaviour of fractured rock as a function of size and shear displacement
Vlcek et al. Comparative analysis of dynamic methods for earthwork controlling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 300142 Hebei District, Zhongshan Road, No. 10,

Patentee after: China Railway Design Group Limited

Address before: 300142 Hebei District, Zhongshan Road, No. 10,

Patentee before: China Railway Third Survey and Design Institute Group Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140528

Termination date: 20210405