CN110080222B - Piling equipment for petroleum exploitation marking - Google Patents

Piling equipment for petroleum exploitation marking Download PDF

Info

Publication number
CN110080222B
CN110080222B CN201910271650.2A CN201910271650A CN110080222B CN 110080222 B CN110080222 B CN 110080222B CN 201910271650 A CN201910271650 A CN 201910271650A CN 110080222 B CN110080222 B CN 110080222B
Authority
CN
China
Prior art keywords
spring
support frame
slider
upper side
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910271650.2A
Other languages
Chinese (zh)
Other versions
CN110080222A (en
Inventor
黄志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhang Mei
Original Assignee
Jiao Dongsheng
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiao Dongsheng filed Critical Jiao Dongsheng
Priority to CN201910271650.2A priority Critical patent/CN110080222B/en
Publication of CN110080222A publication Critical patent/CN110080222A/en
Application granted granted Critical
Publication of CN110080222B publication Critical patent/CN110080222B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/10Follow-blocks of pile-drivers or like devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/04Hand (-actuated) pile-drivers

Abstract

The invention relates to the field of petroleum, in particular to a piling device for petroleum exploitation marks. The technical problem is as follows: the piling equipment for the oil exploitation marker is flexible in movement, convenient to operate and labor-saving. The technical scheme is as follows: a piling device for oil exploitation marking comprises a bottom plate, a supporting frame, a guide rod, a fixing plate, a first spring, a pressing plate, a right bracket, a first sliding rail, a first sliding block, a second spring, a rack, a vertical rod and the like; the bottom plate is provided with a support frame on the left part of the upper side face, a guide hole is formed in the middle of the top of the support frame, a first spring is connected to the middle of the inner wall of the upper side of the support frame, the tail end of the first spring is connected with a pressing plate, and a guide rod is arranged in the middle of the upper side of the pressing plate. The invention achieves the effects of more flexible movement, more convenient operation and more labor saving. Through setting up the wheel, the staff can conveniently move this equipment to the place that needs carry out the pile laborsavingly, has reached the effect that makes this equipment can nimble removal.

Description

Piling equipment for petroleum exploitation marking
Technical Field
The invention relates to the field of petroleum, in particular to a piling device for petroleum exploitation marks.
Background
Petroleum is a fluid mineral buried deep in the ground. At first, oily liquid minerals produced in nature are called petroleum, combustible gas is called natural gas, and solid combustible oily minerals are called asphalt. With the intensive research on these minerals, it is recognized that they are hydrocarbon compounds in composition, and are related to each other in origin, so they are collectively called petroleum. The 11 th world oil in 9/1983 proposed that oil be a complex mixture of gaseous, liquid and solid hydrocarbons found in nature, with a small amount of impurities. Oil production also includes natural gas production.
Compared with coal, petroleum is an important energy source, and has the advantages of high energy density, convenience in transportation and storage, small pollution degree to the atmosphere after combustion and the like. Fuel oil extracted from petroleum is the main fuel for various kilns in the transportation, power station boilers, metallurgical and building material industries. Liquefied gas and pipeline gas which use petroleum as raw materials are high-quality fuels used in life of urban residents. Airplanes, tanks, naval vessels, rockets, and other spacecraft also consume large amounts of petroleum fuel. Thus, many countries rank oil as strategic material. Since the 70 s of the 20 th century, petroleum has moved ahead of coal in the composition of world energy consumption. 45% in 1979, it is expected that this situation will not change much by the beginning of the 21 st century. Petroleum products are also widely used as lubricants for various machines. Asphalt is an important material for roads and construction. Petrochemical products are widely used in agriculture, light industry, textile industry, medicine and health departments, such as synthetic fibers, plastics and synthetic rubber products, and become necessities of life of people.
Oil extraction refers to the act of excavating and extracting oil in places where oil is stored. In the process of oil exploitation, oil and gas flow from a reservoir to the bottom of a well and rise from the bottom of the well to the top of the well in a driving mode. The position where the oil is to be extracted needs to be marked by piling before the oil is extracted, and the existing piling equipment has the defects of being not flexible in movement, not convenient to operate and labor-consuming.
Disclosure of Invention
In order to overcome the defects that the existing piling equipment is not flexible in movement, inconvenient to operate and labor-consuming, the technical problem is as follows: the piling equipment for the oil exploitation marker is flexible in movement, convenient to operate and labor-saving.
The technical scheme is as follows: a piling device for petroleum exploitation marks comprises a bottom plate, a support frame, a guide rod, a fixing plate, a first spring, a pressing plate, a right support frame, a first slide rail, a first slide block, a second spring, a rack, a vertical rod, a pull ring, a support rod, a rotating shaft, a sector gear, a swinging rod and a knocking block, wherein the support frame is arranged at the left part of the upper side surface of the bottom plate, the guide hole is formed in the middle of the top of the support frame, the first spring is connected to the middle of the inner wall of the upper side of the support frame, the pressing plate is connected to the tail end of the first spring, the guide rod penetrates through the first spring and the guide hole, the fixing plate is arranged at the top end of the guide rod, a through hole is formed in the left part of the upper side surface of the bottom plate and is positioned at the lower side of the support frame, the right support frame is arranged at the right part of the upper side surface, first slider left side is equipped with the rack, and the rack downside is connected with the montant, and the montant end is equipped with the pull ring, and support frame right side middle part is equipped with branch, and the branch top is equipped with the pivot, and the pivot right side is equipped with sector gear, and sector gear is located the rack left side, and sector gear and rack toothing, the pivot front side is equipped with the swinging arms, and swinging arms downside left part is equipped with strikes the piece, strikes the piece and is located directly over the fixed plate.
Further, still including the second slide rail, the second slider, the third spring, splint, electronic reel and first acting as go-between, the side left part is equipped with two second slide rails on the bottom plate, the through-hole is located between two second slide rails, equal sliding connection has the second slider on the second slide rail of the left and right sides, the second slider left part on left second slider right part and right side all is connected with splint, second slider downside all is connected with the third spring, the end of third spring all links to each other with the bottom plate, inner wall upper portion all is equipped with electronic reel about the support frame, all around having first acting as go-between on the electronic reel, the end of first acting as go-between all links to each other with the second slider.
Further, the novel bicycle pedal comprises a second pull wire, a fourth spring and a pedal plate, wherein the right part of the upper side face of the bottom plate is connected with the two fourth springs, the fourth springs are all positioned on the right side of the right support, the pedal plate is connected between the top ends of the fourth springs, the left part of the upper side of the pedal plate is connected with the second pull wire, and the tail end of the second pull wire is connected with the first sliding block.
Further, still including wheel, electric putter and inserted bar, both parts all are equipped with the wheel about the bottom plate downside, and both parts all are equipped with electric putter about the bottom plate downside, and the wheel is located between the electric putter of the left and right sides, and the electric putter downside all is connected with the inserted bar.
When a worker uses the device to pile, the device is moved to a place where the pile needs to be piled, the pile is placed on the lower side of the pressing plate, the top of the pile is in contact with the pressing plate, the pile is held by hands, then the pull ring is pulled downwards, the pull ring drives the rack to move downwards through the vertical rod, the second spring is stretched along with the pull ring, the rack drives the sector gear to rotate anticlockwise, the sector gear drives the swing rod to swing downwards through the rotating shaft, the knocking block knocks the fixing plate to move downwards along with the knock block, the fixing plate drives the pressing plate to move downwards through the guide rod, the first spring is stretched, the pressing plate presses the pile to move downwards, when the worker stops pulling the pull ring downwards, the second spring is reset immediately, the first sliding block and the rack move upwards under the action of the elasticity of the second spring, finally, the swing rod drives the knocking block to move upwards, and the worker pulls the pull ring downwards again, the pressing plate can press the wooden pile to move downwards continuously. The operation is repeated, the wooden pile can move deep into the ground, and after the piling is finished, the pulling of the pull ring is stopped, and the equipment is moved back to the original position.
Because still including the second slide rail, the second slider, the third spring, splint, electronic reel and first acting line, the side left part is equipped with two second slide rails on the bottom plate, the through-hole is located between two second slide rails, equal sliding connection has the second slider on the second slide rail of the left and right sides, left second slider right part all is connected with splint with the second slider left part on right side, second slider downside all is connected with the third spring, the end of third spring all links to each other with the bottom plate, inner wall upper portion all is equipped with electronic reel about the support frame, all around having first acting line on the electronic reel, the end of first acting line all links to each other with the second slider, so the staff can utilize splint to fix the stake, thereby splint can adapt to the stake shape for the arc and fix the stake betterly. At the pile in-process, the staff can open electronic reel, makes electronic reel emit first acting as go-between gradually, and second slider and splint can be along with the gradual downward and downstream of stake, just so can fix the stake constantly, just need not the people hand and hold the stake, can use manpower sparingly, also make the staff operate safelyr. And after the pile is driven, the electric reel is closed.
Because still including the second stay cord, fourth spring and running-board, the side right part is connected with two fourth springs on the bottom plate, and the fourth spring all is located right-hand side of right branch frame, is connected with the running-board between the fourth spring top, and the side left part is connected with the second stay cord on the running-board, and the end that the second was stayed cord is connected with first slider. Because the position of pull ring is lower, and the staff is very inconvenient downwards to pulling the pull ring repeatedly, so the staff can step on the running-board downwards, and the fourth spring is compressed thereupon, and the running-board downstream drives first slider downstream through the second stay wire to make rack downstream can make the piece of strikeing downwards strike the fixed plate and pile, when stopping stepping on the running-board downwards, the fourth spring resets, and drive relevant equipment such as first slider and rack upward movement. Repeated operation can complete pile driving, so that the pull ring does not need to be pulled downwards by hands, and the operation is more convenient and labor-saving.
Because still including the wheel, electric putter and inserted bar, bottom plate downside is controlled two and is all equipped with the wheel, bottom plate downside is controlled two and is all equipped with electric putter, the wheel is located between the electric putter of the left and right sides, the electric putter downside all is connected with the inserted bar, so the staff can conveniently remove this equipment to the place that needs carry out the pile laborsavingly, when needing to fix this equipment, can control the electric putter extension, make the inserted bar insert in the soil, just so can fix this equipment better, close electric putter after fixed the completion. When the equipment needs to be moved after the piling is finished, the electric push rod can be controlled to be shortened, so that the electric push rod drives the inserted bar to move upwards until the inserted bar is not in contact with the ground, and then the electric push rod can be closed and the equipment can be moved.
The beneficial effects are that: the invention achieves the effects of more flexible movement, more convenient operation and more labor saving. Through setting up the wheel, the staff can conveniently move this equipment to the place that needs carry out the pile laborsavingly, has reached the effect that makes this equipment can nimble removal. Through setting up running-board and second stay wire, the staff steps on the running-board downwards and just can make to strike the piece and strike the fixed plate downwards and pile, has reached the more convenient and more laborsaving effect of operation.
Drawings
Fig. 1 is a first front view structure diagram of the present invention.
Fig. 2 is a second front view structure diagram of the present invention.
Fig. 3 is a third schematic view of the present invention.
Fig. 4 is a schematic diagram of a fourth front view structure according to the present invention.
Part names and serial numbers in the figure: the device comprises a base plate 1, a support frame 2, a guide rod 3, a fixing plate 4, a guide hole 5, a first spring 6, a pressing plate 7, a through hole 8, a timber pile 9, a right support 10, a first slide rail 11, a first slide block 12, a second spring 13, a rack 14, a vertical rod 15, a pull ring 16, a support rod 17, a rotating shaft 18, a sector gear 19, a swing rod 20, a knocking block 21, a second slide rail 22, a second slide block 23, a third spring 24, a clamping plate 25, an electric reel 26, a first pull wire 27, a second pull wire 28, a fourth spring 29, a pedal 30, a wheel 31, an electric push rod 32 and an inserted rod 33.
Detailed Description
The technical scheme of the invention is further explained by combining the attached drawings.
Example 1
A piling device for petroleum exploitation marks is disclosed, as shown in figures 1-4, comprising a base plate 1, a support frame 2, a guide rod 3, a fixing plate 4, a first spring 6, a pressure plate 7, a right support 10, a first slide rail 11, a first slide block 12, a second spring 13, a rack 14, a vertical rod 15, a pull ring 16, a support rod 17, a rotating shaft 18, a sector gear 19, a swing rod 20 and a knocking block 21, wherein the support frame 2 is arranged on the left part of the upper side of the base plate 1, a guide hole 5 is arranged in the middle of the top of the support frame 2, the first spring 6 is connected with the middle part of the inner wall of the upper side of the support frame 2, the pressure plate 7 is connected with the end of the first spring 6, the guide rod 3 is arranged in the middle of the upper side of the pressure plate 7, the guide rod 3 passes through the first spring 6 and the guide hole 5, the fixing plate 4 is arranged, right branch frame 10 left side upper portion is equipped with first slide rail 11, sliding connection has first slider 12 on first slide rail 11, the side right part on first slider 12 is connected with second spring 13, the end-to-end connection of second spring 13 is at first slide rail 11 upside, first slider 12 left side is equipped with rack 14, rack 14 downside is connected with montant 15, montant 15 end is equipped with pull ring 16, 2 right side middle parts of support frame are equipped with branch 17, branch 17 top is equipped with pivot 18, 18 right sides of pivot are equipped with sector gear 19, sector gear 19 is located 14 left sides of rack, sector gear 19 meshes with rack 14, 18 front sides of pivot are equipped with swinging arms 20, 20 downside left parts of swinging arms are equipped with strikes piece 21, strike piece 21 and be located directly over fixed plate 4.
Example 2
A piling device for petroleum exploitation marks is disclosed, as shown in figures 1-4, comprising a base plate 1, a support frame 2, a guide rod 3, a fixing plate 4, a first spring 6, a pressure plate 7, a right support 10, a first slide rail 11, a first slide block 12, a second spring 13, a rack 14, a vertical rod 15, a pull ring 16, a support rod 17, a rotating shaft 18, a sector gear 19, a swing rod 20 and a knocking block 21, wherein the support frame 2 is arranged on the left part of the upper side of the base plate 1, a guide hole 5 is arranged in the middle of the top of the support frame 2, the first spring 6 is connected with the middle part of the inner wall of the upper side of the support frame 2, the pressure plate 7 is connected with the end of the first spring 6, the guide rod 3 is arranged in the middle of the upper side of the pressure plate 7, the guide rod 3 passes through the first spring 6 and the guide hole 5, the fixing plate 4 is arranged, right branch frame 10 left side upper portion is equipped with first slide rail 11, sliding connection has first slider 12 on first slide rail 11, the side right part on first slider 12 is connected with second spring 13, the end-to-end connection of second spring 13 is at first slide rail 11 upside, first slider 12 left side is equipped with rack 14, rack 14 downside is connected with montant 15, montant 15 end is equipped with pull ring 16, 2 right side middle parts of support frame are equipped with branch 17, branch 17 top is equipped with pivot 18, 18 right sides of pivot are equipped with sector gear 19, sector gear 19 is located 14 left sides of rack, sector gear 19 meshes with rack 14, 18 front sides of pivot are equipped with swinging arms 20, 20 downside left parts of swinging arms are equipped with strikes piece 21, strike piece 21 and be located directly over fixed plate 4.
Still including second slide rail 22, second slider 23, third spring 24, splint 25, electronic reel 26 and first acting as go-between 27, the side left part is equipped with two second slide rails 22 on bottom plate 1, through-hole 8 is located between two second slide rails 22, all sliding connection has second slider 23 on the second slide rail 22 of both sides about, left side second slider 23 right part and the second slider 23 left part on right side all are connected with splint 25, second slider 23 downside all is connected with third spring 24, the end of third spring 24 all links to each other with bottom plate 1, inner wall upper portion all is equipped with electronic reel 26 about support frame 2, all around having first acting as go-between 27 on the electronic reel 26, the end of first acting as go-between 27 all links to each other with second slider 23.
Example 3
A piling device for petroleum exploitation marks is disclosed, as shown in figures 1-4, comprising a base plate 1, a support frame 2, a guide rod 3, a fixing plate 4, a first spring 6, a pressure plate 7, a right support 10, a first slide rail 11, a first slide block 12, a second spring 13, a rack 14, a vertical rod 15, a pull ring 16, a support rod 17, a rotating shaft 18, a sector gear 19, a swing rod 20 and a knocking block 21, wherein the support frame 2 is arranged on the left part of the upper side of the base plate 1, a guide hole 5 is arranged in the middle of the top of the support frame 2, the first spring 6 is connected with the middle part of the inner wall of the upper side of the support frame 2, the pressure plate 7 is connected with the end of the first spring 6, the guide rod 3 is arranged in the middle of the upper side of the pressure plate 7, the guide rod 3 passes through the first spring 6 and the guide hole 5, the fixing plate 4 is arranged, right branch frame 10 left side upper portion is equipped with first slide rail 11, sliding connection has first slider 12 on first slide rail 11, the side right part on first slider 12 is connected with second spring 13, the end-to-end connection of second spring 13 is at first slide rail 11 upside, first slider 12 left side is equipped with rack 14, rack 14 downside is connected with montant 15, montant 15 end is equipped with pull ring 16, 2 right side middle parts of support frame are equipped with branch 17, branch 17 top is equipped with pivot 18, 18 right sides of pivot are equipped with sector gear 19, sector gear 19 is located 14 left sides of rack, sector gear 19 meshes with rack 14, 18 front sides of pivot are equipped with swinging arms 20, 20 downside left parts of swinging arms are equipped with strikes piece 21, strike piece 21 and be located directly over fixed plate 4.
Still including second slide rail 22, second slider 23, third spring 24, splint 25, electronic reel 26 and first acting as go-between 27, the side left part is equipped with two second slide rails 22 on bottom plate 1, through-hole 8 is located between two second slide rails 22, all sliding connection has second slider 23 on the second slide rail 22 of both sides about, left side second slider 23 right part and the second slider 23 left part on right side all are connected with splint 25, second slider 23 downside all is connected with third spring 24, the end of third spring 24 all links to each other with bottom plate 1, inner wall upper portion all is equipped with electronic reel 26 about support frame 2, all around having first acting as go-between 27 on the electronic reel 26, the end of first acting as go-between 27 all links to each other with second slider 23.
The novel bicycle pedal is characterized by further comprising a second pull wire 28, a fourth spring 29 and a pedal plate 30, wherein the right part of the upper side face of the base plate 1 is connected with the two fourth springs 29, the fourth springs 29 are all located on the right side of the right support 10, the pedal plate 30 is connected between the top ends of the fourth springs 29, the left part of the upper side of the pedal plate 30 is connected with the second pull wire 28, and the tail end of the second pull wire 28 is connected with the first sliding block 12.
Example 4
A piling device for petroleum exploitation marks is disclosed, as shown in figures 1-4, comprising a base plate 1, a support frame 2, a guide rod 3, a fixing plate 4, a first spring 6, a pressure plate 7, a right support 10, a first slide rail 11, a first slide block 12, a second spring 13, a rack 14, a vertical rod 15, a pull ring 16, a support rod 17, a rotating shaft 18, a sector gear 19, a swing rod 20 and a knocking block 21, wherein the support frame 2 is arranged on the left part of the upper side of the base plate 1, a guide hole 5 is arranged in the middle of the top of the support frame 2, the first spring 6 is connected with the middle part of the inner wall of the upper side of the support frame 2, the pressure plate 7 is connected with the end of the first spring 6, the guide rod 3 is arranged in the middle of the upper side of the pressure plate 7, the guide rod 3 passes through the first spring 6 and the guide hole 5, the fixing plate 4 is arranged, right branch frame 10 left side upper portion is equipped with first slide rail 11, sliding connection has first slider 12 on first slide rail 11, the side right part on first slider 12 is connected with second spring 13, the end-to-end connection of second spring 13 is at first slide rail 11 upside, first slider 12 left side is equipped with rack 14, rack 14 downside is connected with montant 15, montant 15 end is equipped with pull ring 16, 2 right side middle parts of support frame are equipped with branch 17, branch 17 top is equipped with pivot 18, 18 right sides of pivot are equipped with sector gear 19, sector gear 19 is located 14 left sides of rack, sector gear 19 meshes with rack 14, 18 front sides of pivot are equipped with swinging arms 20, 20 downside left parts of swinging arms are equipped with strikes piece 21, strike piece 21 and be located directly over fixed plate 4.
Still including second slide rail 22, second slider 23, third spring 24, splint 25, electronic reel 26 and first acting as go-between 27, the side left part is equipped with two second slide rails 22 on bottom plate 1, through-hole 8 is located between two second slide rails 22, all sliding connection has second slider 23 on the second slide rail 22 of both sides about, left side second slider 23 right part and the second slider 23 left part on right side all are connected with splint 25, second slider 23 downside all is connected with third spring 24, the end of third spring 24 all links to each other with bottom plate 1, inner wall upper portion all is equipped with electronic reel 26 about support frame 2, all around having first acting as go-between 27 on the electronic reel 26, the end of first acting as go-between 27 all links to each other with second slider 23.
The novel bicycle pedal is characterized by further comprising a second pull wire 28, a fourth spring 29 and a pedal plate 30, wherein the right part of the upper side face of the base plate 1 is connected with the two fourth springs 29, the fourth springs 29 are all located on the right side of the right support 10, the pedal plate 30 is connected between the top ends of the fourth springs 29, the left part of the upper side of the pedal plate 30 is connected with the second pull wire 28, and the tail end of the second pull wire 28 is connected with the first sliding block 12.
Still including wheel 31, electric putter 32 and inserted bar 33, two parts all are equipped with wheel 31 about 1 downside of bottom plate, and two parts all are equipped with electric putter 32 about 1 downside of bottom plate, and wheel 31 is located between the electric putter 32 of the left and right sides, and electric putter 32 downside all is connected with inserted bar 33.
When a worker uses the device to pile, firstly, the device is moved to a place where the pile needs to be piled, then the timber pile 9 is placed on the lower side of the pressure plate 7, the top of the timber pile 9 is in contact with the pressure plate 7, the timber pile 9 is held by hands, then the pull ring 16 is pulled downwards, the pull ring 16 drives the rack 14 to move downwards through the vertical rod 15, the second spring 13 is stretched along with the second spring, the rack 14 drives the sector gear 19 to rotate anticlockwise, the sector gear 19 drives the swing rod 20 to swing downwards through the rotating shaft 18, the knocking block 21 drives the fixing plate 4 to move downwards along with the knocking block, the fixing plate 4 drives the pressure plate 7 to move downwards through the guide rod 3, the first spring 6 is stretched, the pressure plate 7 presses the timber pile 9 to move downwards, when the worker stops pulling the pull ring 16 downwards, the second spring 13 is reset along with the second spring, the first sliding block 12 and the rack 14 move upwards under the elasticity of the second spring 13, and finally, the swing rod 20 drives the knocking, the worker pulls the pull ring 16 downward again, and the press plate 7 presses the stake 9 to move downward. Repeated operation can make the timber pile 9 move deep into the ground, and after the piling is finished, pulling the pull ring 16 is stopped, and the device is moved back to the original position.
Because the electric reel support further comprises a second slide rail 22, a second slide block 23, a third spring 24, a clamping plate 25, an electric reel 26 and a first pull wire 27, the left part of the upper side surface of the bottom plate 1 is provided with the two second slide rails 22, the through hole 8 is positioned between the two second slide rails 22, the second slide rails 22 on the left side and the right side are both connected with the second slide block 23 in a sliding way, the right part of the second slide block 23 on the left side and the left part of the second slide block 23 on the right side are both connected with the clamping plate 25, the lower side of the second slide block 23 is both connected with the third spring 24, the tail end of the third spring 24 is both connected with the bottom plate 1, the upper parts of the left inner wall and the right inner wall of the support frame 2 are both provided with the electric reel 26, the first pull wire 27, the worker can fix the timber pile 9 by using the clamping plates 25, and the clamping plates 25 are arc-shaped to be adapted to the shape of the timber pile 9 so as to fix the timber pile 9 well. In the piling process, the operator can open the electric reel 26 to enable the electric reel 26 to gradually release the first pull wire 27, and the second sliding block 23 and the clamping plate 25 can move downwards along with the gradual downward movement of the wooden pile 9, so that the wooden pile 9 can be fixed at any time, the wooden pile 9 does not need to be held by hands, manpower can be saved, and the operation of the operator is safer. After the pile driving is completed, the electric reel 26 is closed.
Because the novel bicycle pedal device further comprises a second pull wire 28, a fourth spring 29 and a pedal plate 30, the right part of the upper side surface of the base plate 1 is connected with the two fourth springs 29, the fourth springs 29 are all positioned on the right side of the right bracket 10, the pedal plate 30 is connected between the top ends of the fourth springs 29, the left part of the upper side of the pedal plate 30 is connected with the second pull wire 28, and the tail end of the second pull wire 28 is connected with the first sliding block 12. Because the pull ring 16 is located at a lower position, it is inconvenient for a person to pull the pull ring 16 downwards repeatedly, so that the worker can press the pedal 30 downwards, the fourth spring 29 is compressed, the pedal 30 moves downwards and drives the first slider 12 to move downwards through the second pull wire 28, so as to move the rack 14 downwards, finally the knocking block 21 can knock the fixing plate 4 downwards to pile, and when the pedal 30 stops being pressed downwards, the fourth spring 29 is reset and drives the first slider 12 and the rack 14 and other related devices to move upwards. The pile can be driven by repeated operation, so that the pull ring 16 does not need to be pulled downwards by hands, and the operation is more convenient and labor-saving.
Because still including wheel 31, electric putter 32 and inserted bar 33, two all are equipped with wheel 31 about bottom plate 1 downside, two all are equipped with electric putter 32 about bottom plate 1 downside, wheel 31 is located between the electric putter 32 of the left and right sides, electric putter 32 downside all is connected with inserted bar 33, so the staff can conveniently move this equipment to the place that needs carry out the pile with laborsaving, when needing to fix this equipment, can control electric putter 32 extension, make inserted bar 33 insert in the soil, just so can fix this equipment better, close electric putter 32 after the fixed completion. When the equipment needs to be moved after the pile driving is finished, the electric push rod 32 can be controlled to be shortened, so that when the electric push rod 32 drives the inserted link 33 to move upwards and not to contact with the ground, the electric push rod 32 can be closed, and the equipment can be moved.
Finally, it should be noted that the above embodiments are only used for illustrating the technical solutions of the present invention and not for limiting the protection scope of the present invention, and although the present invention is described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that modifications or equivalent substitutions can be made on the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention.

Claims (3)

1. The piling equipment for the petroleum exploitation mark comprises a bottom plate, a support frame, a guide rod, a fixing plate, a first spring and a pressing plate, wherein the support frame is arranged at the left part of the upper side surface of the bottom plate, a guide hole is formed in the middle of the top of the support frame, the first spring is connected with the middle part of the inner wall of the upper side of the support frame, the pressing plate is connected with the tail end of the first spring, the guide rod is arranged in the middle of the upper side surface of the pressing plate and penetrates through the first spring and the guide hole, the fixing plate is arranged at the top end of the guide rod, a through hole is formed in the left part of the upper side surface of the bottom plate and is positioned at the lower side of the support frame, the piling equipment is characterized by further comprising a right support, a first slide rail, a first slide block is slidably connected on the first slide rail, a second spring is connected to the right part of the upper side surface, the tail end of the second spring is connected to the upper side of the first sliding rail, a rack is arranged on the left side of the first sliding block, a vertical rod is connected to the lower side of the rack, a pull ring is arranged at the tail end of the vertical rod, a supporting rod is arranged in the middle of the right side of the supporting frame, a rotating shaft is arranged at the top end of the supporting rod, a sector gear is arranged on the right side of the rotating shaft and located on the left side of the rack, the sector gear is meshed with the rack, a swing rod is arranged on the front side of; still including the second slide rail, the second slider, the third spring, splint, electronic reel and first acting as go-between, the side left part is equipped with two second slide rails on the bottom plate, the through-hole is located between two second slide rails, equal sliding connection has the second slider on the second slide rail of the left and right sides, the second slider left part on left second slider right part and right side all is connected with splint, second slider downside all is connected with the third spring, the end of third spring all links to each other with the bottom plate, inner wall upper portion all is equipped with electronic reel about the support frame, all around having first acting as go-between on the electronic reel, the end of first acting as go-between all links to each other with the second slider.
2. The piling device for the oil exploitation marker as recited in claim 1, further comprising a second pull wire, a fourth spring and a pedal, wherein the right part of the upper side of the bottom plate is connected with the two fourth springs, the fourth springs are both positioned at the right side of the right bracket, the pedal is connected between the top ends of the fourth springs, the left part of the upper side of the pedal is connected with the second pull wire, and the tail end of the second pull wire is connected with the first sliding block.
3. The piling device for the petroleum exploitation marker as recited in claim 2, further comprising wheels, electric push rods and insertion rods, wherein the wheels are disposed on the left and right portions of the lower side surface of the bottom plate, the electric push rods are disposed on the left and right portions of the lower side surface of the bottom plate, the wheels are disposed between the electric push rods on the left and right portions, and the insertion rods are connected to the lower sides of the electric push rods.
CN201910271650.2A 2019-04-04 2019-04-04 Piling equipment for petroleum exploitation marking Active CN110080222B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910271650.2A CN110080222B (en) 2019-04-04 2019-04-04 Piling equipment for petroleum exploitation marking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910271650.2A CN110080222B (en) 2019-04-04 2019-04-04 Piling equipment for petroleum exploitation marking

Publications (2)

Publication Number Publication Date
CN110080222A CN110080222A (en) 2019-08-02
CN110080222B true CN110080222B (en) 2020-11-20

Family

ID=67414293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910271650.2A Active CN110080222B (en) 2019-04-04 2019-04-04 Piling equipment for petroleum exploitation marking

Country Status (1)

Country Link
CN (1) CN110080222B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622219A (en) * 2020-05-08 2020-09-04 谢凌云 Pile driver for building site building
CN111877341B (en) * 2020-07-29 2022-04-05 珠海建工控股集团有限公司 Steel pipe pile planting equipment for bridge construction

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759331A (en) * 2017-02-21 2017-05-31 张家港市兴鸿达基础有限公司 Floating piling plant
CN107604910A (en) * 2017-09-14 2018-01-19 郑州大学 A kind of rotary adjustable building piling machine
CN206902708U (en) * 2017-05-07 2018-01-19 盖雪峰 A kind of efficient pile driving equipment of road construction
CN207672568U (en) * 2017-12-08 2018-07-31 耿祥东 A kind of adjustable building piling equipment
CN207760855U (en) * 2017-12-27 2018-08-24 杭州容云网络科技有限公司 A kind of highway structure construction ringing engine
CN109537590A (en) * 2018-11-29 2019-03-29 浙江海洋大学 A kind of efficient vertical piling machine of civil engineering

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759331A (en) * 2017-02-21 2017-05-31 张家港市兴鸿达基础有限公司 Floating piling plant
CN206902708U (en) * 2017-05-07 2018-01-19 盖雪峰 A kind of efficient pile driving equipment of road construction
CN107604910A (en) * 2017-09-14 2018-01-19 郑州大学 A kind of rotary adjustable building piling machine
CN207672568U (en) * 2017-12-08 2018-07-31 耿祥东 A kind of adjustable building piling equipment
CN207760855U (en) * 2017-12-27 2018-08-24 杭州容云网络科技有限公司 A kind of highway structure construction ringing engine
CN109537590A (en) * 2018-11-29 2019-03-29 浙江海洋大学 A kind of efficient vertical piling machine of civil engineering

Also Published As

Publication number Publication date
CN110080222A (en) 2019-08-02

Similar Documents

Publication Publication Date Title
CN110080222B (en) Piling equipment for petroleum exploitation marking
CN206544200U (en) A kind of rubber blocks cutting equipment
CN206085150U (en) Portable type hydraulic engineering manages cutting device
CN205080014U (en) Tubular product hammer impact testing machine that falls
CN107469726A (en) A kind of constructing tunnel flocculant for sewage treatment Preparation equipment
CN113668344B (en) Construction auxiliary device is backfilled in maintenance of highway section
CN207314416U (en) A kind of oil exploitation topsoil loosening device
CN107448159B (en) Petroleum well workover pipe arranging method
CN102654040A (en) Automation device for storage of oil drilling string
CN205591850U (en) Full -automatic oil pipe post calandria moves a tub device
CN108149555A (en) A kind of road repair construction evener
CN107327132A (en) A kind of flush-type laydown machine
CN206590527U (en) Steel plate turning mechanism for oil equipment
CN116424640A (en) Tubular product garbage collection mechanism
CN102175110B (en) Method for detecting mortar joints of coke oven
CN208121589U (en) Large-tonnage highway ramp spells wide beam construction equipment
CN108221816A (en) A kind of construction iron nail reclaimer
CN105756580B (en) A kind of Full automatic oil pipe column comb shifting pipe device
CN107487705A (en) A kind of petroleum pipeline installs laying boom hoisting
CN108209170A (en) A kind of underground mine use is moved easily type food and drink device
CN204418180U (en) A kind of hydraulic pressure plays a machine
CN208683886U (en) A kind of MPP pipeline production traction assisting device
CN206939934U (en) Based on the chemical industry oil drum switching mechanism vertically placed
CN208967229U (en) A kind of asphalt delivery hose jacking clamping device
CN203575065U (en) Manual rice transplanter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20201030

Address after: 241000 quantang town Fuyuan administrative village Dajiao natural village 8, Wuwei County, Wuhu City, Anhui Province

Applicant after: Jiao Dongsheng

Address before: 512026 Room 1202, Bijiang Pavilion, South Fengya Road, Wujiang North District, Shaoguan City, Guangdong Province

Applicant before: Huang Zhiqiang

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230920

Address after: 343000 Room 227, 2nd Floor, E-commerce Entrepreneurship Incubation Park, Wan'an County, Ji'an City, Jiangxi Province

Patentee after: Wan'an Maosheng Information Technology Co.,Ltd.

Address before: 241000 8 Dajiao natural village, Fuyuan administrative village, quantang Town, Wuwei County, Wuhu City, Anhui Province

Patentee before: Jiao Dongsheng

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240227

Address after: Room 409, Unit 5, Building 1, No. 61 Liujia Lane, Hantai District, Hanzhong City, Shaanxi Province, 710000

Patentee after: Zhang Mei

Guo jiahuodiqu after: Zhong Guo

Address before: 343000 Room 227, 2nd Floor, E-commerce Entrepreneurship Incubation Park, Wan'an County, Ji'an City, Jiangxi Province

Patentee before: Wan'an Maosheng Information Technology Co.,Ltd.

Guo jiahuodiqu before: Zhong Guo

TR01 Transfer of patent right