CN109537590A - A kind of efficient vertical piling machine of civil engineering - Google Patents
A kind of efficient vertical piling machine of civil engineering Download PDFInfo
- Publication number
- CN109537590A CN109537590A CN201811444922.6A CN201811444922A CN109537590A CN 109537590 A CN109537590 A CN 109537590A CN 201811444922 A CN201811444922 A CN 201811444922A CN 109537590 A CN109537590 A CN 109537590A
- Authority
- CN
- China
- Prior art keywords
- piling
- piling machine
- civil engineering
- bracket
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/02—Placing by driving
- E02D7/06—Power-driven drivers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/04—Guide devices; Guide frames
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/02—Placing by driving
- E02D7/06—Power-driven drivers
- E02D7/14—Components for drivers inasmuch as not specially for a specific driver construction
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/22—Placing by screwing down
Abstract
The present invention discloses a kind of efficient vertical piling machine of civil engineering, belong to building machinery technical field, including pedestal, damping device, piling mechanism, screw pile driver structure, fixed device, base bottom is equipped with wheel hub, wheel hub side and fixed device is fixed with close to the position of base end, L bracket is flexibly connected above base right side, piling mechanism is connected with below the short side of L shape bracket, mounting base is equipped with above chassis left side, housing is connected by connecting rod on the left of mounting base, casing interior is equipped with screw pile driver structure.Two kinds of piling modes of the invention, piling stability is stronger, can effectively ensure the phenomenon that soil is not in loosening, isolation, will not be subjected to displacement when squeezing into ground, the hammering time is short.
Description
Technical field
The invention belongs to building machinery technical fields, and in particular to a kind of efficient vertical piling machine of civil engineering.
Background technique
Piling machine is made of pile monkey, pile frame and auxiliary device etc..Pile monkey is attached to that pile frame front two is parallel to lead vertically
Between bar (being commonly called as gantry), liter is hung with lifting hook.Pile frame is a steelwork tower truss, and portion is equipped with hoist engine behind, to rise
Hang stake and pile monkey.The leading truck being made of before pile frame two guide rods makes stake according to design orientation standard to control piling direction
True ground injection stratum.The basic fundamental parameter of piling machine is impact moiety by weight, impact kinetic energy and frequency of impact.Pile monkey is by movement
Power resources can be divided into drop hammer, steam hammer, diesel hammer, hydraulic hammer etc..Construction site piling machine is generally driven by wirerope
Pile monkey rises, and is then driven piles using the weight whereabouts of pile monkey, and this piling machine is generally without guiding device, so piling
Orthostatic is poor, is easy pile body inclination squeezing into ground, and it is lower to rise efficiency by rope traction pile monkey.
Summary of the invention
The purpose of the present invention is to provide a kind of efficient vertical piling machine of civil engineering, two kinds of piling modes, piling is steady
It is qualitative relatively strong, it can effectively ensure the phenomenon that soil is not in loosening, isolation, will not be subjected to displacement when squeezing into ground, be hammered
Time is short.
The technical solution that the present invention is taken to achieve the above object are as follows: a kind of efficient vertical piling machine of civil engineering,
Including pedestal, damping device, piling mechanism, screw pile driver structure, fixed device, base bottom is equipped with wheel hub, wheel hub side and
It is fixed with fixed device close to the position of base end, is flexibly connected L bracket, the short side of L shape bracket above base right side
Lower section is connected with piling mechanism, is equipped with mounting base above chassis left side, by connecting rod connection housing on the left of mounting base, in housing
Portion is equipped with screw pile driver structure.For the present apparatus there are two types of the mode of piling, Piling speed is fast, and safety coefficient is high, during piling, damping
Device can fix piling mechanism, on the one hand timber can be effectively prevent to shift during hammering, influence effect of driving piles, separately
On the one hand it can be reduced seismaesthesia caused by piling, screw pile driver structure carries out depth aperture to soil by drill bit, can make timber
Faster landfill, saves human and material resources and improves work efficiency, and is convenient for the movement of piling machine by the wheel hub of setting, keeps away
Exempt from manually to carry it, the fixation device of wheel hub side plays good branch while increasing with frictional ground force
Support effect will not be conducive to the running for filling a device due to making piling machine ontology generate movement under the action of wheel hub.
Preferably, being equipped with hinged block above the middle of the base, hinged block is connected and fixed seat, fixing seat by the first telescopic rod
It is fixedly connected with L bracket, hinged block, the first telescopic mast and fixing seat are at least provided with 2 groups.First connected on the left of L bracket stretches
Contracting column can increase the flexibility of piling machine, and in the case where piling machine does not use, the first telescopic mast is shunk, to the left by piling mechanism
Layback is dynamic, so that it is slowly fallen down, sets certain angle, which can play counterweight effect, piling machine can be made to be not easy side when moving
It turns over, also saves certain space resources.
Preferably, connecting electrohydraulic cylinder below L bracket short side, the movable end of electrohydraulic cylinder connects piling machine
Structure, the sliding slot of piling mechanism left side connection L bracket long side, sliding slot lower section are equipped with damping device, and damping device connects L bracket
Side wall.Electrohydraulic cylinder energy band power driver structure moves down, and is moved to closer position from the ground and starts to drive piles, piling machine
Idler wheel clamping on the left of structure improves the flexibility of piling mechanism in sliding slot.
Preferably, piling mechanism includes the gear in the middle part of housing, gear is meshed with the rack gear on the left of it, gear
Middle part is flexibly connected third telescopic rod, and flexible box is equipped in the middle part of third telescopic rod, and third telescopic rod lower end connects pile monkey, and pile monkey
On the outside of casing base, housing connects pulley by connecting rod, and pulley is inside sliding slot.Roller-coaster is to sliding slot bottom
When, the bottom of housing, which can be protruded into damping device, to be fixed, while gear is moved down along rack gear, and third telescopic rod is pushed away
Housing out, when timber is closer from the ground, telescopic mast quickly stretches out telescopic rod, gives pile monkey great lower punch power, enables timber
That squeezes into is deeper, so that ground foundation is more firm, reduces the risk of collapsing, due to the fixation of damping device, is striking
Seismaesthesia can be greatly decreased during hitting, and the position tapped is also more accurate, hammer is not easy partially, while improving work efficiency
Also ensure work quality.
Preferably, damping device includes connecting rod, connecting rod right-hand end connects gripper jaw, and ring is furnished with bullet in gripper jaw
Spring, spring one end connect gripper jaw inner ring, and the other end connects roller mount, directive wheel in the middle part of roller mount.Housing will protrude into clamping
Directive wheel when in pawl in roller mount can play guiding role to housing, and spring, which plays, can not only play buffer function, moreover it is possible to
Housing is clamped, the shaking of pile monkey at work is reduced.
Preferably, top is equipped with hoist engine on the right side of mounting base, the cable wire inside hoist engine is worn around auxiliary wheel to cover
It is connect inside shell with screw pile driver structure upper end, auxiliary wheel is at least provided with 2.Cable wire on hoist engine wheel rim is rolled along auxiliary
Wheel slides up and down, and the screw pile driver structure that can complete work pulls out ground, efficient and convenient.
Preferably, screw pile driver structure includes transition block, the connected sliding block in block two sides is crossed, sliding block is flexibly connected with sliding slot,
The other end of transition block bottom attachment support bar one end, support rod connects electronic box, and support rod surface is wrapped with damping elastic piece, electricity
Case lower end connects column, and leg surface, which is equipped with, revolves native piece, constrictor is equipped with inside column, constrictor connects electronic box bottom, shrinks
Connection expansion link below device, telescopic rod, constrictor and electronic box are electrically connected, column lower end connection drill bit, on the cutting edge of drill bit
Equipped with jaw.Screw pile driver structure carries out aperture to the soil of non-aperture, and electronic box is powered, and constrictor control telescopic rod is stretched downwards
Out, it is also equipped with micro-machine in electronic box, in telescopic rod to can also quickly rotate while extension in soil, the drill bit of post end is matched
Can quickly soil be pushed aside equipped with jaw by closing cutting edge, and since jaw surfaces product is small, resistance when protruding into soil is also small, piling
When periphery soil the phenomenon that being not in loosening, isolation, ensure that the fastness in soil after piling, drill bit can be beaten by revolving native piece
The spiral helicine discharge hole of soil of pine, prevents from blocking, influences working efficiency.
Preferably, fixed device includes supporting block, fixed link is equipped in the middle part of supporting block, and fixed link passes through supporting block
Top surface connects base bottom, and the lower semisection of fixed link offers symmetrical locating slot, is plugged with pull rod inside locating slot, is located at branch
Compressed spring is arranged on pull rod inside bracer, pull rod left end connects pull ring, and pull ring is located at outside supporting block.It is driving piles
, will not be due to making piling machine generate movement under the action of wheel hub when machine is worked, fixed link two sides, which offer, equidistant determines
Position slot, pull rod can be plugged in inside locating slot, make supporting block and ground face contact, improve the stability and piling of piling machine
Accuracy, the compressed spring being arranged on pull rod can play fastening effect, be plugged on pull rod and be not easy to skid off in locating slot, also ensure that
The safety of device needs to pull out pull rod when mobile piling machine, pull rod is plugged on to the locating slot of fixed link bottom end.
Compared with prior art, the invention has the benefit that the first telescopic mast 1) connected on the left of L bracket can increase
The flexibility of piling machine, the design can play counterweight effect, and piling machine can be made to be not easy to turn on one's side when moving, also save certain
Space resources;2) when timber is closer from the ground, telescopic mast quickly stretches out telescopic rod, gives pile monkey great undershoot for piling mechanism
Power enables timber to squeeze into deeper, so that ground foundation is more firm, reduces the risk of collapsing;3) damping device is solid
Surely will drive piles mechanism, seismaesthesia can be greatly decreased during percussion, and the position tapped is also more accurate, be not easy hammer partially, mention
Work quality is also ensured while high working efficiency;4) screw pile driver structure soil on periphery in piling is not in pine
The phenomenon that moving, isolating, ensure that the fastness in soil after piling;5) fixed device can preferably jack up piling machine, and increase is beaten
The stability of stake machine, is not easy that piling machine is made to turn on one's side.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of the civil engineering of the present invention with efficiently vertical piling machine;
Fig. 2 is the structural schematic diagram of present invention piling mechanism;
Fig. 3 is the structural schematic diagram of damping device of the present invention;
Fig. 4 is the structural schematic diagram of screw pile driver structure of the present invention
Fig. 5 is the structural schematic diagram of the fixed device of the present invention.
Description of symbols: 1 pedestal;2 damping devices;21 connecting rods;22 directive wheels;23 springs;24 gripper jaws;25 idler wheels
Seat;3 sliding slots;4 piling mechanisms;41 gears;42 third telescopic rods;43 flexible boxes;44 rack gears;45 pile monkeys;46 pulleys;5 electronic liquid
Cylinder pressure;6L shape bracket;7 fixing seats;8 first telescopic rods;9 hinged blocks;10 mounting bases;11 hoist engines;12 cable wires;13 auxiliary rollings
Wheel;14 housings;15 rotating wheels;16 screw pile driver structures;161 transition blocks;162 support rods;163 damping elastic pieces;164 electronic boxs;
165 constrictors;166 second telescopic rods;167 revolve native piece;168 columns;169 drill bits;1610 sliding blocks;1611 jaws;17 connecting rods;
18 wheel hubs;19 fixed devices;191 fixed links;192 supporting blocks;193 compressed springs;194 pull rods;195 tension springs;196 locating slots.
Specific embodiment
Present invention is further described in detail with attached drawing with reference to embodiments:
Embodiment 1:
As shown in Figs. 1-5, the efficient vertical piling machine of a kind of civil engineering, including pedestal 1, damping device 2, piling mechanism
4, screw pile driver structure 16, fixed device 19,1 bottom of pedestal are equipped with wheel hub 18,18 side of wheel hub and the position close to 1 end of pedestal
It sets and is fixed with fixed device 19,1 right side top of pedestal is flexibly connected L bracket 6, is connected with and beats below the short side of L shape bracket 6
Stake mechanism 4, the left side of pedestal 1 top are equipped with mounting base 10, connect housing 14 by connecting rod 17 on the left of mounting base 10, in housing 14
Portion is equipped with screw pile driver structure 16.For the present apparatus there are two types of the mode of piling, Piling speed is fast, and safety coefficient is high, during piling, subtracts
Shake device can fix piling mechanism, on the one hand timber can be effectively prevent to shift during hammering, influence effect of driving piles,
On the other hand it can be reduced seismaesthesia caused by piling, screw pile driver structure carries out depth aperture to soil by drill bit, can make wood
Stake faster fills, and saves human and material resources and improves work efficiency, and is convenient for the movement of piling machine by the wheel hub of setting,
It avoids and manually it is carried, the fixation device of wheel hub side plays well while increasing with frictional ground force
Supporting role will not be conducive to the running for filling a device due to making piling machine ontology generate movement under the action of wheel hub.
1 middle part top of pedestal is equipped with hinged block 9, and hinged block 9 is connected and fixed seat 7 by the first telescopic rod 8, and fixing seat 7 is solid
Surely L bracket 6 is connected, hinged block 9, the first telescopic mast 8 are with fixing seat 7 at least provided with 2 groups.First connected on the left of L bracket
Telescopic mast can increase the flexibility of piling machine, in the case where piling machine does not use, the first telescopic mast shrink, will piling mechanism to
Left side pulls, and so that it is slowly fallen down, sets certain angle, which can play counterweight effect, piling machine can be made to be not easy when moving
Rollover, also saves certain space resources.
Electrohydraulic cylinder 5, the movable end connection piling mechanism 4 of electrohydraulic cylinder 5, piling are connected below 6 short side of L bracket
The sliding slot 3 of 6 long side of L bracket is connected on the left of mechanism 4, damping device 2 is equipped with below sliding slot 3, and damping device 2 connects L bracket 6
Side wall.Electrohydraulic cylinder energy band power driver structure moves down, and is moved to closer position from the ground and starts to drive piles, piling machine
Idler wheel clamping on the left of structure improves the flexibility of piling mechanism in sliding slot.
Piling mechanism 4 includes the gear 41 positioned at 14 middle part of housing, and gear 41 is meshed with the rack gear 44 on the left of it, gear
41 middle parts are flexibly connected third telescopic rod 42, and flexible box 43, the connection of 42 lower end of third telescopic rod are equipped in the middle part of third telescopic rod 42
Pile monkey 45, and pile monkey 45 is set to 14 bottom outside of housing, housing 14 connects pulley 46 by connecting rod 17, and pulley 46 is embedded in sliding slot
Inside 3.When roller-coaster to sliding slot bottom, the bottom of housing, which can be protruded into damping device, to be fixed, while gear is along tooth
Item moves down, and third telescopic rod is pushed out housing, and when timber is closer from the ground, flexible box quickly stretches out telescopic rod, gives
The great lower punch power of pile monkey enables timber to squeeze into deeper, so that ground foundation is more firm, reduces the wind of collapsing
Seismaesthesia can be greatly decreased due to the fixation of damping device in danger during percussion, and the position tapped is also more accurate, no
Easily hammer partially, also ensures work quality while improving work efficiency.
Damping device 2 includes connecting rod 21, and 21 right-hand end of connecting rod connects gripper jaw 24, and ring is furnished with spring in gripper jaw 24
23,23 one end of spring connects 24 inner ring of gripper jaw, and the other end connects roller mount 25,25 middle part directive wheel 22 of roller mount.Housing is
Directive wheel when protruding into gripper jaw in roller mount can be played into guiding role to housing, spring, which plays, can not only play buffering
Effect, moreover it is possible to housing is clamped, the shaking of pile monkey at work is reduced.
10 right side top of mounting base is equipped with hoist engine 11, and the cable wire 12 inside hoist engine 11 is worn around auxiliary wheel 13 to cover
14 inside of shell is connect with 16 upper end of screw pile driver structure, and auxiliary wheel 13 is at least provided with 2.Cable wire on hoist engine wheel rim along
Auxiliary wheel slides up and down, and the screw pile driver structure that can complete work pulls out ground, efficient and convenient.
Screw pile driver structure 16 includes transition block 161, crosses the connected sliding block 1610 in 161 two sides of block, and sliding block 1610 and sliding slot 3 are living
The other end of dynamic connection, 161 bottom attachment support bar of transition block, 162 one end, support rod 162 connects electronic box 164, support rod 162
Surface is wrapped with damping elastic piece 163, and 164 lower end of electronic box connects column 168, and 168 surface of column, which is equipped with, revolves native piece 167, column
168 inside are equipped with constrictor 165, and constrictor 165 connects 164 bottom of electronic box, and 165 lower section connection expansion link 166 of constrictor stretches
Bar 166, constrictor 165 and electronic box 164 are electrically connected, and 168 lower end of column connects drill bit 169, and the cutting edge of drill bit 169 is equipped with
Jaw 1611.Screw pile driver structure carries out aperture to the soil of non-aperture, and electronic box is powered, and constrictor control telescopic rod is stretched downwards
Out, it is also equipped with micro-machine in electronic box, in telescopic rod to can also quickly rotate while extension in soil, the drill bit of post end is matched
Can quickly soil be pushed aside equipped with jaw by closing cutting edge, and since jaw surfaces product is small, resistance when protruding into soil is also small, piling
When periphery soil the phenomenon that being not in loosening, isolation, ensure that the fastness in soil after piling, drill bit can be beaten by revolving native piece
The spiral helicine discharge hole of soil of pine, prevents from blocking, influences working efficiency.
Fixed device 19 includes supporting block 192, fixed link 191 is equipped in the middle part of supporting block 192, and fixed link 191 passes through branch
The top surface of bracer 192 connects 1 bottom of pedestal, and the lower semisection of fixed link 191 offers symmetrical locating slot 196, in locating slot 196
Portion is plugged with pull rod 194, and compressed spring 193,194 left end of pull rod are arranged on the pull rod 194 inside supporting block 192
Pull ring 195 is connected, pull ring 195 is located at outside supporting block 192.It, will not be due to the effect in wheel hub when piling machine is worked
Under so that piling machine is generated movement, fixed link two sides offer equidistant locating slot, and pull rod can be plugged in inside locating slot, make to prop up
Bracer and ground face contact, improve the stability of piling machine and the accuracy of piling, the compressed spring being arranged on pull rod can play
Fastening effect is plugged on pull rod and is not easy to skid off in locating slot, also ensures the safety of device, drawing when needing to move piling machine
Pull rod is plugged on the locating slot of fixed link bottom end by pull rod out.
Embodiment 2:
A kind of civil engineering of the invention with efficiently vertical piling machine in actual use: by piling machine there is a continuing need for
The position of piling, fixed device 19, which is pulled to, can support to ground location, and hoist engine 11 puts down cable wire 12, and cable wire 12 is along auxiliary
Idler wheel 13 is helped slowly to fall, screw pile driver structure 16 also can slowly slide, when being slipped to certain position, in screw pile driver structure 16
164 electronic box of electronic box in portion is powered, and constrictor 165 controls the second telescopic rod 166 and extends downwardly, and is also equipped with small electrical in electronic box 164
Machine, in telescopic rod 166 to can also quickly rotate while extension in soil, the drill bit 169 of 168 end of column cooperates to be set on cutting edge
There is jaw 1611 that can quickly push soil aside, and hole can be squeezed into rapidly deeper position, after the completion of punching, cable wire 12 again will
Screw pile driver structure 16 retracts in housing 14, and wooden stick is put into the hole accomplished fluently, and piling mechanism 4 is placed in above timber, rolling
When wheel 46 slides into 3 bottom of sliding slot, the bottom of housing 14, which can be protruded into damping device 2, to be fixed, while gear 41 is along tooth
Item 44 moves down, and third telescopic rod 42 is pushed out housing 14, and when timber is closer from the ground, flexible box 43 is quickly by telescopic rod 42
It stretches out, gives pile monkey 45 great lower punch power, so that timber is squeezed into deeper, so that ground foundation is more firm, subtract
The risk collapsed less, work are completed, and fixed device 19 is packed up.
The prior art of 1,2 routine techniques dawn known to those skilled in the art in above-described embodiment is not made in detail herein
Thin narration.
The above embodiments are only used to illustrate the present invention, and not limitation of the present invention, the ordinary skill people of this field
Member can also make a variety of changes and modification without departing from the spirit and scope of the present invention.Therefore, all equivalent
Technical solution also belong to scope of the invention, scope of patent protection of the invention should be defined by the claims.
Claims (8)
1. a kind of efficient vertical piling machine of civil engineering, including pedestal (1), damping device (2), piling mechanism (4), rotation piling
Mechanism (16), fixed device (19), it is characterised in that: pedestal (1) bottom is equipped with wheel hub (18), wheel hub (18) side
And be fixed with fixed device (19) close to the position of pedestal (1) end, top is flexibly connected L bracket on the right side of the pedestal (1)
(6), piling mechanism (4) is connected with below the short side of the L shape bracket (6), top is equipped with mounting base on the left of the pedestal (1)
(10), by connecting rod (17) connection housing (14) on the left of the mounting base (10), the housing (14) is internal to be equipped with spiral beating
Stake mechanism (16).
2. a kind of efficient vertical piling machine of civil engineering according to claim 1, it is characterised in that: the pedestal (1)
Hinged block (9) are equipped with above middle part, the hinged block (9) is connected and fixed seat (7), the fixing seat by the first telescopic rod (8)
(7) it is fixedly connected L bracket (6), the hinged block (9), the first telescopic mast (8) are with fixing seat (7) at least provided with 2 groups.
3. a kind of efficient vertical piling machine of civil engineering according to claim 1, it is characterised in that: the L bracket
(6) electrohydraulic cylinder (5) are connected below short side, movable end connection piling mechanism (4) of the electrohydraulic cylinder (5) is described to beat
The sliding slot (3) of connection L bracket (6) long side on the left of stake mechanism (4), sliding slot (3) lower section is equipped with damping device (2), described
Damping device (2) connects the side wall of L bracket (6).
4. a kind of according to claim 1, the efficient vertical piling machine of civil engineering described in 3, it is characterised in that: the piling machine
Structure (4) includes the gear (41) in the middle part of housing (14), and the gear (41) is meshed with the rack gear (44) on the left of it, described
Third telescopic rod (42) are flexibly connected in the middle part of gear (41), are equipped with flexible box (43) in the middle part of the third telescopic rod (42), it is described
Third telescopic rod (42) lower end connects pile monkey (45), and pile monkey (45) is set to housing (14) bottom outside, and the housing (14) is logical
Connecting rod (17) connection pulley (46) is crossed, the pulley (46) is internal embedded in sliding slot (3).
5. a kind of according to claim 1, the efficient vertical piling machine of civil engineering described in 3, it is characterised in that: the damping dress
Setting (2) includes connecting rod (21), and connecting rod (21) right-hand end connects gripper jaw (24), and the interior ring of the gripper jaw (24) is furnished with
Spring (23), described spring (23) one end connect gripper jaw (24) inner ring, and the other end connects roller mount (25), the roller mount
(25) middle part directive wheel (22).
6. a kind of efficient vertical piling machine of civil engineering according to claim 1, it is characterised in that: the mounting base
(10) right side top is equipped with hoist engine (11), and the internal cable wire (12) of the hoist engine (11) is worn around auxiliary wheel (13) to cover
It is connect inside shell (14) with screw pile driver structure (16) upper end, the auxiliary wheel (13) is at least provided with 2.
7. a kind of according to claim 1, the efficient vertical piling machine of civil engineering described in 6, it is characterised in that: the spiral beating
Stake mechanism (16) includes transition block (161), and block (161) two sides of crossing are connected sliding block (1610), the sliding block (1610) and cunning
Slot (3) is flexibly connected, described transition block (161) bottom attachment support bar (162) one end, the other end connection of support rod (162)
Electronic box (164), support rod (162) surface are wrapped with damping elastic piece (163), and electronic box (164) lower end connects column
(168), column (168) surface, which is equipped with, revolves native piece (167), is equipped with constrictor (165) inside the column (168), described
Constrictor (165) connects electronic box (164) bottom, connection expansion link (166), the telescopic rod below the constrictor (165)
(166), constrictor (165) and electronic box (164) are electrically connected, and column (168) lower end connects drill bit (169), the drill bit
(169) cutting edge is equipped with jaw (1611).
8. a kind of efficient vertical piling machine of civil engineering according to claim 1, it is characterised in that: the fixed device
(19) include supporting block (192), be equipped with fixed link (191) in the middle part of the supporting block (192), and fixed link (191) passes through support
The top surface of block (192) connects pedestal (1) bottom, and the lower semisection of the fixed link (191) offers symmetrical locating slot (196),
It is plugged with pull rod (194) inside the locating slot (196), is arranged on the pull rod (194) internal positioned at supporting block (192)
Compressed spring (193), pull rod (194) left end connect pull ring (195), and the pull ring (195) is located at supporting block (192)
It is external.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811444922.6A CN109537590A (en) | 2018-11-29 | 2018-11-29 | A kind of efficient vertical piling machine of civil engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811444922.6A CN109537590A (en) | 2018-11-29 | 2018-11-29 | A kind of efficient vertical piling machine of civil engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109537590A true CN109537590A (en) | 2019-03-29 |
Family
ID=65852038
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811444922.6A Pending CN109537590A (en) | 2018-11-29 | 2018-11-29 | A kind of efficient vertical piling machine of civil engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109537590A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080222A (en) * | 2019-04-04 | 2019-08-02 | 黄志强 | A kind of oil exploitation label uses pile driving equipment |
CN110528521A (en) * | 2019-09-05 | 2019-12-03 | 宁波青缇工业设计有限公司 | A kind of construction site tubular pole piling equipment |
CN111576411A (en) * | 2020-05-13 | 2020-08-25 | 刘灵寿保 | Impact type pile body driving machine |
CN112376560A (en) * | 2020-11-11 | 2021-02-19 | 雷玉亮 | Stake pile driving device is bred in poultry |
CN112726607A (en) * | 2020-12-29 | 2021-04-30 | 陈肖云 | Vertical pile driver with pre-pit digging function for installing highway protective guard |
CN113622424A (en) * | 2021-07-23 | 2021-11-09 | 中国水利水电第九工程局有限公司 | Automatic pile driver for building site |
CN115506388A (en) * | 2022-10-17 | 2022-12-23 | 中建二局土木工程集团有限公司 | Waterproof curtain device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20140131829A (en) * | 2013-05-06 | 2014-11-14 | 반석기초이앤씨(주) | Hollow bar anchor pile and construction method of the same |
CN104863525A (en) * | 2015-06-10 | 2015-08-26 | 马妮 | Deep-hole spiral pile hammer |
CN206233235U (en) * | 2016-12-06 | 2017-06-09 | 西安外事学院 | A kind of architectural engineering pile driving equipment |
CN107476303A (en) * | 2017-10-09 | 2017-12-15 | 李云 | A kind of construction site ringing engine |
CN207160007U (en) * | 2017-08-23 | 2018-03-30 | 周宇星 | It is a kind of can be with the piling machine of strength of adjustment |
CN107938669A (en) * | 2017-12-29 | 2018-04-20 | 绍兴市柯桥区欧祥机械有限公司 | One kind building piling machine |
-
2018
- 2018-11-29 CN CN201811444922.6A patent/CN109537590A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20140131829A (en) * | 2013-05-06 | 2014-11-14 | 반석기초이앤씨(주) | Hollow bar anchor pile and construction method of the same |
CN104863525A (en) * | 2015-06-10 | 2015-08-26 | 马妮 | Deep-hole spiral pile hammer |
CN206233235U (en) * | 2016-12-06 | 2017-06-09 | 西安外事学院 | A kind of architectural engineering pile driving equipment |
CN207160007U (en) * | 2017-08-23 | 2018-03-30 | 周宇星 | It is a kind of can be with the piling machine of strength of adjustment |
CN107476303A (en) * | 2017-10-09 | 2017-12-15 | 李云 | A kind of construction site ringing engine |
CN107938669A (en) * | 2017-12-29 | 2018-04-20 | 绍兴市柯桥区欧祥机械有限公司 | One kind building piling machine |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080222A (en) * | 2019-04-04 | 2019-08-02 | 黄志强 | A kind of oil exploitation label uses pile driving equipment |
CN110080222B (en) * | 2019-04-04 | 2020-11-20 | 焦东升 | Piling equipment for petroleum exploitation marking |
CN110528521A (en) * | 2019-09-05 | 2019-12-03 | 宁波青缇工业设计有限公司 | A kind of construction site tubular pole piling equipment |
CN111576411A (en) * | 2020-05-13 | 2020-08-25 | 刘灵寿保 | Impact type pile body driving machine |
CN111576411B (en) * | 2020-05-13 | 2021-11-16 | 吴丽旋 | Impact type pile body driving machine |
CN112376560A (en) * | 2020-11-11 | 2021-02-19 | 雷玉亮 | Stake pile driving device is bred in poultry |
CN112726607A (en) * | 2020-12-29 | 2021-04-30 | 陈肖云 | Vertical pile driver with pre-pit digging function for installing highway protective guard |
CN113622424A (en) * | 2021-07-23 | 2021-11-09 | 中国水利水电第九工程局有限公司 | Automatic pile driver for building site |
CN115506388A (en) * | 2022-10-17 | 2022-12-23 | 中建二局土木工程集团有限公司 | Waterproof curtain device |
CN115506388B (en) * | 2022-10-17 | 2023-10-27 | 中建二局土木工程集团有限公司 | Waterproof curtain device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109537590A (en) | A kind of efficient vertical piling machine of civil engineering | |
CN107476303A (en) | A kind of construction site ringing engine | |
CN106522223B (en) | A kind of Purely mechanical piling machine for building | |
CN207331691U (en) | A kind of construction site ringing engine | |
CN108625371A (en) | A kind of building piling machine | |
CN108708376A (en) | A kind of stable civil engineering piling machine with positioning function | |
CN108914936B (en) | Quick and efficient pile driver for building construction | |
CN107905120A (en) | A kind of bridge construction vibreatory hammer | |
CN207484477U (en) | A kind of civil engineering small building piling machine | |
CN207553096U (en) | A kind of civil engineering piling equipment | |
CN208430514U (en) | A kind of building piling machine | |
CN208136913U (en) | A kind of bridge construction piling equipment | |
CN209277168U (en) | A kind of underground utilities access foundation ditch strengthening device | |
US6061933A (en) | Compactor for use with backhoe method and apparatus | |
CN216041144U (en) | Tensioning device of pile driver | |
CN212336021U (en) | Portable pile driver for constructional engineering | |
CN206987814U (en) | A kind of plate-hammer crusher of improved structure | |
US4106298A (en) | Device for the production of earth holes | |
CN206457226U (en) | A kind of town road cesspool cover plays lid arrangement automatically | |
CN212956522U (en) | Pile machine installation securing device | |
CN211713959U (en) | Bridge construction is with pile device | |
CN208328926U (en) | A kind of small-sized piling equipment | |
CN209244501U (en) | A kind of piling machine for building with anti-fracture function | |
CN207760858U (en) | A kind of piling machine direction guiding mechanism | |
CN111271001A (en) | Pile-driving drilling machine capable of efficiently replacing drill bit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190329 |