CN107487705A - A kind of petroleum pipeline installs laying boom hoisting - Google Patents

A kind of petroleum pipeline installs laying boom hoisting Download PDF

Info

Publication number
CN107487705A
CN107487705A CN201710733937.3A CN201710733937A CN107487705A CN 107487705 A CN107487705 A CN 107487705A CN 201710733937 A CN201710733937 A CN 201710733937A CN 107487705 A CN107487705 A CN 107487705A
Authority
CN
China
Prior art keywords
petroleum pipeline
sliding block
installing plate
slide rail
support bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710733937.3A
Other languages
Chinese (zh)
Other versions
CN107487705B (en
Inventor
颜杰雄
李静
李瑞宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinchang Xing'ou Intelligent Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710733937.3A priority Critical patent/CN107487705B/en
Publication of CN107487705A publication Critical patent/CN107487705A/en
Application granted granted Critical
Publication of CN107487705B publication Critical patent/CN107487705B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/16Applications of indicating, registering, or weighing devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C25/00Cranes not provided for in groups B66C17/00 - B66C23/00
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C5/00Base supporting structures with legs
    • B66C5/02Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The present invention relates to a kind of boom hoisting, more particularly to a kind of petroleum pipeline installation laying boom hoisting.Petroleum pipeline can be driven accurately to be placed into some position, different size of petroleum pipeline can be directed to it be installed the technical problem to be solved in the present invention is to provide a kind of and laying boom hoisting can be installed with the petroleum pipeline of rain cover.In order to solve the above-mentioned technical problem, the invention provides such a petroleum pipeline to install laying boom hoisting, includes base etc.;Base top is connected with support bar, and placement mechanism is connected with the upside of support bar left wall, drive mechanism is connected with the left of placement mechanism.The present invention can lift by crane different size of petroleum pipeline, be also provided with first baffle, because installation laying petroleum pipeline is all carried out out of doors; and it is portable progress; so inconvenient protection device, first baffle can keep off the rain water, and protection drive mechanism is less likely to be damaged it.

Description

A kind of petroleum pipeline installs laying boom hoisting
Technical field
The present invention relates to a kind of boom hoisting, more particularly to a kind of petroleum pipeline installation laying boom hoisting.
Background technology
One of oil, the main object of geological prospecting, it is a kind of sticky, dark brown liquid, is referred to as " industrial blood There is a petroleum storage liquid ", upper crustal some areas, and main component is the mixture of various alkane, cycloalkane, aromatic hydrocarbon, oil There is biogenic deposit to become oil and the oily two kinds of theories of petrochemical industry into oil machine reason, the former more widely receives, it is believed that oil be ancient times ocean or Biology in lake is formed by very long evolution, is belonged to biogenic deposit and is become oil, non-renewable, the latter thinks that oil is by the earth's crust The interior carbon generation of itself, it is unrelated with biology, it is renewable.Oil is mainly used as fuel oil and gasoline, and many chemical works Industry product, such as solution, chemical fertilizer, the raw material of insecticide and plastics.
Oil equipment pipe fitting concerns oil gas transportation safety, and China's oil equipment pipe is installed recently as me The further expansion of state's exploitation of oil-gas field scale and use range and achieve great development, but petroleum pipeline install lay During due to being designed, installed, working service etc. is more easily influences, also in the presence of many leaks, there is potential safety hazard, pipe The arrangement in road is the important step of petrochemical pipe construction, and pipe arrangement obtains bad, will directly affect whole construction quality.
Therefore needing research and development one kind badly can drive petroleum pipeline to be accurately placed into some position, can be directed to different size Petroleum pipeline carry out installation and laying boom hoisting can be installed with the petroleum pipeline of rain cover, to overcome in the prior art Petroleum pipeline can not be accurately placed into some position very much, can not be installed for different size of petroleum pipeline and can not The shortcomings that rain cover.
The content of the invention
(1) technical problems to be solved
Petroleum pipeline can not accurately be placed into some position in the prior art, can not be directed to by the present invention very much in order to overcome The shortcomings that different size of petroleum pipeline is installed and is unable to rain cover, the technical problem to be solved in the present invention is to provide one Kind petroleum pipeline can be driven accurately to be placed into some position, can be installed for different size of petroleum pipeline and can Laying boom hoisting is installed with the petroleum pipeline of rain cover.
(2) technical scheme
In order to solve the above-mentioned technical problem, the invention provides such a petroleum pipeline to install laying boom hoisting, Include base, support bar, placement mechanism and drive mechanism, base top is connected with support bar, connected on the upside of support bar left wall There is placement mechanism, drive mechanism is connected with the left of placement mechanism.
Preferably, placement mechanism include support, the first sliding block, the first slide rail, fix bar, the second slide rail, the second sliding block, First steel wire rope and rubber sleave, support bar left wall upside are connected with support, and support left side is symmetrical above and below to be respectively connected with the first cunning Block, slidingtype is connected with the first slide rail on the first sliding block, and the first slide rail bottom is connected with fix bar, and fix bar inner bottom part is connected with Second slide rail, slidingtype is connected with the second sliding block at left and right sides of the second slide rail, and the is symmetrically connected with before and after the second slider bottom One steel wire rope, the first steel wire rope bottom of the left and right sides are respectively connected with rubber sleave.
Preferably, drive mechanism includes the first installing plate, first baffle, ring baffle, the first servomotor, reel With the second steel wire rope, the first sliding block left wall of downside is connected with the first installing plate, first baffle is connected with the top of the first installing plate, First baffle bottom is connected with ring baffle, is provided with the first servomotor on the left of the first installing plate, the first servomotor is located at Below first baffle, reel is connected with the first servo motor output shaft, the second steel wire rope, the second steel wire are wound with reel Rope bottom is connected with fix bar.
Preferably, also include pole, the 3rd sliding block, the second installing plate, the 3rd slide rail, connecting rod and electric pushrod, prop up Symmetrical above and below on the upside of strut left wall to be respectively connected with pole, pole top is respectively connected with the 3rd with symmetrical above and below on the upside of support bar antetheca Sliding block, slidingtype is connected with the 3rd slide rail on the 3rd sliding block, and the 3rd slide rail left end is connected with the first sliding block, and the 3rd of upper and lower both sides the Connecting rod is connected between on the right side of slide rail, electric pushrod, the output shaft of electric pushrod and connection are installed on the upside of support bar antetheca Bar is connected, and the second installing plate is connected with the left of the first sliding block of upper and lower both sides, and the first servomotor is installed on the second installing plate left side Side, the second installing plate left wall upside are connected with first baffle.
Preferably, laser pen, the 3rd installing plate and graduated scale are also included, fix bar right-hand member is connected with laser pen, support The 3rd installing plate is connected with the downside of bar antetheca, the 3rd installing plate left wall is connected with graduated scale, and graduated scale coordinates with laser pen.
Preferably, the 4th installing plate, the second servomotor, bearing block, flat belt, endless glide, the 4th cunning are also included Block, bull stick and belt pulley, support bar bottom are connected with the 4th installing plate, the first groove, base top are provided with the right side of base top Endless glide is connected with, the left and right sides slidingtype is connected with Four-slider, Four-slider and the 4th installing plate in endless glide Bottom connects, and right side is provided with the second servomotor in base, and middle part is connected with bearing block in base, is connected with and turns in bearing block Bar, bull stick middle part are wound with flat skin with being respectively connected with belt pulley on the second servo motor output shaft between the belt pulley of the left and right sides Band, bull stick top are connected with the 4th installing plate bottom.
Preferably, also include chamber door and handle, be provided with the second groove on the left of base front wall, base front wall passes on left conjunction The mode of page connection is connected with chamber door, and handle is connected with the left of chamber door antetheca.
Preferably, the material of support bar is Q235 steel.
Operation principle:When needing to use the present apparatus to lay petroleum pipeline, drive mechanism can be enabled and drive boom hoisting Start working, petroleum pipeline installation is then routed to required position with placement mechanism.
Because placement mechanism includes support, the first sliding block, the first slide rail, fix bar, the second slide rail, the second sliding block, One steel wire rope and rubber sleave, support bar left wall upside are connected with support, and support left side is symmetrical above and below to be respectively connected with the first sliding block, Slidingtype is connected with the first slide rail on first sliding block, and the first slide rail bottom is connected with fix bar, and fix bar inner bottom part is connected with Two slide rails, the second slide rail left and right sides slidingtype are connected with the second sliding block, first are symmetrically connected with before and after the second slider bottom Steel wire rope, the first steel wire rope bottom of the left and right sides is respectively connected with rubber sleave, when user of service needs to use placement mechanism to put When putting petroleum pipeline so as to be lifted by crane, it is possible to pipeline is placed on rubber sleave, placement mechanism is provided with the second sliding block, When needing to place different size of pipeline, now can moves the second sliding block, and slidingtype connects at left and right sides of the second slide rail Connect the second sliding block, when needing to place less petroleum pipeline, user of service's can by the second sliding block of the left and right sides to Medial movement, will now drive front and rear symmetrical first steel wire rope also to move inward, then can also drive rubber sleave to Medial movement, less petroleum pipeline can be thus placed, when needing to place larger petroleum pipeline, user of service can So that the second sliding block of the left and right sides to be moved laterally, front and rear symmetrical first steel wire rope also outside sidesway will be now driven It is dynamic, it then can also drive rubber sleave to move laterally, can thus place larger petroleum pipeline, so allow for device Different size of petroleum pipeline can be lifted by crane.
Because drive mechanism include the first installing plate, first baffle, ring baffle, the first servomotor, reel and Second steel wire rope, the first sliding block left wall of downside are connected with the first installing plate, first baffle are connected with the top of the first installing plate, the One baffle bottom is connected with ring baffle, is provided with the first servomotor on the left of the first installing plate, and the first servomotor is positioned at the Below one baffle plate, reel is connected with the first servo motor output shaft, the second steel wire rope, the second steel wire rope are wound with reel Bottom is connected with fix bar, when user of service needs to use drive mechanism to lift by crane petroleum pipeline, when needing to make petroleum pipeline During rising, user of service's can enables the first servomotor, drives reel to reel second by starting the first servomotor Steel wire rope, this can cause fix bar to rise, it is possible to drive petroleum pipeline also to rise, when needing to decline petroleum pipeline When, drive reel to unclasp the second steel wire rope by starting the first servomotor, this can causes fix bar to decline, it is possible to Petroleum pipeline is driven also to decline, the thus free rise and fall of convenient use personnel control petroleum pipeline, the present apparatus is herein First baffle is also provided with, because installation laying petroleum pipeline is all carried out out of doors, and is portable progress, so not Facilitate protection device, first baffle can keep off the rain water, and the first servomotor of protection is less likely to be damaged it.
Because also include pole, the 3rd sliding block, the second installing plate, the 3rd slide rail, connecting rod and electric pushrod, support bar Symmetrical above and below on the upside of left wall to be respectively connected with pole, pole top is respectively connected with the 3rd cunning with symmetrical above and below on the upside of support bar antetheca Block, slidingtype is connected with the 3rd slide rail on the 3rd sliding block, and the 3rd slide rail left end is connected with the first sliding block, and the 3rd of upper and lower both sides slide Connecting rod is connected between on the right side of rail, electric pushrod, the output shaft and connecting rod of electric pushrod are installed on the upside of support bar antetheca Connection, the first sliding block left side of upper and lower both sides are connected with the second installing plate, and the first servomotor is installed on the left of the second installing plate, It is connected on the upside of second installing plate left wall with first baffle, when user of service needs to use present apparatus installation laying petroleum pipeline, When needing to move left and right petroleum pipeline, electric pushrod can be started, electric pushrod drives connecting rod to move right, then connecting rod The 3rd slide rail will be driven to move right, the 3rd slide rail moves right and the first sliding block will be driven to move right, the first sliding block to Moving right will drive the first slide rail also to move right, and so as to drive petroleum pipeline to move right, be driven when enabling electric pushrod Connecting rod is moved to the left, and then connecting rod will drive the 3rd slide rail to be moved to the left, and the 3rd slide rail, which is moved to the left, will drive One sliding block is moved to the left, and the first sliding block, which is moved to the left, will drive the first slide rail to be also moved to the left, so as to drive petroleum pipeline to Move left, thus convenient use personnel control petroleum pipeline freely moves left and right.
Because also including laser pen, the 3rd installing plate and graduated scale, fix bar right-hand member is connected with laser pen, before support bar The 3rd installing plate is connected with the downside of wall, the 3rd installing plate left wall is connected with graduated scale, and graduated scale coordinates with laser pen, works as user When member needs to use present apparatus installation laying petroleum pipeline, because the present apparatus is provided with laser pen and graduated scale, laser pen and quarter Degree chi is used cooperatively, and when needing that petroleum pipeline accurately is placed into some position, user of service's can, which utilizes, to swash Light pen and graduated scale are operated, because fix bar can move up, fix bar, which moves up, will drive laser pen Move up, after user of service starts laser pen, the light of laser pen will shine on the scale, and then user of service can Accurately to know how many height risen, the installation laying scope of petroleum pipeline thus can be more accurately controlled, because Fix bar is connected with the second slide rail, and the second slide rail is connected with the second sliding block, the second sliding block be can conveniently place it is different size of Petroleum pipeline, at the same can also by the cooperation of laser pen and graduated scale, accurately control petroleum pipeline can also to the left or Person moves right how many, passes through these cooperations, it is possible to largely solve the irrationality of petroleum pipeline installation, Yi Jifang Leakage problem when only the petroleum pipeline later stage uses.
Because also include the 4th installing plate, the second servomotor, bearing block, flat belt, endless glide, Four-slider, Bull stick and belt pulley, support bar bottom are connected with the 4th installing plate, and the first groove, base top connection are provided with the right side of base top There is an endless glide, the left and right sides slidingtype is connected with Four-slider, Four-slider and the 4th installing plate bottom in endless glide Connection, the interior right side of base are provided with the second servomotor, and middle part is connected with bearing block in base, and bull stick is connected with bearing block, Belt pulley is respectively connected with the middle part of bull stick and on the second servo motor output shaft, flat belt is wound between the belt pulley of the left and right sides, It is connected at the top of bull stick with the 4th installing plate bottom, when user of service needs to use present apparatus installation laying petroleum pipeline, installation Period needs to drive petroleum pipeline when being rotated, and user of service's can enables the work of the second servomotor, the second servo electricity Machine will drive pulley rotation, and now the belt pulley on right side by flat belt, will drive the pulley rotation in left side, then Bar rotation is driven, then bull stick will drive support bar to rotate, and support bar rotates can and drives petroleum pipeline to rotate, so Convenient use personnel rotate petroleum pipeline and are transported to required position.
Because also including chamber door and handle, the second groove is provided with the left of base front wall, base front wall passes on left hinge The mode of connection is connected with chamber door, and handle is connected with the left of chamber door antetheca, when user of service is carrying out petroleum pipeline installation laying During work, the instrument needed to use during some other laying petroleum pipeline can be used, the present apparatus is provided with chamber door, works as user of service Need place laying petroleum pipeline when need to use instrument when, it is possible to pull open handle, instrument be put into, when need take out work Tool is used in use, just pulling open handle and taking out instrument, and some laying petroleum pipelines can be thus placed with convenient use personnel When the instrument that needs to use.
Because the material of support bar is Q235 steel, Q235 steel hardness is high, it is not easy to deforms, makes the service life of support bar more It is long.
(3) beneficial effect
The present invention devises a kind of petroleum pipeline installation laying boom hoisting, by being provided with the second sliding block, when need When placing different size of pipeline, now can moves the second sliding block, slidingtype connection the at left and right sides of the second slide rail Two sliding blocks, when needing to place less petroleum pipeline, user of service's can is by the second sliding block of the left and right sides to inner side It is mobile, it will now drive front and rear symmetrical first steel wire rope also to move inward, then can also drive rubber sleave to inner side It is mobile, less petroleum pipeline can be thus placed, when needing to place larger petroleum pipeline, user of service's can will Second sliding block of the left and right sides moves laterally, will now drive front and rear symmetrical first steel wire rope also to move laterally, Then it can also drive rubber sleave to move laterally, can thus place larger petroleum pipeline, so allowing for device can To lift by crane different size of petroleum pipeline, first baffle is also provided with, because installation laying petroleum pipeline is all to carry out out of doors , and it is portable progress, so inconvenient protection device, first baffle can keep off the rain water, protect drive mechanism to make it not It is easily damaged.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the main structure diagram of placement mechanism of the present invention.
Fig. 3 is the main structure diagram of drive mechanism of the present invention.
Fig. 4 is second of main structure diagram of the present invention.
Fig. 5 is the third main structure diagram of the present invention.
Fig. 6 is the 4th kind of main structure diagram of the present invention.
Fig. 7 is the part main structure diagram of the present invention.
Mark in accompanying drawing for:1- bases, 2- support bars, 3- placement mechanisms, 4- drive mechanisms, 31- supports, 32- first Sliding block, the slide rails of 33- first, 34- fix bars, the slide rails of 35- second, the sliding blocks of 36- second, the steel wire ropes of 37- first, 38- rubber sleaves, The installing plates of 41- first, 42- first baffles, 43- ring baffles, the servomotors of 44- first, 45- reels, the steel wires of 46- second Rope, 5- poles, the sliding blocks of 6- the 3rd, the installing plates of 7- second, the slide rails of 8- the 3rd, 9- connecting rods, 10- electric pushrods, 11- laser pens, The installing plates of 12- the 3rd, 13- graduated scales, the installing plates of 14- the 4th, the grooves of 15- first, the servomotors of 16- second, 17- bearing blocks, 18- flat belts, 19- endless glides, 20- Four-sliders, 21- bull sticks, 22- belt pulleys, 23- chamber doors, the grooves of 24- second, 25- handles Hand.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of petroleum pipeline installs laying boom hoisting, as shown in figs. 1-7, includes base 1, support bar 2, placement machine Structure 3 and drive mechanism 4, the top of base 1 are connected with support bar 2, placement mechanism 3, placement mechanism are connected with the upside of the left wall of support bar 2 3 left sides are connected with drive mechanism 4.
Embodiment 2
A kind of petroleum pipeline installs laying boom hoisting, as shown in figs. 1-7, includes base 1, support bar 2, placement machine Structure 3 and drive mechanism 4, the top of base 1 are connected with support bar 2, placement mechanism 3, placement mechanism are connected with the upside of the left wall of support bar 2 3 left sides are connected with drive mechanism 4.
Placement mechanism 3 includes support 31, the first sliding block 32, the first slide rail 33, fix bar 34, the second slide rail 35, second Sliding block 36, the first steel wire rope 37 and rubber sleave 38, the left wall of support bar 2 upside are connected with support 31, and the left side of support 31 is right up and down Title is respectively connected with the first sliding block 32, and slidingtype is connected with the first slide rail 33 on the first sliding block 32, and the bottom of the first slide rail 33 is connected with Fix bar 34, the inner bottom part of fix bar 34 are connected with the second slide rail 35, and the left and right sides of the second slide rail 35 slidingtype is connected with second Sliding block 36, the first steel wire rope 37 is symmetrically connected with before and after the bottom of the second sliding block 36, the bottom of the first steel wire rope 37 of the left and right sides is equal It is connected with rubber sleave 38.
Embodiment 3
A kind of petroleum pipeline installs laying boom hoisting, as shown in figs. 1-7, includes base 1, support bar 2, placement machine Structure 3 and drive mechanism 4, the top of base 1 are connected with support bar 2, placement mechanism 3, placement mechanism are connected with the upside of the left wall of support bar 2 3 left sides are connected with drive mechanism 4.
Placement mechanism 3 includes support 31, the first sliding block 32, the first slide rail 33, fix bar 34, the second slide rail 35, second Sliding block 36, the first steel wire rope 37 and rubber sleave 38, the left wall of support bar 2 upside are connected with support 31, and the left side of support 31 is right up and down Title is respectively connected with the first sliding block 32, and slidingtype is connected with the first slide rail 33 on the first sliding block 32, and the bottom of the first slide rail 33 is connected with Fix bar 34, the inner bottom part of fix bar 34 are connected with the second slide rail 35, and the left and right sides of the second slide rail 35 slidingtype is connected with second Sliding block 36, the first steel wire rope 37 is symmetrically connected with before and after the bottom of the second sliding block 36, the bottom of the first steel wire rope 37 of the left and right sides is equal It is connected with rubber sleave 38.
Drive mechanism 4 includes the first installing plate 41, first baffle 42, ring baffle 43, the first servomotor 44, coiling The steel wire rope 46 of wheel 45 and second, the left wall of the first sliding block 32 of downside are connected with the first installing plate 41, and the top of the first installing plate 41 connects First baffle 42 is connected to, the bottom of first baffle 42 is connected with ring baffle 43, and the left side of the first installing plate 41 is provided with the first servo Motor 44, the first servomotor 44 are located at the lower section of first baffle 42, reel 45 are connected with the output shaft of the first servomotor 44, The second steel wire rope 46 is wound with reel 45, the bottom of the second steel wire rope 46 is connected with fix bar 34.
Embodiment 4
A kind of petroleum pipeline installs laying boom hoisting, as shown in figs. 1-7, includes base 1, support bar 2, placement machine Structure 3 and drive mechanism 4, the top of base 1 are connected with support bar 2, placement mechanism 3, placement mechanism are connected with the upside of the left wall of support bar 2 3 left sides are connected with drive mechanism 4.
Placement mechanism 3 includes support 31, the first sliding block 32, the first slide rail 33, fix bar 34, the second slide rail 35, second Sliding block 36, the first steel wire rope 37 and rubber sleave 38, the left wall of support bar 2 upside are connected with support 31, and the left side of support 31 is right up and down Title is respectively connected with the first sliding block 32, and slidingtype is connected with the first slide rail 33 on the first sliding block 32, and the bottom of the first slide rail 33 is connected with Fix bar 34, the inner bottom part of fix bar 34 are connected with the second slide rail 35, and the left and right sides of the second slide rail 35 slidingtype is connected with second Sliding block 36, the first steel wire rope 37 is symmetrically connected with before and after the bottom of the second sliding block 36, the bottom of the first steel wire rope 37 of the left and right sides is equal It is connected with rubber sleave 38.
Drive mechanism 4 includes the first installing plate 41, first baffle 42, ring baffle 43, the first servomotor 44, coiling The steel wire rope 46 of wheel 45 and second, the left wall of the first sliding block 32 of downside are connected with the first installing plate 41, and the top of the first installing plate 41 connects First baffle 42 is connected to, the bottom of first baffle 42 is connected with ring baffle 43, and the left side of the first installing plate 41 is provided with the first servo Motor 44, the first servomotor 44 are located at the lower section of first baffle 42, reel 45 are connected with the output shaft of the first servomotor 44, The second steel wire rope 46 is wound with reel 45, the bottom of the second steel wire rope 46 is connected with fix bar 34.
Also include pole 5, the 3rd sliding block 6, the second installing plate 7, the 3rd slide rail 8, connecting rod 9 and electric pushrod 10, prop up Symmetrical above and below on the upside of the left wall of strut 2 to be respectively connected with pole 5, the top of pole 5 is respectively connected with symmetrical above and below on the upside of the antetheca of support bar 2 3rd sliding block 6, slidingtype is connected with the 3rd slide rail 8 on the 3rd sliding block 6, and the left end of the 3rd slide rail 8 is connected with the first sliding block 32, up and down Connecting rod 9 is connected between the right side of the 3rd slide rail 8 of both sides, electric pushrod 10, electric pushrod are installed on the upside of the antetheca of support bar 2 10 output shaft is connected with connecting rod 9, and the left side of the first sliding block 32 of upper and lower both sides is connected with the second installing plate 7, the first servo electricity Machine 44 is installed on the left side of the second installing plate 7, is connected on the upside of the left wall of the second installing plate 7 with first baffle 42.
Also include laser pen 11, the 3rd installing plate 12 and graduated scale 13, the right-hand member of fix bar 34 is connected with laser pen 11, branch The 3rd installing plate 12 is connected with the downside of the antetheca of strut 2, the left wall of the 3rd installing plate 12 is connected with graduated scale 13, graduated scale 13 and laser Pen 11 coordinates.
Also include the 4th installing plate 14, the second servomotor 16, bearing block 17, flat belt 18, endless glide the 19, the 4th Sliding block 20, bull stick 21 and belt pulley 22, the bottom of support bar 2 are connected with the 4th installing plate 14, and it is recessed that the top right side of base 1 is provided with first Groove 15, the top of base 1 are connected with endless glide 19, and the left and right sides slidingtype is connected with Four-slider 20 in endless glide 19, Four-slider 20 is connected with the bottom of the 4th installing plate 14, and right side is provided with the second servomotor 16, the interior middle part of base 1 in base 1 Bearing block 17 is connected with, bull stick 21 is connected with bearing block 17, the middle part of bull stick 21 on the output shaft of the second servomotor 16 with connecting Belt pulley 22 is connected to, flat belt 18, the top of bull stick 21 and the bottom of the 4th installing plate 14 are wound between the belt pulley 22 of the left and right sides Connection.
Also include chamber door 23 and handle 25, be provided with the second groove 24 on the left of the antetheca of base 1, the antetheca of base 1 passes on left The mode of hinge connection is connected with chamber door 23, and handle 25 is connected with the left of the antetheca of chamber door 23.
The material of support bar 2 is Q235 steel.
Operation principle:When needing to use the present apparatus to lay petroleum pipeline, drive mechanism 4 can be enabled and drive boom hoisting Start working, petroleum pipeline installation is then routed to required position with placement mechanism 3.
Because placement mechanism 3 include support 31, the first sliding block 32, the first slide rail 33, fix bar 34, the second slide rail 35, Second sliding block 36, the first steel wire rope 37 and rubber sleave 38, are connected with support 31 on the upside of the left wall of support bar 2, on the left side of support 31 The first sliding block 32 is symmetrically respectively connected with down, and slidingtype is connected with the first slide rail 33 on the first sliding block 32, and the bottom of the first slide rail 33 connects Fix bar 34 is connected to, the inner bottom part of fix bar 34 is connected with the second slide rail 35, and the left and right sides of the second slide rail 35 slidingtype is connected with Second sliding block 36, the first steel wire rope 37, the bottom of the first steel wire rope 37 of the left and right sides are symmetrically connected with before and after the bottom of the second sliding block 36 Portion is respectively connected with rubber sleave 38, when user of service needs to use placement mechanism 3 to place petroleum pipeline so as to be lifted by crane, just Pipeline can be placed on rubber sleave 38, placement mechanism 3 is provided with the second sliding block 36, when needing to place different size of pipe During road, now can moves the second sliding block 36, and the left and right sides of the second slide rail 35 slidingtype connects the second sliding block 36, works as needs When placing less petroleum pipeline, user of service's can moves inward the second sliding block 36 of the left and right sides, now Front and rear symmetrical first steel wire rope 37 can be driven also to move inward, then also rubber sleave 38 can be driven to move inward, this Sample can places less petroleum pipeline, and when needing to place larger petroleum pipeline, user of service's can is by left and right two Second sliding block 36 of side moves laterally, will now drive front and rear symmetrical first steel wire rope 37 also to move laterally, so Also rubber sleave 38 can be driven to move laterally afterwards, can thus place larger petroleum pipeline, so allowing for device can To lift by crane different size of petroleum pipeline.
Because drive mechanism 4 include the first installing plate 41, first baffle 42, ring baffle 43, the first servomotor 44, The steel wire rope 46 of reel 45 and second, the left wall of the first sliding block 32 of downside are connected with the first installing plate 41, and the first installing plate 41 pushes up Portion is connected with first baffle 42, and the bottom of first baffle 42 is connected with ring baffle 43, and the left side of the first installing plate 41 is provided with first Servomotor 44, the first servomotor 44 are located at the lower section of first baffle 42, coiling are connected with the output shaft of the first servomotor 44 45 are taken turns, the second steel wire rope 46 is wound with reel 45, the bottom of the second steel wire rope 46 is connected with fix bar 34, when user of service needs When using drive mechanism 4, petroleum pipeline is lifted by crane, when needing to make petroleum pipeline increase, user of service's can enables first and watched Motor 44 is taken, drives reel 45 to reel the second steel wire rope 46 by starting the first servomotor 44, this can to fix Bar 34 rises, it is possible to drives petroleum pipeline also to rise, when needing to decline petroleum pipeline, by starting the first servomotor 44 drive reels 45 unclasp the second steel wire rope 46, and this can causes fix bar 34 to decline, it is possible to drives petroleum pipeline Decline, thus the free rise and fall of convenient use personnel control petroleum pipeline, the present apparatus are also provided with first gear herein Plate 42, because installation laying petroleum pipeline is all carried out out of doors, and it is portable progress, so being inconvenient to protect dress Put, first baffle 42 can keep off the rain water, and the first servomotor 44 of protection is less likely to be damaged it.
Because also include pole 5, the 3rd sliding block 6, the second installing plate 7, the 3rd slide rail 8, connecting rod 9 and electric pushrod 10, the left wall of support bar 2 upside is symmetrical above and below to be respectively connected with pole 5, and the top of pole 5 is symmetrical above and below with the antetheca of support bar 2 upside The 3rd sliding block 6 is connected with, slidingtype is connected with the 3rd slide rail 8 on the 3rd sliding block 6, and the left end of the 3rd slide rail 8 connects with the first sliding block 32 Connect, be connected with connecting rod 9 between the right side of the 3rd slide rail 8 of upper and lower both sides, electric pushrod 10 is installed on the upside of the antetheca of support bar 2, The output shaft of electric pushrod 10 is connected with connecting rod 9, and the left side of the first sliding block 32 of upper and lower both sides is connected with the second installing plate 7, the One servomotor 44 is installed on the left side of the second installing plate 7, is connected on the upside of the left wall of the second installing plate 7 with first baffle 42, works as use , it is necessary to when moving left and right petroleum pipeline when personnel need to use present apparatus installation laying petroleum pipeline, electric pushrod can be started 10, electric pushrod 10 drives connecting rod 9 to move right, and then connecting rod 9 will drive the 3rd slide rail 8 to move right, and the 3rd slides Rail 8, which moves right, will drive the first sliding block 32 to move right, and the first sliding block 32, which moves right, will drive the first slide rail 33 Move right, so as to drive petroleum pipeline to move right, drive connecting rod 9 to be moved to the left when enabling electric pushrod 10, Ran Houlian Extension bar 9 will drive the 3rd slide rail 8 to be moved to the left, and the 3rd slide rail 8, which is moved to the left, will drive the first sliding block 32 to be moved to the left, the One sliding block 32, which is moved to the left, will drive the first slide rail 33 to be also moved to the left, so as to drive petroleum pipeline to be moved to the left, thus Convenient use personnel control petroleum pipeline freely moves left and right.
Because also including laser pen 11, the 3rd installing plate 12 and graduated scale 13, the right-hand member of fix bar 34 is connected with laser pen 11, the antetheca of support bar 2 downside is connected with the 3rd installing plate 12, and the left wall of the 3rd installing plate 12 is connected with graduated scale 13, graduated scale 13 Coordinate with laser pen 11, when user of service needs to use present apparatus installation laying petroleum pipeline, swash because the present apparatus is provided with Light pen 11 and graduated scale 13, laser pen 11 and graduated scale 13 are used cooperatively, when petroleum pipeline is accurately placed into by needs During some position, user of service's can is operated using laser pen 11 and graduated scale 13, because fix bar 34 is can be to Upper movement, fix bar 34, which moves up, will drive laser pen 11 to move up, and after user of service starts laser pen 11, swash The light of light pen 11 will be impinged upon on graduated scale 13, and then user of service's can accurately knows how many height risen, this Sample can more accurately controls the installation laying scope of petroleum pipeline, because the slide rail 35 of fix bar 34 and second connects, second Slide rail 35 is connected with the second sliding block 36, and the second sliding block 36 can conveniently place different size of petroleum pipeline, while also may be used By the cooperation of laser pen 11 and graduated scale 13, accurately to control petroleum pipeline to the left or can also move right how many, Pass through these cooperations, it is possible to largely solve the irrationality of petroleum pipeline installation, and prevent the petroleum pipeline later stage Leakage problem during use.
Because also include the 4th installing plate 14, the second servomotor 16, bearing block 17, flat belt 18, endless glide 19, Four-slider 20, bull stick 21 and belt pulley 22, the bottom of support bar 2 are connected with the 4th installing plate 14, and the top right side of base 1 is provided with One groove 15, the top of base 1 are connected with endless glide 19, and the left and right sides slidingtype is connected with Four-slider in endless glide 19 20, Four-slider 20 is connected with the bottom of the 4th installing plate 14, and right side is provided with the second servomotor 16 in base 1, during base 1 is interior Portion is connected with bearing block 17, is connected with bull stick 21 in bearing block 17, the middle part of bull stick 21 with the output shaft of the second servomotor 16 Belt pulley 22 is connected with, flat belt 18, the top of bull stick 21 and the bottom of the 4th installing plate 14 are wound between the belt pulley 22 of the left and right sides Portion connects, and when user of service needs to use present apparatus installation laying petroleum pipeline, needs to drive petroleum pipeline to enter during installation When row rotates, user of service's can enables the second servomotor 16 and worked, and the second servomotor 16 will drive belt pulley 22 Rotate, now the belt pulley 22 on right side by flat belt 18, will drive the belt pulley 22 in left side to rotate, and then drive bull stick 21 Rotate, then bull stick 21 will drive support bar 2 to rotate, and support bar 2 rotates can and drives petroleum pipeline to rotate, thus side Just user of service rotates petroleum pipeline and is transported to required position.
Because also including chamber door 23 and handle 25, the second groove 24, the antetheca of base 1 left side are provided with the left of the antetheca of base 1 Chamber door 23 is connected with by way of hinge connection, handle 25 is connected with the left of the antetheca of chamber door 23, when user of service is carrying out stone During oil-piping installation laying work, the instrument needed to use during some other laying petroleum pipeline can be used, the present apparatus is provided with Chamber door 23, when the instrument that user of service needs placement to be needed to use when laying petroleum pipeline, it is possible to handle 25 is pulled open, work Tool is put into, and is used when needing taking-up instrument in use, just pulling open handle 25 and taking out instrument, thus can be with convenient use personnel Place the instrument needed to use during some laying petroleum pipelines.
Because the material of support bar 2 is Q235 steel, Q235 steel hardness is high, it is not easy to deforms, makes the service life of support bar 2 It is longer.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (8)

1. a kind of petroleum pipeline installs laying boom hoisting, it is characterised in that includes base (1), support bar (2), places Mechanism (3) and drive mechanism (4), base (1) top are connected with support bar (2), placement machine are connected with the upside of support bar (2) left wall Structure (3), placement mechanism (3) left side are connected with drive mechanism (4).
A kind of 2. petroleum pipeline installation laying boom hoisting according to claim 1, it is characterised in that placement mechanism (3) support (31), the first sliding block (32), the first slide rail (33), fix bar (34), the second slide rail (35), the second sliding block are included (36), the first steel wire rope (37) and rubber sleave (38), support bar (2) left wall upside are connected with support (31), and support (31) is left Side is symmetrical above and below to be respectively connected with the first sliding block (32), and slidingtype is connected with the first slide rail (33) on the first sliding block (32), and first slides Rail (33) bottom is connected with fix bar (34), and fix bar (34) inner bottom part is connected with the second slide rail (35), and the second slide rail (35) is left The right equal slidingtype in both sides is connected with the second sliding block (36), and the first steel wire rope is symmetrically connected with before and after the second sliding block (36) bottom (37), the first steel wire rope (37) bottom of the left and right sides is respectively connected with rubber sleave (38).
A kind of 3. petroleum pipeline installation laying boom hoisting according to claim 2, it is characterised in that drive mechanism (4) the first installing plate (41), first baffle (42), ring baffle (43), the first servomotor (44), reel (45) are included With the second steel wire rope (46), the first sliding block (32) left wall of downside is connected with the first installing plate (41), the first installing plate (41) top Portion is connected with first baffle (42), and first baffle (42) bottom is connected with ring baffle (43), pacified on the left of the first installing plate (41) Equipped with the first servomotor (44), the first servomotor (44) is located at below first baffle (42), and the first servomotor (44) is defeated Reel (45) is connected with shaft, the second steel wire rope (46) is wound with reel (45), the second steel wire rope (46) bottom is with consolidating Fixed pole (34) connects.
4. a kind of petroleum pipeline installation laying boom hoisting according to claim 3, it is characterised in that also include branch Bar (5), the 3rd sliding block (6), the second installing plate (7), the 3rd slide rail (8), connecting rod (9) and electric pushrod (10), support bar (2) It is symmetrical above and below on the upside of left wall to be respectively connected with pole (5), it is all connected with the top of pole (5) with symmetrical above and below on the upside of support bar (2) antetheca There is the 3rd sliding block (6), slidingtype is connected with the 3rd slide rail (8), the 3rd slide rail (8) left end and the first sliding block on the 3rd sliding block (6) (32) connect, be connected with connecting rod (9) between the 3rd slide rail (8) right side of upper and lower both sides, be provided with the upside of support bar (2) antetheca Electric pushrod (10), the output shaft of electric pushrod (10) are connected with connecting rod (9), are connected on the left of the first sliding block (32) of upper and lower both sides The second installing plate (7) is connected to, the first servomotor (44) is installed on the left of the second installing plate (7), in the second installing plate (7) left wall Side is connected with first baffle (42).
5. a kind of petroleum pipeline installation laying boom hoisting according to claim 4, it is characterised in that also include sharp Light pen (11), the 3rd installing plate (12) and graduated scale (13), fix bar (34) right-hand member are connected with laser pen (11), support bar (2) Be connected with the 3rd installing plate (12) on the downside of antetheca, the 3rd installing plate (12) left wall is connected with graduated scale (13), graduated scale (13) with Laser pen (11) coordinates.
6. a kind of petroleum pipeline installation laying boom hoisting according to claim 5, it is characterised in that also include the Four installing plates (14), the second servomotor (16), bearing block (17), flat belt (18), endless glide (19), Four-slider (20), bull stick (21) and belt pulley (22), support bar (2) bottom are connected with the 4th installing plate (14), and base (1) top right side is opened There is the first groove (15), endless glide (19) is connected with the top of base (1), the left and right sides slidingtype connects in endless glide (19) Four-slider (20) is connected to, Four-slider (20) is connected with the 4th installing plate (14) bottom, and right side is provided with second in base (1) Servomotor (16), the interior middle part of base (1) are connected with bearing block (17), bull stick (21), bull stick are connected with bearing block (17) (21) middle part on the second servomotor (16) output shaft with being respectively connected with belt pulley (22), between the belt pulley (22) of the left and right sides Flat belt (18) is wound with, is connected at the top of bull stick (21) with the 4th installing plate (14) bottom.
7. a kind of petroleum pipeline installation laying boom hoisting according to claim 6, it is characterised in that also include case Door (23) and handle (25), base (1) antetheca left side are provided with the second groove (24), and base (1) antetheca passes on left hinge connection Mode be connected with chamber door (23), be connected with handle (25) on the left of chamber door (23) antetheca.
A kind of 8. petroleum pipeline installation laying boom hoisting according to claim 7, it is characterised in that support bar (2) Material be Q235 steel.
CN201710733937.3A 2017-08-24 2017-08-24 A kind of petroleum pipeline installation laying boom hoisting Active CN107487705B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710733937.3A CN107487705B (en) 2017-08-24 2017-08-24 A kind of petroleum pipeline installation laying boom hoisting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710733937.3A CN107487705B (en) 2017-08-24 2017-08-24 A kind of petroleum pipeline installation laying boom hoisting

Publications (2)

Publication Number Publication Date
CN107487705A true CN107487705A (en) 2017-12-19
CN107487705B CN107487705B (en) 2019-04-16

Family

ID=60646564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710733937.3A Active CN107487705B (en) 2017-08-24 2017-08-24 A kind of petroleum pipeline installation laying boom hoisting

Country Status (1)

Country Link
CN (1) CN107487705B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108373112A (en) * 2018-01-31 2018-08-07 连雪琼 A kind of petroleum pipeline installation laying boom hoisting
CN112571079A (en) * 2020-11-30 2021-03-30 王振凯 Pipe gallery and pipeline integrated construction device and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130121769A1 (en) * 2010-07-23 2013-05-16 Pearse Gately Pipe laying device
CN203715108U (en) * 2013-11-27 2014-07-16 国家电网公司 Lifting equipment
CN203754289U (en) * 2014-03-17 2014-08-06 北京金风科创风电设备有限公司 Crane in wind turbine generator system
CN105540415A (en) * 2016-02-17 2016-05-04 成都高峰石油机械有限公司 Hoisting device for hoisting petroleum pipeline
CN205676037U (en) * 2016-06-22 2016-11-09 李迪 Equipment installed by a kind of petroleum pipeline for different geological conditions

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130121769A1 (en) * 2010-07-23 2013-05-16 Pearse Gately Pipe laying device
CN203715108U (en) * 2013-11-27 2014-07-16 国家电网公司 Lifting equipment
CN203754289U (en) * 2014-03-17 2014-08-06 北京金风科创风电设备有限公司 Crane in wind turbine generator system
CN105540415A (en) * 2016-02-17 2016-05-04 成都高峰石油机械有限公司 Hoisting device for hoisting petroleum pipeline
CN205676037U (en) * 2016-06-22 2016-11-09 李迪 Equipment installed by a kind of petroleum pipeline for different geological conditions

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108373112A (en) * 2018-01-31 2018-08-07 连雪琼 A kind of petroleum pipeline installation laying boom hoisting
CN108373112B (en) * 2018-01-31 2019-05-14 林传醒 A kind of petroleum pipeline installation laying boom hoisting
CN112571079A (en) * 2020-11-30 2021-03-30 王振凯 Pipe gallery and pipeline integrated construction device and construction method

Also Published As

Publication number Publication date
CN107487705B (en) 2019-04-16

Similar Documents

Publication Publication Date Title
CN102645346A (en) Novel submarine pipe soil interaction model test platform
CN110441028B (en) Experimental device capable of simulating landslide and impact caused by liquefaction of seabed sandy soil
CN105571790B (en) A kind of air-tightness detection device
CN107487705A (en) A kind of petroleum pipeline installs laying boom hoisting
CN111650002A (en) Hydrogeology water quality sampling device and use method thereof
CN206654651U (en) It is capable of the lifting appliance of Fast Installation petroleum pipeline
CN106093046B (en) Submerged pipeline horizontal direction pipeclay interaction test system
CN205634751U (en) Portable car maintenance station and formula of cutting machine of lifting thereof
CN108894182A (en) A kind of landslide trigger device and method applied to the research of submarine landslide flume test
CN106053130B (en) A kind of phytal zone Underwater Deep Silt columnar deposition matter collection device
CN206855488U (en) The adjustable mobile robot test device of the gradient
CN205898794U (en) Towed landslide model test device based on field monitoring
CN204903300U (en) Testing arrangement is cuted in drilling of soil body normal position
CN212844493U (en) Water quality sampling equipment for hydrology and water resource engineering
CN202631275U (en) Novel seabed pipe soil interacting model test platform
CN108088640A (en) Chemical barrel reliability test
CN110887954A (en) Physical simulation experiment device and method capable of controlling soil cave forming process
CN204188506U (en) A kind of novel micro-control kinetic friction coefficient tester
CN208234420U (en) Construction site Miniature hanging device
CN203758880U (en) Experiment device for researching permeation mechanism of low-permeability oil layer
CN206593902U (en) A kind of oil tank sampler
CN110847223A (en) Positioning construction ship capable of completing overwater steel pipe pile sinking operation
CN208721453U (en) Petroleum sampler suitable for petroleum geology exploration
CN207776788U (en) Extreme low-altitude full-sleeve full-rotation drill
CN206458373U (en) Change the servicing unit of oil pumper rope plait

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190321

Address after: 312500 No. 80 Wozhou Road, Xinchang County, Shaoxing City, Zhejiang Province

Applicant after: XINCHANG XING'OU INTELLIGENT TECHNOLOGY Co.,Ltd.

Address before: No. 36, Yuelu District Lu Mountain Road, Changsha, Hunan

Applicant before: Yan Jiexiong

GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20171219

Assignee: Shanxun Intelligent Technology (Hangzhou) Co.,Ltd.

Assignor: XINCHANG XING'OU INTELLIGENT TECHNOLOGY Co.,Ltd.

Contract record no.: X2021330000668

Denomination of invention: A lifting device for oil pipeline installation and laying

Granted publication date: 20190416

License type: Common License

Record date: 20211104

EC01 Cancellation of recordation of patent licensing contract
EC01 Cancellation of recordation of patent licensing contract

Assignee: Shanxun Intelligent Technology (Hangzhou) Co.,Ltd.

Assignor: XINCHANG XING'OU INTELLIGENT TECHNOLOGY Co.,Ltd.

Contract record no.: X2021330000668

Date of cancellation: 20230220