CN110080111A - Cast-in-Situ Box Girders pre-pressing bracket construction method - Google Patents

Cast-in-Situ Box Girders pre-pressing bracket construction method Download PDF

Info

Publication number
CN110080111A
CN110080111A CN201910319946.7A CN201910319946A CN110080111A CN 110080111 A CN110080111 A CN 110080111A CN 201910319946 A CN201910319946 A CN 201910319946A CN 110080111 A CN110080111 A CN 110080111A
Authority
CN
China
Prior art keywords
water tank
water
load
pressing bracket
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910319946.7A
Other languages
Chinese (zh)
Inventor
孙浩
张秀艳
李东海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201910319946.7A priority Critical patent/CN110080111A/en
Publication of CN110080111A publication Critical patent/CN110080111A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention provides a kind of Cast-in-Situ Box Girders pre-pressing bracket construction method, before pre-pressing bracket, beam bottom each section unwrapping wire piecemeal is numbered, determines the position of each load assignment;According to load assignment, water tank quantity needed for calculating each region;According to the water tank and water tank quantity of the applicable volume of the payload values of calculation on Construction and live site area selection;Water tank is hung and serves frame body, according to load assignment arrangement water tank location;It is filled the water step by step using water pump into water tank, carries out pre-pressing bracket load;It opens discharging valve and the water in water tank is released into unloading, in addition water tank, which hangs precompressed and shows sound, to be piled up for use, the method does not need manually to load weight, material is manually brought up into mast-up, load is pressed onto precompressed construction height with water with water pump, and pre- hydraulic water can recycle, environmentally protective.

Description

Cast-in-Situ Box Girders pre-pressing bracket construction method
Technical field
The invention belongs to construction engineering technical fields, and in particular to a kind of Cast-in-Situ Box Girders pre-pressing bracket construction method.
Background technique
With the continuous accumulation of bridge construction experience, the work of Cast-in-Situ Box Girders pre-pressing bracket is proved to be very important. Because the calculation formula for calculating bracket settling amount is that approximate, precision is limited.By the way that inelastic deformation can be eliminated after precompressed, Obtain the accurate numerical value of flexible deformation.Cast-in-Situ Box Girders pre-pressing bracket is constructed at present, before pre-pressing bracket, by each portion of beam bottom Divide unwrapping wire piecemeal number, sand hangs the mode sent using artificial pack, crane.The sand pocket for first hanging every a batch before sending and sending is hung to carry out It weighs weighing, and places on record.Sandbag is hung serve frame after, manually stacked according to the load assignment situation of calculating.Precompressed is complete Cheng Hou hangs the mode sent again by crane and is unloaded.Manpower is excessively relied in the construction of cast-in-place box beam bracket precompressed at present, is applied Work complex steps, have seriously affected construction speed.
Summary of the invention
It is an object of the invention to reduce the workload of construction personnel, while simplifying the construction process of pre-pressing bracket, improves Working efficiency.
Realize that foregoing invention purpose adopts the following technical scheme that
A kind of Cast-in-Situ Box Girders pre-pressing bracket construction method, follows the steps below:
1) surveying setting-out: before pre-pressing bracket, beam bottom each section unwrapping wire piecemeal is numbered, with the position of each load assignment of determination It sets;
2) each regional water use amount distribution is calculated: according to load assignment, water tank quantity needed for calculating each region;
3) water tank is chosen: according to the water tank and water of the applicable volume of the payload values of calculation on Construction and live site area selection Box number;
4) water tank lifts: hanging water tank according to calculated result and serves frame body, according to load assignment arrangement water tank location;
5) pre-pressing bracket loads: being filled the water using water pump into water tank, calculates water injection time, control load according to pump capacity Size;
6) it unloads: opening discharging valve and release the water in water tank, water tank hangs frame top with crane, and rule piles up and gives over to next time It uses.
In this method, the water tank is steel water tank or plastic cistern.Steel water tank field fabrication is convenient, the number of turnover It is high;Plastic cistern size category is more, convenient transportation.
In above-mentioned construction procedure, loaded when precompressed load using precompressed step by step: the first order is loaded onto the 50% of gross weight, Bottom plate, web reinforcement, presstressed reinforcing steel, internal model installation, the installation of top plate edge of a wing reinforcing bar and presstressed reinforcing steel are completed for simulating Process, load consider by being distributed on bottom plate;The second level is loaded onto the 75% of gross weight, for simulating underplate concrete, oblique abdomen Board concrete, top plate and edge of a wing board concrete pour to form the tunneling boring of certain construction gradient, at the same can simulate top, Bottom, edge of a wing board concrete span centre section least favorable stress;Third level loading mode is loaded onto the 100% of gross weight, mould Quasi- box beam concrete pours the situation of completion.
Water in water tank of the present invention is after the completion of precompressed is constructed for concrete curing, site operation water or scene drop Dirt.
Beneficial effects of the present invention: this construction method does not need manually to load weight, and material is manually brought up to mast-up, and It is that sand material is replaced with water, the filling restocking of water water pump is saved largely manually, used after precompressed compared with conventional construction method Water energy recycles, environmentally protective, does not generate fugitive dust, meets green construction principle.Present invention production is simple and convenient to operate, can Construction efficiency is greatly improved, is shortened the construction period, the use of material and mechanical equipment is reduced, cost is greatly saved.
Detailed description of the invention
Fig. 1 steel water tank Facad structure figure;
Fig. 2 is steel water tank side view;
Fig. 3 is steel water tank angle of depression figure.
Specific embodiment
Below to the detailed description of the invention:
It is existing
A kind of Cast-in-Situ Box Girders pre-pressing bracket construction method, follows the steps below:
1) surveying setting-out: before pre-pressing bracket, beam bottom each section unwrapping wire piecemeal is numbered, with the position of each load assignment of determination It sets.
2) each regional water use amount distribution is calculated: according to load assignment, water tank quantity needed for calculating each region.
3) water tank is chosen: according to the water tank and water tank number of the applicable volume of the payload values of calculating and live site area selection Amount.Water tank can be steel water tank or plastic cistern.Steel water tank field fabrication is convenient, and the number of turnover is high;Plastic cistern size Type is more, convenient transportation.
4) water tank lift: water tank is hung according to calculated result and serves frame body, according to where branch arrange water tank.
5) pre-pressing bracket loads: being filled the water using water pump into water tank.Water injection time, control are calculated according to pump capacity Load.
Multistage loadings are used when load, the first order is loaded onto the 50% of gross weight, this stage be mainly used for simulation complete bottom plate, Web reinforcement, presstressed reinforcing steel, internal model installation, top plate edge of a wing reinforcing bar and presstressed reinforcing steel installation process, load is by uniformly distributed In considering on bottom plate.
The second level is loaded onto the 75% of gross weight, this step simulations underplate concrete, skew web plate concrete, top plate and flange plate Concrete, so that the tunneling boring for forming certain construction gradient pours, while also simulation top, bottom, edge of a wing board concrete are disconnected in span centre The least favorable stress in face.
Third level loading mode is loaded onto the 100% of gross weight, the situation that simulation box beam concreting is completed.
6) it unloads: opening discharging valve and release the water in water tank, water tank hangs frame top with crane, and rule piles up and gives over to next time It uses.The water that water tank is released, which is kept, can give over to concrete curing, site operation water or live depositing dust use.
Steel water tank used in the present invention is made of steel plate 1, reinforcing rib 2, hanging ring 3, water valve 4, steel plate and steel plate opposite side Welding, institute's seam are fully welded using two-sided.Hanging ring, hanging ring and steel plate weld length are set at the top of steel water tank (even not less than 10d Hanging ring uses 20 reinforcement fabrication of φ, it and steel plate weld length are greater than 200 millimeters).Steel water tank bottom sets water valve, and water valve uses Ball valve.Steel water tank structure is as shown in Figs. 1-3.
The present invention does not need manually to load weight, and material is manually brought up to mast-up, but replaces sand material, water water with water Filling restocking is pumped, compared with conventional construction method, saves largely manually, is recycled after precompressed with water energy, it is environmentally protective, no Fugitive dust is generated, green construction principle is met.Present invention production is simple and convenient to operate, and can greatly improve construction efficiency, shortens work Phase reduces the use of material and mechanical equipment, cost is greatly saved.

Claims (2)

1. a kind of Cast-in-Situ Box Girders pre-pressing bracket construction method, follows the steps below:
1) surveying setting-out: before pre-pressing bracket, beam bottom each section unwrapping wire piecemeal is numbered, with the position of each load assignment of determination;
2) each regional water use amount distribution is calculated: according to load assignment, water tank quantity needed for calculating each region;
3) water tank is chosen: according to the water tank and water tank number of the applicable volume of the payload values of calculation on Construction and live site area selection Amount;
4) water tank lifts: hanging water tank according to calculated result and serves frame body, according to load assignment arrangement water tank location;
5) pre-pressing bracket loads: being filled the water using water pump into water tank, calculates water injection time according to pump capacity, control load is big It is small;
6) it unloads: opening discharging valve and release the water in water tank, water tank hangs frame top with crane, and rule, which piles up to give over to, to be made next time With.
2. Cast-in-Situ Box Girders pre-pressing bracket construction method according to claim 1, it is characterized in that: used when precompressed load Precompressed loads step by step: the first order is loaded onto the 50% of gross weight, completes bottom plate, web reinforcement, presstressed reinforcing steel, internal model peace for simulating The installation process of dress, top plate edge of a wing reinforcing bar and presstressed reinforcing steel, load consider by being distributed on bottom plate;The second level is loaded onto The 75% of gross weight forms certain construction for simulating underplate concrete, skew web plate concrete, top plate and edge of a wing board concrete The tunneling boring of gradient pours, at the same can simulate top, bottom, edge of a wing board concrete span centre section least favorable stress;The Three-level loading mode is loaded onto the 100% of gross weight, the situation that simulation box beam concreting is completed.
CN201910319946.7A 2019-04-19 2019-04-19 Cast-in-Situ Box Girders pre-pressing bracket construction method Withdrawn CN110080111A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910319946.7A CN110080111A (en) 2019-04-19 2019-04-19 Cast-in-Situ Box Girders pre-pressing bracket construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910319946.7A CN110080111A (en) 2019-04-19 2019-04-19 Cast-in-Situ Box Girders pre-pressing bracket construction method

Publications (1)

Publication Number Publication Date
CN110080111A true CN110080111A (en) 2019-08-02

Family

ID=67415767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910319946.7A Withdrawn CN110080111A (en) 2019-04-19 2019-04-19 Cast-in-Situ Box Girders pre-pressing bracket construction method

Country Status (1)

Country Link
CN (1) CN110080111A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111364759A (en) * 2020-03-18 2020-07-03 重庆交通建设(集团)有限责任公司 Prepressing device of full-scale support of giant open-web girder steel pipe and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101234558B1 (en) * 2010-12-28 2013-02-19 재단법인 포항산업과학연구원 Method for constructing a girder
CN103437291A (en) * 2013-08-02 2013-12-11 中交二公局第一工程有限公司 Integral water tank preloading construction process
CN206828968U (en) * 2017-04-27 2018-01-02 吴增猛 A kind of simple precompressed assembled water tank

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101234558B1 (en) * 2010-12-28 2013-02-19 재단법인 포항산업과학연구원 Method for constructing a girder
CN103437291A (en) * 2013-08-02 2013-12-11 中交二公局第一工程有限公司 Integral water tank preloading construction process
CN206828968U (en) * 2017-04-27 2018-01-02 吴增猛 A kind of simple precompressed assembled water tank

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
梁文雨: ""水压法在现浇箱梁支架体系预压中运用"", 《低温建筑技术》 *
王刚: "" 浅谈现浇梁满堂支架法水箱预压技术"", 《建筑安全》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111364759A (en) * 2020-03-18 2020-07-03 重庆交通建设(集团)有限责任公司 Prepressing device of full-scale support of giant open-web girder steel pipe and construction method thereof

Similar Documents

Publication Publication Date Title
CN106836013B (en) Ballasting method when cantilever construction under closure section both sides bridge flexibility asymmetry
CN103437291A (en) Integral water tank preloading construction process
CN102031756A (en) Support assembly and construction method of cast-in-place box girder
CN102839601A (en) Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure
CN210066671U (en) Novel rectangular gallery structure
CN105401958A (en) Prefabricating construction method with movable prefabricating trolley for tunnel cable trench cover plate
CN110184926A (en) A kind of public affairs rail is built together the overhead pier stud construction method of double-layer integrallyization
CN108049313A (en) A kind of anchor body construction method
CN110080111A (en) Cast-in-Situ Box Girders pre-pressing bracket construction method
CN107059574A (en) A kind of method of concrete structure and its prefabricated assembled cement concrete pavement of leveling
CN110837667A (en) Soil filling method based on steel corrugated plate bridge reinforcement
CN110067198A (en) A kind of steel reinforced concrete composite beam bridge and its construction method
CN203066083U (en) Supporting structure for two adjacent foundation pits
CN109507387A (en) A kind of construction method of domes original position accumulated loading test
CN211769949U (en) Movable arm type tower crane underframe ballast type foundation
CN107460827A (en) A kind of method of cast-in-situ box girder form bracing system precompressed
CN209211477U (en) A kind of high-rise pile cap cast-in-place bed die construction system entirely
CN209742364U (en) Construction template is rolled to gelatinization granule material
CN115288191B (en) Reverse construction method
CN207714158U (en) Bridge pier unloads balanced structure
CN111186780A (en) Movable arm type tower crane underframe weight type foundation and construction method
CN205777582U (en) A kind of concrete pier base moulding bed assembled for large-scale steel structure body
CN110499775B (en) Bearing platform foundation backfill structure and construction method
CN110499739B (en) Man-machine cooperative reynolds protection pad construction method for check net
CN103437549A (en) Preloading structural part for high and large formwork support system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190802