CN207714158U - Bridge pier unloads balanced structure - Google Patents

Bridge pier unloads balanced structure Download PDF

Info

Publication number
CN207714158U
CN207714158U CN201820386327.0U CN201820386327U CN207714158U CN 207714158 U CN207714158 U CN 207714158U CN 201820386327 U CN201820386327 U CN 201820386327U CN 207714158 U CN207714158 U CN 207714158U
Authority
CN
China
Prior art keywords
bridge pier
balanced structure
platform
unloading
unloads
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820386327.0U
Other languages
Chinese (zh)
Inventor
林玉叶
朱丽娟
何勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Original Assignee
Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Investigation Design and Research Institute Co Ltd SIDRI filed Critical Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Priority to CN201820386327.0U priority Critical patent/CN207714158U/en
Application granted granted Critical
Publication of CN207714158U publication Critical patent/CN207714158U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model is related to technical field of bridge construction, and in particular to a kind of bridge pier unloading balanced structure that can balance unloading.Bridge pier unloading balanced structure includes the holder being arranged on cushion cap, the platform being supported on holder and the clump weight being placed on platform, the weight that bridge pier unloads balanced structure are identical as the weight of the soil body that the needs on cushion cap are excavated.Technical solution provided by the utility model unloads balanced structure by bridge pier, balances the soil body covered on removal pier cap so that deformation of bridge pier during unloading soil is greatly reduced or avoided, to ensure that the integrally-built stabilization of bridge.

Description

Bridge pier unloads balanced structure
Technical field
The utility model is related to technical field of bridge construction, are unloaded more particularly to a kind of bridge pier that can balance unloading flat Weigh structure.
Background technology
With the rapid development of high ferro, freeway net in recent years, high ferro, highway crossing river channel case layer go out not Thoroughly, the dredging of the Bridge Pier Construction and river being located in river, which is opened up, dredges construction often there is temporal dislocation, thus causes Contradiction frequent occurrence.River is dredged again after the completion of Bridge Pier Construction, and the covering soil body on pier cap is removed, and is often caused The resilience of bridge pier, for settlement Control and its stringent high-speed railway, such resilience is not allowed to.
Utility model content
In view of prior art described above there are the problem of, the purpose of this utility model at least that provide one kind can put down The bridge pier of weighing apparatus unloading unloads balanced structure.
In order to achieve the above objects and other related objects, an embodiment of the utility model provides a kind of bridge pier unloading Balanced structure, the bridge pier include cushion cap and the bridge pier cylinder that is supported on cushion cap, and the bridge pier unloading balanced structure includes branch Frame, platform and clump weight, the holder are arranged on the cushion cap, the platform on the bracket, the clump weight It places on the platform;The weight for the soil body that the weight of the bridge pier unloading balanced structure is excavated with the needs on the cushion cap It is identical.
In one embodiment, the clump weight is casting pig, lead or copper billet.
In one embodiment, the platform is from all around around the bridge pier cylinder.
The above-mentioned technical proposal that the utility model embodiment provides unloads balanced structure by bridge pier, balances removal bridge The soil body covered on pier cushion cap so that deformation of bridge pier during unloading soil is greatly reduced or avoided, to ensure that bridge is whole The stabilization of body structure.
Description of the drawings
Fig. 1 is shown as bridge pier in the utility model embodiment and unloads balanced structure schematic diagram;
Fig. 2 is shown as the A-A direction views of Fig. 1;
Fig. 3 is shown as a kind of the utility model balance schematic diagram of embodiment of method for discharging construction.
Component label instructions
1 pile foundation
2 cushion caps
3 bridge pier cylinders
4 bridge floors
5 holders
6 platforms
7 clump weights
8 soil bodys
Specific implementation mode
Illustrate that the embodiment of the utility model, those skilled in the art can be by these by particular specific embodiment below Content disclosed by specification understands other advantages and effect of the utility model easily.
It should be clear that structure, ratio, size etc. depicted in this specification attached drawing, only coordinating disclosed in specification Content, for those skilled in the art understand and read, be not limited to the enforceable qualifications of the utility model, Therefore not having technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size are not influencing this reality With under novel the effect of can be generated and the purpose that can reach, should all still falling in the revealed technology contents institute of the utility model In the range of capable of covering.Meanwhile it is cited such as "upper", "lower", "left", "right", " centre " and " one " in this specification Term is merely convenient to being illustrated for narration, rather than to limit the enforceable range of the utility model, the change of relativeness Or adjustment, in the case where changing technology contents without essence, when being also considered as the enforceable scope of the utility model.
Fig. 1 and one embodiment Fig. 2 shows the utility model.In the embodiment, bridge pier includes the pile foundation positioned at bottom The bridge pier cylinder 3 on cushion cap 2 and cushion cap 2 on plinth 1, pile foundation 1.Bridge pier cylinder 3 supports bridge floor 4.Bridge pier unloading balance knot Structure includes holder 5, platform 6 and clump weight 7.Holder 5 rides upon on cushion cap 2, upper part support platform 6.Platform 6 from all around around Bridge pier cylinder 3.Clump weight 7 is deposited on platform 6.The soil body 8 that the total weight of holder 5, platform 6 and clump weight 7 is excavated with needs Weight it is identical.The soil body 8 is covered on cushion cap 2, including soil, sand, rubble, stone etc..By bridge pier unload balanced structure with The displacement of the soil body excavated is needed, the balance unloading of bridge pier can be realized, greatly reduce or avoid bridge pier during unloading soil Deformation.
The construction method of bridge pier unloading balanced structure provided by the utility model is exemplified below.First on cushion cap 2 Holder 5 is set up, and excavates the soil body identical with 5 weight of holder 8 on cushion cap 2.It is preferred that setting up for holder 5 and excavating for the soil body 8 Alternately.Then, platform 6 is set up on holder 5, and excavates the soil body identical with 6 weight of platform 8 on cushion cap 2.It is preferred that flat Setting up for platform 6 and excavating alternately for the soil body 8.Finally, clump weight 7 is stacked on platform 6, and is excavated identical heavy on cushion cap 2 The soil body 8 of amount.It is preferred that the stacking of clump weight 7 and the soil body 8 are excavated alternately.Clump weight 7 is optional cylinder iron, lead or copper are contour The material of proportion.The soil body 8 on cushion cap 2, which is excavated, to be finished, and balance unloading operation is completed.It is visual practical in above-mentioned operation process It needs in due course to reinforce holder 5 to ensure its stability.
Fig. 3 shows another embodiment of bridge pier unloading balanced structure construction method.The embodiment is in aforementioned construction Clump weight 7 is gradually moved on cushion cap 2 on the basis of method, and can also further remove platform 6 and holder 5, and with The clump weight 7 of equivalent weight substitutes.The dismounting of preferred platform 6 and holder 5 and the stacking of clump weight 7 are alternately.
Balanced structure and its construction method are unloaded by bridge pier provided by the utility model, removal pier cap can be balanced The soil body of upper covering so that deformation of bridge pier during unloading soil is greatly reduced or avoided, to ensure bridge overall structure While stabilization the obstacle that blocks water has been cleared away for the training of channel.
The above embodiments are only illustrative of the principle and efficacy of the utility model, new not for this practicality is limited Type.Any person skilled in the art can all carry out above-described embodiment under the spirit and scope without prejudice to the utility model Modifications and changes.Therefore, such as those of ordinary skill in the art without departing from the revealed essence of the utility model All equivalent modifications completed under refreshing and technological thought or change, should be covered by the claim of the utility model.

Claims (3)

1. a kind of bridge pier unloads balanced structure, the bridge pier includes cushion cap and the bridge pier cylinder that is supported on cushion cap, and feature exists In:
The bridge pier unloading balanced structure includes holder, platform and clump weight, and the holder is arranged on the cushion cap, described flat Platform supports on the bracket, and the clump weight is placed on the platform;The weight of the bridge pier unloading balanced structure and institute The weight for stating the soil body that the needs on cushion cap are excavated is identical.
2. bridge pier according to claim 1 unloads balanced structure, it is characterised in that:
The clump weight is casting pig, lead or copper billet.
3. bridge pier according to claim 1 unloads balanced structure, it is characterised in that:
The platform is from all around around the bridge pier cylinder.
CN201820386327.0U 2018-03-21 2018-03-21 Bridge pier unloads balanced structure Active CN207714158U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820386327.0U CN207714158U (en) 2018-03-21 2018-03-21 Bridge pier unloads balanced structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820386327.0U CN207714158U (en) 2018-03-21 2018-03-21 Bridge pier unloads balanced structure

Publications (1)

Publication Number Publication Date
CN207714158U true CN207714158U (en) 2018-08-10

Family

ID=63053400

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820386327.0U Active CN207714158U (en) 2018-03-21 2018-03-21 Bridge pier unloads balanced structure

Country Status (1)

Country Link
CN (1) CN207714158U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108286222A (en) * 2018-03-21 2018-07-17 上海勘测设计研究院有限公司 Bridge pier unloads balanced structure and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108286222A (en) * 2018-03-21 2018-07-17 上海勘测设计研究院有限公司 Bridge pier unloads balanced structure and its construction method

Similar Documents

Publication Publication Date Title
CN207714158U (en) Bridge pier unloads balanced structure
CN112878332A (en) Basement elevator shaft sump construction structure and method thereof
CN110387888A (en) Tunnel upper foundation ditch strengthening structure and its manufacturing method
CN108286222A (en) Bridge pier unloads balanced structure and its construction method
CN208934006U (en) The double-deck barrier wall structure
CN113737654A (en) Deepwater high-flow-rate river dike embankment advancing island building platform and construction method thereof
CN107938594A (en) Deep water mixing dike construction method
CN107938514A (en) A kind of anti-device for plugging of bridge construction
CN211772879U (en) Spacing top of steel case roof beam hoist and mount pushes away construction structures
CN107816046A (en) Deep basal pit narrow zone backfills construction method
CN112854309A (en) Underground cast-in-place concrete pipe gallery top plate deformation joint construction structure and construction method thereof
CN208586527U (en) A kind of rack construction precompressed loading device
CN208121775U (en) A kind of underwater filler throwing system
CN207552830U (en) A kind of Anti-settling device of highway subgrade
CN203222735U (en) Temporary support used for erection of suspension crossbeam
CN206887995U (en) Detachable cement tank tower foundation device
CN111519477A (en) Transition section structure of overhead pile plate structure and embankment and construction method thereof
CN108442319A (en) A kind of compact-type sand gravel fills device and construction method
CN107740381A (en) A kind of opened debris flow blocking dam set based on waste and old Container Reconstruction
CN110499775B (en) Bearing platform foundation backfill structure and construction method
CN108252306A (en) A kind of underwater filler throwing system and construction method
CN110499775A (en) A kind of cushion cap foundation backfill structure and construction method
CN106368128A (en) Construction method of complete sand bottom form of molding flasks combination for supporting hanging side of 10,000 tons turning arc bridge abutment
CN208531747U (en) Tippler and its underground structure
JPS59207331A (en) Method for loading large lumps of stone

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant