CN110080081A - A kind of construction method of roadmarking - Google Patents

A kind of construction method of roadmarking Download PDF

Info

Publication number
CN110080081A
CN110080081A CN201910350351.8A CN201910350351A CN110080081A CN 110080081 A CN110080081 A CN 110080081A CN 201910350351 A CN201910350351 A CN 201910350351A CN 110080081 A CN110080081 A CN 110080081A
Authority
CN
China
Prior art keywords
coating
construction
graticule
temperature
road surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910350351.8A
Other languages
Chinese (zh)
Inventor
蒋国庆
白书伟
潘胡英
侯广艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shunjie Tongchang Transportation Facilities Engineering Co Ltd
Original Assignee
Beijing Shunjie Tongchang Transportation Facilities Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shunjie Tongchang Transportation Facilities Engineering Co Ltd filed Critical Beijing Shunjie Tongchang Transportation Facilities Engineering Co Ltd
Priority to CN201910350351.8A priority Critical patent/CN110080081A/en
Publication of CN110080081A publication Critical patent/CN110080081A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/16Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings
    • E01C23/20Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings for forming markings in situ
    • E01C23/22Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings for forming markings in situ by spraying

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Repair (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The present invention relates to a kind of construction methods of roadmarking, including following construction procedure: S1: preparation of construction, is familiar with construction drawing, prepares material and mechanical equipment;S2: cleaning road surface, road pavement are cleaned, and guarantee that road surface is dry;S3: surveying and locating longitudinally determines then graticule central point draws waterline by line-marking vehicle with 30 meters for correcting unit along road according to construction drawing;S4: preparing coating, and plurality of raw materials is put into molten-bath by a certain percentage, stirs in fusing, to be melted in after melt-flow state, and coating is put into the heat preservation melting hopper of line-marking vehicle;S5: lower coating is sprayed, correct nozzle is selected according to scribe widths, spraying operation is then carried out by flush coater;S6: site clearing;S7: IMM algorithm.It is an advantage of the invention that improving the service life of graticule, guarantees the accuracy of graticule in the construction process, avoid the occurrence of the phenomenon that doing over again, improve working efficiency.

Description

A kind of construction method of roadmarking
Technical field
The present invention relates to roadmarking technical fields, more particularly, to a kind of construction method of roadmarking.
Background technique
Roadmarking be broadly divided into hot melt graticule, the cold paint graticule of room temperature, antislip colour graticule, vibrate Reflecting antiskid graticule and Preforming graticule.Wherein, hot melt graticule is a kind of graticule most widely used on China's roadmarking, and the construction time is short, wear-resisting Property high and low cost.
Under normal conditions, roadmarking is delineated in road surface, for guaranteeing the safety of vehicle in the process of moving, by Coating is spread across on ground by the leakage of coating car in being all made of the artificial mobile mode for applying truck in the prior art, therefore is often resulted in Coating deviates predetermined graticule, and coating is difficult to thoroughly remove once be coated on ground, comes to corrigendum graticule band of position Difficulty reduces working efficiency;In addition, due to roadmarking for a long time be subjected to exposing to the sun and rain, wind and snow frost and vehicle rush Abrasion is hit, causes service life short, the high problem of maintenance cost.
Summary of the invention
The object of the present invention is to provide a kind of construction methods of roadmarking, its advantage is that the service life of graticule is improved, Guarantee the accuracy of graticule in the construction process, avoid the occurrence of the phenomenon that doing over again, improves working efficiency.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of construction party of roadmarking Method, including following construction procedure:
S1: construction drawing is familiar in preparation of construction, prepares material and mechanical equipment;
S2: cleaning road surface, road pavement cleaned, and guarantees that road surface is dry, no discrete particles, dust, pitch, grease stain or its His harmful substance;
S3: surveying and locating longitudinally determines then graticule central point leads to 30 meters for correcting unit along road according to construction drawing It crosses line-marking vehicle and draws waterline;
S4: preparing coating, by Petropols, rosin resin, polyamide, alkyd resin, reflectorized material, anti-settling agent, additional Agent and admixture are put into molten-bath by a certain percentage, and temperature in the kettle controls between 180 DEG C -210 DEG C, are stirred in fusing, It is to be melted in after melt-flow state, coating is put into the heat preservation melting hopper of line-marking vehicle;
S5: spraying lower coating, select correct nozzle according to scribe widths, then carry out spraying operation by flush coater, spray coated Cheng Zhongxu guarantees that material temperature is not less than 180 DEG C, quantity for spray 125-250g/m, brushes with a thickness of 0.25~0.40mm, brushing width Greater than graticule setting-out width;
S6: site clearing arranges construction machinery, cleaning construction residue, it is ensured that the cleaning of construction site;
S7: IMM algorithm.
Through the above technical solutions, removing the impurity on road surface in the application by cleaning road surface, guarantee that road surface is dry;It is logical Surveying and locating is crossed to guarantee accuracy of graticule during subsequent construction;By the way that a variety of originals are added during preparing coating Material, Lai Tigao coating intensity and the high temperature resistance with the adhesive property on road surface and product obtain that formability is good, deformation resistant The high coating of property, while ensure that the resistance to low temperatures such as the cracking resistance of product, peel;Guarantee each blanking by flush coater Amount and brushing thickness, avoid wasting;The construction method spread is leaked in compared with the prior art, the construction method in the application not only mentions The service life of high graticule, and also assure the accuracy of graticule in the construction process, a possibility that doing over again is reduced, It improves work efficiency.
The present invention is further arranged to: in step S1, after reaching construction site, utilizing the safety devices pipe such as mark, guardrail Pedestrian and traffic have been managed, and has been constructed in strict accordance with operation rules, to guarantee the safety of passerby and staff, has avoided accident as far as possible Generation.
Through the above technical solutions, the setting of the safety devices such as mark, guardrail, for guaranteeing the peace of passerby and staff Entirely, a possibility that safety accident occurs is reduced.
The present invention is further arranged to: in step S2, when pavement roughness at scribing line, being milled using milling machine Plane makes road surface form pit slot, then by spoil removing, and the brushing adhesives in pit slot, pitch is then inserted in pit slot Concrete is simultaneously compacted, and keeps its surface consistent with road surface elevation, after bituminous concrete dryness finalization, clears up road by high-tension apparatus Then face carries out local drying by equipment road pavements such as hair dryer or blowtorch again.
Through the above technical solutions, by milling technique, will the leveling of scribing line road surface, prevent graticule surface due to out-of-flatness, And cause to combine insecure or fracture between graticule and road surface;The setting of adhesives and bituminous concrete, not only can be by road Face leveling, also improves the service life of the combination degree and graticule between graticule and road surface.
The present invention is further arranged to: it further include removing old line in step S2, it will be old by the steel alloy bistrique of line removing machine Line abrades.
Through the above technical solutions, the wear-resistant coefficient of steel alloy bistrique is high, it can guarantee that old line is thoroughly removed.
The present invention is further arranged to: in step S5, two coatings is sprayed, after the first coating sprays, in coating Before unseasoned, the distributing under pressure bead on the first coating sprays the second coating, then after the first coating is dry Distributing under pressure bead is repeated on the second coating, is allowed to form roadmarking.
Through the above technical solutions, the setting of two coatings, the wearability of graticule ensure that, and the addition of bead, it uses In the reflecting effect for improving graticule, guarantee the traffic safety at night.
The present invention is further arranged to: uniformly being dispensed by bead dispenser.
Through the above technical solutions, guaranteeing the uniformity coefficient of bead, graticule is improved in the reflecting effect at night.
The present invention is further arranged to: in step S5, the moment observes pavement temperature and temperature, when pavement temperature is lower than 10 ° When C, it should forbid to construct;When temperature of constructing is low, hot melt kettle inside courtyard temperature is properly increased;It is appropriate to drop when temperature of constructing is high Low hot melt kettle inside courtyard temperature;When melt, coating in hot melt kettle or work car is avoided to deactivate for a long time, should not generally allow coating Temperature is maintained at 220 °C or more for a long time, prevents the ingredient for destroying coating, influences graticule service life.
Through the above technical solutions, the temperature of hot melt kettle inside courtyard is adjusted according to the variation of pavement temperature and temperature at any time, Guarantee that coating is in the flow regime of melting always, so as to staff's spraying.
The present invention is further arranged to: in step S7, caution sign is arranged according to related specification requirement, prevents vehicle and row People is current in operation area.
Through the above technical solutions, the setting of caution sign avoids pedestrian or vehicle will for guaranteeing that graticule is sufficiently dry Track is taken or formed on graticule to coating out of.
In conclusion advantageous effects of the invention are as follows:
1, the impurity on road surface is removed in the application by cleaning road surface, guarantees that road surface is dry;Guarantee to mark by surveying and locating Accuracy of line during subsequent construction;By the way that plurality of raw materials, Lai Tigao coating intensity are added during preparing coating With the high temperature resistance of adhesive property and product with road surface, it is help to obtain the coating that formability is good, deformation resistance is high, It ensure that the resistance to low temperatures such as cracking resistance, the peel of product simultaneously;Guarantee each discharge quantity by flush coater and brushes thick Degree, avoids wasting;The construction method spread is leaked in compared with the prior art, the construction method in the application not only improves making for graticule It with the service life, and also assures the accuracy of graticule in the construction process, reduces a possibility that doing over again, improve work Efficiency;
2, it prevents graticule surface due to out-of-flatness the leveling of scribing line road surface by milling technique, and causes between graticule and road surface In conjunction with insecure or fracture;The setting of adhesives and bituminous concrete can not only flatten road surface, also improve graticule with The service life of combination degree and graticule between road surface;
3, according to the variation of pavement temperature and temperature, the temperature of hot melt kettle inside courtyard is adjusted at any time, guarantees that coating is in molten always The flow regime melted, so as to staff's spraying.
Specific embodiment
For a kind of construction method of roadmarking disclosed by the invention, including following construction procedure:
S1: construction drawing is familiar in preparation of construction, prepares material and mechanical equipment, after reaching construction site, utilizes mark, shield The safety devices such as column have managed pedestrian and traffic, and construct in strict accordance with operation rules, to guarantee the peace of passerby and staff Entirely, the generation of accident is avoided as far as possible.
S2: cleaning road surface, road pavement are cleaned, and guarantee that road surface is dry, no discrete particles, dust, pitch, grease stain Or other harmful substances, if road surface residual is had been friends in the past line, staff is abraded by line removing machine, when removing, using conjunction Golden steel bistrique, wear-resistant coefficient is high, can guarantee that old line is thoroughly removed;When pavement roughness at scribing line, work people Member using milling machine carry out milling, make road surface formed pit slot, after spoil removing, the brushing adhesives in pit slot, then to Bituminous concrete is inserted in pit slot and is compacted, and is kept its surface consistent with road surface elevation, after bituminous concrete dryness finalization, is passed through High-tension apparatus clears up road surface, then carries out local drying by equipment road pavements such as hair dryer or blowtorch.
S3: surveying and locating, after the completion of cleaning work, staff longitudinally determines that graticule is several along road according to construction drawing Then central point draws waterline by line-marking vehicle with 30 meters for correcting unit, it is accurate during subsequent construction to improve graticule Property, the phenomenon that doing over again is avoided the occurrence of, and then improve working efficiency.
S4: preparing coating, by Petropols, rosin resin, polyamide, alkyd resin, reflectorized material, anti-settling agent, Additive and admixture are put into molten-bath by a certain percentage, and temperature in the kettle controls between 180 DEG C -210 DEG C, are stirred in fusing It mixes, it is to be melted in after melt-flow state, coating is put into the heat preservation melting hopper of line-marking vehicle, wherein Petropols, rosin It is used cooperatively between resin, alkyd resin and anti-settling agent, significantly improves coating intensity and the adhesive property with road surface;Polyamide The addition of resin and alkyd resin improves the high temperature resistance of product, help to obtain the painting that formability is good, deformation resistance is high Material, while ensure that the resistance to low temperatures such as the cracking resistance of product, peel, improve the service life of coating.
S5: lower coating is sprayed, selects correct nozzle according to scribe widths, spraying operation, spray are then carried out by flush coater Need to guarantee that material temperature not less than 180 DEG C, quantity for spray 125-250g/m, is brushed with a thickness of 0.25~0.40mm, brushed during applying Width is greater than graticule setting-out width, to guarantee the wearability in graticule later period use process, sprays two coatings, the first coating After spraying, before coating is unseasoned, by bead dispenser distributing under pressure bead on the first coating, to first After coating is dry, spray the second coating, distributing under pressure bead then repeated on the second coating, every time with The dosage of 0.3kg/m2 dispenses, and guarantees that bead dispenses the uniformly addition of bead, for improving the reflecting effect of graticule, protects Demonstrate,prove the traffic safety at night.
During above-mentioned spraying operation, staff takes quarter observation pavement temperature and temperature, when pavement temperature is low When 10 °C, it should forbid to construct;When temperature of constructing is low, hot melt kettle inside courtyard temperature is properly increased;When temperature of constructing is high, It is appropriate to reduce hot melt kettle inside courtyard temperature;When melt, the coating in hot melt kettle or work car is avoided to deactivate for a long time, it is general unsuitable It allows coating material temperature to be maintained at 220 °C or more for a long time, prevents the ingredient for destroying coating, influence graticule service life.
S6: site clearing arranges construction machinery, cleaning construction residue, it is ensured that the cleaning of construction site;
S7: caution sign is arranged according to related specification requirement in IMM algorithm, prevents vehicle and pedestrian current in operation area, uses In guaranteeing that graticule is sufficiently dry, avoid pedestrian or vehicle that coating is taken out of to or formed on graticule track.
The impurity for removing road surface in the application by cleaning road surface guarantees that road surface is dry;Guaranteed by surveying and locating Accuracy of graticule during subsequent construction;By the way that plurality of raw materials is added during preparing coating, Lai Tigao coating is strong Degree and the high temperature resistance with the adhesive property on road surface and product obtain the coating that formability is good, deformation resistance is high, simultaneously It ensure that the resistance to low temperatures such as cracking resistance, the peel of product;Guarantee each discharge quantity and brushing thickness by flush coater, keeps away Exempt to waste;The construction method spread is leaked in compared with the prior art, the construction method in the application not only improves the use longevity of graticule Life, and also assure the accuracy of graticule in the construction process, a possibility that doing over again is reduced, work effect is improved Rate.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (9)

1. a kind of construction method of roadmarking, it is characterised in that: including following construction procedure:
S1: construction drawing is familiar in preparation of construction, prepares material and mechanical equipment;
S2: cleaning road surface, road pavement cleaned, and guarantees that road surface is dry, no discrete particles, dust, pitch, grease stain or its His harmful substance;
S3: surveying and locating longitudinally determines then graticule central point leads to 30 meters for correcting unit along road according to construction drawing It crosses line-marking vehicle and draws waterline;
S4: preparing coating, by Petropols, rosin resin, polyamide, alkyd resin, reflectorized material, anti-settling agent, additional Agent and admixture are put into molten-bath by a certain percentage, and temperature in the kettle controls between 180 DEG C -210 DEG C, are stirred in fusing, It is to be melted in after melt-flow state, coating is put into the heat preservation melting hopper of line-marking vehicle;
S5: spraying lower coating, select correct nozzle according to scribe widths, then carry out spraying operation by flush coater, spray coated Cheng Zhongxu guarantees that material temperature is not less than 180 DEG C, quantity for spray 125-250g/m, brushes with a thickness of 0.25~0.40mm, brushing width Greater than graticule setting-out width;
S6: site clearing arranges construction machinery, cleaning construction residue, it is ensured that the cleaning of construction site;
S7: IMM algorithm.
2. a kind of construction method of roadmarking according to claim 1, it is characterised in that: in step S1, reach construction Behind scene, pedestrian and traffic are managed using safety devices such as mark, guardrails, and construct in strict accordance with operation rules, to guarantee The safety of passerby and staff avoid the generation of accident as far as possible.
3. a kind of construction method of roadmarking according to claim 1, it is characterised in that: in step S2, at scribing line Pavement roughness when, using milling machine carry out milling, make road surface formed pit slot, then by spoil removing, and applied in pit slot Then brush adhesives is inserted bituminous concrete and is compacted in pit slot, keeps its surface consistent with road surface elevation, to pitch coagulation After native dryness finalization, road surface is cleared up by high-tension apparatus, part is then carried out by equipment road pavements such as hair dryer or blowtorch again Drying.
4. a kind of construction method of roadmarking according to claim 1, it is characterised in that: further include clear in step S2 Except old line, old line is abraded by the steel alloy bistrique of line removing machine.
5. a kind of construction method of roadmarking according to claim 1, it is characterised in that: in step S5, spray two layers Coating, after the first coating sprays, before coating is unseasoned, the distributing under pressure bead on the first coating, to first After coating is dry, the second coating is sprayed, distributing under pressure bead is then repeated on the second coating, is allowed to form road Graticule.
6. a kind of construction method of roadmarking according to claim 5, it is characterised in that: by bead dispenser into Row uniformly dispenses.
7. a kind of construction method of roadmarking according to claim 6, it is characterised in that: every time with 0.3kg/m2 Dosage dispense bead.
8. a kind of construction method of roadmarking according to claim 1, it is characterised in that: in step S5, moment observation Pavement temperature and temperature should be forbidden to construct when pavement temperature is lower than 10 °C;When temperature of constructing is low, hot melt is properly increased Kettle inside courtyard temperature;It is appropriate to reduce hot melt kettle inside courtyard temperature when temperature of constructing is high;When melt, hot melt kettle or construction are avoided Coating in vehicle deactivates for a long time, generally coating material temperature should not be allowed to be maintained at 220 °C or more for a long time, prevent from destroying coating at Point, influence graticule service life.
9. a kind of construction method of roadmarking according to claim 1, it is characterised in that: in step S7, according to correlation Caution sign is arranged in code requirement, prevents vehicle and pedestrian current in operation area.
CN201910350351.8A 2019-04-28 2019-04-28 A kind of construction method of roadmarking Pending CN110080081A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910350351.8A CN110080081A (en) 2019-04-28 2019-04-28 A kind of construction method of roadmarking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910350351.8A CN110080081A (en) 2019-04-28 2019-04-28 A kind of construction method of roadmarking

Publications (1)

Publication Number Publication Date
CN110080081A true CN110080081A (en) 2019-08-02

Family

ID=67417396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910350351.8A Pending CN110080081A (en) 2019-04-28 2019-04-28 A kind of construction method of roadmarking

Country Status (1)

Country Link
CN (1) CN110080081A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111733681A (en) * 2020-07-06 2020-10-02 四川众智公路交通工程有限公司 Construction method of road marking
CN111996895A (en) * 2020-08-26 2020-11-27 冯永飞 Construction method of road marking
CN115595028A (en) * 2022-10-09 2023-01-13 天途路业集团有限公司(Cn) Dot-shaped paint suitable for road marking vehicle
GB2623288A (en) * 2022-08-12 2024-04-17 Micropply Ltd A system and method for the preparation of a ground surface for the application of thermoplastics

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306222A (en) * 2013-07-09 2013-09-18 台州市四方交通建设工程有限公司 Discontinuous road traffic marking and scribing device and method thereof
CN104513643A (en) * 2014-12-18 2015-04-15 安庆市虹宇化工有限责任公司 Polyamide hot melt adhesive for road marking and preparation method thereof
CN106243890A (en) * 2016-08-23 2016-12-21 陕西世纪交通工程股份有限公司 A kind of nanoscale MMA double-component superbright type reflexed light ring friendly coating and preparation method thereof and using method
CN109137774A (en) * 2018-09-28 2019-01-04 江苏瑞鑫交通科技有限公司 A kind of roadmarking method
CN109401518A (en) * 2018-11-06 2019-03-01 南京鑫亮交通设施有限公司 A kind of reflecting reticle of road band and its preparation process

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306222A (en) * 2013-07-09 2013-09-18 台州市四方交通建设工程有限公司 Discontinuous road traffic marking and scribing device and method thereof
CN104513643A (en) * 2014-12-18 2015-04-15 安庆市虹宇化工有限责任公司 Polyamide hot melt adhesive for road marking and preparation method thereof
CN106243890A (en) * 2016-08-23 2016-12-21 陕西世纪交通工程股份有限公司 A kind of nanoscale MMA double-component superbright type reflexed light ring friendly coating and preparation method thereof and using method
CN109137774A (en) * 2018-09-28 2019-01-04 江苏瑞鑫交通科技有限公司 A kind of roadmarking method
CN109401518A (en) * 2018-11-06 2019-03-01 南京鑫亮交通设施有限公司 A kind of reflecting reticle of road band and its preparation process

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111733681A (en) * 2020-07-06 2020-10-02 四川众智公路交通工程有限公司 Construction method of road marking
CN111996895A (en) * 2020-08-26 2020-11-27 冯永飞 Construction method of road marking
GB2623288A (en) * 2022-08-12 2024-04-17 Micropply Ltd A system and method for the preparation of a ground surface for the application of thermoplastics
CN115595028A (en) * 2022-10-09 2023-01-13 天途路业集团有限公司(Cn) Dot-shaped paint suitable for road marking vehicle

Similar Documents

Publication Publication Date Title
CN110080081A (en) A kind of construction method of roadmarking
DK165340B (en) PROCEDURE AND VEHICLE FOR PROVIDING OR RENEWAL OF A HORIZONTAL MARKING ROAD
CN101914886B (en) Construction method of wear-resistant non-slip ramp
CN102226330A (en) Method for micro-treatment of cement concrete road surface
CN107151511B (en) A kind of concrete guardrail anti-collision wall breakage renovation agent and renovation technique
CN108914748A (en) A kind of road surface construction grout sealing technique
CN109898397A (en) A kind of lines on road surface method
WO2014111672A1 (en) Self- illuminating ground surface
CN105839556A (en) Road marking construction process
CN105386382A (en) Construction method for semi-rigid base asphalt pavement fiber-reinforced under-sealed layer
US9017769B2 (en) Method and apparatus for applying a coating to a surface
CN109137774A (en) A kind of roadmarking method
CN109082969A (en) A kind of construction technology of the anticoagulant ice thin overlay of snow melt
CN107740334A (en) Pitch cotton ginning color spray pavement construction
CN111733681A (en) Construction method of road marking
CN109468930B (en) Crack repairing method for asphalt pavement after snow
CN113265183A (en) Orange reflective traffic marking paint and preparation method and application thereof
JP2791598B2 (en) Pavement repair method using resin concrete
US2260461A (en) Traffic guide
CN110158435A (en) A kind of construction method in seamlessization punishment bituminous pavement slight lateral crack
CN107386040B (en) A kind of cationic high molecular polymer pitch airfield pavement sealing maintenance process
KR101262633B1 (en) Road line for road and method of application using thereof
US1462903A (en) Apparatus for
CN117417643A (en) Road maintenance ginseng-attached liquid asphalt, manufacturing method and maintenance method
JP2792606B2 (en) How to repair cracks on paved roads

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190802