CN110076888B - Construction template structure based on immersed tube prefabrication middle and narrow space corridor - Google Patents

Construction template structure based on immersed tube prefabrication middle and narrow space corridor Download PDF

Info

Publication number
CN110076888B
CN110076888B CN201910472281.3A CN201910472281A CN110076888B CN 110076888 B CN110076888 B CN 110076888B CN 201910472281 A CN201910472281 A CN 201910472281A CN 110076888 B CN110076888 B CN 110076888B
Authority
CN
China
Prior art keywords
template
trolley
chamfer
immersed tube
narrow space
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910472281.3A
Other languages
Chinese (zh)
Other versions
CN110076888A (en
Inventor
曲远辉
王磊
梁丰
阮明华
杨宝林
翟保进
苏艳
罗平
薛帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN201910472281.3A priority Critical patent/CN110076888B/en
Publication of CN110076888A publication Critical patent/CN110076888A/en
Application granted granted Critical
Publication of CN110076888B publication Critical patent/CN110076888B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/04Discharging the shaped articles
    • B28B13/06Removing the shaped articles from moulds
    • B28B13/065Removing the shaped articles from moulds by applying electric current or other means of discharging, e.g. pneumatic or hydraulic discharging means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/16Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes
    • B28B7/18Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes the holes passing completely through the article

Abstract

The invention relates to the technical field of immersed tube prefabrication construction, in particular to a construction template structure based on a narrow space gallery in immersed tube prefabrication. Including the platform truck, its characterized in that: the device also comprises a template; the template comprises a top die fixed at the upper end of the trolley, side dies connected to two sides of the trolley, an upper chamfer template connected between the top die and the side dies, and a lower chamfer template hinged at the lower end of the side dies; the lower chamfer template is a retractable and extensible folding structure formed by a plurality of sections of templates. The invention has simple structure and convenient operation, can effectively adapt to the mold stripping and mold closing of the template with small narrow corridor space, has high construction efficiency and high precision, and has great popularization value.

Description

Construction template structure based on immersed tube prefabrication middle and narrow space corridor
Technical Field
The invention relates to the technical field of immersed tube prefabrication construction, in particular to a construction template structure based on a narrow space gallery in immersed tube prefabrication.
Background
The immersed tube prefabrication is a method commonly used in underwater tunnel construction in China, and is widely used for the construction of immersed tube prefabrication projects such as a Kong-zhu-ao bridge, a Taihu tunnel and the like. Compared with other underwater tunnel construction methods such as a shield method, the method has the advantages of good construction quality, low construction cost, short construction period, high construction safety and the like. However, gallery construction in the existing immersed tube prefabrication is quite spacious, and mechanized operation of a gallery inner mold and a trolley device is facilitated. However, aiming at the gallery construction in a narrow area in the immersed tube structure, the field of immersed tube construction does not show any embodiment at present, and the gallery construction in the narrow area, the problems of difficult shrinkage or expansion and serious influence on construction because the template is demoulded, matched molds and walks are different from a spacious gallery due to narrow space.
Disclosure of Invention
The invention aims to solve the defects of the background technology and provides a construction template structure based on a narrow space gallery in immersed tube prefabrication.
The technical scheme of the invention is as follows: construction template structure based on narrow space corridor in immersed tube prefabrication, including the platform truck, its characterized in that: the device also comprises a template; the template comprises a top die fixed at the upper end of the trolley, side dies connected to two sides of the trolley, an upper chamfer template connected between the top die and the side dies, and a lower chamfer template hinged at the lower end of the side dies; the lower chamfer template is a retractable and extensible folding structure formed by a plurality of sections of templates.
Further the lower chamfer template includes a first chamfer portion and a second chamfer portion; the upper end of the first chamfering part is rotatably hinged to the lower end of the side die, and the lower end of the first chamfering part is rotatably hinged to the upper end of the second chamfering part and forms a gallery lower end chamfering part template with the second chamfering part.
A transverse supporting rod is arranged between the two lower chamfer templates; the transverse supporting rods are horizontally and transversely arranged, and two ends of the transverse supporting rods are respectively and rotatably hinged to the two first chamfer portions.
A vertical supporting rod is further arranged between the lower chamfering template and the trolley; the vertical supporting rods are arranged along the vertical direction, and the upper end and the lower end of the vertical supporting rods are respectively and rotatably hinged to the trolley and the second chamfering part.
Further, sliding grooves are formed in the two transverse ends of the top die; the sliding groove is a long hole perpendicular to the upper chamfer template, and a bolt capable of sliding in the sliding groove is arranged in the sliding groove in a penetrating manner; the upper chamfer template is connected in the chute through a bolt in a sliding way.
And a driving structure for driving the side mold to be demolded and closed is arranged between the trolley and the side mold.
The driving structure further comprises a plurality of demoulding cylinders; the demolding cylinder shell is hinged to the trolley, and the pushing end is hinged to the side mold.
Further the drive structure comprises a sleeve fixed on the trolley; the sleeve is of a cylindrical structure with the axis parallel to the axis of the demolding cylinder, and a guide rod capable of axially moving along the sleeve is arranged in the sleeve in a penetrating manner; one end of the guide rod is connected with the sleeve in a sliding manner, and the other end of the guide rod is connected with the side die in a hinged manner.
The lower end of the trolley is further provided with a jacking cylinder for driving the trolley and the template to vertically move.
The invention has the advantages that: 1. the lower chamfer template in the template is set to be a retractable and extensible folding structure, so that the occupation of the transverse space of the lower chamfer template during demolding and die assembly is reduced, the pouring construction of a narrow space can be dealt with, the problem that the existing template structure is not easy to extend and use in the narrow space is solved, and the template structure has great popularization value;
2. the lower chamfer template is of a two-section structure, the end parts of the first chamfer part and the end part of the second chamfer part are both of hinged connection structures and can rotate through hinge points, and the template can be realized through secondary rotation during demolding or die assembly, so that the operation is convenient;
3. the lower chamfer template is fixed by arranging the vertical supporting rods and the transverse supporting rods, and after die assembly is completed, the lower chamfer template can be stably supported by the vertical supporting rods and the transverse supporting rods, so that the stability of the template structure is improved;
4. by arranging the side die driving structure, the transverse space is saved, power output is provided for side die demolding and die closing, the degree of automation of side die mold closing and demolding is improved, the labor input is reduced, and the construction efficiency is improved;
5. by arranging the guide structure, the moving precision of the side die during demolding and die assembly is improved;
6. through set up spout structure at top mould both ends, be favorable to the removal regulation of upper chamfer template when drawing of patterns and compound die, under the combined action of top mould and side form, upper chamfer template can be quick accurate positioning, easy operation, and the efficiency of construction is high.
The invention has simple structure and convenient operation, can effectively adapt to the mold stripping and mold closing of the template with small narrow corridor space, has high construction efficiency and high precision, and has great popularization value.
Drawings
Fig. 1: the template structure of the invention is schematically shown;
fig. 2: the lower chamfer template shrink structure schematic diagram of the invention;
fig. 3: the upper chamfer template structure of the invention is schematically shown;
wherein: 1-a trolley; 2-top mold; 3-side mold; 4-upper chamfer template; 5-lower chamfer templates; 5.1-a first chamfer portion; 5.2-a second chamfer portion; 6, a transverse supporting rod; 7, a vertical supporting rod; 8-a chute; 9, a bolt; 10-demolding oil cylinder; 11-a sleeve; 12-a guide rod; 13-jacking oil cylinder.
Detailed Description
The invention will now be described in further detail with reference to the drawings and to specific examples.
As shown in fig. 1 to 3, the template structure of the present embodiment includes four parts, namely a top mold 2, an upper chamfer template 4, a side mold 3 and a lower chamfer template 5, wherein the top mold 2 is fixed at the upper end of the trolley 1, a lifting cylinder 13 for driving the trolley 1 and the template structure to move vertically is arranged at the lower end of the trolley 1, and when the top mold 2 needs to be demolded or closed, the top mold 2 can be demolded or closed by driving the lifting cylinder 13 to drive the trolley 1 and the top mold 2 to move vertically.
The side dies 3 are positioned on two lateral sides of the trolley 1, and a driving structure for driving the side dies 3 to demould and die are arranged between the trolley 1 and the side dies 3. As shown in fig. 1, the driving structure comprises a plurality of demolding cylinders 10, wherein the shell of each demolding cylinder 10 is hinged to the trolley 1, and the pushing end is hinged to the side mold 3.
The driving structure further comprises a guiding structure, as shown in fig. 1, the guiding structure comprises a sleeve 11 fixed on the trolley 1, the sleeve 11 is of a cylindrical structure with the axis parallel to the axis of the demolding cylinder 10, a guiding rod 12 capable of axially moving along the sleeve 11 is arranged in the sleeve 11 in a penetrating manner, one end of the guiding rod 12 is slidably connected with the sleeve 11, and the other end of the guiding rod is hinged to the side mold 3.
When the side mold 3 needs to be demolded or clamped, the side mold 3 moves along the axial direction of the sleeve 11 under the guiding action of the guide rod 12 by driving the demolding oil cylinder 10, so that demolding or clamping is realized.
The upper chamfer template 4 of this embodiment is hinged between the top mold 2 and the side mold 3, as shown in fig. 3, the two transverse ends of the top mold 2 are provided with sliding grooves 8, the sliding grooves 8 are long holes perpendicular to the upper chamfer template 4, the sliding grooves 8 are internally provided with bolts 9 which can slide in the sliding grooves 8, and the upper chamfer template 4 is slidably connected in the sliding grooves 8 through the bolts 9. The upper chamfer template 4 of this embodiment uses the driving force of the top mold 2 and the side mold 3 during demolding and mold closing, that is, the upper chamfer template 4 moves along with the top mold 2 and the side mold 3 during demolding or mold closing, and the chute 8 is an adjustment space reserved for the upper chamfer template 4. The side mold 3 is released or clamped by the release cylinder 10, and at this time, a part of the upper chamfer mold plate 4 connected with the side mold 3 moves along with the side mold 3.
As shown in fig. 1 to 2, the upper end of the lower chamfer template 5 of the present embodiment is hinged to the lower end of the side template 3, and the lower chamfer template 5 is a retractable and stretchable folding structure formed by a plurality of sections of templates. The lower chamfer template 5 comprises a first chamfer part 5.1 and a second chamfer part 5.2, wherein the upper end of the first chamfer part 5.1 is rotatably hinged to the lower end of the side die 3, and the lower end of the first chamfer part is rotatably hinged to the upper end of the second chamfer part 5.2 and forms a gallery lower end chamfer part template with the second chamfer part 5.2.
When the lower chamfer template 5 is subjected to demoulding or mould closing, the electric hoist or other power equipment drives the first chamfer part 5.1 to rotate around a hinge point with the side mould 3, and drives the second chamfer part 5.2 to rotate around a hinge point with the first chamfer part 5.1, so that the demoulding or mould closing of the lower chamfer template 5 can be realized through two times of rotation. The lower chamfer template 5 of this embodiment is a folded structure.
After the die assembly is completed, in order to fix the lower chamfer template 5, in this embodiment, a transverse supporting rod 6 is disposed between the two lower chamfer templates 5, as shown in fig. 1, the transverse supporting rod 6 is horizontally and transversely disposed, and two ends of the transverse supporting rod are respectively rotatably hinged to the two first chamfer portions 5.1. A vertical supporting rod 7 is arranged between the lower chamfering template 5 and the trolley 1, the vertical supporting rod 7 is arranged along the vertical direction, and the upper end and the lower end are respectively and rotatably hinged on the trolley 1 and the second chamfering part 5.2.
When the die is assembled, the jacking cylinder 13 is driven to push the trolley 1 and the whole die plate to move in place vertically, the demolding cylinder 10 drives the side die 3 and the upper chamfering die plate 4 to move in place horizontally, the first chamfering part 5.1 and the second chamfering part 5.2 are unfolded to enable the lower chamfering die plate 5 to extend in place, and the vertical supporting rod 7 and the transverse supporting rod 6 are arranged to fix the lower chamfering die plate 5, so that the die assembly is completed.
After pouring is completed, when demoulding is required, the vertical support rod 7 and the transverse support rod 6 are disassembled, the first chamfering part 5.1 and the second chamfering part 5.2 are lifted to enable the lower chamfering template 5 to be folded, the demoulding oil cylinder 10 is driven to enable the side mould 3 and the upper chamfering template 4 to move towards the trolley 1, and the jacking oil cylinder 13 is driven to enable the trolley 1 and the templates to descend, so that demoulding is completed.
The foregoing has shown and described the basic principles, principal features and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present invention, and various changes and modifications may be made without departing from the spirit and scope of the invention, which is defined in the appended claims. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides a narrow space corridor construction template structure based on immersed tube prefabrication, includes platform truck (1), its characterized in that: the device also comprises a template; the template comprises a top die (2) fixed at the upper end of the trolley (1), side dies (3) connected to two sides of the trolley (1), an upper chamfering template (4) connected between the top die (2) and the side dies (3) and a lower chamfering template (5) hinged at the lower end of the side dies (3); the lower chamfer template (5) is a retractable and extensible folding structure formed by a plurality of sections of templates;
the lower chamfer template (5) comprises a first chamfer part (5.1) and a second chamfer part (5.2); the upper end of the first chamfering part (5.1) is rotatably hinged to the lower end of the side die (3), and the lower end of the first chamfering part is rotatably hinged to the upper end of the second chamfering part (5.2) and the second chamfering part (5.2) to form a gallery lower end chamfering part template;
a driving structure for driving the side mold (3) to release and mold is arranged between the trolley (1) and the side mold (3).
2. The construction template structure based on the narrow space gallery in immersed tube prefabrication as set forth in claim 1, wherein: a transverse supporting rod (6) is arranged between the two lower chamfer templates (5); the transverse supporting rods (6) are horizontally and transversely arranged, and two ends of each transverse supporting rod are respectively and rotatably hinged to the two first chamfer portions (5.1).
3. A narrow space corridor construction formwork structure in immersed tube prefabrication as claimed in claim 1 or 2, wherein: a vertical supporting rod (7) is arranged between the lower chamfering template (5) and the trolley (1); the vertical supporting rods (7) are arranged along the vertical direction, and the upper end and the lower end of each vertical supporting rod are respectively and rotatably hinged to the trolley (1) and the second chamfering part (5.2).
4. The construction template structure based on the narrow space gallery in immersed tube prefabrication as set forth in claim 1, wherein: the driving structure comprises a plurality of demoulding cylinders (10); the shell of the demolding oil cylinder (10) is hinged to the trolley (1), and the pushing end is hinged to the side mold (3).
5. The construction template structure based on the narrow space gallery in immersed tube prefabrication as set forth in claim 4, wherein: the driving structure comprises a sleeve (11) fixed on the trolley (1); the sleeve (11) is of a cylindrical structure with the axis parallel to the axis of the demolding cylinder (10), and a guide rod (12) capable of axially moving along the sleeve (11) is arranged in the sleeve (11) in a penetrating manner; one end of the guide rod (12) is connected with the sleeve (11) in a sliding way, and the other end of the guide rod is connected with the side die (3) in a hinged way.
6. The construction template structure based on the narrow space gallery in immersed tube prefabrication as set forth in claim 1, wherein: the lower end of the trolley (1) is provided with a jacking cylinder (13) for driving the trolley (1) and the templates to vertically move.
7. A narrow space corridor construction formwork structure in immersed tube prefabrication as claimed in claim 1 or 6, wherein: sliding grooves (8) are formed in the two transverse ends of the top die (2); the sliding groove (8) is a long hole perpendicular to the upper chamfer template (4), and a bolt (9) capable of sliding in the sliding groove (8) is arranged in the sliding groove (8) in a penetrating manner; the upper chamfer template (4) is connected in the chute (8) in a sliding way through a bolt (9).
CN201910472281.3A 2019-05-31 2019-05-31 Construction template structure based on immersed tube prefabrication middle and narrow space corridor Active CN110076888B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910472281.3A CN110076888B (en) 2019-05-31 2019-05-31 Construction template structure based on immersed tube prefabrication middle and narrow space corridor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910472281.3A CN110076888B (en) 2019-05-31 2019-05-31 Construction template structure based on immersed tube prefabrication middle and narrow space corridor

Publications (2)

Publication Number Publication Date
CN110076888A CN110076888A (en) 2019-08-02
CN110076888B true CN110076888B (en) 2024-04-09

Family

ID=67423021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910472281.3A Active CN110076888B (en) 2019-05-31 2019-05-31 Construction template structure based on immersed tube prefabrication middle and narrow space corridor

Country Status (1)

Country Link
CN (1) CN110076888B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110450279B (en) * 2019-08-13 2020-04-28 中交第四航务工程局有限公司 Dry dock system for pouring full-section precast concrete and arrangement method
CN111391074B (en) * 2020-04-01 2020-12-15 中交第四航务工程局有限公司 Immersed tube tunnel middle cavity template system and construction method

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2238872Y (en) * 1994-12-27 1996-10-30 中国建筑第一工程局构件厂 Extension electrical lift well die carrier
JP2001049997A (en) * 1999-08-04 2001-02-20 Hokukon Co Ltd Panel for narrow carry-in passage, and its building method
DE202011109777U1 (en) * 2011-10-26 2012-02-07 Holzmann Gmbh & Co. Kg Foldable corner formwork element
JP3189496U (en) * 2013-09-10 2014-03-20 利子 上田 Corner chamfer for formwork
CN104763446A (en) * 2015-03-24 2015-07-08 粤水电轨道交通建设有限公司 Multi-functional trolley for subway station construction
CN107165192A (en) * 2017-06-16 2017-09-15 中建七局安装工程有限公司 A kind of pipe gallery segmentation brake type shaped steel door frame and its construction
CN107882064A (en) * 2017-10-30 2018-04-06 成都建工路桥建设有限公司 A kind of formwork jumbo and slding form operation method for pipe gallery cast-in-place concrete slding form operation
CN107905254A (en) * 2017-11-16 2018-04-13 中铁四局集团有限公司 The construction method of mould trolley in a kind of pipe gallery formwork integrated hydraulic
CN108661670A (en) * 2018-05-03 2018-10-16 十九冶成都建设有限公司 The construction method of piping lane construction is carried out using formwork jumbo
CN109184744A (en) * 2018-09-25 2019-01-11 中国建筑第八工程局有限公司 Plate device and its construction method for narrow space
CN109441484A (en) * 2018-11-26 2019-03-08 中铁隧道集团三处有限公司 A kind of formwork jumbo construction method of underground narrow space air hose passage construction
CN109469100A (en) * 2018-12-25 2019-03-15 平煤神马建工集团有限公司 A kind of piping lane template integral support device
CN210256639U (en) * 2019-05-31 2020-04-07 中交武汉港湾工程设计研究院有限公司 Narrow space corridor construction template structure in immersed tube prefabrication

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2238872Y (en) * 1994-12-27 1996-10-30 中国建筑第一工程局构件厂 Extension electrical lift well die carrier
JP2001049997A (en) * 1999-08-04 2001-02-20 Hokukon Co Ltd Panel for narrow carry-in passage, and its building method
DE202011109777U1 (en) * 2011-10-26 2012-02-07 Holzmann Gmbh & Co. Kg Foldable corner formwork element
JP3189496U (en) * 2013-09-10 2014-03-20 利子 上田 Corner chamfer for formwork
CN104763446A (en) * 2015-03-24 2015-07-08 粤水电轨道交通建设有限公司 Multi-functional trolley for subway station construction
CN107165192A (en) * 2017-06-16 2017-09-15 中建七局安装工程有限公司 A kind of pipe gallery segmentation brake type shaped steel door frame and its construction
CN107882064A (en) * 2017-10-30 2018-04-06 成都建工路桥建设有限公司 A kind of formwork jumbo and slding form operation method for pipe gallery cast-in-place concrete slding form operation
CN107905254A (en) * 2017-11-16 2018-04-13 中铁四局集团有限公司 The construction method of mould trolley in a kind of pipe gallery formwork integrated hydraulic
CN108661670A (en) * 2018-05-03 2018-10-16 十九冶成都建设有限公司 The construction method of piping lane construction is carried out using formwork jumbo
CN109184744A (en) * 2018-09-25 2019-01-11 中国建筑第八工程局有限公司 Plate device and its construction method for narrow space
CN109441484A (en) * 2018-11-26 2019-03-08 中铁隧道集团三处有限公司 A kind of formwork jumbo construction method of underground narrow space air hose passage construction
CN109469100A (en) * 2018-12-25 2019-03-15 平煤神马建工集团有限公司 A kind of piping lane template integral support device
CN210256639U (en) * 2019-05-31 2020-04-07 中交武汉港湾工程设计研究院有限公司 Narrow space corridor construction template structure in immersed tube prefabrication

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高层建筑狭窄空间伸缩缝墙体支模施工技术的探析;朱树旺;;河南建材(03);全文 *

Also Published As

Publication number Publication date
CN110076888A (en) 2019-08-02

Similar Documents

Publication Publication Date Title
CN110076888B (en) Construction template structure based on immersed tube prefabrication middle and narrow space corridor
CN111594228B (en) Lining of round water delivery tunnel steel mould trolley and construction method
CN106223980B (en) A kind of construction method of tunnel ditch cable trough construction trolley
CN108661670B (en) Construction method for pipe gallery construction by using formwork trolley
CN109736841B (en) Tunnel split type lining side wall lap joint longitudinal slot pouring end die and device
CN210256639U (en) Narrow space corridor construction template structure in immersed tube prefabrication
CN211250585U (en) Movable prefabricated box girder template system
CN106050271B (en) A kind of tunnel ditch die set device and its construction method
CN206053965U (en) A kind of tunnel ditch cable trough construction trolley
CN106089257B (en) A kind of tunnel ditch cable trough construction trolley
CN206035501U (en) Tunnel water ditch die carrier device
CN114214954B (en) Construction method of municipal viaduct cast-in-situ pier
CN109629437A (en) A kind of mobile whole hole in-situ depositing equipment of box beam and its application method
CN214026213U (en) Adjustable U-shaped beam internal mold
CN212554387U (en) Concrete tubular pile cast molding auxiliary device
CN209775027U (en) prefabricated box girder integral contraction type hydraulic internal mold dismounting trolley combined structure
CN206035502U (en) Cable die carrier device and ditch cable duct construction trolley car for tunnel
CN201952740U (en) Hydraulic inner die of asymmetric box girder
CN114378933A (en) Group stair formwork erection production system
CN111119061A (en) Circular hollow pier column internal mold system capable of automatically closing mold and demolding
CN111958781A (en) Auxiliary forming device for prefabricated section beam
CN111571775A (en) Assembled hollow pier body and construction device and construction method thereof
CN214741353U (en) Large-span station tunnel lining trolley
CN216992384U (en) Wind power tower precast concrete foundation mold equipment
CN218893956U (en) Bridge guardrail base shaping template

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant