CN110071499A CN201910267803.6A CN201910267803A CN110071499A CN 110071499 A CN110071499 A CN 110071499A CN 201910267803 A CN201910267803 A CN 201910267803A CN 110071499 A CN110071499 A CN 110071499A
Authority
CN
China
Prior art keywords
cyclization
steady
line
closing operation
power distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910267803.6A
Other languages
Chinese (zh)
Other versions
CN110071499B (en
Inventor
张启亮
袁冰
董振
周科
李想
刘倩影
张海
刘印磊
刘超
夏明光
丁鲁玺
孔平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jining Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201910267803.6A priority Critical patent/CN110071499B/en
Publication of CN110071499A publication Critical patent/CN110071499A/en
Application granted granted Critical
Publication of CN110071499B publication Critical patent/CN110071499B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/005
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of method and systems for quickly judging the safe cyclization of power distribution network, can quickly judge whether route can be with cyclization.Method includes the following steps: building power distribution network typical case's cyclization model;Obtain the real time execution duty parameter of power distribution network typical case cyclization model;According to the real time execution duty parameter of power distribution network typical case's cyclization model, steady-state current during Loop Closing Operation is calculated;Construct line security cyclization condition;Route steady-state current before Loop Closing Operation in acquisition power distribution network typical case cyclization model, whether route steady-state current meets line security cyclization condition before judging Loop Closing Operation, if satisfied, then route carries out and ring operates.

Description

A kind of method and system of the quick safe cyclization of judgement power distribution network
Technical field
This disclosure relates to a kind of method and system for quickly judging the safe cyclization of power distribution network.
Background technique
During line maintenance or load adjustment, for the continuity for ensureing resident, commercial power, need affected user It is reduced to minimum, therefore, cyclization tune electric (heat is fallen) operation gradually replaces previous " cold fall " mode.For cyclization tune electric line, answer Meet cyclization condition, it is ensured that the variation of trend does not exceed the limit of relay protection, place capacity etc. after cyclization, and considers The sensitivity of route protection.Meanwhile adjusting electric equipment that must not connect with fault zone, it prevents that electricity is adjusted to cause the danger such as fault coverage expansion Dangerous situation condition.
In existing method, some main points only is operated to distribution network closed loop and has carried out qualitative or quantitative research, contained by calculation formula Parameter cannot directly inquire acquisition, and distribution regulation personnel still cannot quickly and effectively be instructed to judge whether to close in practical operation Ring.
Therefore, how quickly and effectively to judge distribution line can cyclization, still lack effective technical solution.
Summary of the invention
In order to overcome the above-mentioned deficiencies of the prior art, present disclose provides a kind of sides for quickly judging the safe cyclization of power distribution network Method and system can quickly judge whether route can be with cyclization.
Technical solution used by the disclosure is:
A kind of method of the quick safe cyclization of judgement power distribution network, method includes the following steps:
Build power distribution network typical case's cyclization model;
Obtain the real time execution duty parameter of power distribution network typical case cyclization model;
According to the real time execution duty parameter of power distribution network typical case's cyclization model, steady-state current during Loop Closing Operation is calculated;
Construct line security cyclization condition;
Route steady-state current before Loop Closing Operation, judges line steady-state before Loop Closing Operation in acquisition power distribution network typical case cyclization model Whether electric current meets line security cyclization condition, if satisfied, then route carries out and ring operates.
Further, the power distribution network typical case cyclization model includes positioned at the first transformer of the side 110kV, positioned at 110kV Second transformer of side, positioned at the first line of the side 10kV being connect with the first transformer and positioned at the side 10kV and the second transformation Second route of device connection;Interconnection switch is connected between the first line and the second route.
Further, the real time execution duty parameter of the power distribution network typical case cyclization model includes the maximum allowable electricity of route The equivalent impedance of stream, interconnection switch two sides voltage, the first transformer of the side 110kV and the second transformer to the impedance of the side 10kV, The first line impedance and the second line impedance of the side 10kV.
Further, during the Loop Closing Operation steady-state current calculation method are as follows:
The difference of (1-1) calculating interconnection switch two sides voltage;
(1-2) calculates the equivalent impedance of the first transformer of the side 110kV to the impedance of the side 10kV, the side 110kV the second transformer Equivalent impedance to the impedance of the side 10kV, the side 10kV first line impedance and the second line impedance sum;
(1-2) by difference that step (1-1) obtains with step (1-2) obtain and value compared with, and multiplied by complex operator, obtain Steady-state current during to Loop Closing Operation.
Further, the construction method of the line security cyclization condition are as follows:
According to steady-state current during Loop Closing Operation, establish before Loop Closing Operation during route steady-state current and Loop Closing Operation The relational expression of the sum of steady-state current and line steady-state electric current after Loop Closing Operation, and according to steady-state current during Loop Closing Operation and Impact coefficient, establish before Loop Closing Operation steady-state current and impact coefficient product during route steady-state current and Loop Closing Operation and With the relational expression of cyclization dash current maximum virtual value;
Line current protection seting value is set, establishes line steady-state after line current protection seting value and Loop Closing Operation respectively The relational expression of electric current, cyclization dash current maximum virtual value;
It is protected using the relationship and line current of line current protection seting value and 10kV side line road maximum permissible current The relational expression of the second line steady-state electric current, cyclization dash current maximum virtual value, establishes the side 10kV after setting valve and Loop Closing Operation The relationship of route maximum permissible current and route steady-state current before the difference and Loop Closing Operation of steady-state current during Loop Closing Operation Formula;
During steady-state current during Loop Closing Operation and 10kV side line road maximum permissible current and Loop Closing Operation The relational expression of second line steady-state electric current before the difference and cyclization of steady-state current establishes 10kV side line road maximum permissible current and most During big Loop Closing Operation before the difference of steady-state current and Loop Closing Operation route steady-state current relational expression, as line security closes Ring condition.
Further, the line security cyclization condition are as follows:
Wherein,The respectively two sides interconnection switch K voltage, ZH1、ZH2The respectively side 110kV A transformer and B transformation Impedance of the device equivalent impedance to the side 10kV, Z1、Z2Respectively 10kV side line road L1And L2Impedance, impedance Z Z1、Z2、ZH1、ZH2 Among minimum virtual value, ImaxFor 10kV route maximum permissible current;I1For first line steady-state current before Loop Closing Operation;I2To close Ring operates preceding second line steady-state electric current.
A kind of system of the quick safe cyclization of judgement power distribution network is matched it is characterized in that: running on processor or memory Execution is set to give an order:
Build power distribution network typical case's cyclization model;
Obtain the real time execution duty parameter of power distribution network typical case cyclization model;
According to the real time execution duty parameter of power distribution network typical case's cyclization model, steady-state current during Loop Closing Operation is calculated;
Construct line security cyclization condition;
Route steady-state current before Loop Closing Operation, judges line steady-state before Loop Closing Operation in acquisition power distribution network typical case cyclization model Whether electric current meets line security cyclization condition, if satisfied, then route carries out and ring operates.
A kind of computer readable storage medium, wherein being stored with a plurality of instruction, described instruction is suitable for by terminal device Reason device loads and executes the method that described one kind quickly judges the safe cyclization of power distribution network.
A kind of terminal device, including processor and computer readable storage medium, processor is for realizing each instruction;It calculates Machine readable storage medium storing program for executing is suitable for being loaded by processor and being executed described one kind and quickly sentences for storing a plurality of instruction, described instruction The method of the disconnected safe cyclization of power distribution network.
Through the above technical solution, the beneficial effect of the disclosure is:
(1) disclosure first constructs power distribution network typical case's cyclization model, on power distribution network typical case's cyclization model, in conjunction with scheduling SCADA system obtains typical cyclization model real time execution duty parameter, steady-state current during cyclization is calculated, before deriving cyclization The safe cyclization conditional expression of line steady-state electric current, and can be judged according to the size of cyclization presteady state electric current cyclization;
(2) disclosure is for a certain specific circuit, and route real-time current is less than line steady-state before maximum cyclization before cyclization When electric current, can safe cyclization simplify distinguishing rule without being calculated or tested again in advance, quickly judge for dispatcher Reference is provided, this method is simple and fast, safe and effective.
Detailed description of the invention
The Figure of description for constituting a part of this disclosure is used to provide further understanding of the disclosure, and the disclosure is shown Meaning property embodiment and its explanation do not constitute the improper restriction to the disclosure for explaining the disclosure.
Fig. 1 is the method flow diagram that the present embodiment one quickly judges the safe cyclization of power distribution network;
Fig. 2 is the structure chart of two distribution typical case's cyclization model of the present embodiment;
Fig. 3 is the simplification figure of two distribution typical case's cyclization model of the present embodiment;
Fig. 4 is the simulation model schematic diagram of distribution typical case's cyclization model;
Fig. 5 is line current waveform figure before and after cyclization;
Fig. 6 is line current waveform figure before and after critical value cyclization.
Specific embodiment
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the disclosure.Unless another It indicates, all technical and scientific terms used herein has usual with disclosure person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the disclosure.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
Embodiment one
A kind of method for quickly judging the safe cyclization of power distribution network is present embodiments provided, referring to Fig. 1, this method includes following Step:
S101 builds distribution typical case's cyclization model.
Specifically, the power distribution network typical case's cyclization model built in the step 101 includes being arranged in the first of the side 110kV to become Depressor and the second transformer, and be arranged in the side 10kV first line and the second route, the first line and the first transformer Connection, second route are connect with the second transformer, are connected with interconnection switch between the first line and the second route.
S102 obtains the real time execution duty parameter of power distribution network typical case cyclization model.
Specifically, obtaining the real-time fortune of power distribution network typical case cyclization model by SCADA dispatching system in the step 102 Row duty parameter, including route maximum permissible current, the two sides interconnection switch K voltage, the impedance etc. of the first transformer of the side 110kV Effect is to the equivalent impedance of the impedance of the side 10kV and the second transformer to 10kV side impedance, the first line impedance of the side 10kV and second Line impedance, the steady-state current of first line and the second route before Loop Closing Operation.
S103 calculates the steady-state current during Loop Closing Operation.
Specifically, calculating the steady-state current during Loop Closing Operation in step S103, realized using following scheme:
S103-1 calculates the difference of the two sides interconnection switch K voltage;
S103-2 calculates the equivalent impedance of the first transformer of the side 110kV to the impedance of the side 10kV, the second transformer of the side 110kV Equivalent impedance to the impedance of the side 10kV, the side 10kV first line impedance and the second line impedance sum;
S103-3, by difference that step 103-1 is obtained with step S103-2 obtain and value compared with, and calculated multiplied by plural number Son obtains the steady-state current during Loop Closing Operation.
S104 constructs the safe cyclization condition of first line and the second route.
Specifically, constructing the safe cyclization condition of first line in the step 104, specific implementation can be using such as Lower scheme:
S1041-1, steady-state current during the Loop Closing Operation obtained according to step 103, establishes First Line before Loop Closing Operation The relational expression of the sum of steady-state current and first line steady-state current after Loop Closing Operation during road steady-state current and Loop Closing Operation, with And steady-state current and impact coefficient during the Loop Closing Operation obtained according to step 103, first line is steady before establishing Loop Closing Operation The sum and the pass of cyclization dash current maximum virtual value of steady-state current and impact coefficient product during state electric current and Loop Closing Operation It is formula;
First line current protection setting valve is arranged in S1041-2, establishes first line current protection setting valve respectively and closes The relational expression of first line steady-state current, cyclization dash current maximum virtual value after ring operation;
S1041-3, using the relationship of first line current protection setting valve and 10kV side line road maximum permissible current, and First line steady-state current, cyclization impact electricity after first line current protection setting valve and Loop Closing Operation that step 1041-2 is obtained The relational expression for flowing maximum virtual value, establishes the difference of steady-state current during 10kV side line road maximum permissible current and Loop Closing Operation With the relational expression of first line steady-state current before cyclization;
S1041-4 is grasped according to steady-state current during Loop Closing Operation and 10kV side line road maximum permissible current and cyclization During work before the difference and cyclization of steady-state current first line steady-state current relational expression, it is maximum allowable to establish 10kV side line road During electric current and maximum Loop Closing Operation before the difference and cyclization of steady-state current first line steady-state current relational expression, as the One line security cyclization condition.
Similarly, in the step 104, the safe cyclization condition of the second route is constructed, specific implementation can use as follows Scheme:
S1042-1, steady-state current during the Loop Closing Operation obtained according to step 103, establishes the second line before Loop Closing Operation The relational expression of the sum of steady-state current and the second line steady-state electric current after Loop Closing Operation during road steady-state current and Loop Closing Operation, with And steady-state current and impact coefficient during the Loop Closing Operation obtained according to step 103, the second route is steady before establishing Loop Closing Operation The sum and the pass of cyclization dash current maximum virtual value of steady-state current and impact coefficient product during state electric current and Loop Closing Operation It is formula;
The second line current protection seting value is arranged in S1042-2, establishes the second line current protection seting value respectively and closes The relational expression of second line steady-state electric current, cyclization dash current maximum virtual value after ring operation;
S1042-3, using the relationship of the second line current protection seting value and 10kV side line road maximum permissible current, and Second line steady-state electric current, cyclization impact electricity after the second line current protection seting value and Loop Closing Operation that step 1042-2 is obtained The relational expression for flowing maximum virtual value, establishes the difference of steady-state current during 10kV side line road maximum permissible current and Loop Closing Operation With the relational expression of the second line steady-state electric current before cyclization;
S1042-4 is grasped according to steady-state current during Loop Closing Operation and 10kV side line road maximum permissible current and cyclization During work before the difference and cyclization of steady-state current the second line steady-state electric current relational expression, it is maximum allowable to establish 10kV side line road During electric current and maximum Loop Closing Operation before the difference and cyclization of steady-state current the second line steady-state electric current relational expression, as the Two line security cyclization conditions.
S105 judges whether first line steady-state current and the second line steady-state electric current meet corresponding route peace before cyclization Full cyclization condition, if satisfied, then carrying out Loop Closing Operation.
Specifically, according to the size of first line steady-state current before cyclization, judging whether satisfaction in the step 105 One line security cyclization condition;According to the size of the second line steady-state electric current before cyclization, judge whether to meet the second line security Cyclization condition;If all meeting simultaneously, Loop Closing Operation is carried out.
The method for the quick safe cyclization of judgement power distribution network that the present embodiment proposes first constructs power distribution network typical case cyclization model, On power distribution network typical case's cyclization model, typical cyclization model real time execution duty parameter is obtained in conjunction with SCADA dispatching system, is counted Steady-state current during calculation cyclization, derives the safe cyclization conditional expression of route steady-state current before cyclization, and according to cyclization Can the size of presteady state electric current is judged cyclization.
Embodiment two
In order to make those skilled in the art be best understood from the application, a more detailed embodiment is set forth below, The present embodiment provides a kind of methods for quickly judging the safe cyclization of power distribution network, method includes the following steps:
S201 builds distribution typical case's cyclization model.
Fig. 2 shows the structure of power distribution network typical case's cyclization model, the side 110kV is first station in power distribution network typical case's cyclization model A transformer and second station B transformer, 10kV side line road L1And L2, route L1And L2Live nuclear phase, tentatively has cyclization condition, leads to Cross interconnection switch K connection.
Under normal circumstances, interconnection switch K separating brake;When needing Electromagnetic coupling, interconnection switch K closes a floodgate.
S202 obtains the real time execution duty parameter of power distribution network typical case cyclization model.
Specifically, obtaining the real-time fortune of power distribution network typical case cyclization model by SCADA dispatching system in the step 202 Row duty parameter, including route maximum permissible current Imax, the two sides interconnection switch K voltageWithThe transformer of the side 110kV two Equivalent impedance is to the side 10kV impedance ZH1And ZH2, 10kV cyclization line impedance Z1And Z2
S203 calculates the steady-state current I during Loop Closing Operationc
Fig. 3 shows the simplification figure of power distribution network typical case's cyclization model, and balance nodes are considered as 110kV bus, and three in Fig. 3 It is symmetrical.
Alloy White Iron by before cyclization steady-state current and cyclization circulation two parts form, size can be carried out according to superposition theorem It calculates.
Specifically, in the step 203, definitionIt is cyclization in the process by the two sides interconnection switch K voltage Caused steady-state current defines IcIt can be obtained for corresponding virtual value according to parameter shown in superposition theorem and Fig. 3:
In formula,The respectively two sides interconnection switch K voltage, ZH1、ZH2The respectively side 110kV A transformer and B transformation Impedance of the device equivalent impedance to the side 10kV, Z1、Z2Respectively 10kV side line road L1And L2Impedance.
Step 204, route L before acquisition cyclization1And L2Steady-state current I1、I2, judge route L before cyclization1And L2Stable state Electric current I1、I2With the size I of route maximum permissible currentmaxWhether line security cyclization condition is met, if satisfied, can then be closed Ring operation.
Specifically, in the step 204, if before Loop Closing Operation, 10kV side line road L1With route L2Steady-state current is respectivelyAnd corresponding virtual value is respectively I1、I2, after Loop Closing Operation, 10kV side line road L1With route L2Steady-state current is And corresponding virtual value is respectively I '1、I′2, I 'tFor cyclization dash current maximum virtual value, then have:
I′t≤I1+kIc (3)
Wherein, k is impact coefficient, takes 1.62;After Loop Closing Operation, 10kV side line road L1Steady-state current;I′1For Virtual value;Before Loop Closing Operation, 10kV side line road L1Steady-state current;I1ForVirtual value;I′tFor cyclization dash current Maximum virtual value;For steady-state current during cyclization, IcFor corresponding virtual value.
The 10kV route maximum permissible current I obtained according to step 102maxIf corresponding line current protection setting valve is IsetIf having:
I′1≤I1+Ic≤Imax (4)
I′t≤I1+kIc≤Iset (5)
When formula (4), (5) are set up simultaneously, for cyclization steady-state current in route itself tolerance range, transient process will not Protective relaying maloperation is caused to be made, it can be ensured that the safety of cyclization.
For distribution line electric current three-stage protection, setting valve IsetMeet:
Imax≤Iset (6)
It is solved, is obtained by formula (4), (5), (6):
I1≤Imax-Ic (7)
When formula (7) are set up and according to obtained Ic, operator on duty can be according to route steady-state current I before cyclization1Size, directly Can judgement be connect direct cyclization.
If impedance Z is Z1、Z2、ZH1、ZH2Among minimum virtual value, then route L is acquired by formula (1), (7) simultaneous1Safety is closed Ring condition:
Route L can similarly be obtained2Safe cyclization condition:
In formula (8), (9), for specific substation and specific distribution line, ImaxZ can dispatched It inquires and obtains in SCADA system, therefore for typical case's cyclization network, the route steady-state current I before cyclization1、I2Meet formula (8), (9) when the line security cyclization condition provided, Loop Closing Operation can be carried out.
The method for the quick safe cyclization of judgement power distribution network that the present embodiment proposes first constructs power distribution network typical case cyclization model, On power distribution network typical case's cyclization model, typical cyclization model real time execution duty parameter is obtained in conjunction with SCADA dispatching system, is counted Steady-state current during calculation cyclization, derives the safe cyclization conditional expression of route steady-state current before cyclization, and according to cyclization The size of presteady state electric current judge can cyclization, this method is simple and fast, safe and effective.
The present embodiment additionally provides the emulation of the method to the above-mentioned quick safe cyclization of judgement power distribution network, the Realization of Simulation Process is as follows:
Regional typical cyclization network simulation model, line electricity before and after involutive ring are built by Matlab/Simulink module Stream is emulated, and model is as shown in Figure 4.
In simulation process, interconnection switch K is controlled when setting 0.06s and is closed, Loop Closing Operation is carried out, Alloy White Iron wave during being somebody's turn to do Shape is as shown in Figure 5.
From figure 5 it can be seen that the Alloy White Iron transient process duration is about 0.02s, meet tT≤tsetⅡCondition; Route steady-state current virtual value is 141A before cyclization, in the line security cyclization condition and range that the present embodiment is proposed (less In 337A);Cyclization process maximum impact electric current is 411A, is less than instantaneous fast tripping protection and acts setting valve 4200A;Route after cyclization Steady-state current virtual value is about 212A, is less than route maximum permissible current 600A.In conclusion this kind of situation will not firing line Road protective relaying maloperation is made, and safe cyclization condition is met, can be with cyclization.
As route carrying electric current is gradually increased before cyclization, steady-state current also will be with more after cyclization dash current, cyclization Come bigger.The route steady-state current virtual value I before cyclization2When -310A, line current waveform figure is as shown in Figure 6 before and after cyclization.From It can be concluded that, cyclization dash current will raise to 930A, and steady-state current virtual value will also be promoted to 590A after cyclization in figure, connect The nearly route maximum permissible current, there are some potential safety problemss for cyclization in the case of this kind, need to carry out a step calculating or test, with Just ensure that the variation of each link trend after cyclization is no more than the limit of relay protection, the stabilization of power grids and place capacity etc..
The present embodiment also provides a kind of system for quickly judging the safe cyclization of power distribution network, which runs on processor or deposit On reservoir, it is configured as executing to give an order:
Build power distribution network typical case's cyclization model;
Obtain the real time execution duty parameter of power distribution network typical case cyclization model;
According to the real time execution duty parameter of power distribution network typical case's cyclization model, steady-state current during Loop Closing Operation is calculated;
Construct line security cyclization condition;
Route steady-state current before Loop Closing Operation, judges line steady-state before Loop Closing Operation in acquisition power distribution network typical case cyclization model Whether electric current meets line security cyclization condition, if satisfied, then route carries out and ring operates.
The present embodiment also provides a kind of computer readable storage medium, wherein being stored with a plurality of instruction, described instruction is suitable for Loaded by the processor of terminal device and executed the method that described one kind quickly judges the safe cyclization of power distribution network.
The present embodiment also provides a kind of terminal device, including processor and computer readable storage medium, processor are used for Realize each instruction;Computer readable storage medium is suitable for being loaded and being executed by processor for storing a plurality of instruction, described instruction The method that described one kind quickly judges the safe cyclization of power distribution network.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
The foregoing is merely preferred embodiment of the present application, are not intended to limit this application, for the skill of this field For art personnel, various changes and changes are possible in this application.Within the spirit and principles of this application, made any to repair Change, equivalent replacement, improvement etc., should be included within the scope of protection of this application.
Although above-mentioned be described in conjunction with specific embodiment of the attached drawing to the disclosure, model not is protected to the disclosure The limitation enclosed, those skilled in the art should understand that, on the basis of the technical solution of the disclosure, those skilled in the art are not Need to make the creative labor the various modifications or changes that can be made still within the protection scope of the disclosure.

Claims (9)

1. a kind of method for quickly judging the safe cyclization of power distribution network, characterized in that method includes the following steps:
Build power distribution network typical case's cyclization model;
Obtain the real time execution duty parameter of power distribution network typical case cyclization model;
According to the real time execution duty parameter of power distribution network typical case's cyclization model, steady-state current during Loop Closing Operation is calculated;
Construct line security cyclization condition;
Route steady-state current before Loop Closing Operation, judges route steady-state current before Loop Closing Operation in acquisition power distribution network typical case cyclization model Whether line security cyclization condition is met, if satisfied, then route carries out and ring operates.
2. the method for the quick safe cyclization of judgement power distribution network according to claim 1, characterized in that the power distribution network is typical Cyclization model includes the first transformer positioned at the side 110kV, the second transformer positioned at the side 110kV, positioned at 10kV side and the The first line that one transformer connects and the second route being connect with the second transformer positioned at the side 10kV;The first line and Interconnection switch is connected between second route.
3. the method for the quick safe cyclization of judgement power distribution network according to claim 1, characterized in that the power distribution network is typical The real time execution duty parameter of cyclization model include route maximum permissible current, interconnection switch two sides voltage, the side 110kV first The equivalent impedance of transformer and the second transformer is to 10kV side impedance, the first line impedance of the side 10kV and the second line impedance.
4. the method for the quick safe cyclization of judgement power distribution network according to claim 1, characterized in that the Loop Closing Operation mistake The calculation method of steady-state current in journey are as follows:
The difference of (1-1) calculating interconnection switch two sides voltage;
(1-2) calculates the equivalent impedance of the first transformer of the side 110kV to the impedance of the side 10kV, the impedance of the second transformer of the side 110kV The equivalent sum to the impedance of the side 10kV, the side 10kV first line impedance and the second line impedance;
(1-3) by difference that step (1-1) obtains with step (1-2) obtain and value compared with, and multiplied by complex operator, closed Steady-state current in ring operating process.
5. the method for the quick safe cyclization of judgement power distribution network according to claim 1, characterized in that the line security closes The construction method of ring condition are as follows:
According to steady-state current during Loop Closing Operation, stable state during route steady-state current and Loop Closing Operation is established before Loop Closing Operation The relational expression of the sum of electric current and line steady-state electric current after Loop Closing Operation, and according to steady-state current during Loop Closing Operation and impact Coefficient establishes the sum and conjunction of steady-state current and impact coefficient product during route steady-state current and Loop Closing Operation before Loop Closing Operation The relational expression of ring dash current maximum virtual value;
Line current protection seting value is set, establishes line steady-state electricity after line current protection seting value and Loop Closing Operation respectively The relational expression of stream, cyclization dash current maximum virtual value;
Utilize the relationship and line current protection seting of line current protection seting value and 10kV side line road maximum permissible current The relational expression of value and the second line steady-state electric current, cyclization dash current maximum virtual value after Loop Closing Operation, establishes 10kV side line road The relational expression of maximum permissible current and route steady-state current before the difference and Loop Closing Operation of steady-state current during Loop Closing Operation;
According to stable state during steady-state current during Loop Closing Operation and 10kV side line road maximum permissible current and Loop Closing Operation The relational expression of second line steady-state electric current before the difference and cyclization of electric current establishes 10kV side line road maximum permissible current and maximum conjunction In ring operating process before the difference of steady-state current and Loop Closing Operation route steady-state current relational expression, as line security cyclization item Part.
6. the method for the quick safe cyclization of judgement power distribution network according to claim 5, characterized in that the line security closes Ring condition are as follows:
Wherein,The respectively two sides interconnection switch K voltage, ZH1、ZH2The respectively side 110kV A transformer and the resistance of B transformer Resist the equivalent impedance to the side 10kV, Z1、Z2Respectively 10kV side line road L1And L2Impedance, impedance Z Z1、Z2、ZH1、ZH2Among Minimum virtual value, ImaxFor 10kV route maximum permissible current;I1For first line steady-state current before Loop Closing Operation;I2For cyclization behaviour Make preceding second line steady-state electric current.
7. one kind quickly judges the system of the safe cyclization of power distribution network, it is characterized in that: running on processor or memory, it is configured To execute to give an order:
Build power distribution network typical case's cyclization model;
Obtain the real time execution duty parameter of power distribution network typical case cyclization model;
According to the real time execution duty parameter of power distribution network typical case's cyclization model, steady-state current during Loop Closing Operation is calculated;
Construct line security cyclization condition;
Route steady-state current before Loop Closing Operation, judges route steady-state current before Loop Closing Operation in acquisition power distribution network typical case cyclization model Whether line security cyclization condition is met, if satisfied, then route carries out and ring operates.
8. a kind of computer readable storage medium, wherein a plurality of instruction is stored with, it is characterized in that: described instruction is suitable for being set by terminal Standby processor loads the side that one kind described in simultaneously any one of perform claim requirement 1 to 6 quickly judges the safe cyclization of power distribution network Method.
9. a kind of terminal device, including processor and computer readable storage medium, processor is for realizing each instruction;Computer Readable storage medium storing program for executing is for storing a plurality of instruction, it is characterized in that: described instruction is suitable for by processor load and perform claim requires 1 The method of the safe cyclization of power distribution network is quickly judged to one kind described in any one of 6.
CN201910267803.6A 2019-04-03 2019-04-03 Method and system for rapidly judging safety loop closing of power distribution network Active CN110071499B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910267803.6A CN110071499B (en) 2019-04-03 2019-04-03 Method and system for rapidly judging safety loop closing of power distribution network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910267803.6A CN110071499B (en) 2019-04-03 2019-04-03 Method and system for rapidly judging safety loop closing of power distribution network

Publications (2)

Publication Number Publication Date
CN110071499A true CN110071499A (en) 2019-07-30
CN110071499B CN110071499B (en) 2021-11-02

Family

ID=67367053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910267803.6A Active CN110071499B (en) 2019-04-03 2019-04-03 Method and system for rapidly judging safety loop closing of power distribution network

Country Status (1)

Country Link
CN (1) CN110071499B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111509709A (en) * 2020-04-26 2020-08-07 贵州电网有限责任公司 Power distribution network closed loop switching power supply current evaluation method based on closed current moment
CN112350303A (en) * 2020-09-09 2021-02-09 广东电网有限责任公司 Method and system for quickly switching power supply and computer readable storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1056737A (en) * 1996-08-07 1998-02-24 Toshiba Corp Distribution system operating equipment
CN101908763A (en) * 2010-07-23 2010-12-08 广东电网公司中山供电局 Method for controlling distribution network closed loop
CN107749635A (en) * 2017-11-15 2018-03-02 江苏方天电力技术有限公司 A kind of closed loop network running optimizatin method
CN108711850A (en) * 2018-06-05 2018-10-26 国网上海市电力公司 The determination method of safe Loop Closing Operation is carried out to medium voltage distribution network
CN108711851A (en) * 2018-06-05 2018-10-26 国网上海市电力公司 A method of assessment medium voltage distribution network Loop Closing Operation safety

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1056737A (en) * 1996-08-07 1998-02-24 Toshiba Corp Distribution system operating equipment
CN101908763A (en) * 2010-07-23 2010-12-08 广东电网公司中山供电局 Method for controlling distribution network closed loop
CN107749635A (en) * 2017-11-15 2018-03-02 江苏方天电力技术有限公司 A kind of closed loop network running optimizatin method
CN108711850A (en) * 2018-06-05 2018-10-26 国网上海市电力公司 The determination method of safe Loop Closing Operation is carried out to medium voltage distribution network
CN108711851A (en) * 2018-06-05 2018-10-26 国网上海市电力公司 A method of assessment medium voltage distribution network Loop Closing Operation safety

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘健等: ""配电网合环分析与合环条件判断"", 《电力系统自动化》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111509709A (en) * 2020-04-26 2020-08-07 贵州电网有限责任公司 Power distribution network closed loop switching power supply current evaluation method based on closed current moment
CN111509709B (en) * 2020-04-26 2021-11-26 贵州电网有限责任公司 Power distribution network closed loop switching power supply current evaluation method based on closed current moment
CN112350303A (en) * 2020-09-09 2021-02-09 广东电网有限责任公司 Method and system for quickly switching power supply and computer readable storage medium

Also Published As

Publication number Publication date
CN110071499B (en) 2021-11-02

Similar Documents

Publication Publication Date Title
CN109936133B (en) Power system vulnerability analysis method considering information and physics combined attack
Wan et al. An adaptive multiagent approach to protection relay coordination with distributed generators in industrial power distribution system
Jamborsalamati et al. Enhancing power grid resilience through an IEC61850-based EV-assisted load restoration
Medina et al. Demand response and distribution grid operations: Opportunities and challenges
Rios et al. Value of security: modeling time-dependent phenomena and weather conditions
Han et al. An automated impedance estimation method in low-voltage distribution network for coordinated voltage regulation
CN105576660B (en) Local distribution network in-circuit emulation analytical equipment and system
CN103746368A (en) Method of optimizing static safe and stable operation limit of electric power system
Ye et al. A new method for standing phase angle reduction in system restoration by incorporating load pickup as a control means
CN109103879A (en) A kind of full dimension closed loop network appraisal procedure
Wan et al. An multi-agent approach to protection relay coordination with distributed generators in industrial power distribution system
CN110071499A (en) A kind of method and system of the quick safe cyclization of judgement power distribution network
Pinceti et al. Design criteria for a power management system for microgrids with renewable sources
Su et al. Performance evaluation of multiagent systems for navy shipboard power system restoration
Monadi et al. Measurement-based network clustering for active distribution systems
Meyer-Huebner et al. N-1-secure dispatch strategies of embedded HVDC using optimal power flow
Bruno et al. Unified power flow controllers for security-constrained transmission management
CN106253344B (en) A kind of electric power networks and its control system and control method, network scheduling device
CN107181321A (en) It is a kind of that the quick method for drawing lotus is realized based on topological structure of electric
Zhang et al. Real-time power management for microgrids with dynamic boundaries and multiple source locations
CN108988338A (en) The power grid for being suitable for open loop power supply based on strong continune component depth-first search adjusts method for electrically and device automatically
Bronzini et al. Coordination of active and reactive distributed resources in a smart grid
Liu et al. DC (optimal) power flow-based models for simulation and mitigation of overload cascading failures
Recalde et al. A review of operation methods and simulation requirements for future smart distribution grids
CN109066676A (en) A kind of cyclization based on SCADA system turns the safety evaluation method of power supply

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant