Prior art keywords
goaf
preliminary bracing
emergency processing
avris portion
processing method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910256778.1A
Other languages
Chinese (zh)
Inventor
王欣亮
陈永
邵帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201910256778.1A priority Critical patent/CN110067572A/en
Publication of CN110067572A publication Critical patent/CN110067572A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention provides a kind of constructing tunnels to pass through goaf emergency processing method, it include: during using three benching tunnelling method tunnelings, in top bar arch springing bottom and/or front of tunnel heading, there are the constructions stopped in the case where goaf to face, and carry out back-pressure backfill to top bar using hole slag;Fan-shaped support frame is applied between top bar surface and top and the preliminary bracing of avris portion;Concrete guard wall is formed using concrete backfill gob collapse space at the top and avris portion preliminary bracing position of deformation;The top of limit deformation section is invaded in top bar and avris portion preliminary bracing steel arch-shelf above and behind position applies Shed-pipe Advanced Support grouting support respectively;The preliminary bracing for invading limit deformation is reinforced or replaced from the small mileage direction in tunnel;It in face and gets out of a predicament or an embarrassing situation and the advanced inspecting hole of middle ledge surface encryption setting, determines whether that there are goaf or cavities by detection;Goaf emergency processing is completed in the case where detecting and goaf or cavity being not present.

Description

Constructing tunnel passes through goaf emergency processing method
Technical field
The present invention relates to technical field of tunnel construction, and in particular to a kind of constructing tunnel passes through goaf emergency processing side Method.
Background technique
In the work progress in tunnel, the case where passing through coal mine gob is needed to happen occasionally, in constructing tunnel to mined out After area causes goaf to be disclosed for, tunnel would generally deform, or even generate the safety accidents such as landslide, it is therefore desirable in tunnel Construction carries out emergency processing in the case where encountering goaf, guarantee progress of the constructing tunnel smoothly with safety.
Summary of the invention
The present invention provides a kind of constructing tunnel and passes through goaf emergency processing method to solve the above problems.
Constructing tunnel provided by the invention passes through goaf emergency processing method, comprising the following steps: S1) using three During rank method tunneling, in top bar arch springing bottom and/or front of tunnel heading, there are in the case where goaf, stop pair The construction of face, and back-pressure backfill is carried out to top bar using hole slag;S2) after the soil stabilization of face, in top bar Fan-shaped support frame is applied between surface and top and the preliminary bracing of avris portion with bracing reinforcement top and the preliminary bracing of avris portion; S3) in the top of deformation and the drilling of avris portion preliminary bracing position and embedding concrete pumping pipe, passed through using concrete described Pumping line backfilling goaf collapses space, forms concrete guard wall;S4 at the beginning of the top and avris portion of) invading limit deformation section in top bar Phase supporting steel arch-shelf above and behind position applies Shed-pipe Advanced Support grouting support respectively;S5) from the small mileage direction in tunnel to invading The preliminary bracing of limit deformation is reinforced or is replaced;S6 it) in face and gets out of a predicament or an embarrassing situation and the encryption setting of middle ledge surface is advanced visits Hole determines whether that there are goaf or cavities by detection;It completes to adopt in the case where detecting and goaf or cavity being not present Dead zone emergency processing.
Preferably, the step S1) use hole slag to carry out back-pressure backfill to top bar, comprising: it will be got out of a predicament or an embarrassing situation using hole slag All covering is extremely flushed with top bar surface with middle step;By the hole slag from end of getting out of a predicament or an embarrassing situation backwards to three step directions with predetermined The gradient carries out slope backfill.
Preferably, the step S2) fan-shaped support is applied between top bar surface and top and the preliminary bracing of avris portion Frame, comprising: apply crossbeam along top bar edge;It is applied between the crossbeam center and top and the preliminary bracing of avris portion Make stringer;The stringer two sides symmetrically apply multipair inclined shore between the crossbeam and top and the preliminary bracing of avris portion Beam.
Preferably, using crossbeam described in I20 section steel manufacture, stringer and inclined shore beam.
Preferably, the step S3) described in collapse space include: apart from top and avris portion initial stage for backfilling goaf It is backfilled in supporting predetermined distance range, backfill height is more than or equal to tunnel vault height.
Preferably, the step S4) above top and the avris portion preliminary bracing steel arch-shelf that top bar invades limit deformation section Apply Shed-pipe Advanced Support grouting support respectively with rear position, comprising: at the top and avris portion preliminary bracing steel arch-shelf that need to be reinforced Above and behind position is drilled with injected hole and installs Grouting Pipe;Tube shed grouting is carried out by Grouting Pipe to reinforce the top and side Side preliminary bracing top country rock.
Preferably, the injected hole and Grouting Pipe and vault are arranged in predetermined angular.
Preferably, the step S5) the preliminary bracing arch for invading limit deformation is reinforced from the small mileage direction in tunnel Or displacement, comprising: reinforce or replace first the deformation arch of tunnel-side, then reinforce or replace the top and avris portion initial stage The vault of supporting, and reinforced or replaced in the way of by Pin and segmentation.
Preferably, the step S6) further include: detecting there are in the case where goaf or cavity, using ductule Radial grouting carries out Concrete Filled;It is detected again, until detecting there is no goaf or cavity, completes goaf and answer Anxious processing.
Constructing tunnel provided by the invention passes through goaf emergency processing method, carries out back-pressure backfill to top bar first, Ensure the stabilization of the face range soil body, and prevent the further deformation of preliminary bracing structure, and is grasped for subsequent reinforcing Offer workbench is provided;Secondly fan-shaped support frame is applied between top bar surface and top and the preliminary bracing of avris portion to support Reinforce top and the preliminary bracing of avris portion, prevent the further deformation of the top and the preliminary bracing of avris portion, also for the later period at Safety operation space is reserved at the top and the preliminary bracing of avris portion for managing deformation;Reuse concrete backfill gob collapse Space forms concrete guard wall, to be filled support to the gob collapse space, and infiltrates through soil layer around, enhances The stability of surrounding soil;The top of limit deformation section is invaded in top bar later and avris portion preliminary bracing position applies respectively Shed-pipe Advanced Support grouting support carries out consolidation process with the loose wall rock mechanism to the top and avris portion preliminary bracing top, Guarantee the safety at the top and the preliminary bracing of avris portion;The preliminary bracing for invading limit deformation is carried out from the small mileage direction in tunnel It reinforces or replaces, with the safety for ensuring constructing tunnel and using;In face and get out of a predicament or an embarrassing situation super with the encryption setting of middle ledge surface Preceding inspecting hole determines whether that there are goaf or cavities by detection;Finally detecting the situation there is no goaf or cavity Lower completion goaf emergency processing, it is ensured that the safety that constructing tunnel and later period use.
The other feature and advantage of the embodiment of the present invention will the following detailed description will be given in the detailed implementation section.
Detailed description of the invention
Attached drawing is to further understand for providing to the embodiment of the present invention, and constitute part of specification, under The specific embodiment in face is used to explain the present invention embodiment together, but does not constitute the limitation to the embodiment of the present invention.Attached In figure:
Fig. 1 is that the constructing tunnel of embodiment according to the present invention passes through the step flow chart of goaf emergency processing method;
Fig. 2 is the tunnel that the constructing tunnel of embodiment according to the present invention passes through that back-pressure backfills in the emergency processing method of goaf The skiagraph in road;
Fig. 3 is that the constructing tunnel of embodiment according to the present invention passes through in the emergency processing method of goaf and applies fan-shaped support The cross-sectional view in the tunnel of frame;
Fig. 4 is that the constructing tunnel of embodiment according to the present invention passes through fan-shaped support frame in the emergency processing method of goaf Structural schematic diagram;
Fig. 5 is that the constructing tunnel of embodiment according to the present invention passes through backfilling goaf in the emergency processing method of goaf The cross-sectional view in tunnel;And
Fig. 6 is that the constructing tunnel of embodiment according to the present invention passes through in the emergency processing method of goaf and applies Shed-pipe Advanced Support The skiagraph in the tunnel of grouting support.
Description of symbols
1 top bar, 2 face
3 hole slag, 4 top and the preliminary bracing of avris portion
56 concrete guard walls of fan-shaped support frame
Step 8 is got out of a predicament or an embarrassing situation in 7
9 crossbeam, 10 stringer
11 inclined shore beam, 12 pumping line
13 Grouting Pipes
Specific embodiment
It is described in detail below in conjunction with specific embodiment of the attached drawing to the embodiment of the present invention.It should be understood that this Locate described specific embodiment and be merely to illustrate and explain the present invention embodiment, is not intended to restrict the invention embodiment.
With reference to the accompanying drawing, technical solution in the embodiment of the present invention is described in detail.
In the work progress in tunnel, the case where passing through coal mine gob is needed to happen occasionally, in constructing tunnel to mined out After area causes goaf to be disclosed for, tunnel would generally deform, or even generate the safety accidents such as landslide, it is therefore desirable in tunnel Construction carries out emergency processing in the case where encountering goaf, guarantee progress of the constructing tunnel smoothly with safety.
As shown in Figure 1, the present invention, which provides a kind of constructing tunnel, passes through goaf emergency processing method, comprising the following steps: S1) during using three benching tunnelling method tunnelings, there are goafs in front of 1 arch springing bottom of top bar and/or face 2 In the case where, stop the construction to face 2, and back-pressure backfill is carried out to top bar 1 using hole slag 3;S2) to face 2 After soil stabilization, fan-shaped support frame 5 is applied between 1 surface of top bar and top and avris portion preliminary bracing 4 with bracing reinforcement Top and avris portion preliminary bracing 4;S3) in the top of deformation and the drilling of 4 position of avris portion preliminary bracing and embedding concrete pump Pipe is sent, space is collapsed by the pumping line backfilling goaf using concrete, forms concrete guard wall 6;S4) in top bar 1 The top and 4 steel arch-shelf above and behind position of avris portion preliminary bracing for invading limit deformation section apply Shed-pipe Advanced Support slip casting branch respectively Shield;S5) preliminary bracing for invading limit deformation is reinforced or replaced from the small mileage direction in tunnel;S6) in face 2 and leave from office Advanced inspecting hole is arranged in rank 8 and the encryption of 7 surface of middle step, determines whether that there are goaf or cavities by detection;It is detecting not Goaf emergency processing is completed in the case where there are goaf or cavity.
According to the technique and scheme of the present invention, as shown in Fig. 2, carrying out step S1 first) using three benching tunnelling method tunnelings During, there are in the case where goaf in front of 1 arch springing bottom of top bar and/or face 2, stop to face 2 Construction, and back-pressure backfill is carried out to top bar 1 using hole slag 3.
In the 1 arch springing bottom of top bar in the tunnel there are in the case where goaf, top bar 1 arch springing in tunnel easily occurs heavy It falls into, so as to cause the deformation of Tunnel, the construction to face 2 need to be stopped immediately, by in-cavity construction personnel and equipment It all withdraws, to guarantee the safety of construction personnel and prevent the further destruction in tunnel;The range in usual goaf is larger, is not easy It verifies completely, in the 1 arch springing bottom of top bar in the tunnel there are in the case where goaf, the front of tunnel tunnel face 2 is also same There are goafs for sample, and the deformation of the further deformation and face 2 of Tunnel structure, right using hole slag 3 in order to prevent Top bar 1 carries out back-pressure backfill.
A kind of embodiment according to the present invention, the step S1) use hole slag 3 to carry out back-pressure backfill, packet to top bar 1 Include: using hole slag 3 will get out of a predicament or an embarrassing situation 8 and middle step 7 all covering to being flushed with 1 surface of top bar;The hole slag 3 is got out of a predicament or an embarrassing situation certainly 8 ends carry out slope backfill backwards to three step directions with predetermined slope, and back-pressure backfill can provide support for the top bar 1 Power, it is ensured that the stabilization of the 2 range soil body of face, and the further deformation of preliminary bracing structure is prevented, and add to be subsequent Gu operation provides workbench.
Preferably, the hole slag 3 carries out slope time backwards to three step directions from 8 ends are got out of a predicament or an embarrassing situation with predetermined slope 1:1.5 It fills out, to reach preferable support effect, effective back-pressure is formed to the top bar 1 and is backfilled.
According to the technique and scheme of the present invention, as shown in figure 3, step S2) after the soil stabilization of face 2, in top bar 1 Fan-shaped support frame 5 is applied between surface and top and avris portion preliminary bracing 4 with bracing reinforcement top and the preliminary bracing of avris portion 4, the sector support frame 5 provides branch based on the surface of the top bar 1 for the top and avris portion preliminary bracing 4 Support force plays the role of reinforcing to prevent the further deformation at the top and avris portion preliminary bracing 4, is also post-processing Safety operation space is reserved at the top and avris portion preliminary bracing 4 of deformation.
A kind of embodiment according to the present invention, as shown in figure 4, the step S2) on 1 surface of top bar and top and side Fan-shaped support frame 5 is applied between side preliminary bracing 4, comprising: apply crossbeam 9 along 1 edge of top bar;In the crossbeam 9 Stringer 10 is applied between heart position and top and avris portion preliminary bracing 4;In the crossbeam 9 and top and the preliminary bracing of avris portion 10 two sides of stringer symmetrically apply multipair inclined shore beam 11 between 4.The crossbeam 9, stringer 10 and multipair inclined shore Beam 11 forms fan-shaped support frame 5, to form support to the top and avris portion preliminary bracing 4.
A kind of embodiment according to the present invention, using crossbeam 9, stringer 10 described in I20 section steel manufacture and inclined shore Beam 11.Preferably, fixed composition sector is propped up by welding for the crossbeam 9, stringer 10 and multipair inclined shore beam 11 Support 5, it is fixed, there is enough support forces, preferable support effect can be reached.
A kind of embodiment according to the present invention, it is preferable that apply one at the top and 4 surface of avris portion preliminary bracing Ring set arch applies stringer 10 between set arch and 9 center of the crossbeam, between set arch and the crossbeam 9 10 two sides of stringer symmetrically apply multipair inclined shore beam 11, further enhance support force, at the beginning of the top and avris portion Phase supporting 4 reaches better support effect.
According to the technique and scheme of the present invention, as shown in figure 5, S3) it is bored at the top of deformation and 4 position of avris portion preliminary bracing Hole and embedding concrete pumping pipe collapse space by the pumping line backfilling goaf using concrete, form concrete shield Wall 6 to be filled support to the gob collapse space, and infiltrates through soil layer around, enhances the stabilization of surrounding soil Property.
For example, the pumping line 12 that three row's mutual spacings are 1 meter is arranged altogether, every row includes 6 pumping lines 12, to increase Pumping efficiency reaches preferable pumping effect;By the way of intermittently pouring, incorporation is not more than cement content 4% in concrete Accelerator or waterglass no more than 2%, effect is poured with enhancing.
A kind of embodiment according to the present invention, it includes: apart from top and avris that the backfilling goaf, which collapses space, It is backfilled in 4 predetermined distance range of portion's preliminary bracing, backfill height is more than or equal to tunnel vault height.Preferably, pre- spacing From being 3 meters, to form the concrete guard wall 6 of adequate thickness, with the safety for guaranteeing constructing tunnel and using;It is described encountering In the biggish situation of the volume in goaf, when backfill height is more than spring line, pumping flyash is can be used in spring line range above Or the materials such as medium coarse sand are backfilled, to reduce the pressure to preliminary bracing structure.
According to the technique and scheme of the present invention, as shown in fig. 6, step S4) top and the avris for limiting deformation section are invaded in top bar 1 Preliminary bracing 4 steel arch-shelf above and behind position in portion's applies Shed-pipe Advanced Support grouting support respectively, to the top and avris portion The loose wall rock mechanism of 4 steel arch-shelf above and behind of preliminary bracing carries out consolidation process, guarantees the top and avris portion initial stage The safety of supporting 4.
A kind of embodiment according to the present invention, it is preferable that the step S4) on the top for invading limit deformation section in top bar 1 Portion and 4 steel arch-shelf above and behind position of avris portion preliminary bracing apply Shed-pipe Advanced Support grouting support respectively, comprising: are needing to reinforce Top and 4 steel arch-shelf above and behind position of avris portion preliminary bracing be drilled with injected hole and Grouting Pipe 13 be installed;Pass through slip casting Pipe 13 carries out tube shed grouting to reinforce 4 top country rock of the top and the preliminary bracing of avris portion.
A kind of embodiment according to the present invention, it is preferable that the injected hole and Grouting Pipe 13 and vault are in predetermined angular Setting, the predetermined angular can be chosen for 15 ° of outer limb, to rise to the top and 4 top country rock of avris portion preliminary bracing Fixed function is reinforced to preferable.
So-called " invading limit " refers to that the preliminary bracing in tunnel is deformed due to the change of support force, invades Tunnel Design boundary, Construction and use to the later period bring adverse effect, therefore according to the technique and scheme of the present invention, step S5) small mileage from tunnel Direction is reinforced or is replaced to the preliminary bracing for invading limit deformation, with the safety for ensuring constructing tunnel and using.
A kind of embodiment according to the present invention, it is preferable that the step S5) become from the small mileage direction in tunnel to limit is invaded The preliminary bracing arch of shape is reinforced or is replaced, comprising: reinforces or replace the deformation arch of tunnel-side, first to form foot Enough support forces, then the top and avris portion preliminary bracing 4 are reinforced or replace, and added in the way of by Pin and segmentation Gu or displacement, safe with guarantee construction carry out.
According to the technique and scheme of the present invention, step S6) face 2 and get out of a predicament or an embarrassing situation 8 and the encryption setting of 7 surface of middle step it is super Preceding inspecting hole determines whether that there are goaf or cavities by detection;It is complete in the case where detecting there is no goaf or cavity At goaf emergency processing, it is ensured that the safety that constructing tunnel and later period use.
A kind of embodiment according to the present invention, it is preferable that the step S6) further include: there are goafs detecting Or in the case where cavity, Concrete Filled is carried out using ductule radial grouting;It is detected, is not present until detecting again Goaf emergency processing is completed in goaf or cavity.Preferably, radial grouting is carried out using Φ 42mm ductule, it is described small to lead Pipe will go deep into basement rock, reinforce to basement rock, prevent from disturbing loose media, abutment wall backfill in two sides is mixed because leading under in excavating Solidifying soil depression, causes Tunnel to crack, further ensures the safety of construction.
It needs to detect the effect of slip casting simultaneously and whether quality meets construction requirement, and influence section in goaf and carry out lining cutting Strengthening supporting is continued to monitor in the coverage of goaf.
For example, being deformed after 16 days to the vault sinking at the monitoring section K0+337 mileage in the coverage of goaf Start to tend to mitigate, monitoring section was restrained at 15 days or so;Treatment process scheme is implemented 40 days altogether, to goaf influence area After emergency processing one month, monitoring section horizontal convergence and Vault settlement total deformation are less than 10mm, then are able to confirm that and answer Anxious processing has reached preferable treatment effect.
The object of the present invention is to provide a kind of constructing tunnels to pass through goaf emergency processing method, first to top bar 1 into The backfill of row back-pressure, it is ensured that the stabilization of the 2 range soil body of face, and the further deformation of preliminary bracing structure is prevented, and be Subsequent reinforcing operation provides workbench;Secondly fan is applied between 1 surface of top bar and top and avris portion preliminary bracing 4 Shape support frame 5 at the top of bracing reinforcement and avris portion preliminary bracing 4, with prevent the top and avris portion preliminary bracing 4 into The deformation of one step also reserves safety operation space for the top and avris portion preliminary bracing 4 of post-processing deformation;It reuses Concrete backfill gob collapse space forms concrete guard wall 6, to be filled support to the gob collapse space, And soil layer around is infiltrated through, enhance the stability of surrounding soil;At the beginning of top bar invades the top and avris portion of limit deformation section later Phase supporting steel arch-shelf above and behind position applies Shed-pipe Advanced Support grouting support respectively, to the top and avris portion initial stage branch The loose wall rock mechanism for protecting 4 tops carries out consolidation process, guarantees the safety at the top and avris portion preliminary bracing 4;From tunnel Small mileage direction to invade limit deformation preliminary bracing reinforced or replaced, with the safety for ensuring constructing tunnel and using;? Face 2 and get out of a predicament or an embarrassing situation 8 and the advanced inspecting hole of 7 surface of middle step encryption setting, determine whether that there are goaf or skies by detection Hole;Goaf emergency processing finally is completed in the case where detecting and goaf or cavity being not present, it is ensured that constructing tunnel is with after The safety that phase uses.
The optional embodiment of the embodiment of the present invention is described in detail in conjunction with attached drawing above, still, the embodiment of the present invention is simultaneously The detail being not limited in above embodiment can be to of the invention real in the range of the technology design of the embodiment of the present invention The technical solution for applying example carries out a variety of simple variants, these simple variants belong to the protection scope of the embodiment of the present invention.
It is further to note that specific technical features described in the above specific embodiments, in not lance In the case where shield, it can be combined in any appropriate way.In order to avoid unnecessary repetition, the embodiment of the present invention pair No further explanation will be given for various combinations of possible ways.
In addition, any combination can also be carried out between a variety of different embodiments of the embodiment of the present invention, as long as it is not The thought of the embodiment of the present invention is violated, equally should be considered as disclosure of that of the embodiment of the present invention.

Claims (9)

1. a kind of constructing tunnel passes through goaf emergency processing method, which is characterized in that the emergency processing method includes following Step:
S1 it) during using three benching tunnelling method tunnelings, is deposited in front of top bar (1) arch springing bottom and/or face (2) In the case where goaf, stop the construction to face (2), and back-pressure backfill is carried out to top bar (1) using hole slag (3);
S2 it) after the soil stabilization of face (2), is applied between top bar (1) surface and top and avris portion preliminary bracing (4) Make fan-shaped support frame (5) with bracing reinforcement top and the preliminary bracing of avris portion (4);
S3 logical using concrete) in the top of deformation and the drilling of avris portion preliminary bracing (4) position and embedding concrete pumping pipe It crosses the pumping line backfilling goaf and collapses space, formed concrete guard wall (6);
S4 the top of limit deformation section) is invaded in top bar (1) and the preliminary bracing of avris portion (4) steel arch-shelf above and behind position is distinguished Apply Shed-pipe Advanced Support grouting support;
S5) preliminary bracing for invading limit deformation is reinforced or replaced from the small mileage direction in tunnel;
S6 it) in face (2) and gets out of a predicament or an embarrassing situation (8) and advanced inspecting hole is arranged in the encryption of middle step (7) surface, is determined whether by detection There are goaf or cavities;Goaf emergency processing is completed in the case where detecting and goaf or cavity being not present.
2. emergency processing method according to claim 1, which is characterized in that the step S1) use hole slag (3) to top bar (1) back-pressure backfill is carried out, comprising:
It will be got out of a predicament or an embarrassing situation (8) using hole slag (3) and middle step (7) is all covered and extremely flushed with top bar (1) surface;
By the hole slag (3) get out of a predicament or an embarrassing situation certainly (8) end backwards to three step directions with predetermined slope carry out slope backfill.
3. emergency processing method according to claim 1, which is characterized in that the step S2) on top bar (1) surface and top Fan-shaped support frame (5) are applied between portion and avris portion preliminary bracing (4), comprising:
Crossbeam (9) are applied along top bar (1) edge;
Stringer (10) are applied between the crossbeam (9) center and top and avris portion preliminary bracing (4);
Stringer (10) two sides, which symmetrically apply, between the crossbeam (9) and top and avris portion preliminary bracing (4) multipair inclines Bearing diagonal beam (11).
4. emergency processing method according to claim 3, which is characterized in that using crossbeam (9) described in I20 section steel manufacture, indulge Beam (10) and inclined shore beam (11).
5. emergency processing method according to claim 1, which is characterized in that the step S3) described in backfilling goaf collapse Sunken space includes:
It is backfilled in top and the preliminary bracing of avris portion (4) predetermined distance range, backfill height is more than or equal to tunnel Spring of arch.
6. emergency processing method according to claim 1, which is characterized in that the step S4) top bar (1) invade limit deformation The top and the preliminary bracing of avris portion (4) steel arch-shelf above and behind position of section apply Shed-pipe Advanced Support grouting support respectively, comprising:
Injected hole is drilled at the top and the preliminary bracing of avris portion (4) steel arch-shelf above and behind position that need to be reinforced and slip casting is installed It manages (13);
Tube shed grouting is carried out by Grouting Pipe (13) to reinforce the top and the preliminary bracing of avris portion (4) top country rock.
7. emergency processing method according to claim 6, which is characterized in that the injected hole and Grouting Pipe (13) are in vault Predetermined angular setting.
8. emergency processing method according to claim 1, which is characterized in that the step S5) from the small mileage direction in tunnel The preliminary bracing arch for invading limit deformation is reinforced or is replaced, comprising:
The deformation arch of tunnel-side is reinforced or replaced first, then reinforces or replace the top and avris portion preliminary bracing (4) Vault, and reinforced or replaced in the way of by Pin and segmentation.
9. emergency processing method according to claim 1, which is characterized in that the step S6) further include: detecting presence In the case where goaf or cavity, Concrete Filled is carried out using ductule radial grouting;It is detected again, until detecting There is no goaf or cavities, complete goaf emergency processing.
CN201910256778.1A 2019-04-01 2019-04-01 Constructing tunnel passes through goaf emergency processing method Pending CN110067572A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910256778.1A CN110067572A (en) 2019-04-01 2019-04-01 Constructing tunnel passes through goaf emergency processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910256778.1A CN110067572A (en) 2019-04-01 2019-04-01 Constructing tunnel passes through goaf emergency processing method

Publications (1)

Publication Number Publication Date
CN110067572A true CN110067572A (en) 2019-07-30

Family

ID=67366807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910256778.1A Pending CN110067572A (en) 2019-04-01 2019-04-01 Constructing tunnel passes through goaf emergency processing method

Country Status (1)

Country Link
CN (1) CN110067572A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110821513A (en) * 2019-10-24 2020-02-21 中铁十八局集团有限公司 Construction method for performing advanced grouting and supporting on tunnel local collapse
CN112814736A (en) * 2020-12-31 2021-05-18 新疆北新路桥集团股份有限公司 Tunnel collapse treatment method
CN116950687A (en) * 2023-09-20 2023-10-27 太原西北二环高速公路发展有限公司 Tunnel supporting system penetrating through multilayer goaf and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3713887A1 (en) * 1987-04-25 1988-11-17 Gewerk Eisenhuette Westfalia Walking mechanism for hydraulic support assemblies
CN1804374A (en) * 2006-01-06 2006-07-19 山东科技大学 Method for preventing and controlling impact geopressure in longwall face gate of coal mine
CN101105129A (en) * 2007-07-16 2008-01-16 中南大学 Mining environment reconstructed continuous mining afterwards filling mining method
CN201714426U (en) * 2010-06-28 2011-01-19 中铁二十局集团有限公司 Coal seam gob tunnel initial-stage reinforcing and supporting system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3713887A1 (en) * 1987-04-25 1988-11-17 Gewerk Eisenhuette Westfalia Walking mechanism for hydraulic support assemblies
CN1804374A (en) * 2006-01-06 2006-07-19 山东科技大学 Method for preventing and controlling impact geopressure in longwall face gate of coal mine
CN101105129A (en) * 2007-07-16 2008-01-16 中南大学 Mining environment reconstructed continuous mining afterwards filling mining method
CN201714426U (en) * 2010-06-28 2011-01-19 中铁二十局集团有限公司 Coal seam gob tunnel initial-stage reinforcing and supporting system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
莫江涛: "《天龙山隧道穿越采空区技术研究》", 《福建建设科技》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110821513A (en) * 2019-10-24 2020-02-21 中铁十八局集团有限公司 Construction method for performing advanced grouting and supporting on tunnel local collapse
CN110821513B (en) * 2019-10-24 2021-07-06 中铁十八局集团有限公司 Construction method for performing advanced grouting and supporting on tunnel local collapse
CN112814736A (en) * 2020-12-31 2021-05-18 新疆北新路桥集团股份有限公司 Tunnel collapse treatment method
CN112814736B (en) * 2020-12-31 2023-01-31 新疆北新路桥集团股份有限公司 Tunnel collapse treatment method
CN116950687A (en) * 2023-09-20 2023-10-27 太原西北二环高速公路发展有限公司 Tunnel supporting system penetrating through multilayer goaf and construction method thereof
CN116950687B (en) * 2023-09-20 2023-12-01 太原西北二环高速公路发展有限公司 Tunnel supporting system penetrating through multilayer goaf and construction method thereof

Similar Documents

Publication Publication Date Title
CN103089275B (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN102562099B (en) Method for carrying out rapid face excavation construction of loess tunnel by double rows of small conduits
CN103899323B (en) A kind of construction method of shield crossing rail yard
CN104453946B (en) Advanced reinforcing construction method for building tunnel in soft surrounding rock
CN102134998B (en) Construction method for wind-blown sand tunnel
CN107060774B (en) A kind of anti-tunnel portal wall damage device and construction method
CN104818991A (en) Construction method of residual slope wash tunnel with shallow cover and unsymmetrical pressure
CN110067572A (en) Constructing tunnel passes through goaf emergency processing method
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN106930321B (en) The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole
CN108412503B (en) Bias shallow-buried tunnel portal construction protection structure and construction method thereof
CN106049195A (en) Method for strengthening subgrade basement of existing high speed railway line
CN110284885A (en) Shield inspection-pit construction method
CN109538216A (en) Pass through mined out and subsidence area constructing tunnel technique
CN102650210B (en) Method for constructing tunnel with low-half cross section being dry powder and fine sand layers
CN103993885A (en) Construction method for underground excavation tunnel side-direction hole opening supporting system
CN107489433A (en) A kind of tunnel CRD engineering methods anti-leakage structure and Antiseep method
CN112145203A (en) Full-face advancing type sectional grouting construction method and overlapped tunnel construction method
CN207813651U (en) A kind of ground water drainage system for double-hole tunnel
CN107165641B (en) High inclination-angle ladder way opposite direction excavating construction method in thin layer breaking up hard rock stratum
CN112177635A (en) Construction method of step multiple advanced small guide pipe and construction method of overlapped tunnel
CN109826635B (en) Construction method for reinforcing shield receiving space peripheral soil body constructed by subsurface excavation method
JP2019015100A (en) Removing method of earth retaining wall
CN111156005A (en) Construction method for tunnel to pass through subway station at close distance
CN107191206A (en) A kind of step construction method of Shallow-buried Large-span Tunnel Unit two six

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190730

RJ01 Rejection of invention patent application after publication