CN110059956A - A kind of cross-cutting infrastructure security pre-alarming control system and its method - Google Patents
A kind of cross-cutting infrastructure security pre-alarming control system and its method Download PDFInfo
- Publication number
- CN110059956A CN110059956A CN201910309940.1A CN201910309940A CN110059956A CN 110059956 A CN110059956 A CN 110059956A CN 201910309940 A CN201910309940 A CN 201910309940A CN 110059956 A CN110059956 A CN 110059956A
- Authority
- CN
- China
- Prior art keywords
- data
- module
- detection data
- infrastructure
- evaluation information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
- G06Q50/265—Personal security, identity or safety
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Tourism & Hospitality (AREA)
- Economics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Computer Security & Cryptography (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to infrastructure maintenance technology fields, and its purpose is to provide a kind of cross-cutting infrastructure security pre-alarming control systems and its method.The invention discloses a kind of cross-cutting infrastructure security pre-alarming control systems, including data acquisition module, database module, data exhibiting module, analysis evaluation module and application and business support module.A kind of cross-cutting infrastructure security pre-warning and control method is also disclosed, the following steps are included: S1: management terminal sends the detection data of infrastructure to data acquisition module, after data acquisition module obtains detection data, it will test data classification and be sent to database module;S2: database module classification storage detection data;S3: data exhibiting module is extracted specified detection data and is shown;S4: analysis evaluation module extracts specified detection data and generates detection data evaluation information.The real-time acquisition of the detection data of each infrastructure can be achieved in the present invention, while can realize showing in real time for detection data.
Description
Technical field
The present invention relates to infrastructure maintenance technology fields, more particularly to a kind of cross-cutting infrastructure security early warning
Control system and its method.
Background technique
Infrastructure, which refers to, provides the substance job facilities of public service for social production and resident living, is for guaranteeing
The public service system that country socio-economic activity is normally carried out.It is the general substance item of social development of depending on for existence
Part is the basis of national economy all our undertakings development.Infrastructure needs to carry out the maintenance in later period after the completion of construction,
It is essential to the daily control of infrastructure during the maintenance of infrastructure.
In the prior art, biography can not be merged such as the detection system of field of traffic applied to the detection system of infrastructure
Inspection data, tunneling data and the highway data of system, this can not provide more convenience for the administrative department of various regions,
It is unfavorable for the real-time development of various regions administrative department work.In addition, though existing system can collect real-time detection data,
It can not accomplish that real-time data are shown.
Summary of the invention
In order to solve the above problems existing in the present technology, the present invention provides a kind of cross-cutting infrastructure security is pre-
Alert control system and its method.
The technical solution adopted by the present invention is that:
A kind of cross-cutting infrastructure security pre-alarming control system, including data acquisition module, database module, data
Display module, analysis evaluation module and application and business support module;Wherein:
The data acquisition module, for obtaining the detection of the infrastructure sent by application and business support module in real time
Data, and will test data classification and be sent to database module;
The database module is used for classification storage detection data;
The data exhibiting module for extracting specified detection data from database module, and will test data conversion
Real-time exhibition is carried out for viewdata;
The analysis evaluation module is carried out for extracting specified detection data from database module, and to detection data
Processing generates detection data evaluation information, then will test data evaluation information and be sent to application and business support module;
The application and business support module, for the detection data of infrastructure to be sent to data acquisition module in real time,
It is also used to receive the detection data evaluation information generated by analysis evaluation module and real-time exhibition.
Preferably, the data acquisition module, for obtaining the infrastructure sent by application and business support module
Detection data, and will test data and classified in the form of " representing data operator " and be sent to database module;The number
According to library module, multiple " representing data operator collection " are provided with, the inspection of the form for classification storage different " representing data operator "
Measured data.
Preferably, described " representing data operator collection " stores for what is set up according to country and industry standard for category
The file of different detection datas.
Preferably, the application and business support module, including monitoring display screen and management terminal, the management terminal,
For sending the detection data of infrastructure, the monitoring to data acquisition module in real time according to the detection data of detection sensor
Display screen, for receiving the detection data evaluation information generated by analysis evaluation module and real-time display.
Preferably, the analysis evaluation module is also used to will test data evaluation information and normal data evaluation information library
Interior normal data evaluation information compares, and is not belonging in normal data evaluation information library in detection data evaluation information
When normal data evaluation information, warning message is sent to monitoring display screen;
The monitoring display screen after being also used to receive the warning message sent by analysis evaluation module, will not belong to mark
The detection data evaluation information of normal data evaluation information in quasi- data evaluation information bank is shown in different colors.
Preferably, the application and business support module, further include information extraction modules;The information extraction modules are used
In the detection data evaluation information that reception is generated by analysis evaluation module, it then will test data evaluation information and be converted to text envelope
Breath.
Preferably, the viewdata is the image data of broken line diagram form and/or bar graph form.
A kind of control method of cross-cutting infrastructure security pre-alarming control system, comprising the following steps:
S1: management terminal sends the detection data of infrastructure to data acquisition module, and data acquisition module obtains detection
After data, it will test data classification and be sent to database module;
S2: database module classification storage detection data;
S3: data exhibiting module extracts specified detection data, and will test data and be converted to viewdata and be shown;
S4: analysis evaluation module extracts specified detection data, and handles detection data, generates detection data and comments
Then valence information will test data evaluation information and be sent to application and business support module.
Preferably, in step s3, when the data exhibiting module will test data and be converted to viewdata and be shown,
Detection data is handled using filtering algorithm.
Preferably, in step s 4, after the analysis evaluation module extracts specified detection data, to the place of detection data
Steps are as follows for reason: firstly, classifying according to the difference of infrastructure and detection sensor to detection data, forming different type
Test database;Then, the detection data in different types of Test database is compared one by one, extracts the type
Test database in average detected data, maximum detection data and/or minimum detection data;Finally, by different types of
Average detected data in Test database, maximum detection data and/or minimum detection data summarization and according to country and industry
Set formula in specification is calculated, and detection data evaluation information is thus generated.
The beneficial effects of the present invention are: the real-time acquisition of the detection data of each infrastructure can be realized, while it can realize inspection
Measured data shows in real time, grasps its operating condition for being responsible for infrastructure in real time conducive to each administrative department, saves manpower.Specifically
For, the present invention is sent firstly, being obtained in real time by data acquisition module by application and business support module in implementation process
Infrastructure detection data, and will test data classification and be sent to database module, database divides detection data
Class storage;Then, data exhibiting module is extracted specified detection data by database module, and be will test data and be converted to visually
Data carry out real-time exhibition, and at the same time, analysis evaluation module can be extracted specified detection data by database module, and to inspection
Measured data is handled, and is generated detection data evaluation information, then be will test data evaluation information and be sent to application and business branch
Hold module;Finally, using and business support module in real time to data acquisition module send infrastructure detection data, be also used to
The detection data evaluation information generated by analysis evaluation module is received, the real-time receipts of the detection data of infrastructure are achieved in
Hair, grasps its operating condition for being responsible for infrastructure conducive to each administrative department in real time, for abnormal monitoring data evaluation information and
When handle, have promote the use of value.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is a kind of structural block diagram of cross-cutting infrastructure security pre-alarming control system in the present invention;
Fig. 2 is a kind of flow chart of cross-cutting infrastructure security pre-warning and control method in the present invention.
Specific embodiment
Hereinafter reference will be made to the drawings, by way of example describe in detail a kind of rubbish recovering method provided by the invention and
Realize the garbage retrieving system of this method.It should be noted that being used to help manage for the explanation of these way of example
The solution present invention, but and do not constitute a limitation of the invention.
The terms "and/or", only a kind of incidence relation for describing affiliated partner, indicates that there may be three kinds of passes
System, for example, A and/or B, can indicate: individualism A, individualism B exist simultaneously tri- kinds of situations of A and B, the terms
"/and " it is to describe another affiliated partner relationship, indicate may exist two kinds of relationships, for example, A/ and B, can indicate: individually depositing
In A, two kinds of situations of individualism A and B, in addition, character "/" herein, typicallying represent forward-backward correlation object is a kind of "or" pass
System.
Embodiment 1:
A kind of cross-cutting infrastructure security pre-alarming control system, as shown in Figure 1, including data acquisition module, data
Library module, data exhibiting module, analysis evaluation module and application and business support module;Wherein:
The data acquisition module, for obtaining the detection of the infrastructure sent by application and business support module in real time
Data, and will test data classification and be sent to database module, it should be noted that infrastructure in the present embodiment can with but
It is not limited only to as high voltage tower, communication iron tower, wind power generation stepped, large stadium, bridge, road, tunnel, underground civil defense engineering etc.
Strategic infrastructure, application and business support module are safeguarded by the administrative department of each infrastructure, are set by each basis
The detection data of its responsible infrastructure is sent to data acquisition module in real time and counted by the administrative department applied, convenient for each
The real-time development of ground administrative department work.
The database module is used for classification storage detection data.
The data exhibiting module for extracting specified detection data from database module, and will test data conversion
Real-time exhibition is carried out for viewdata, in the present embodiment, data exhibiting module is safeguarded by the relevant personnel of data management,
Viewdata includes but are not limited to as the image datas such as line chart, histogram, text data etc., and the data exhibiting module can
To be realized using monitor terminal.
The analysis evaluation module is carried out for extracting specified detection data from database module, and to detection data
Processing generates detection data evaluation information, then will test data evaluation information and be sent to application and business support module, need
Illustrate, in the present embodiment, according to country or industry standard in calculation formula, detection data is analyzed, calculate and
The processing such as assessment.
The application and business support module, for the detection data of infrastructure to be sent to data acquisition module in real time,
Be also used to receive the detection data evaluation information generated by analysis evaluation module and real-time exhibition, it should be appreciated that application and
The real-time tranception to the detection data of infrastructure can be achieved at the same time in business support module, convenient for the administrative department of each infrastructure
The operating condition of its responsible infrastructure is grasped in real time, conducive to when abnormal conditions occurs in infrastructure, is safeguarded in time
Work.
The present embodiment can realize the real-time acquisition of the detection data of each infrastructure, while can realize the real-time of detection data
Show, grasps its operating condition for being responsible for infrastructure in real time conducive to each administrative department, save manpower.Specifically, this implementation
Example is set firstly, being obtained in real time by data acquisition module by the basis that application and business support module are sent in implementation process
The detection data applied, and will test data classification and be sent to database module, database carries out classification storage to detection data;So
Afterwards, data exhibiting module is extracted specified detection data by database module, and be will test data and be converted to viewdata progress
Real-time exhibition, at the same time, analysis evaluation module can be extracted specified detection data by database module, and to detection data into
Row processing, generates detection data evaluation information, then will test data evaluation information and be sent to application and business support module;Most
Afterwards, application and business support module send the detection data of infrastructure to data acquisition module in real time, are also used to receive by dividing
The detection data evaluation information that evaluation module generates is analysed, the real-time tranception of the detection data of infrastructure is achieved in, is conducive to each
Administrative department grasps its operating condition for being responsible for infrastructure in real time, handles in time for abnormal monitoring data evaluation information, tool
There is the value of popularization and use.It should be understood that each administrative department includes but are not limited to responsible departments of the government, contingency management portion
The target users such as door, comprehensive detection company, the present embodiment can avoid the above-mentioned multiple infrastructure securities of target user's overlapping development
Pre-alarming control system, effectively save exploitation or purchase cost.
Embodiment 2:
A kind of cross-cutting infrastructure security pre-alarming control system, as shown in Figure 1, including data acquisition module, data
Library module, data exhibiting module, analysis evaluation module and application and business support module;Wherein:
The data acquisition module, for obtaining the detection of the infrastructure sent by application and business support module in real time
Data, and will test data classification and be sent to database module, it should be noted that infrastructure in the present embodiment can with but
It is not limited only to as high voltage tower, communication iron tower, wind power generation stepped, large stadium, bridge, road, tunnel, underground civil defense engineering etc.
Strategic infrastructure, application and business support module are safeguarded by the administrative department of each infrastructure, are set by each basis
The detection data of its responsible infrastructure is sent to data acquisition module in real time and counted by the administrative department applied, convenient for each
The real-time development of ground administrative department work.
In the present embodiment, the data acquisition module is set for obtaining by the basis that application and business support module are sent
The detection data applied, and will test data and classified in the form of " representing data operator " and be sent to database module;Institute
Database module is stated, multiple " representing data operator collection " are provided with, the form for classification storage different " representing data operator "
Detection data.
Specifically, described " representing data operator collection " is depositing for category for setting up according to country and industry standard
Store up the file of different detection datas.For example, according to traffic transport industry " highway technology status assessment standard " (JTG H20-
2007), international roughness index, rutting depth index, pavement damage ratio etc. be set as GL_IRI100, GL_rut5, GL_
DR100 etc. is artificially established the detection based on different industries field or monitoring data frame, and is formed and be used in a manner of code name
Store the file of different detection datas.
The database module is used for classification storage detection data.
The data exhibiting module for extracting specified detection data from database module, and will test data conversion
Real-time exhibition is carried out for viewdata, in the present embodiment, data exhibiting module is safeguarded by the relevant personnel of data management,
Viewdata includes but are not limited to as the image datas such as line chart, histogram, text data etc., and the data exhibiting module can
To be realized using monitor terminal;It is preferably provided with, in the present embodiment, the viewdata is broken line diagram form and/or histogram
The image data of form, conducive to the intuitive situation of change for understanding detection data.
The analysis evaluation module is carried out for extracting specified detection data from database module, and to detection data
Processing generates detection data evaluation information, then will test data evaluation information and be sent to application and business support module, need
Illustrate, in the present embodiment, according to country or industry standard in calculation formula, detection data is analyzed, calculate and
The processing such as assessment.
The application and business support module, for the detection data of infrastructure to be sent to data acquisition module in real time,
Be also used to receive the detection data evaluation information generated by analysis evaluation module and real-time exhibition, it should be appreciated that application and
The real-time tranception to the detection data of infrastructure can be achieved at the same time in business support module, convenient for the administrative department of each infrastructure
The operating condition of its responsible infrastructure is grasped in real time, conducive to when abnormal conditions occurs in infrastructure, is safeguarded in time
Work.
Embodiment 3:
A kind of cross-cutting infrastructure security pre-alarming control system, as shown in Figure 1, including data acquisition module, data
Library module, data exhibiting module, analysis evaluation module and application and business support module;Wherein:
The data acquisition module, for obtaining the detection of the infrastructure sent by application and business support module in real time
Data, and will test data classification and be sent to database module, it should be noted that infrastructure in the present embodiment can with but
It is not limited only to as high voltage tower, communication iron tower, wind power generation stepped, large stadium, bridge, road, tunnel, underground civil defense engineering etc.
Strategic infrastructure, application and business support module are safeguarded by the administrative department of each infrastructure, are set by each basis
The detection data of its responsible infrastructure is sent to data acquisition module in real time and counted by the administrative department applied, convenient for each
The real-time development of ground administrative department work.
In the present embodiment, the data acquisition module is set for obtaining by the basis that application and business support module are sent
The detection data applied, and will test data and classified in the form of " representing data operator " and be sent to database module;Institute
Database module is stated, multiple " representing data operator collection " are provided with, the form for classification storage different " representing data operator "
Detection data.
Specifically, described " representing data operator collection " is depositing for category for setting up according to country and industry standard
Store up the file of different detection datas.
The database module is used for classification storage detection data.
The data exhibiting module for extracting specified detection data from database module, and will test data conversion
Real-time exhibition is carried out for viewdata, in the present embodiment, data exhibiting module is safeguarded by the relevant personnel of data management,
Viewdata includes but are not limited to as the image datas such as line chart, histogram, text data etc., and the data exhibiting module can
To be realized using monitor terminal;It is preferably provided with, in the present embodiment, the viewdata is broken line diagram form and/or histogram
The image data of form, conducive to the intuitive situation of change for understanding detection data.
The analysis evaluation module is carried out for extracting specified detection data from database module, and to detection data
Processing generates detection data evaluation information, then will test data evaluation information and be sent to application and business support module, need
Illustrate, in the present embodiment, according to country or industry standard in calculation formula, detection data is analyzed, calculate and
The processing such as assessment.
The application and business support module, for the detection data of infrastructure to be sent to data acquisition module in real time,
It is also used to receive the detection data evaluation information generated by analysis evaluation module and real-time exhibition, it should be appreciated that testing number
According to can with but be not limited only to be made of artificial Daily Round Check data, automation equipment inspection data;Using and business support module
The real-time tranception to the detection data of infrastructure can be achieved at the same time, to grasp it in real time negative convenient for the administrative department of each infrastructure
The operating condition of the infrastructure of duty carries out maintenance work conducive to when abnormal conditions occurs in infrastructure in time.
In the present embodiment, the application and business support module, including monitoring display screen and management terminal, the management is eventually
End, it is described for sending the detection data of infrastructure to data acquisition module in real time according to the detection data of detection sensor
Monitoring display screen, for receiving the detection data evaluation information generated by analysis evaluation module and real-time display;It needs to illustrate
It is that monitoring display screen and management terminal can be used for real-time exhibition detection data.
In the present embodiment, the analysis evaluation module, is also used to will test data evaluation information and normal data evaluation is believed
Normal data evaluation information in breath library compares, and is not belonging to normal data evaluation information library in detection data evaluation information
When interior normal data evaluation information, warning message is sent to monitoring display screen;
The monitoring display screen after being also used to receive the warning message sent by analysis evaluation module, will not belong to mark
The detection data evaluation information of normal data evaluation information in quasi- data evaluation information bank is shown in different colors.
In the present embodiment, the application and business support module, further include information extraction modules;The information extraction mould
Then block will test data evaluation information and be converted to for receiving the detection data evaluation information generated by analysis evaluation module
Text information, and text information is passed through into monitoring display screen real-time display, it should be noted that detection data evaluation information can be certainly
The pre-designed text template of dynamic wadding warp, then forms that final text is novel, and information extraction modules can be used for week
The extraction of phase property detection data.
Embodiment 4:
A kind of control method of cross-cutting infrastructure security pre-alarming control system, as shown in Fig. 2, including following step
It is rapid:
S1: the detection data of application and business support module to data acquisition module transmission infrastructure, data acquisition mould
After block obtains detection data, it will test data classification and be sent to database module;
S2: database module classification storage detection data;
S3: data exhibiting module extracts specified detection data, and will test data and be converted to viewdata and be shown;
Further, in step s3, the data exhibiting module, which will test data and be converted to viewdata, is shown
When, detection data is handled using filtering algorithm.
The step of filtering algorithm is to detection data processing is as follows: (the subsequent value when detection sensor is displacement sensor
More all it is using absolute value), compare second detection data and its upper first detection data at a time point first
Whether difference is greater than 1mm, that second detection data being greater than then is given up if it is greater than 1mm, and the analysis evaluation module receives
It is then compared with the first detection data to after new data (such as third detection data), then with third detection data, when its difference is big
Continue to give up in 1mm and so on.If the second detection data is not greater than more than 1mm, newly than the value of the first detection data
Third detection data directly and the second detection data be compared.If successively more each data all compare continuous 10 data
Its upper detection data goes out greatly 1mm and then judges that this section of detection data is correctly, then to retain this 10 detection datas.Using filter
Wave algorithm can make the viewdata shown more steadily without zigzag is presented, and avoid the viewing experience for influencing user.
S4: analysis evaluation module extracts specified detection data, and handles detection data, generates detection data and comments
Then valence information will test data evaluation information and be sent to application and business support module.
Further, in step s 4, after the analysis evaluation module extracts specified detection data, to detection data
Processing step is as follows: firstly, classifying according to the difference of infrastructure and detection sensor to detection data, forming inhomogeneity
The Test database of type;Then, the detection data in different types of Test database is compared one by one, extracts such
Average detected data, maximum detection data and/or minimum detection data in the Test database of type;Finally, by different type
Test database in average detected data, maximum detection data and/or minimum detection data summarization and according to country and row
Set formula in industry specification is calculated, and detection data evaluation information is thus generated.
In step s 4, " highway technology can be used in average detected data, maximum detection data and/or minimum detection data
Status assessment standard " (H20-2007), " Highway bridge technique status assessment standard " (H21-2011), " town road maintenance skill
Art specification " all formula appeared in the specification such as (CJJ36-2016) are the knot that is calculated, and will be calculated by formula
Fruit is the evaluation score to some index.Wherein, what is occurred in " highway technology status assessment standard " (H20-2007) is all
Formula is as follows:
(1) road surface Pavement distress (PCI):
(2) pavement damage ratio (DR):
Wherein, AiFor measurement data.
(3) Road surface quality index (RQI):
Wherein, IRI is measurement data.
(4) pavement rutting depth index (RDI):
Wherein, RD is measurement data.
(5) pavement skid resistance index (SRI):
Wherein, SFC is measurement data.
(6) pavement structural strength index (PSSI):
Wherein, l0For measurement data.
(7) roadbed technology status index (SCI)
Wherein, GDiSCIFor measurement data.
(8) bridge tunnel structure technology status index (BCI):
BCI=min (100-GDiBCI)
Wherein, GDiBCIFor measurement data.
(9) equipment along road technology status index (TCI):
Wherein, GDiTCIFor measurement data.
(10) Pavement Condition index (PQI):
PQI=ωPCIPCI+ωRQIRQI+ωRDIRDI+ωSRISRI
Wherein, PCI, RQI, RDI, SRI are the data of aforementioned calculating.
When being calculated, above-mentioned formula will be pre-entered into database module in a manner of variable, corresponding data
The result of needs is calculated according to these formula.It, can be according to field correlation if there is the data input in additional field
Standard inputs new formula, and system will transfer the formula and calculate.
It should be noted that the form of detection data evaluation information is as follows: by taking the detection data in highway field as an example, foundation
" highway technology status assessment standard " (H20-2007), corresponding Pavement distress (scoring), wherein 90 points the above are
Excellent, 80-90 point for good, 70-80 points be in, 60-70 points be time, 60 points the following are difference, thus the pavement damage situation on certain section of road,
That is the detection data evaluation information in highway field may respectively be: it is excellent, good, in, it is secondary, poor;In addition to pavement damage situation, pavement usage
Performance index, coefficient of friction etc., are equally evaluated in this way.For bridge field, then according to " bridge technology status assessment mark
It is quasi- " (H21-2011), the detection data evaluation information in bridge field is classified are as follows: 1 class bridge, 2 class bridges, 3 class bridges, 4 class bridges, 5 classes
Bridge.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair
Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills
Art field, is included within the scope of the present invention.
Claims (10)
1. a kind of cross-cutting infrastructure security pre-alarming control system, it is characterised in that: including data acquisition module, database
Module, data exhibiting module, analysis evaluation module and application and business support module;Wherein:
The data acquisition module, for obtaining the testing number of the infrastructure sent by application and business support module in real time
According to, and will test data classification and be sent to database module;
The database module is used for classification storage detection data;
The data exhibiting module, for extracting specified detection data from database module, and will test that data are converted to can
Real-time exhibition is carried out depending on data;
The analysis evaluation module for extracting specified detection data from database module, and is handled detection data,
Detection data evaluation information is generated, data evaluation information is then will test and is sent to application and business support module;
The application and business support module are also used for sending the detection data of infrastructure to data acquisition module in real time
In receiving the detection data evaluation information generated by analysis evaluation module and real-time exhibition.
2. the cross-cutting infrastructure security pre-alarming control system of one kind according to claim 1, it is characterised in that: described
Data acquisition module for obtaining the detection data of the infrastructure sent by application and business support module, and will test number
The form for " representing data operator " accordingly is classified and is sent to database module;The database module is provided with multiple
" representing data operator collection ", the detection data of the form for classification storage different " representing data operator ".
3. the cross-cutting infrastructure security pre-alarming control system of one kind according to claim 2, it is characterised in that: described
The file that different detection datas are stored for category that " representing data operator collection " sets up for foundation country and industry standard
Folder.
4. the cross-cutting infrastructure security pre-alarming control system of one kind according to claim 1, it is characterised in that: described
Using and business support module, including monitoring display screen and management terminal, the management terminal, for according to detection sensor
Detection data sends the detection data of infrastructure, the monitoring display screen, for receiving by dividing to data acquisition module in real time
Analyse the detection data evaluation information that evaluation module generates and real-time display.
5. the cross-cutting infrastructure security pre-alarming control system of one kind according to claim 4, it is characterised in that: described
Evaluation module is analyzed, is also used to will test the normal data evaluation information in data evaluation information and normal data evaluation information library
It compares, and when detection data evaluation information is not belonging to the normal data evaluation information in normal data evaluation information library,
Warning message is sent to monitoring display screen;
The monitoring display screen will not belong to criterion numeral after being also used to receive the warning message sent by analysis evaluation module
It is shown in different colors according to the detection data evaluation information of the normal data evaluation information in evaluation information library.
6. the cross-cutting infrastructure security pre-alarming control system of one kind according to claim 4 or 5, it is characterised in that:
The application and business support module, further include information extraction modules;The information extraction modules are assessed for receiving by analysis
The detection data evaluation information that module generates, then will test data evaluation information and is converted to text information.
7. the cross-cutting infrastructure security pre-alarming control system of one kind according to claim 1, it is characterised in that: described
Viewdata is the image data of broken line diagram form and/or bar graph form.
8. according to the control of the cross-cutting infrastructure security pre-alarming control system of the described in any item one kind of claim 4 to 6
Method, it is characterised in that: the following steps are included:
S1: management terminal sends the detection data of infrastructure to data acquisition module, and data acquisition module obtains detection data
Afterwards, it will test data classification and be sent to database module;
S2: database module classification storage detection data;
S3: data exhibiting module extracts specified detection data, and will test data and be converted to viewdata and be shown;
S4: analysis evaluation module extracts specified detection data, and handles detection data, generates detection data evaluation letter
Breath, then will test data evaluation information and is sent to application and business support module.
9. the control method of the cross-cutting infrastructure security pre-alarming control system of one kind according to claim 8, special
Sign is: in step s3, when the data exhibiting module will test data and be converted to viewdata and be shown, utilizing filtering
Algorithm handles detection data.
10. the control method of the cross-cutting infrastructure security pre-alarming control system of one kind according to claim 8, special
Sign is: in step s 4, after the analysis evaluation module extracts specified detection data, such as to the processing step of detection data
Under: firstly, classifying according to the difference of infrastructure and detection sensor to detection data, form different types of testing number
According to library;Then, the detection data in different types of Test database is compared one by one, extracts the testing number of the type
According to average detected data, maximum detection data and/or the minimum detection data in library;Finally, by different types of detection data
Average detected data in library, maximum detection data and/or minimum detection data summarization and according in country and industry standard
Set formula is calculated, and detection data evaluation information is thus generated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910309940.1A CN110059956A (en) | 2019-04-17 | 2019-04-17 | A kind of cross-cutting infrastructure security pre-alarming control system and its method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910309940.1A CN110059956A (en) | 2019-04-17 | 2019-04-17 | A kind of cross-cutting infrastructure security pre-alarming control system and its method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110059956A true CN110059956A (en) | 2019-07-26 |
Family
ID=67319340
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910309940.1A Pending CN110059956A (en) | 2019-04-17 | 2019-04-17 | A kind of cross-cutting infrastructure security pre-alarming control system and its method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110059956A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114005278A (en) * | 2021-11-01 | 2022-02-01 | 河北省高速公路延崇管理中心 | Intelligent monitoring and early warning system and method for highway infrastructure group |
CN117557255A (en) * | 2024-01-12 | 2024-02-13 | 吉林大学 | Dangerous scene driving risk assessment system and method for automatic driving automobile |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103034207A (en) * | 2012-12-14 | 2013-04-10 | 江苏飞尚安全监测咨询有限公司 | Infrastructure health monitoring system and implementation process thereof |
CN103049480A (en) * | 2012-11-27 | 2013-04-17 | 浙江工业职业技术学院 | Set of management and maintenance system for monitoring clusters of urban major transportation infrastructures |
CN104424611A (en) * | 2013-08-23 | 2015-03-18 | 深圳市昆特科技有限公司 | Early warning information data acquisition system |
CN107817744A (en) * | 2017-10-25 | 2018-03-20 | 长春市智慧城市科技有限公司 | Communal facility safety monitoring system |
CN108848129A (en) * | 2018-05-24 | 2018-11-20 | 烟台智慧云谷云计算有限公司 | A kind of smart city cloud control service platform |
CN109302487A (en) * | 2018-10-30 | 2019-02-01 | 广西交投科技有限公司 | Highway project quality administration information system based on cloud platform |
-
2019
- 2019-04-17 CN CN201910309940.1A patent/CN110059956A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103049480A (en) * | 2012-11-27 | 2013-04-17 | 浙江工业职业技术学院 | Set of management and maintenance system for monitoring clusters of urban major transportation infrastructures |
CN103034207A (en) * | 2012-12-14 | 2013-04-10 | 江苏飞尚安全监测咨询有限公司 | Infrastructure health monitoring system and implementation process thereof |
CN104424611A (en) * | 2013-08-23 | 2015-03-18 | 深圳市昆特科技有限公司 | Early warning information data acquisition system |
CN107817744A (en) * | 2017-10-25 | 2018-03-20 | 长春市智慧城市科技有限公司 | Communal facility safety monitoring system |
CN108848129A (en) * | 2018-05-24 | 2018-11-20 | 烟台智慧云谷云计算有限公司 | A kind of smart city cloud control service platform |
CN109302487A (en) * | 2018-10-30 | 2019-02-01 | 广西交投科技有限公司 | Highway project quality administration information system based on cloud platform |
Non-Patent Citations (2)
Title |
---|
杨永崇: "《实用土地信息系统》", 30 November 2009, 测绘出版社 * |
闵永智: "《高等学校仪器科学与技术"十三五"规划教材 电气测试技术》", 31 October 2017, 西安电子科技大学出版社 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114005278A (en) * | 2021-11-01 | 2022-02-01 | 河北省高速公路延崇管理中心 | Intelligent monitoring and early warning system and method for highway infrastructure group |
CN117557255A (en) * | 2024-01-12 | 2024-02-13 | 吉林大学 | Dangerous scene driving risk assessment system and method for automatic driving automobile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107945081B (en) | Urban operation display and monitoring early warning system | |
CN103400044B (en) | A kind of water environment safety evaluation analysis method of improvement | |
CN106017556A (en) | Bridge safety operation monitoring and management system | |
CN105574593B (en) | Track state static detection and control system and method based on cloud computing and big data | |
CN101465059B (en) | Early-warning system for inspecting and judging urban road traffic safety situation | |
CN109931109A (en) | A kind of constructing tunnel dynamic landslide safety comprehensive method for early warning based on multivariate data | |
CN101916365A (en) | Intelligent video identifying method for cheat in test | |
CN110059956A (en) | A kind of cross-cutting infrastructure security pre-alarming control system and its method | |
CN111027631B (en) | X-ray image classification and identification method for judging crimping defects of high-voltage strain clamp | |
CN109857782A (en) | A kind of Monitor of Logging Data Processing System | |
CN103955596A (en) | Accident hotspot comprehensive judging method based on traffic accident collection technology | |
CN107862433A (en) | A kind of extra high voltage direct current transmission line live-working safety appraisal procedure and system | |
CN111563530A (en) | Intelligent bridge disease inspection method and system | |
CN107230350A (en) | A kind of urban transportation amount acquisition methods based on bayonet socket Yu mobile phone flow call bill data | |
CN114417981B (en) | Intelligent river length inspection system | |
CN107145608A (en) | A kind of intelligent environmental sanitation platform application is in the processing management control system of garbage apparatus | |
CN110532872A (en) | A kind of landslide hierarchy system and method based on convolution supporting vector neural network | |
CN109885605B (en) | Urban physical sign index model data preprocessing method | |
CN107610261A (en) | The system of management of withdrawing from the arena is entered in a kind of building site that can carry out | |
CN112653675A (en) | Intelligent intrusion detection method and device based on deep learning | |
CN109725121B (en) | Method and system for generating sampling task | |
CN116859842A (en) | Chemical production line safety evaluation system | |
CN111784151A (en) | System and method for generating industrial chain panoramic image | |
CN103279823A (en) | Vehicle axle overhaul working procedure detecting method and system | |
CN108629975B (en) | Quality evaluation method of traffic flow data of highway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190726 |