CN110043105A - 一种10kV线路线杆卡托盘 - Google Patents

一种10kV线路线杆卡托盘 Download PDF

Info

Publication number
CN110043105A
CN110043105A CN201910348841.4A CN201910348841A CN110043105A CN 110043105 A CN110043105 A CN 110043105A CN 201910348841 A CN201910348841 A CN 201910348841A CN 110043105 A CN110043105 A CN 110043105A
Authority
CN
China
Prior art keywords
line bar
pallet
hole
recessed pockets
holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910348841.4A
Other languages
English (en)
Other versions
CN110043105B (zh
Inventor
郭长荣
许强
郭轩昊
孙英军
何翠
高振
孟涛
杨宁
韩梅梅
张艳霞
俞迎新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yucheng Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Yucheng Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yucheng Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Yucheng Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN201910348841.4A priority Critical patent/CN110043105B/zh
Publication of CN110043105A publication Critical patent/CN110043105A/zh
Application granted granted Critical
Publication of CN110043105B publication Critical patent/CN110043105B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2253Mounting poles or posts to the holder

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Pallets (AREA)
  • Manufacturing Of Electrical Connectors (AREA)

Abstract

本发明涉及电力设施领域,特别公开了一种10kV线路线杆卡托盘。它包括两个半托盘,两个半托盘相对的部分设有凹进槽,两个半托盘对到一起后,两个凹进槽组成一个圆形,每个半托盘上设有若干卡爪,每个凹进槽处开有通孔,两个通孔位于同一条直线上,两个通孔共同配套一个插杆,在线杆的相应位置上开有穿过孔。本发明的托盘在使用时位于线杆下端的上方,离线杆的下端还有一段距离,并且托盘由两部分组成,卡爪与托盘成为一体,因此施工过程中只需钻一个较小的孔即可,对土地的破坏性大大减小,同时在将线杆插入空中立起来后,在安装卡托盘的过程中就可以通电,因此大大减小了断电时间,提高了工作效率。

Description

一种10kV线路线杆卡托盘
技术领域
本发明涉及电力设施领域,特别涉及一种10kV线路线杆卡托盘。
背景技术
现阶段,在线杆架设过程中,通常是用托盘和卡盘对线杆进行固定,确保了线杆的稳定性和安全性。托盘是四方体,是一个整体,托盘通常占地面积比较大,并且深埋于线杆下端,并且由于必须使用挖掘机进行开挖,开挖面积较大,对庄稼的破坏性也较大,同时卡盘与托盘是分离设置的,在将线杆立于托盘上后,还要在托盘上方用卡盘对线杆进行固定,然后才能填土,因此不但增加了施工工作难度,施工进度慢,还对施工迁占带来了工作压力,并且公司对施工过程中的停电是有限制的,因此,较低的效率又增加了施工紧张度,同时对人身、设备安全都增加了不安全因素。
发明内容
本发明为了弥补现有技术的缺陷,提供了一种施工快、效率高的10kV线路线杆卡托盘。
本发明是通过如下技术方案实现的:
一种10kV线路线杆卡托盘,其特征是:包括两个半托盘,两个半托盘相对的部分设有凹进槽,两个半托盘对到一起后,两个凹进槽组成一个圆形,每个半托盘上设有若干卡爪,每个凹进槽处开有通孔,两个通孔位于同一条直线上,两个通孔共同配套一个插杆,在线杆的相应位置上开有穿过孔。
所述插杆两端为螺纹段,所述螺纹段配套紧固螺母。
两个半托盘对到一起后组成的图案为内圆外方,所述卡爪共四个,它们分别位于外方的四个角上。
本发明的有益效果是:
本发明的托盘在使用时位于线杆下端的上方,离线杆的下端还有一段距离,并且托盘由两部分组成,卡爪与托盘成为一体,因此施工过程中只需用钻孔机钻一个较小的孔即可,对土地的破坏性大大减小,同时在将线杆插入孔中立起来后,就可以先通电,通电后再进行填埋、压实等工作,因此大大减小了停电时间,减少了对用电户的影响,提高了工作效率。
附图说明
下面结合附图对本发明作进一步的说明。
图1为本发明使用过程中的俯视结构示意图。
图中,1半托盘,2凹进槽,3卡爪,4通孔,5穿过孔,6插杆,7紧固螺母,8线杆。
具体实施方式
附图为本发明的具体实施例。如图1所示,该种10kV线路线杆卡托盘,有两个半托盘1组成,两个半托盘1相对的部分设有凹进槽2,两个半托盘1对到一起后,两个凹进槽2组成一个圆形,其整体呈现内圆外方的形状,每个半托盘1上有两个卡爪3,卡爪3位于外方的四个角上,每个凹进槽2处开有通孔4,两个通孔4位于同一条直线上,两个通孔4共同配套一个插杆6,插杆6两端为螺纹段,螺纹段配套紧固螺母,在线杆8的相应位置上开有穿过孔5。
使用过程如下:首先在地上打孔,打孔深度为线杆8深埋的深度,将线杆8插入孔内,然后在孔周围向下开挖至线杆8上的穿过孔5处,填埋土至靠近穿过孔5处,压实,然后将两个半托盘1对到一起,夹住线杆8,此时半托盘1下面就是土,半托盘1和卡爪3都与土壤接触,然后将插杆6穿过通孔4和穿过孔5,两端用紧固螺母拧紧,在填埋土至与原地面持平,压实即可;在施工过程中,可以先将所有线杆8立在孔内后,安装好本发明后,先送上电,然后再进行填埋土至与地面持平等扫尾工作,这样就可以大大缩减停电时间。
除说明书所述技术特征外,其余技术特征均为本领域技术人员已知技术。

Claims (3)

1.一种10kV线路线杆卡托盘,其特征是:包括两个半托盘(1),两个半托盘(1)相对的部分设有凹进槽(2),两个半托盘(1)对到一起后,两个凹进槽(2)组成一个圆形,每个半托盘(1)上设有若干卡爪(3),每个凹进槽(2)处开有通孔(4),两个通孔(4)位于同一条直线上,两个通孔(4)共同配套一个插杆(6),在线杆(8)的相应位置上开有穿过孔(5)。
2.根据权利要求1所述的10kV线路线杆卡托盘,其特征是,所述插杆(6)两端为螺纹段,所述螺纹段配套紧固螺母(7)。
3.根据权利要求1所述的10kV线路线杆卡托盘,其特征是,两个半托盘(1)对到一起后组成的图案为内圆外方,所述卡爪(3)共四个,它们分别位于外方的四个角上。
CN201910348841.4A 2019-04-28 2019-04-28 一种10kV线路线杆卡托盘 Active CN110043105B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910348841.4A CN110043105B (zh) 2019-04-28 2019-04-28 一种10kV线路线杆卡托盘

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910348841.4A CN110043105B (zh) 2019-04-28 2019-04-28 一种10kV线路线杆卡托盘

Publications (2)

Publication Number Publication Date
CN110043105A true CN110043105A (zh) 2019-07-23
CN110043105B CN110043105B (zh) 2024-01-30

Family

ID=67279845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910348841.4A Active CN110043105B (zh) 2019-04-28 2019-04-28 一种10kV线路线杆卡托盘

Country Status (1)

Country Link
CN (1) CN110043105B (zh)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU5442480A (en) * 1979-01-18 1980-08-14 Austpole Industries Ltd. Poles
US20040199930A1 (en) * 2003-04-07 2004-10-07 Yen-Jen Chang Position adjustment mechanism and method thereof
KR100648440B1 (ko) * 2006-04-07 2006-11-24 (주) 선엔지니어링종합건축사사무소 연약지반 설치용 지선근가
CN101487355A (zh) * 2009-02-23 2009-07-22 廖力锋 一种电线杆及其安装固定方法
CN202299577U (zh) * 2011-09-29 2012-07-04 天津中电华利电器科技集团有限公司 一种用于柔性地面的固定座
JP3179187U (ja) * 2012-08-08 2012-10-18 全冠企業有限公司 多方向線材の固定装置
CN103726706A (zh) * 2013-12-31 2014-04-16 宁海县雁苍山电力设备厂 自稳固型电线杆
CN205062828U (zh) * 2015-08-06 2016-03-02 咸阳亨通电力检修有限公司 一种用于电线杆基础固定的装置
US20170055685A1 (en) * 2015-08-27 2017-03-02 David Head Adjustable stand for barbeque grills and other camping gear
CN210141035U (zh) * 2019-04-28 2020-03-13 国网山东省电力公司禹城市供电公司 一种10kV线路线杆卡托盘

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU5442480A (en) * 1979-01-18 1980-08-14 Austpole Industries Ltd. Poles
US20040199930A1 (en) * 2003-04-07 2004-10-07 Yen-Jen Chang Position adjustment mechanism and method thereof
KR100648440B1 (ko) * 2006-04-07 2006-11-24 (주) 선엔지니어링종합건축사사무소 연약지반 설치용 지선근가
CN101487355A (zh) * 2009-02-23 2009-07-22 廖力锋 一种电线杆及其安装固定方法
CN202299577U (zh) * 2011-09-29 2012-07-04 天津中电华利电器科技集团有限公司 一种用于柔性地面的固定座
JP3179187U (ja) * 2012-08-08 2012-10-18 全冠企業有限公司 多方向線材の固定装置
CN103726706A (zh) * 2013-12-31 2014-04-16 宁海县雁苍山电力设备厂 自稳固型电线杆
CN205062828U (zh) * 2015-08-06 2016-03-02 咸阳亨通电力检修有限公司 一种用于电线杆基础固定的装置
US20170055685A1 (en) * 2015-08-27 2017-03-02 David Head Adjustable stand for barbeque grills and other camping gear
CN210141035U (zh) * 2019-04-28 2020-03-13 国网山东省电力公司禹城市供电公司 一种10kV线路线杆卡托盘

Also Published As

Publication number Publication date
CN110043105B (zh) 2024-01-30

Similar Documents

Publication Publication Date Title
CN110043105A (zh) 一种10kV线路线杆卡托盘
CN202400757U (zh) 一种塔机标准节
CN206393563U (zh) 一种工装快换辅助机构
CN204960500U (zh) 快速安装护栏
CN106192625B (zh) 一种铁路道岔铺设机组
CN110792284A (zh) 一种铁塔加固装置
DE10203765B4 (de) Elektromagnetisches Mehrwegeventil mit einer kontaktfreien elektrischen Leistungsübertragung
CN204418153U (zh) 一种建筑工程用的土石笼结构
CN203533173U (zh) 一种楔形连接板
CN203529658U (zh) 输电铁塔升降设备用导轨的安装结构及输电铁塔
CN209429579U (zh) 一种配电线路水泥杆快速恢复装置
CN204691348U (zh) 一种立体车库自动升降台
CN108423268A (zh) 一种改进型物流托盘及其调节和装配方法
CN205778287U (zh) 十字连接结构
CN104397955A (zh) 一种多功能工具包
CN207288967U (zh) 磁力钻在不锈钢构件上的固定装置
CN204960504U (zh) 园林用快速安装护栏
CN105016408B (zh) 新型格栅除污机
CN205535020U (zh) 一种穿孔型格栅
CN215289557U (zh) 一种纵板开合走路板
CN104607950B (zh) 一种机械维修撬装设备
CN207480486U (zh) 一种起重机小车装配平台
CN212249308U (zh) 一种铁塔加固装置
CN211690511U (zh) 一种钢爪装置及步履式液压挖掘机
CN203775753U (zh) 一种延伸杆和具有该延伸杆的动力工具

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20231117

Address after: 251200 No. 339, east side of Renmin Road, Yucheng City, Dezhou City, Shandong Province

Applicant after: YUCHENG POWER SUPPLY COMPANY, STATE GRID SHANDONG ELECTRIC POWER Co.

Address before: No. 339, East Side of Renmin Road, Yucheng City, Dezhou City, Shandong Province, 251200

Applicant before: YUCHENG POWER SUPPLY COMPANY, STATE GRID SHANDONG ELECTRIC POWER Co.

Applicant before: Guo Changrong

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant