CN110029720A - A kind of intelligent construction system - Google Patents
A kind of intelligent construction system Download PDFInfo
- Publication number
- CN110029720A CN110029720A CN201910303721.2A CN201910303721A CN110029720A CN 110029720 A CN110029720 A CN 110029720A CN 201910303721 A CN201910303721 A CN 201910303721A CN 110029720 A CN110029720 A CN 110029720A
- Authority
- CN
- China
- Prior art keywords
- wallboard
- water
- side wall
- construction system
- intelligent construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G25/00—Watering gardens, fields, sports grounds or the like
- A01G25/02—Watering arrangements located above the soil which make use of perforated pipe-lines or pipe-lines with dispensing fittings, e.g. for drip irrigation
-
- A—HUMAN NECESSITIES
- A62—LIFE-SAVING; FIRE-FIGHTING
- A62C—FIRE-FIGHTING
- A62C3/00—Fire prevention, containment or extinguishing specially adapted for particular objects or places
- A62C3/02—Fire prevention, containment or extinguishing specially adapted for particular objects or places for area conflagrations, e.g. forest fires, subterranean fires
- A62C3/0214—Fire prevention, containment or extinguishing specially adapted for particular objects or places for area conflagrations, e.g. forest fires, subterranean fires for buildings or installations in fire storms
-
- A—HUMAN NECESSITIES
- A62—LIFE-SAVING; FIRE-FIGHTING
- A62C—FIRE-FIGHTING
- A62C31/00—Delivery of fire-extinguishing material
- A62C31/02—Nozzles specially adapted for fire-extinguishing
-
- A—HUMAN NECESSITIES
- A62—LIFE-SAVING; FIRE-FIGHTING
- A62C—FIRE-FIGHTING
- A62C37/00—Control of fire-fighting equipment
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/10—Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/14—Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/22—Adaptations of pumping plants for lifting sewage
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/0023—Building characterised by incorporated canalisations
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/34315—Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
- E04B1/34321—Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by panels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/344—Structures characterised by movable, separable, or collapsible parts, e.g. for transport with hinged parts
- E04B1/3448—Structures characterised by movable, separable, or collapsible parts, e.g. for transport with hinged parts with rotating shell-forming segments
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/44—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
- E04C2/52—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose with special adaptations for auxiliary purposes, e.g. serving for locating conduits
- E04C2/521—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose with special adaptations for auxiliary purposes, e.g. serving for locating conduits serving for locating conduits; for ventilating, heating or cooling
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Electromagnetism (AREA)
- Water Supply & Treatment (AREA)
- Physics & Mathematics (AREA)
- Emergency Management (AREA)
- Business, Economics & Management (AREA)
- Hydrology & Water Resources (AREA)
- Biodiversity & Conservation Biology (AREA)
- Ecology (AREA)
- Forests & Forestry (AREA)
- Soil Sciences (AREA)
- Environmental Sciences (AREA)
- Building Environments (AREA)
Abstract
The present invention provides a kind of intelligent construction system, is related to INTELLIGENT BUILDING TECHNIQUE field.Intelligent construction system includes: building building body, and building building body includes draw water pipeline and the side wall with collecting channel, and the pipeline that draws water is distributed in inside side wall.Regulate and control wall, regulation wall includes wallboard frame, fixed wallboard and fold wallboard, and fixed wallboard and fold wallboard are installed on wallboard frame.Drill steel is connected, fixed wallboard is connected and fixed by connection drill steel with side wall.Wallboard regulatory component, wallboard regulatory component turn down wallboard rotation for making.Water collection sheet, water collection sheet is for directing water into collecting channel.Filtering ponds, water come together in filtering ponds.Reservoir, the pipeline that draws water are connected to reservoir.Water pump assembly, water pump assembly are connected with the pipeline that draws water.Hydraulic spray nozzle group, hydraulic spray nozzle group are connected to the water outlet of water pump assembly.Control system, control system can control water pump assembly, decelerating motor work.The system can effectively radiate under the premise of energy conservation and environmental protection, meet building cooling demand.
Description
Technical field
The present invention relates to INTELLIGENT BUILDING TECHNIQUE fields, in particular to a kind of intelligent construction system.
Background technique
Intelligent building refers to by optimizing the structure of building, system, service and management according to the demand of user
Combination, to provide an efficient, comfortable, convenient humanized architectural environment for user.Intelligent building is collection modern science skill
The product of the great achievement of art.
Its technical foundation is mainly by modern building technology, modern computer technology modern communications technology and modern control technology institute
Composition.
With the raising year by year of present temperature, the demand of the cooling of intelligent building entirety also highlights further.
The simple air-conditioning by building cools down, although there is good effect, the use of freon can further
Promote greenhouse effects, and the energy consumption of air-conditioning is also big, will cause burden for the use cost of intelligent building, for the energy
It is also a kind of loss, is unfavorable for the sustainable development of natural environment.
In addition, increasing with building, urban heat land effect is also that the cooling demand of building can be made to become even more important,
To ensure the good life and work state for building interior personnel.
Summary of the invention
The purpose of the present invention is to provide a kind of intelligent construction systems, can effectively radiate, and meet building cooling need
It asks, while energy conservation and environmental protection, efficiently uses natural resources.
The embodiment of the present invention is achieved in that
The embodiment provides a kind of intelligent construction systems, comprising:
Building body is built, the building building body includes draw water pipeline and side wall, and the pipeline that draws water is distributed in the side wall
Portion also has collecting channel inside the side wall;
Regulate and control wall, be set to the outside of the building building body regulation wall week and there is spacing, institute between the side wall
Stating regulation wall includes wallboard frame, fixed wallboard and fold wallboard, and the fixed wallboard and the fold wallboard are successively spaced peace
Loaded on the wallboard frame, the fold wallboard is rotatably connected at the wallboard frame, and the side wall is equipped with window
Position correspond to the fixed wallboard, the fixed wallboard is transparent panel;
Drill steel is connected, the fixed wallboard is connected and fixed by the connection drill steel with the side wall, the connection drill steel
It is evenly spaced in the side wall;
Wallboard regulatory component, the wallboard regulatory component include decelerating motor, sprocket wheel and driving chain, the decelerating motor
It is set up in the top of the building building body, the driving chain is set around the shaft of the fold wallboard and can be by being sheathed on
The sprocket wheel of the shaft of the fold wallboard is connect with the rotating shaft transmission of the fold wallboard, the output end of the decelerating motor and institute
State driving chain transmission connection;
Water collection sheet, the side of the water collection sheet connect with the wallboard frame and are located at the bottom position of the fold wallboard
It sets, the other side of the water collection sheet is connected to the side wall and height is lower than the side connecting with the wallboard frame, described
Water collection sheet can be used in collecting water and direct water into the collecting channel;
Filtering ponds, the water being collected come together in the filtering ponds from the collecting channel;
Reservoir, the reservoir is for accumulating through the filtered water of the filtering ponds, pipeline and the storage of drawing water
Pond connection;
Water pump assembly, the water pump assembly are installed on the top of the building building body and are connected with the pipeline that draws water;
Hydraulic spray nozzle group, the hydraulic spray nozzle group are laid in the connection drill steel and by pipelines and the water pump assembly
Water outlet connection;
Control system, the control system is for controlling the water pump assembly, decelerating motor work.
In addition, the intelligent construction system that embodiment according to the present invention provides, can also have following additional technology
Feature:
In alternative embodiment of the invention, the intelligent construction system further includes temperature sensor group, the temperature
Sensor group includes multiple temperature sensors, and the temperature sensor has threshold value, and multiple temperature sensors are laid
Temperature on the outside of the side wall and for monitoring the side wall appearance, the temperature sensor group can feed back monitoring signals
To the control system, when the temperature of monitoring position is more than threshold value where having the temperature sensor, the control system control
Make the corresponding water pump assembly work of the hydraulic spray nozzle group near the position.
In alternative embodiment of the invention, the intelligent construction system further includes fire nozzle group, the fire-fighting spray
Mouth group is laid in the inside of the building building body and passes through pipeline connection with the water pump assembly.
In alternative embodiment of the invention, the one side far from the side wall of the fold wallboard has scattering layer, institute
Stating has glass disintegrating slag inside scattering layer.
In alternative embodiment of the invention, it is provided between the side coping and the top of the wallboard frame anti-
Protective net.
In alternative embodiment of the invention, the intelligent construction system further includes greenbelt and collecting-tank, described green
Change the outside that band is located at the building building body, the collecting-tank is located at the downside of the greenbelt, the collecting-tank and the mistake
Filter tank connection.
In alternative embodiment of the invention, the intelligent construction system further includes irrigation system, the irrigation system
Including irrigation nozzle, irrigation pump and irrigation pipeline, the irrigation nozzle is laid in the greenbelt and by the irrigation pipe
Road is connected to the reservoir, and the irrigation pump can pump water, the control from the reservoir to the irrigation nozzle
System can control the irrigation pump work or stop.
In alternative embodiment of the invention, the upper surface of the water collection sheet has multiple needle tips.
In alternative embodiment of the invention, the water collection sheet is steel plate.
In alternative embodiment of the invention, the fixed wallboard is the internal doubling plate with vacuum area.
The beneficial effects of the present invention are:
Intelligent construction system can realize to intelligent environment protection the cooling work of building building body, not only reduce cost, but also save
The energy, also there are no pollution to the environment, facilitates the routine work or life of personnel, efficiently solves existing technical problem.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached
Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair
The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this
A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the structural schematic diagram for the intelligent construction system that the embodiment of the present invention 1 provides;
Fig. 2 is that Fig. 1 conceals the partial schematic diagram after filtering ponds, reservoir and part regulation wall;
Fig. 3 is the fold wallboard of regulation wall schematic diagram in the open state;
Fig. 4 is the schematic diagram of water collection sheet;
Fig. 5 is the schematic diagram of wallboard regulatory component;
Fig. 6 is the structural schematic diagram for the intelligent construction system that the embodiment 2 of invention provides.
Icon: 100- intelligent construction system;1- builds building body;11- draws water pipeline;12- side wall;13- collecting channel;2-
Regulate and control wall;21- wallboard frame;22- fixes wallboard;23- turns down wallboard;3- connection drill steel;41- decelerating motor;42- sprocket wheel;43-
Driving chain;5- water collection sheet;101- filtering ponds;102- reservoir;103- water pump assembly;104- hydraulic spray nozzle group;105- temperature
Sensor group;106- fire nozzle group;201- greenbelt;202- collecting-tank;203- irrigation nozzle;204- irrigation pump;205-
Irrigation pipeline.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented
The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below claimed
The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiments of the present invention, this field is common
Technical staff's every other embodiment obtained without creative efforts belongs to the model that the present invention protects
It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it should be noted that the orientation or positional relationship of the instructions such as term "inner", "outside" is base
In orientation or positional relationship shown in the drawings or the invention product using when the orientation or positional relationship usually put, only
It is that for the convenience of describing the present invention and simplifying the description, rather than the device or element of indication or suggestion meaning must have specifically
Orientation is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.In addition, term " first ", " the
Two " etc. are only used for distinguishing description, are not understood to indicate or imply relative importance.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ",
" connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can be
Mechanical connection, is also possible to be electrically connected;It can be directly connected, two can also be can be indirectly connected through an intermediary
Connection inside element.For the ordinary skill in the art, above-mentioned term can be understood in the present invention with concrete condition
In concrete meaning.
In the present invention unless specifically defined or limited otherwise, fisrt feature can be on or below second feature
Directly contacted including the first and second features, also may include the first and second features be not direct contact but by them it
Between other characterisation contact.Moreover, fisrt feature is on second feature, top and above include fisrt feature second spy
Right above sign and oblique upper, or first feature horizontal height is merely representative of higher than second feature.Fisrt feature second feature it
Under, lower section and fisrt feature included below be directly below and diagonally below the second feature, or be merely representative of first feature horizontal height
Less than second feature.
Embodiment 1
Fig. 1 to Fig. 5 is please referred to, a kind of intelligent construction system 100 is present embodiments provided, comprising:
Building body 1 is built, building building body 1 includes draw water pipeline 11 and side wall 12, and the pipeline 11 that draws water is distributed in inside side wall 12,
Also there is collecting channel 13 inside side wall 12;
Regulate and control wall 2, be set within regulation wall 2 weeks the outside of building building body 1 and there is spacing between side wall 12, regulation wall 2 wraps
Wallboard frame 21, fixed wallboard 22 and fold wallboard 23 are included, fixed wallboard 22 and fold wallboard 23 are successively spaced and are installed on wallboard
Frame 21, fold wallboard 23 are rotatably connected at wallboard frame 21, the corresponding fixed wall in the position for being equipped with window of side wall 12
Plate 22, fixed wallboard 22 are transparent panel;
Drill steel 3 is connected, fixed wallboard 22 is connected and fixed by connecting drill steel 3 with side wall 12, connection 3 uniform intervals of drill steel point
It is distributed in side wall 12;
Wallboard regulatory component, wallboard regulatory component include decelerating motor 41, sprocket wheel 42 and driving chain 43, decelerating motor 41
It is set up in the top of building building body 1, driving chain 43 is set around the shaft of fold wallboard 23 and can be by being sheathed on fold wall
The sprocket wheel 42 of the shaft of plate 23 is connect with the rotating shaft transmission of fold wallboard 23, and the output end and driving chain 43 of decelerating motor 41 pass
Dynamic connection;
Water collection sheet 5, the side of water collection sheet 5 connect and are located at the bottom position of fold wallboard 23 with wallboard frame 21, catchment
The other side of plate 5 is connected to side wall 12 and height lower than the side connecting with wallboard frame 21, and water collection sheet 5 can be used in collecting
Water and direct water into collecting channel 13;
Filtering ponds 101, the water being collected come together in filtering ponds 101 from collecting channel 13;
Reservoir 102, reservoir 102 is for accumulating through the filtered water of filtering ponds 101, and draw water pipeline 11 and reservoir
102 connections;
Water pump assembly 103, water pump assembly 103 are installed on the top of building building body 1 and are connected with the pipeline 11 that draws water;
Hydraulic spray nozzle group 104, hydraulic spray nozzle group 104 are laid in connection drill steel 3 and going out by pipeline and water pump assembly 103
Mouth of a river connection;
Control system, control system is for controlling water pump assembly 103, the work of decelerating motor 41.
Wherein, control system can realize work, knot of the application to control system using the common control device such as PLC
Structure itself does not improve, therefore repeats no more.
Wherein, the one side for turning down the separate side wall 12 of wallboard 23 has scattering layer, has glass disintegrating slag inside scattering layer.This
Sample helps to scatter sunlight, reduces the direct projection of sunlight to a certain degree.
Wherein, fixed wallboard 22 is the internal doubling plate with vacuum area.Facilitate the conduction of reduction heat in this way, rises
To certain cooling effect.The transparent design of fixed wallboard 22 itself, can be to avoid influence daylighting.
Wherein, protective net is provided between the top of side wall 12 and the top of wallboard frame 21.Can prevent top have compared with
More impurity enter between side wall 12 and regulation wall 2.
Wherein, the pipeline of the present embodiment all has valve, and valve can be solenoid valve, is controlled and is opened and closed by control system,
The related opening and closing of valve is repeated no more hereinafter.
Specifically, intelligent construction system 100 further includes temperature sensor group 105, temperature sensor group 105 includes multiple
Temperature sensor, temperature sensor have threshold value, and multiple temperature sensors are laid in 12 outside of side wall and for monitoring side wall 12
Monitoring signals can be fed back to control system by the temperature of appearance, temperature sensor group 105, the monitoring where having temperature sensor
When the temperature of position is more than threshold value, control system controls corresponding 103 work of water pump assembly of hydraulic spray nozzle group 104 near the position
Make.
Further, intelligent construction system 100 further includes fire nozzle group 106, and fire nozzle group 106 is laid in building
The inside of building body 1 and pass through pipeline connection with water pump assembly 103.
In the present embodiment, water collection sheet 5 is steel plate.It more can significantly expand with heat and contract with cold to avoid having in this way, guarantee is catchmented
The function of plate 5 is unaffected.
In the present embodiment, the upper surface of water collection sheet 5 has multiple needle tips.Humidity is larger in air in this way, and
When night, to the tip of steam one condensation in air, the droplet of condensation is gathered and by catchmenting
Channel 13 flows into filtering ponds 101.It will be appreciated that the entrance of collecting channel 13 needs to be protected with grid, biggish slag is avoided
Dregs blocks collecting channel 13.
The principle of the present embodiment is:
At rainy day, fold wallboard 23 is in the open state, and rainwater can float in the air between regulation wall 2 and side wall 12
It in spacing, and is fallen on water collection sheet 5 under the influence of self gravity, due to the laying mode of water collection sheet 5, rainwater can converge
To at collecting channel 13.And the side due to water collection sheet 5 connect and is located at the bottom position of fold wallboard 23 with wallboard frame 21
Set, can as much as possible by float into rainwater-collecting.
The grid of 13 inlet of collecting channel can be cleared up periodically, avoid the dregs of accumulation excessive, influence to catchment.
Rainwater enters filtering ponds 101 from collecting channel 13, can further filter impurity, filtering ponds 101 simultaneously should not
Asking can be much clean by dmp filter, need to only filter particulate matter precipitating and impurity larger.
Rainwater is just then passed through reservoir 102 to lay in.
Reservoir 102 can be equipped with booster pump, so that the water in reservoir 102 can be applied in advance under daily state
Suction is maintained inside the pipeline 11 that draws water, and due to drawing water, pipeline 11 is embedded in side wall 12, after environment temperature increases,
The water to draw water in pipeline 11 is capable of providing certain cooling effect.
And when the sun is excessive, environment temperature is excessively high, in the presence of causing the external skin temperatures of side wall 12 to have the case where beyond threshold value,
Control system can control the work of water pump assembly 103.
On the one hand, the water in reservoir 102 is drawn at hydraulic spray nozzle by water pump assembly 103, so that hydraulic spray nozzle continues
Ground sprays the steam of atomization, and water mist is full of between side wall 12 and regulation wall 2, can largely absorb the heat of 12 appearance of side wall,
Play cooling effect.
On the other hand, for the water to draw water in pipeline when rising supply, the process of flowing can also take away side wall 12
Internal heat, in conjunction with hydraulic spray nozzle, inside and outside common cooling, so that the excessively high position of temperature is cooled down faster.
It should be noted that staff also can be either manually or by control system even without the feedback of temperature sensor
Water is sprayed from hydraulic spray nozzle, in order to carry out cooling operation according to demand.
In addition, staff also can control decelerating motor 41 by control system and work when sunlight is excessively strong, subtract
Speed motor 41 drives driving chain 43 to rotate, and then fold wallboard 23 is driven to rotate into the closed flushed with fixed wallboard 22
State prevents sunlight to be irradiated on side wall 12 too much.
It is noted that can be used as fire-fighting system water supply since the water in reservoir 102 does not have particulate matter energy impurity
A kind of supplement the water saved is sprayed by fire nozzle group 106 in time when encountering has fire behavior in building, auxiliary carries out
Fire extinguishing, to the utilization more horn of plenty of water.Certainly, reservoir 102 can also access the pipeline of tap water, in reservoir 102
When hydropenic, the supplement of water is carried out by tap water.When water is excessive, the water in reservoir 102 also allows to be taken out
From avoiding dilutional hyponatremia.
The intelligent construction system 100 of the present embodiment can collect the Shui Heshui in natural environment on rainy day and night
Vapour, final accumulation and reservoir 102 are interior for using.Do not generate pollution in temperature-fall period, and compared to air-conditioning, consuming
Electric energy is less, is conducive to energy conservation.To the work to cool down to the side wall 12 of building building body 1 with realizing intelligence and environmental protection
Make, so that the high temperature of external environment will not continue into building building body 1, it is very practical.
Embodiment 2
Fig. 6 is please referred to, the present embodiment is also provided that a kind of intelligent construction system 100, the present embodiment and embodiment 1
Difference is:
Intelligent construction system 100 further includes greenbelt 201 and collecting-tank 202, and greenbelt 201 is located at building building body 1
Outside, collecting-tank 202 are located at the downside of greenbelt 201, and collecting-tank 202 is connected to filtering ponds 101.
Further, intelligent construction system 100 further includes irrigation system, and irrigation system includes irrigation nozzle 203, irrigates
Water pump 204 and irrigation pipeline 205, irrigation nozzle 203 are laid in greenbelt 201 and are connected by irrigation pipeline 205 and reservoir 102
Logical, irrigation pump 204 can pump water from reservoir 102 to irrigation nozzle 203, and control system can control irrigation pump 204
Work stops.
By extending greenbelt 201, the source of the water in reservoir 102 is again at more one, and in summer high temperature, water storage
Water in pond 102 can also be used to the irrigation of 201 vegetation of greenbelt, more diversified to the utilization of water, and produce without polluting
It is raw, it is highly beneficial.
In conclusion intelligent construction system 100 of the invention can realize to intelligent environment protection the cooling work of building building body 1
Make, not only reduce cost, but also energy saving, also there are no pollution to the environment, facilitates the routine work or life of personnel, effectively solves
Existing technical problem.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of intelligent construction system characterized by comprising
Building body is built, the building building body includes draw water pipeline and side wall, and the pipeline that draws water is distributed in inside the side wall, institute
Stating also has collecting channel inside side wall;
Regulate and control wall, be set to the outside of the building building body regulation wall week and there is spacing, the tune between the side wall
Control wall includes wallboard frame, fixed wallboard and fold wallboard, and the fixed wallboard and the fold wallboard are successively spaced and are installed on
The wallboard frame, the fold wallboard are rotatably connected at the wallboard frame, the position for being equipped with window of the side wall
The corresponding fixed wallboard is set, the fixed wallboard is transparent panel;
Drill steel is connected, the fixed wallboard is connected and fixed by the connection drill steel with the side wall, and the connection drill steel is uniform
It is spaced apart in the side wall;
Wallboard regulatory component, the wallboard regulatory component include decelerating motor, sprocket wheel and driving chain, and the decelerating motor is set up
In the top of the building building body, the driving chain is set around the shaft of the fold wallboard and can be described by being sheathed on
The sprocket wheel for turning down the shaft of wallboard is connect with the rotating shaft transmission of the fold wallboard, the output end of the decelerating motor and the biography
Dynamic chain drive connection;
Water collection sheet, the side of the water collection sheet connect with the wallboard frame and are located at the bottom position of the fold wallboard, institute
The other side for stating water collection sheet is connected to the side wall and height lower than the side connecting with the wallboard frame, the water collection sheet
It can be used in collecting water and direct water into the collecting channel;
Filtering ponds, the water being collected come together in the filtering ponds from the collecting channel;
Reservoir, the reservoir is for accumulating through the filtered water of the filtering ponds, pipeline and the reservoir of drawing water
Connection;
Water pump assembly, the water pump assembly are installed on the top of the building building body and are connected with the pipeline that draws water;
Hydraulic spray nozzle group, the hydraulic spray nozzle group are laid in the connection drill steel and pass through the water outlet of pipeline and the water pump assembly
Mouth connection;
Control system, the control system is for controlling the water pump assembly, decelerating motor work.
2. intelligent construction system according to claim 1, which is characterized in that the intelligent construction system further includes temperature
Sensor group is spent, the temperature sensor group includes multiple temperature sensors, and the temperature sensor has threshold value, multiple
The temperature sensor is laid in the temperature on the outside of the side wall and for monitoring the side wall appearance, the temperature sensor group
Monitoring signals can be fed back to the control system, the temperature of monitoring position is more than threshold value where having the temperature sensor
When, the control system controls the corresponding water pump assembly work of the hydraulic spray nozzle group near the position.
3. intelligent construction system according to claim 1, which is characterized in that the intelligent construction system further includes disappearing
Anti- nozzle sets, the fire nozzle group are laid in the inside of the building building body and pass through pipeline connection with the water pump assembly.
4. intelligent construction system according to claim 1, which is characterized in that the separate side wall of the fold wallboard
One side there is scattering layer, there is glass disintegrating slag inside the scattering layer.
5. intelligent construction system according to claim 1, which is characterized in that the side coping and the wall panel frame
Protective net is provided between the top of frame.
6. intelligent construction system according to claim 1, which is characterized in that the intelligent construction system further includes green
Change band and collecting-tank, the greenbelt is located at the outside of the building building body, and the collecting-tank is located at the downside of the greenbelt,
The collecting-tank is connected to the filtering ponds.
7. intelligent construction system according to claim 6, which is characterized in that the intelligent construction system further includes filling
System is irrigate, the irrigation system includes irrigation nozzle, irrigation pump and irrigation pipeline, and the irrigation nozzle is laid in the greening
It is connected to and by the irrigation pipeline with the reservoir, the irrigation pump can be sprayed from the reservoir to the irrigation
Mouth pumps water, and the control system can control the irrigation pump work or stop.
8. intelligent construction system according to claim 1, which is characterized in that the upper surface of the water collection sheet has multiple
Needle tip.
9. intelligent construction system according to claim 1, which is characterized in that the water collection sheet is steel plate.
10. intelligent construction system according to claim 1, which is characterized in that the fixed wallboard is internal with true
The doubling plate of empty region.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910303721.2A CN110029720B (en) | 2019-04-16 | 2019-04-16 | Intelligent building system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910303721.2A CN110029720B (en) | 2019-04-16 | 2019-04-16 | Intelligent building system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110029720A true CN110029720A (en) | 2019-07-19 |
CN110029720B CN110029720B (en) | 2020-12-22 |
Family
ID=67238606
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910303721.2A Active CN110029720B (en) | 2019-04-16 | 2019-04-16 | Intelligent building system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110029720B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110585634A (en) * | 2019-08-21 | 2019-12-20 | 李平 | Building outer wall fire-fighting equipment |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2482970A (en) * | 2010-08-20 | 2012-02-22 | Charlie Greig Bespoke Homes Ltd | Building with rain water collecting roof and reservoir in walls |
CN203346959U (en) * | 2013-05-22 | 2013-12-18 | 厦门鹭路兴绿化工程建设有限公司 | Domestic wastewater recycling irrigation system |
CN206566404U (en) * | 2017-01-06 | 2017-10-20 | 深圳市海景达建筑工程有限公司 | A kind of intelligent fire proof construction structure of transformation |
CN207863244U (en) * | 2018-02-08 | 2018-09-14 | 重庆建筑工程职业学院 | A kind of sponge city novel curtain wall |
CN108895583A (en) * | 2018-07-19 | 2018-11-27 | 长安大学 | A kind of external wall cooling system and cool-down method |
CN208473022U (en) * | 2018-06-22 | 2019-02-05 | 深圳市第一建筑工程有限公司 | A kind of green building wall |
-
2019
- 2019-04-16 CN CN201910303721.2A patent/CN110029720B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2482970A (en) * | 2010-08-20 | 2012-02-22 | Charlie Greig Bespoke Homes Ltd | Building with rain water collecting roof and reservoir in walls |
CN203346959U (en) * | 2013-05-22 | 2013-12-18 | 厦门鹭路兴绿化工程建设有限公司 | Domestic wastewater recycling irrigation system |
CN206566404U (en) * | 2017-01-06 | 2017-10-20 | 深圳市海景达建筑工程有限公司 | A kind of intelligent fire proof construction structure of transformation |
CN207863244U (en) * | 2018-02-08 | 2018-09-14 | 重庆建筑工程职业学院 | A kind of sponge city novel curtain wall |
CN208473022U (en) * | 2018-06-22 | 2019-02-05 | 深圳市第一建筑工程有限公司 | A kind of green building wall |
CN108895583A (en) * | 2018-07-19 | 2018-11-27 | 长安大学 | A kind of external wall cooling system and cool-down method |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110585634A (en) * | 2019-08-21 | 2019-12-20 | 李平 | Building outer wall fire-fighting equipment |
CN110585634B (en) * | 2019-08-21 | 2021-04-16 | 蒙城县立至信安全技术咨询服务有限公司 | Building outer wall fire-fighting equipment |
CN112843560A (en) * | 2019-08-21 | 2021-05-28 | 李平 | Building outer wall fire-fighting system and using method |
Also Published As
Publication number | Publication date |
---|---|
CN110029720B (en) | 2020-12-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209768476U (en) | Water-storage energy-saving farmland water-saving irrigation device | |
CN107548803A (en) | A kind of energy saving greenhouse greenhouse | |
CN209002535U (en) | A kind of wall greening irrigation rig | |
CN107624448A (en) | A kind of multifunction energy-saving warmhouse booth | |
CN107535241A (en) | A kind of intelligent greenhouse | |
CN102080851B (en) | Forced circulation and indirect heat exchange type solar water heating system and control method thereof | |
CN206978286U (en) | A kind of municipal urban green belts of energy timing automatically watering | |
CN110029720A (en) | A kind of intelligent construction system | |
CN110149958A (en) | A kind of architecture greening exterior wall | |
CN109056888A (en) | A kind of collection rain and photovoltaic power generation integral type rainwater collection utilization unit | |
CN209345730U (en) | A kind of intelligence ornamental plant watering device | |
CN209330811U (en) | A kind of park maintenance automatic irrigation device | |
CN110337959A (en) | A kind of energy-saving agricultural greenhouse | |
CN203764473U (en) | Spraying machine | |
CN216062508U (en) | A dust device for afforestation | |
CN211210750U (en) | Can introduce rainwater and be used for big-arch shelter of irrigation | |
CN206923382U (en) | A kind of intelligent irrigation greenhouse | |
CN215406276U (en) | Energy-conserving daylighting equipment of green building construction | |
CN206260409U (en) | A kind of greenhouse for planting dendrobium candidum for being provided with drip irrigation appliance | |
CN215223372U (en) | City view greening wall | |
CN114467703A (en) | Intelligent monitoring's gardens greenery patches water-saving irrigation device | |
CN110810078A (en) | Can introduce rainwater and be used for big-arch shelter of irrigation | |
CN215301533U (en) | Special irrigation water saving fixtures in saline and alkaline land | |
CN205408852U (en) | Flower planting big -arch shelter of multiplicable internal irradiation | |
CN216740407U (en) | Composite energy-saving green building house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201204 Address after: 518000 building 401, building 1-1, Huaqiao new village, Henggang street, Longgang District, Shenzhen City, Guangdong Province Applicant after: Shenzhen Daye Construction Industry Co., Ltd Address before: 153000 Heilongjiang Yichun Yichun District timber Street Construction Committee 16 groups Applicant before: Luo Wei |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |