- CN110016966A CN110016966A CN201910314015.8A CN201910314015A CN110016966A CN 110016966 A CN110016966 A CN 110016966A CN 201910314015 A CN201910314015 A CN 201910314015A CN 110016966 A CN110016966 A CN 110016966A
- Authority
- CN
- China
- Prior art keywords
- column
- muscle
- steel
- concrete
- fixed plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/30—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts being composed of two or more materials; Composite steel and concrete constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/58—Connections for building structures in general of bar-shaped building elements
- E04B1/5806—Connections for building structures in general of bar-shaped building elements with a cross-section having an open profile
- E04B1/5812—Connections for building structures in general of bar-shaped building elements with a cross-section having an open profile of substantially I - or H - form
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/58—Connections for building structures in general of bar-shaped building elements
- E04B1/5825—Connections for building structures in general of bar-shaped building elements with a closed cross-section
- E04B1/5831—Connections for building structures in general of bar-shaped building elements with a closed cross-section of substantially rectangular form
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention belongs to the structural engineering fields in civil engineering, more particularly to a kind of prefabricated overlapping coupled column T-type assembling type node of pre-erection combination beam-, including prefabricated overlapping coupled column and part combination beam, the end of the part combination beam is fixedly connected by steel connector with overlapping coupled column;The internal stress component and external carbuncle component of interlaced arrangement are equipped in the part combination beam;Core firmware and peripheral firmware are equipped in the overlapping coupled column, the core firmware is located at the inside of peripheral firmware;One fixing end of the steel connector is fixedly connected with internal stress component, and another fixing end of steel connector is fixedly connected with core firmware, peripheral firmware respectively.Assembling type node of the invention makes the quick, fastening easy to connect between component reliably, reduces molded-in-place, installation and the workload of welding.
Description
Technical field
The invention belongs to the structural engineering fields in civil engineering, and it is pre- in particular relate to a kind of pre-erection combination beam-
System overlapping coupled column T-type assembling type node.
Background technique
Portion envelops concrete combined component is a kind of new structural members that 1980s Europe proposes,
The basic pattern in section is the fill concrete between the edge of a wing of H profile steel component.This combined member big, rigidity with bearing capacity
Greatly, the advantages that fire resistance is good, there are no practical applications at home at present.
Steel core concrete column is the component that steel pipe and concrete filled are composed, and steel duct concrete is by steel pipe
Effect of contraction improves its bearing capacity, and the presence of concrete also constrains the inside buckling failure of steel pipe, and the structure is in high level
It is widely used in building.It is to grow up that steel tube concrete superposed coupled column, which is in concrete filled steel tube column foundation,
Reinforcing bar is set outside concrete filled steel tube, and new structural members made of casting concrete not only have steel core concrete column
Advantage, while the concrete outside steel pipe can delay the raising of steel beam columns under fire condition tube temperature degree, improve the fire resistance of column.
Current steel tube concrete superposed coupled column is mainly cast-in-place, is not prefabricated components, however as civil engineering
The gradually development of technology, for prefabricated components since its component processing quality is easy to get guarantee, speed of application is fast, connects between component
It is convenient, gradually obtain the concern of people.The part combination beam and prefabricated steel core concrete column of prefabricated steel connector facilitate production
While can reduce that molding amount, assembled in situ be convenient and reliable performance.
Mostly important in prefabricated components connection is exactly node, because the destruction of node may cause under geological process
The continuous collapse of total.If geological process flowering structure assembling type node will lead to structure entirety prior to component damage
Anti-seismic performance decline.In addition, prefabricated components are just being widely used in high-rise, large-span structure, high-rise, large-span structure fire-fighting difficulty
Greatly, to fire resistance, more stringent requirements are proposed.It is therefore proposed that more reasonably prefabricated components and node connection type, raising are pre-
Component processed improves anti-seismic performance, fire resisting reliability becomes the new demand of modern architecture development.
Summary of the invention
According to problems of the prior art, the present invention provides a kind of prefabricated overlapping combinations of pre-erection combination beam-
Column T-type assembling type node, make between component it is easy to connect quickly, fastening it is reliable, reduce molded-in-place, installation and weldering
The workload connect.
The invention adopts the following technical scheme:
A kind of prefabricated overlapping coupled column T-type assembling type node of pre-erection combination beam-, including prefabricated overlapping coupled column and
The end of part combination beam, the part combination beam is fixedly connected by steel connector with overlapping coupled column;The part combination beam
Interior internal stress component and external carbuncle component equipped with interlaced arrangement;It is equipped with core firmware in the overlapping coupled column and periphery is solid
Part, the core firmware are located at the inside of peripheral firmware;One fixing end of the steel connector is fixedly connected with internal stress component, steel
Another fixing end of connector is fixedly connected with core firmware, peripheral firmware respectively.
Preferably, the core firmware includes being filled in along the steel pipe and pouring of the cylinder length direction setting of overlapping coupled column
Core concrete in steel pipe;The peripheral firmware includes indulging muscle along the column of the cylinder length direction setting of overlapping coupled column,
The column indulges muscle and is set as multiple, and multiple columns are indulged muscle and are distributed along the periphery of steel pipe;The column indulges the periphery of muscle, vertical along column
The length direction of muscle is arranged with multiple column tie-bars;The column indulges muscle and column tie-bar passes through outer concrete and steel pipe becomes one
Body;The internal stress component is fixedly connected with outer concrete, steel pipe, core concrete respectively by steel connector.
It is further preferred that the internal stress component includes the H profile steel beam being arranged along the length direction of part combination beam;
The external carbuncle component includes indulging muscle along the beam that the length direction of part combination beam is arranged, and the beam indulges muscle and is set as multiple,
And multiple beams indulge muscle along two empty part cloth of H profile steel beam;The beam indulges the periphery of muscle, and the length direction set of muscle is indulged along beam
Equipped with multiple beam stirrups;The H profile steel beam, beam indulge muscle, beam stirrup passes through beam concrete and becames one;The steel connector is fixed
In the end point of H profile steel beam.
It is uniformly distributed it is further preferred that multiple columns indulge muscle along the periphery of steel pipe;Multiple column tie-bars along
The length direction that column indulges muscle is uniformly distributed, and the plane where column tie-bar indulges muscle setting perpendicular to column.
Still more preferably, multiple beams are indulged muscle and are uniformly distributed at two sky portions of H profile steel beam;It is multiple described
Beam stirrup is uniformly distributed along the length direction that beam indulges muscle, and the plane where beam stirrup indulges muscle setting perpendicular to beam.
Still more preferably, the H profile steel beam includes top flange, lower flange and for connecting top flange and lower flange
Web;The top flange is arranged in parallel with lower flange, and the web is respectively perpendicular to top flange and lower flange setting, and web point
It is not fixed on the middle position of top flange, lower flange;The steel connector is fixedly connected with top flange and lower flange respectively, described
Beam indulges muscle and beam stirrup is arranged at the two sides sky portion of web.
It is further preferred that the steel connector is set as T-shaped piece comprising the beam fixed plate and column of perpendicular fixation are fixed
Plate, the beam fixed plate are fixed on the middle position of column fixed plate;The beam fixed plate is solid with top flange and lower flange respectively
Fixed connection, the column fixed plate are fixedly connected with outer concrete, steel pipe, core concrete respectively;The beam fixed plate and column
Multiple through holes are equipped in fixed plate;At position corresponding with the through hole of column fixed plate, set on the overlapping coupled column
There are multiple provided pipes, the provided pipe extends through outer concrete, steel pipe, core concrete setting.
Still more preferably, the part combination beam is in the end close to overlapping coupled column, the H profile steel beam and Liang Zong
Muscle protrudes the setting of beam concrete.
Still more preferably, the column fixed plate is solid by high-strength bolt and outer concrete, steel pipe, core concrete
After fixed, the H profile steel beam and Liang Zong muscle for protruding part, which pass through to pour, to be covered later period concrete coagulation and is integrated;The beam fixed plate difference
It is fixedly connected by high-strength bolt with top flange and lower flange.
Still more preferably, the beam fixed plate and column fixed plate are all made of steel plate;The steel pipe is using square steel
Pipe, the column tie-bar and beam stirrup are set as rectangle.
The beneficial effects of the present invention are:
1) current overlapping coupled column and part combination beam are all mainly cast-in-place, are not prefabricated components, lead to live work
Sequence is many and diverse, long construction period.Compared with prior art, the present invention uses prefabricated overlapping coupled column and part combination beam, transport
To scene by steel connector the construction of later period gunning concrete can need to be only done after connection is installed, is guaranteeing quality with Fast Installation
Under the premise of, on-site construction processes are simplified, construction working hour is saved.
2) it is traditional it is whole pour node, the moment of flexure and shearing of beam-ends are transferred directly to column peripheral concrete, column peripheral concrete
The moment of flexure and shearing for assuming responsibility for beam-ends, it is relatively high to the intensity requirement of column peripheral concrete especially for middle-high building.And this
The assembling type node of invention is anchored in column on steel pipe since unilateral bolt passes through concrete on the outside of column, and Path of Force Transfer is clear, energy
The moment of flexure and shearing for making steel pipe and outside concrete shared beam-ends in column, have shared stress equally, have improved the stability of structure.
3) internal steel pipe can be effectively protected in the outer concrete of the overlapping coupled column under fire, column indulges muscle and
Column tie-bar, at the same part combination beam under fire still can effective stress, outside package beam concrete delayed H profile steel beam
The raising of temperature improves the fire resistance of assembling type node, enhances the safety of structure.
4) assembling type node of the invention does not need or only needs seldom welding workload, by combining in advance in overlapping
Prepared screw-bolt hole hole on column and steel connector, is convenient to process and mount, and avoids welding residual stress and weld seam to assembling type node matter
The influence of amount.
Detailed description of the invention
Fig. 1 is the structure of the main view of assembling type node of the invention.
Fig. 2 is the structure schematic top plan view of assembling type node of the invention.
Fig. 3 is the structure of the main view of part combination beam of the invention.
Fig. 4 is the schematic cross-section of part combination beam of the invention.
Fig. 5 a is the main view of steel connector of the invention.
Fig. 5 b is the top view of steel connector of the invention.
Appended drawing reference: 1- overlapping coupled column, the part 2- combination beam, 3- steel connector, 11- core firmware, 12- peripheral firmware,
13- provided pipe, 21- internal stress component, 22- external carbuncle component, 31- beam fixed plate, 32- column fixed plate, 33- through hole, 34- high
Strength bolt, 111- steel pipe, 112- core concrete, 113- outer concrete, 121- column indulge muscle, 122- column tie-bar, 211-H fashioned iron
Beam, 212- beam concrete, the top flange 213-, the lower flange 214-, 215- web, 216- later period concrete, 221- beam indulge muscle, 222-
Beam stirrup.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
As shown in Figure 1, a kind of prefabricated overlapping coupled column T-type assembling type node of pre-erection combination beam-, is folded including prefabricated
It is combined zygostyle 1 and part combination beam 2, the end of the part combination beam 2 is fixedly connected by steel connector 3 with overlapping coupled column 1;
The internal stress component 21 and external carbuncle component 22 of interlaced arrangement are equipped in the part combination beam 2;It is set in the overlapping coupled column 1
There are core firmware 11 and peripheral firmware 12, the core firmware 11 is located at the inside of peripheral firmware 12;The one of the steel connector 3 is solid
Fixed end is fixedly connected with internal stress component 21, and another fixing end of steel connector 3 is fixed with core firmware 11, peripheral firmware 12 respectively
Connection.
As shown in Fig. 2, the core firmware 11 includes the steel pipe along the cylinder length direction setting of overlapping coupled column 1
111 and pour the core concrete 112 being filled in steel pipe 111;The peripheral firmware 12 includes long along the cylinder of overlapping coupled column 1
The column for spending direction setting indulges muscle 121, and the column indulges muscle 121 and is set as multiple, and multiple columns indulge muscle 121 along the outer of steel pipe 111
Enclose distribution;The column indulges the periphery of muscle 121, is arranged with multiple column tie-bars 122 along the length direction that column indulges muscle 121;The column
Vertical muscle 121 and column tie-bar 122 are became one by outer concrete 113 with steel pipe 111;The internal stress component 21 passes through steel
Connector 3 is fixedly connected with outer concrete 113, steel pipe 111, core concrete 112 respectively.
As shown in Fig. 3, Fig. 4, Fig. 5 a, Fig. 5 b, the internal stress component 21 includes the length direction along part combination beam 2
The H profile steel beam 211 of setting;The external carbuncle component 22 includes indulging muscle along the beam that the length direction of part combination beam 2 is arranged
221, the beam indulges muscle 221 and is set as multiple, and multiple beams indulge muscle 221 along two empty part cloth of H profile steel beam 211;It is described
Beam indulges the periphery of muscle 221, is arranged with multiple beam stirrups 222 along the length direction that beam indulges muscle 221;The H profile steel beam 211, beam
Vertical muscle 221, beam stirrup 222 are became one by beam concrete 212;The steel connector 3 is fixed on the end of H profile steel beam 211
Place.
Multiple columns are indulged muscle 121 and are uniformly distributed along the periphery of steel pipe 111;Multiple column tie-bars 122 are vertical along column
The length direction of muscle 121 is uniformly distributed, and the plane where column tie-bar 122 is indulged muscle 121 perpendicular to column and is arranged.
Multiple beams are indulged muscle 221 and are uniformly distributed at two sky portions of H profile steel beam 211;Multiple beam stirrups 222
It is uniformly distributed along the length direction that beam indulges muscle 221, and the plane where beam stirrup 222 is indulged muscle 221 perpendicular to beam and is arranged.
The H profile steel beam 211 is including top flange 213, lower flange 214 and for connecting top flange 213 and lower flange 214
Web 215;The top flange 213 is arranged in parallel with lower flange 214, and the web 215 is respectively perpendicular to top flange 213 and bottom wing
Edge 214 is arranged, and web 215 is separately fixed at the middle position of top flange 213, lower flange 214;The steel connector 3 is distinguished
It is fixedly connected with top flange 213 and lower flange 214, the beam indulges muscle 221 and the two sides sky of web 215 is arranged in beam stirrup 222
At portion.
The steel connector 3 is set as T-shaped piece comprising the beam fixed plate 31 and column fixed plate 32 of perpendicular fixation, it is described
Beam fixed plate 31 is fixed on the middle position of column fixed plate 32;The beam fixed plate 31 respectively with top flange 213 and lower flange
214 are fixedly connected, and the column fixed plate 32 is fixedly connected with outer concrete 113, steel pipe 111, core concrete 112 respectively;
Multiple through holes 33 are equipped in the beam fixed plate 31 and column fixed plate 32;Corresponding with the through hole 33 of column fixed plate 32
At position, the overlapping coupled column 1 is equipped with multiple provided pipes 13, and the provided pipe 13 extends through outer concrete 113, steel
Pipe 111, core concrete 112 are arranged.
For the part combination beam 2 in the end close to overlapping coupled column 1, the H profile steel beam 211 and Liang Zong muscle 221 are convex
Beam concrete 212 is arranged out.
The column fixed plate 32 is fixed by high-strength bolt 34 and outer concrete 113, steel pipe 111, core concrete 112
Afterwards, protrude part H profile steel beam 211 and Liang Zong muscle 221 by pour cover later period concrete 216 condensation be integrated;The beam is solid
Fixed board 31 is fixedly connected by high-strength bolt 34 with top flange 213 and lower flange 214 respectively.
Specifically, the beam fixed plate 31 and column fixed plate 32 are all made of steel plate;The steel pipe 111 is using square steel
Pipe, the column tie-bar 122 and beam stirrup 222 are set as rectangle.
Overlapping coupled column 1 and part combination beam 2 of the invention needs to carry out in a pre-installation prefabricated.
When the overlapping coupled column 1 is prefabricated, steel pipe 111 is made in processing factory first, is provided in steel pipe for through pre-
Stay the hole of pipe 13;Then in precasting yard, column is indulged into muscle 121, column tie-bar 122 is arranged according to setting position and is bound in steel pipe
111 periphery is arranged the provided pipe 13 of the pre-buried corresponding size of corresponding position of hole in steel pipe 111, pours core in steel pipe 111
Concrete 112 sets up template after-pouring outer concrete 113 outside steel pipe 111, after all concrete coagulations, entire overlapping group
Zygostyle 1 is just prefabricated to be finished.
When the part combination beam 2 is prefabricated, H profile steel beam 211 and steel connector 3, the steel connector 3 are made in processing factory first
It is welded and fixed by the steel plate of beam fixed plate 31 and column fixed plate 32;Then use is opened up in beam fixed plate 31 and column fixed plate 32
In the through hole 33 for running through high-strength bolt 34.It is set up again in precasting yard and pours the template of part combination beam 2, beam is indulged into 221 He of muscle
Beam stirrup 222 arranges and binds the corresponding position after-pouring beam concrete 212 in H profile steel beam 211, H profile steel according to setting position
Beam 211 reserves setting gap not casting beams concrete 212 in the junction close to steel connector 3, and beam indulges muscle 221 and H profile steel beam
211 stretch out 213 certain length of beam concrete, and after all concrete coagulations, entire part combination beam 2 is just prefabricated to be finished.
Assembling type node of the invention, only need to be by prefabricated overlapping coupled column 1 and part combination beam 2 when installing and using
Be fixed on the position of setting, then high-strength bolt 34 by provided pipe 13 extend through column fixed plate 32, outer concrete 113,
Column fixed plate 32 is tightly secured on overlapping coupled column 1 by steel pipe 111 and core concrete 112, then will by high-strength bolt 34
Beam fixed plate 31 is fixed on H profile steel beam 211, that is, completes the fixation between overlapping coupled column 1 and part combination beam 2.Then
In gap between the beam concrete 213 and column fixed plate 32, the outer surface of fixed plate 31 and column fixed plate 32 pours and covers
Later period concrete 216 further fixes and fireproof purpose to reach.
In conclusion the present invention provides a kind of prefabricated overlapping coupled column T-type assembling type node of pre-erection combination beam-,
It makes the quick, fastening easy to connect between component reliably, reduces molded-in-place, installation and the workload of welding.
Claims (10)
1. a kind of prefabricated overlapping coupled column T-type assembling type node of pre-erection combination beam-, it is characterised in that: folded including prefabricated
It is combined zygostyle (1) and part combination beam (2), the end of the part combination beam (2) passes through steel connector (3) and overlapping coupled column
(1) it is fixedly connected;The internal stress component (21) and external carbuncle component (22) of interlaced arrangement are equipped in the part combination beam (2);
Core firmware (11) and peripheral firmware (12) are equipped in the overlapping coupled column (1), it is solid that the core firmware (11) is located at periphery
The inside of part (12);One fixing end of the steel connector (3) is fixedly connected with internal stress component (21), steel connector (3) it is another
Fixing end is fixedly connected with core firmware (11), peripheral firmware (12) respectively.
2. the prefabricated overlapping coupled column T-type assembling type node of a kind of pre-erection combination beam-according to claim 1, special
Sign is: the core firmware (11) includes the steel pipe (111) along the cylinder length direction setting of overlapping coupled column (1) and pours
The core concrete (112) being filled in steel pipe (111);The peripheral firmware (12) includes the cylinder along overlapping coupled column (1)
The column of length direction setting indulges muscle (121), and the column indulges muscle (121) and is set as multiple, and multiple columns indulge muscle (121) along steel pipe
(111) periphery distribution;The column indulges the periphery of muscle (121), is arranged with multiple ties along the length direction that column indulges muscle (121)
Muscle (122);The column is indulged muscle (121) and column tie-bar (122) and is became one by outer concrete (113) with steel pipe (111);
The internal stress component (21) by steel connector (3) respectively with outer concrete (113), steel pipe (111), core concrete
(112) it is fixedly connected.
3. the prefabricated overlapping coupled column T-type assembling type node of a kind of pre-erection combination beam-according to claim 2, special
Sign is: the internal stress component (21) includes the H profile steel beam (211) being arranged along the length direction of part combination beam (2);Institute
Stating external carbuncle component (22) includes indulging muscle (221) along the beam that the length direction of part combination beam (2) is arranged, and the beam indulges muscle
(221) it is set as multiple, and multiple beams indulge muscle (221) along two empty part cloth of H profile steel beam (211);The beam indulges muscle
(221) periphery is arranged with multiple beam stirrups (222) along the length direction that beam indulges muscle (221);The H profile steel beam (211),
Beam is indulged muscle (221), beam stirrup (222) and is became one by beam concrete (212);The steel connector (3) is fixed on H profile steel beam
(211) end point.
4. the prefabricated overlapping coupled column T-type assembling type node of a kind of pre-erection combination beam-according to claim 2, special
Sign is: multiple columns are indulged muscle (121) and are uniformly distributed along the periphery of steel pipe (111);Multiple column tie-bars (122) along
The length direction that column indulges muscle (121) is uniformly distributed, and the plane where column tie-bar (122) indulges muscle (121) setting perpendicular to column.
5. the prefabricated overlapping coupled column T-type assembling type node of a kind of pre-erection combination beam-according to claim 3, special
Sign is: multiple beams are indulged muscle (221) and are uniformly distributed at two sky portions of H profile steel beam (211);Multiple beam stirrups
(222) it is uniformly distributed along the length direction that beam indulges muscle (221), and the plane where beam stirrup (222) indulges muscle perpendicular to beam
(221) it is arranged.
6. the prefabricated overlapping coupled column T-type assembling type node of a kind of pre-erection combination beam-according to claim 3, special
Sign is: the H profile steel beam (211) includes top flange (213), lower flange (214) and for connecting top flange (213) and bottom wing
The web (215) of edge (214);The top flange (213) is arranged in parallel with lower flange (214), and the web (215) is respectively perpendicular
It is arranged in top flange (213) and lower flange (214), and web (215) is separately fixed at top flange (213), lower flange (214)
Middle position;The steel connector (3) is fixedly connected with top flange (213) and lower flange (214) respectively, and the beam indulges muscle
(221) it is arranged at the two sides sky portion of web (215) with beam stirrup (222).
7. the prefabricated overlapping coupled column T-type assembling type node of a kind of pre-erection combination beam-according to claim 6, special
Sign is: the steel connector (3) is set as T-shaped piece comprising the beam fixed plate (31) and column fixed plate (32) of perpendicular fixation,
The beam fixed plate (31) is fixed on the middle position of column fixed plate (32);The beam fixed plate (31) respectively with top flange
(213) be fixedly connected with lower flange (214), the column fixed plate (32) respectively with outer concrete (113), steel pipe (111), core
Heart concrete (112) is fixedly connected;Multiple through holes (33) are equipped in the beam fixed plate (31) and column fixed plate (32);?
At position corresponding with through hole (33) of column fixed plate (32), the overlapping coupled column (1) is equipped with multiple provided pipes (13),
The provided pipe (13) extends through outer concrete (113), steel pipe (111), core concrete (112) setting.
8. the prefabricated overlapping coupled column T-type assembling type node of a kind of pre-erection combination beam-according to claim 7, special
Sign is: the part combination beam (2) indulges muscle in the end close to overlapping coupled column (1), the H profile steel beam (211) and beam
(221) protrusion beam concrete (212) setting.
9. the prefabricated overlapping coupled column T-type assembling type node of a kind of pre-erection combination beam-according to claim 8, special
Sign is: the column fixed plate (32) passes through high-strength bolt (34) and outer concrete (113), steel pipe (111), core concrete
(112) after fixed, the H profile steel beam (211) and beam for protruding part indulge muscle (221) and cover later period concrete (216) condensation by pouring
It is integrated;The beam fixed plate (31) connects by the way that high-strength bolt (34) and top flange (213) and lower flange (214) are fixed respectively
It connects.
10. the prefabricated overlapping coupled column T-type assembling type node of a kind of pre-erection combination beam-according to claim 7, special
Sign is: the beam fixed plate (31) and column fixed plate (32) are all made of steel plate;The steel pipe (111) uses square steel pipe,
The column tie-bar (122) and beam stirrup (222) are set as rectangle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910314015.8A CN110016966B (en) | 2019-04-18 | 2019-04-18 | T-shaped assembled node of prefabricated part composite beam-prefabricated superposed composite column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910314015.8A CN110016966B (en) | 2019-04-18 | 2019-04-18 | T-shaped assembled node of prefabricated part composite beam-prefabricated superposed composite column |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110016966A true CN110016966A (en) | 2019-07-16 |
CN110016966B CN110016966B (en) | 2022-06-03 |
Family
ID=67191835
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910314015.8A Active CN110016966B (en) | 2019-04-18 | 2019-04-18 | T-shaped assembled node of prefabricated part composite beam-prefabricated superposed composite column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110016966B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL2027578A (en) * | 2020-03-26 | 2021-05-11 | Jiangsu Vocational Inst Architectural Tech | Prefabricated concrete structure beam-column dry-wet combined connection construction and implementation method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000328650A (en) * | 1999-05-19 | 2000-11-28 | Sekisui House Ltd | Connecting structure of beam and column and building having its structure |
CN202248531U (en) * | 2011-09-08 | 2012-05-30 | 深圳市市政设计研究院有限公司 | Steel tube concrete laminated column |
CN103266720A (en) * | 2013-05-20 | 2013-08-28 | 南京工业大学 | Combination beam with steel beam and belly poured with concrete |
CN105569188A (en) * | 2015-03-25 | 2016-05-11 | 福州大学 | Square thin-wall steel pipe concrete filled steel column and steel girder prefabricated node structure and construction method thereof |
CN206752843U (en) * | 2017-05-04 | 2017-12-15 | 浙江绿筑集成科技有限公司 | A kind of combination beam for exempting from fireproof coating |
CN108678285A (en) * | 2018-07-01 | 2018-10-19 | 沈阳建筑大学 | The concrete filled steel tube coupled column and construction method of external wrapping concrete |
CN210263399U (en) * | 2019-04-18 | 2020-04-07 | 合肥工业大学 | T-shaped assembled node of prefabricated part composite beam-prefabricated superposed composite column |
-
2019
- 2019-04-18 CN CN201910314015.8A patent/CN110016966B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000328650A (en) * | 1999-05-19 | 2000-11-28 | Sekisui House Ltd | Connecting structure of beam and column and building having its structure |
CN202248531U (en) * | 2011-09-08 | 2012-05-30 | 深圳市市政设计研究院有限公司 | Steel tube concrete laminated column |
CN103266720A (en) * | 2013-05-20 | 2013-08-28 | 南京工业大学 | Combination beam with steel beam and belly poured with concrete |
CN105569188A (en) * | 2015-03-25 | 2016-05-11 | 福州大学 | Square thin-wall steel pipe concrete filled steel column and steel girder prefabricated node structure and construction method thereof |
CN206752843U (en) * | 2017-05-04 | 2017-12-15 | 浙江绿筑集成科技有限公司 | A kind of combination beam for exempting from fireproof coating |
CN108678285A (en) * | 2018-07-01 | 2018-10-19 | 沈阳建筑大学 | The concrete filled steel tube coupled column and construction method of external wrapping concrete |
CN210263399U (en) * | 2019-04-18 | 2020-04-07 | 合肥工业大学 | T-shaped assembled node of prefabricated part composite beam-prefabricated superposed composite column |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL2027578A (en) * | 2020-03-26 | 2021-05-11 | Jiangsu Vocational Inst Architectural Tech | Prefabricated concrete structure beam-column dry-wet combined connection construction and implementation method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN110016966B (en) | 2022-06-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205954921U (en) | Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area | |
CN106284655B (en) | Precast concrete beam stud connects connecting node and connection method | |
CN105275092A (en) | Energy consumption type node for connecting section steel concrete beam and steel-plate-wrapped composite shear wall | |
CN206016011U (en) | A kind of steel plate concrete composite beam panel structure system | |
CN109372130A (en) | The novel full assembly concrete shaped section steel frame node of one kind and its construction method | |
CN106759865B (en) | A kind of U-shaped steel plate combination beam frame of steel core concrete column- | |
CN204959960U (en) | Prefabricate prefabricated concrete structure entirely | |
CN109372129A (en) | The novel full assembly concrete frame joint of one kind and its construction method | |
CN105201071A (en) | Totally-prefabricated concrete structure | |
CN109024916A (en) | A kind of PVC-FRP pipe binding type steel concrete column-cross node of reinforced beam | |
CN109322388B (en) | Assembly type beam column node structure located in plastic area for earthquake resistance and energy consumption | |
CN108487473A (en) | Prefabrication steel concrete compound shear wall with connect steel beam joint connection structure | |
CN108775084B (en) | Steel-concrete combined precast beam and precast column connecting structure and construction method | |
CN106368348A (en) | Overlapped combined shear wall with double-phase stress characteristic | |
CN109024917A (en) | A kind of PVC-FRP pipe binding type steel concrete column-reinforced beam T-type node | |
CN207176940U (en) | A kind of concrete filled steel tube pole steel beam assembled space nodes | |
CN108951847A (en) | A kind of Precast Concrete Frame system and its construction method based on UHPC | |
KR101637451B1 (en) | Manufacturing Method for Hollow Precast Concret-encased Steel Column and Dry-splicing Methods for the Same | |
CN109024915A (en) | A kind of PVC-FRP pipe binding type steel concrete column-reinforced beam L-type node | |
CN106760036B (en) | A kind of prefabricated steel-combined concrete shear wall | |
CN209907570U (en) | Assembled frame beam column node that steel sheet and reinforcement are connected | |
CN111962948A (en) | Steel tube concrete column-H-shaped steel beam-steel support-pi-shaped connecting piece combined side column bottom node and manufacturing method | |
CN106121055B (en) | A kind of steel box column and beams of concrete connecting node and its construction method | |
CN207620108U (en) | PC fabricated construction dry type column foot connecting structures | |
CN110106985A (en) | A kind of prefabricated assembled SRC column-girder steel cross combined joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |