CN110007229A - 一种同步发电机的定相检查方法 - Google Patents
一种同步发电机的定相检查方法 Download PDFInfo
- Publication number
- CN110007229A CN110007229A CN201910332214.1A CN201910332214A CN110007229A CN 110007229 A CN110007229 A CN 110007229A CN 201910332214 A CN201910332214 A CN 201910332214A CN 110007229 A CN110007229 A CN 110007229A
- Authority
- CN
- China
- Prior art keywords
- generator
- phase
- synchronous
- voltage
- excitation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/34—Testing dynamo-electric machines
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
- G01R31/66—Testing of connections, e.g. of plugs or non-disconnectable joints
- G01R31/67—Testing the correctness of wire connections in electric apparatus or circuits
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Control Of Eletrric Generators (AREA)
Abstract
本发明提供了一种同步发电机的定相检查方法,将发电机中性点断开,从高压侧到主变到发电机进行反送电,以达到发电机定相试验的目的,对于小机组尤其适用,小于10MW的机组便于采用,简单有效,定相试验后,发电机开机升压后只要检测发电机电压相序未正相序,就可以安全并网,保证发电机能一次并网成功,减少发电机开机时的电气试验时间;本发明解决了发电机出口一次定相的问题、检查了发电机出口电压一、二次的正确性,检查了发电机励磁变压器回路的电压、相序的准确性,确保发电机开机后由于励磁电压相序不正确引起的励磁系统失控问题,检查了发电机同期回路的准确性,确保机组安全并网运行。
Description
技术领域
本发明涉及一种发电机优化控制技术,尤其涉及一种同步发电机的定相检查方法。
背景技术
随着国民经济的高速发展,我国电力的发展形成多元化的发展趋势,发电企业以五大发电集团为龙头,以上大项目、大机组为目标,但市场的需求不同,小规模的供热机组和余热发电机组也越来越多的得到重视,发电机组的同期定相问题成为一个课题,现场使用什么样的定相方案,要根据现场的情况,具体分析,目前一般采取的方法:1、发电机带主变、高压母线零起升压。这种方式一般要求高压母线为双母线运行方式,用一条空母线进行零起升压,以达到发电机与系统的定相;2、将发电机出口断开,从高压侧到主变到发电机出口进行反送电,以达到发电机定相试验的目的;3、用一次核相棒核相的同时,检查同期系统工作情况,达到上下指示一致,以确定发电机同期定相。
发电机定相技术,目前应用最多的是,带高压母线零起升压,以达到发电机定相的目的,这种方法有局限性,如果现场电气系统采用单母线或单母线分段的接线方式,同时没有专门的备用电源的话,这种方式就不能实现,一次核相棒核相法也有缺陷,电压差60度以下时,不容易发觉,会引起非同期情况的发生。特别在50MW以下机组发生过多起非同期的情况,不是不得已的情况,不建议采用。
发明内容
本发明所要解决的技术问题是提供一种同步发电机的定相检查方法。
为解决上述技术问题,本发明所采用的技术方案是:一种同步发电机的定相检查方法,同步发电机的定相检查是为发电机同期并网做准备工作,具体检查步骤为:
S1、断开发电机出口的连接,端口保持安全距离,具体包括:
断开发电机出口软连接,确定断开点之间距离>20cm;
用环氧板隔开断开点;
保证对地、相间距离>12cm;
S2、将发电机出口PT和励磁变压器投入运行;
S3、将发电机保护投入运行,将励磁变低压刀闸拉开,合上发电机出口开关;
S4、经过上述操作,发电机组除发电机本体以外的设备均已经带电运行,检查发电机电压的准确性,检查保护、测量、计量、励磁电压的准确性,检查各自动装置的工作情况;
S5、检查发电机同期回路:
将发电机同期装置在手动状态下投入,观察同期装置的工作状态是否满足同期;
将发电机同期装置在自动状态下投入,观察同期装置的工作状态是否满足同期;
检查同期闭锁回路接线是否正确;
用断开一相电压的方法,检查同期装置各状态下的同期情况;
S6、试验均正常后,断开发电机出口开关至试验位置,将发电机出口连接恢复;将发电机出口PT和励磁变公主状态恢复至检修。
作为优选,步骤S1-S6便于小于10MW的机组采用。
作为优选,高压母线电压为11kV母线电压。
作为优选,步骤S1开始前保证足够的安全距离,做好安全防护,防止无关人员进入送电现场。
本发明将发电机中性点断开,从高压侧到主变到发电机进行反送电,以达到发电机定相试验的目的,对于小机组尤其适用,小于10MW的机组便于采用,简单有效,定相试验后,发电机开机升压后只要检测发电机电压相序未正相序,就可以安全并网,保证发电机能一次并网成功,减少发电机开机时的电气试验时间,在开机前解决发电机保护、控制、测量等回路的问题,确保发电机安全、长期运行;本发明解决了发电机出口一次定相的问题、检查了发电机出口电压一、二次的正确性,检查了发电机励磁变压器回路的电压、相序的准确性,确保发电机开机后由于励磁电压相序不正确引起的励磁系统失控问题,检查了发电机同期回路的准确性,确保机组安全并网运行;大机组由于出口铜牌比较大,隔离和恢复比较困难,建议采用其他方法。
附图说明
图1为本发明的步骤示意图。
具体实施方式
下面详细描述本发明的实施例,所述实施例的示例在附图中示出,其中自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。下面通过参考附图描述的实施例是示例性的,仅用于解释本发明,而不能理解为对本发明的限制。
在本发明的描述中,除非另有规定和限定,需要说明的是,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是机械连接或电连接,也可以是两个元件内部的连通,可以是直接相连,也可以通过中间媒介间接相连。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语的具体含义。
下面参照图1描述根据本发明实施例的一种同步发电机的定相检查方法,同步发电机的定相检查是为发电机同期并网做准备工作,具体检查步骤为:
S1、断开发电机出口的连接,端口保持安全距离,具体包括:
断开发电机出口软连接,确定断开点之间距离>20cm;
用环氧板隔开断开点;
保证对地、相间距离>12cm;
S2、将发电机出口PT和励磁变压器投入运行;
S3、将发电机保护投入运行,将励磁变低压刀闸拉开,合上发电机出口开关;
S4、经过上述操作,发电机组除发电机本体以外的设备均已经带电运行,检查发电机电压的准确性,检查保护、测量、计量、励磁电压的准确性,检查各自动装置的工作情况;
S5、检查发电机同期回路:
将发电机同期装置在手动状态下投入,观察同期装置的工作状态是否满足同期;
将发电机同期装置在自动状态下投入,观察同期装置的工作状态是否满足同期;
检查同期闭锁回路接线是否正确;
用断开一相电压的方法,检查同期装置各状态下的同期情况;
S6、试验均正常后,断开发电机出口开关至试验位置,将发电机出口连接恢复;将发电机出口PT和励磁变公主状态恢复至检修。
作为优选,步骤S1-S6便于小于10MW的机组采用。
作为优选,高压母线电压为11kV母线电压。
作为优选,步骤S1开始前保证足够的安全距离,做好安全防护,防止无关人员进入送电现场。
本发明将发电机中性点断开,从高压侧到主变到发电机进行反送电,以达到发电机定相试验的目的,对于小机组尤其适用,小于10MW的机组便于采用,简单有效,定相试验后,发电机开机升压后只要检测发电机电压相序未正相序,就可以安全并网,保证发电机能一次并网成功,减少发电机开机时的电气试验时间,在开机前解决发电机保护、控制、测量等回路的问题,确保发电机安全、长期运行;本发明解决了发电机出口一次定相的问题、检查了发电机出口电压一、二次的正确性,检查了发电机励磁变压器回路的电压、相序的准确性,确保发电机开机后由于励磁电压相序不正确引起的励磁系统失控问题,检查了发电机同期回路的准确性,确保机组安全并网运行;大机组由于出口铜牌比较大,隔离和恢复比较困难,建议采用其他方法。
在本说明书的描述中,参考术语“一个实施例”、“示例”、或“一些示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本发明的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任何的一个或多个实施例或示例中以合适的方式结合。
尽管已经示出和描述了本发明的实施例,本领域的普通技术人员可以理解:在不脱离本发明的原理和宗旨的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由权利要求及其等同物限定。
Claims (3)
1.一种同步发电机的定相检查方法,其特征在于:
同步发电机的定相检查是为发电机同期并网做准备工作,具体检查步骤为:
S1、断开发电机出口的连接,端口保持安全距离,具体包括:
断开发电机出口软连接,确定断开点之间距离>20cm;
用环氧板隔开断开点;
保证对地、相间距离>12cm;
S2、将发电机出口PT和励磁变压器投入运行;
S3、将发电机保护投入运行,将励磁变低压刀闸拉开,合上发电机出口开关;
S4、经过上述操作,发电机组除发电机本体以外的设备均已经带电运行,检查发电机电压的准确性,检查保护、测量、计量、励磁电压的准确性,检查各自动装置的工作情况;
S5、检查发电机同期回路:
将发电机同期装置在手动状态下投入,观察同期装置的工作状态是否满足同期;
将发电机同期装置在自动状态下投入,观察同期装置的工作状态是否满足同期;
检查同期闭锁回路接线是否正确;
用断开一相电压的方法,检查同期装置各状态下的同期情况;
S6、试验均正常后,断开发电机出口开关至试验位置,将发电机出口连接恢复;将发电机出口PT和励磁变公主状态恢复至检修。
2.根据权利要求1所述的检查方法,其特征在于,步骤S1-S6便于小于10MW的机组采用。
3.根据权利要求1所述的检查方法,其特征在于,步骤S1开始前保证足够的安全距离,做好安全防护,防止无关人员进入送电现场。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910332214.1A CN110007229A (zh) | 2019-04-24 | 2019-04-24 | 一种同步发电机的定相检查方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910332214.1A CN110007229A (zh) | 2019-04-24 | 2019-04-24 | 一种同步发电机的定相检查方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110007229A true CN110007229A (zh) | 2019-07-12 |
Family
ID=67173806
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910332214.1A Pending CN110007229A (zh) | 2019-04-24 | 2019-04-24 | 一种同步发电机的定相检查方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110007229A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111342464A (zh) * | 2020-04-21 | 2020-06-26 | 西安热工研究院有限公司 | 一种单母线系统接线方式机组核相的系统及方法 |
CN112345938A (zh) * | 2020-12-01 | 2021-02-09 | 中广核工程有限公司 | 核电厂应急柴油发电机组试验方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3926827A1 (de) * | 1989-08-14 | 1991-02-21 | Ascentronic Geraetebau Gmbh | Verfahren, vorrichtung und tastkopf zur oszilloskopischen messung eines elektrischen dreiphasensystems |
CN101776735A (zh) * | 2009-12-10 | 2010-07-14 | 贵州电力试验研究院 | 发变组高压侧pt反送电试验方法 |
CN105449841A (zh) * | 2016-01-20 | 2016-03-30 | 国网浙江余姚市供电公司 | 电网防自备发电机倒送电系统 |
CN107546779A (zh) * | 2017-08-02 | 2018-01-05 | 中国长江电力股份有限公司 | 一种发电机主动频率跟踪同期方法 |
CN207602998U (zh) * | 2017-12-25 | 2018-07-10 | 中国能源建设集团华东电力试验研究院有限公司 | 一种配套输出工程未完工下的临时整套启动系统 |
-
2019
- 2019-04-24 CN CN201910332214.1A patent/CN110007229A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3926827A1 (de) * | 1989-08-14 | 1991-02-21 | Ascentronic Geraetebau Gmbh | Verfahren, vorrichtung und tastkopf zur oszilloskopischen messung eines elektrischen dreiphasensystems |
CN101776735A (zh) * | 2009-12-10 | 2010-07-14 | 贵州电力试验研究院 | 发变组高压侧pt反送电试验方法 |
CN105449841A (zh) * | 2016-01-20 | 2016-03-30 | 国网浙江余姚市供电公司 | 电网防自备发电机倒送电系统 |
CN107546779A (zh) * | 2017-08-02 | 2018-01-05 | 中国长江电力股份有限公司 | 一种发电机主动频率跟踪同期方法 |
CN207602998U (zh) * | 2017-12-25 | 2018-07-10 | 中国能源建设集团华东电力试验研究院有限公司 | 一种配套输出工程未完工下的临时整套启动系统 |
Non-Patent Citations (3)
Title |
---|
林文孚: "《单元机组电气运行》", 《中国水利水电出版社》 * |
莫仕勋等: "《发电机同期并网实验接线的矢量分析》", 《实验技术与管理》 * |
辽宁东科电力有限公司: "《反送电》", 《百度》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111342464A (zh) * | 2020-04-21 | 2020-06-26 | 西安热工研究院有限公司 | 一种单母线系统接线方式机组核相的系统及方法 |
CN112345938A (zh) * | 2020-12-01 | 2021-02-09 | 中广核工程有限公司 | 核电厂应急柴油发电机组试验方法 |
CN112345938B (zh) * | 2020-12-01 | 2022-05-31 | 中广核工程有限公司 | 核电厂应急柴油发电机组试验方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100570384C (zh) | 电气二次交流回路检测方法 | |
Mulhausen et al. | Anti-islanding today, successful islanding in the future | |
CN110504712B (zh) | 一种燃气电厂π型同源核相系统及方法 | |
CN100550565C (zh) | 电力系统安全稳定紧急控制策略自动匹配方法 | |
EP1783499A1 (en) | Method and apparatus for verifying the accuracy of state estimation calculations | |
CN102280864B (zh) | 配网系统保护装置故障后带电处理方法及便携式保护装置 | |
Schaefer | Art of generator synchronizing | |
Ransom | Get in step with synchronization | |
CN110007229A (zh) | 一种同步发电机的定相检查方法 | |
CN106251748B (zh) | 一种电力系统故障模拟装置 | |
CN102279323A (zh) | 智能变电站的二次准确核相方法 | |
CN105388385A (zh) | 母差保护向量的集中测试方法 | |
CN103743994B (zh) | 低压带负荷测试方法及装置 | |
Borghetti et al. | Synchronized phasors monitoring during the islanding maneuver of an active distribution network | |
Garg et al. | Dynamic positioning power plant system reliability and design | |
CN203084141U (zh) | 变压器套管ct、中性点ct极性试验装置 | |
CN1753264A (zh) | 输电线纵差保护中的双端测试方法 | |
CN105186694A (zh) | 市电转接控制装置 | |
Meliopoulos | Legacy SE to distributed dynamic state estimators: evolution and experience | |
Roy et al. | Design, development and experimental setup of a PMU network for monitoring and anomaly detection | |
Sarvani et al. | Detection of power grid synchronization failure on sensing frequency and voltage beyond the acceptable range and load protection | |
Seeley et al. | Advances in generator control and automatic synchronization-Eliminating the need for standalone synchronization systems | |
Gajić et al. | Integrated protection scheme for pump-storage hydroelectric power plant | |
CN110112788A (zh) | 一种发电厂同期系统调试方法 | |
Dobakhshari et al. | Transmission grid fault diagnosis by wide area measurement system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190712 |