CN110005441A - Pipe-plate lining grouting system and method based on externally embedded type channel Yu extensibility pouch - Google Patents

Pipe-plate lining grouting system and method based on externally embedded type channel Yu extensibility pouch Download PDF

Info

Publication number
CN110005441A
CN110005441A CN201910317110.3A CN201910317110A CN110005441A CN 110005441 A CN110005441 A CN 110005441A CN 201910317110 A CN201910317110 A CN 201910317110A CN 110005441 A CN110005441 A CN 110005441A
Authority
CN
China
Prior art keywords
pipe
pouch
plate lining
slurries
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910317110.3A
Other languages
Chinese (zh)
Other versions
CN110005441B (en
Inventor
戴志仁
胡瑞青
王俊
李谈
高志宏
王立新
李润轩
郭亮
马晓波
康华
王天明
李储军
贾少春
曹伟
杨沛敏
翁木生
毛念华
张海
汪珂
王博
段亚刚
王春希
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201910317110.3A priority Critical patent/CN110005441B/en
Publication of CN110005441A publication Critical patent/CN110005441A/en
Application granted granted Critical
Publication of CN110005441B publication Critical patent/CN110005441B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to pipe-plate lining grouting systems and method based on externally embedded type channel Yu extensibility pouch, including the tunnel structure assembled by pipe-plate lining, pipe-plate lining centre is embedded with the injected hole for also serving as hole for hoist, pipe-plate lining extrados is equipped with transverse and longitudinal externally embedded type channel, along section of jurisdiction, circumferential direction is slurries diffusion main channel, it is slurries diffusion subchannel along tunnel longitudinal direction, slurries diffusion main channel is connected with injected hole;Externally embedded type channel uses pre-buried channel flow, and the pouch of high extensibility is equipped in pre-buried channel flow, and the slurries injected by injected hole can only limit in range in pouch to be flowed.The present invention is more significant to the meaning of rich water, big partial size land pebble stratum, it can effectively solve in the case of stratum backbreaks or disturb, the corresponding slurries of conventional grouting process are diluted or are lost in the scall of periphery the drawbacks of by underground water, realize effective filling in shield tail gap three-dimensional cyclic space, ensure that tunnel is effectively contacted with surrounding formations, realizes tunnel structure stabilization and safety of surrounding environment.

Description

Pipe-plate lining grouting system and method based on externally embedded type channel Yu extensibility pouch
Technical field
The invention belongs to Tunnel Engineering technical fields, and in particular to a kind of pipe based on externally embedded type channel Yu extensibility pouch Sheet built grouting system and method.
Background technique
For the underground tunnel project of current cities in China, due to geological structure and mankind's activity, in stratum There are the influence of different-grain diameter formation particles and certain pressure underground water, therefore shield driving will form different shape, irregular The shield tail gap of distribution, the slurries under the conditions of conventional grouting process before grout cures, are easy by ground by behind injection shield tail gap Be lauched dilution, the underground water that is flowed is taken away and the running pulp of regional area scene, cause slurries to be lost with periphery loosely Layer, shield tail gap are unable to get effective filling, especially tunnel vault region, become in earth's surface Traffic loading and level of ground water Under the extraneous factors interference such as dynamic, gradually development forms stratum cavity, stratum to the unfilled localized voids in place of tunnel surrounding upwards The presence in cavity causes tunnel structure to be on the hazard with formation stability, affects safety of surrounding environment.Surrounding enviroment are protected It is a big control selector for shield requires extremely harsh city track traffic engineering.Based on formation characteristics and shield method tunnel The existing slurry injection technique in road is horizontal, and conventional grouting process is unable to satisfy the demand that shield tail gap three-dimensional cyclic space effectively fills, no It is protected conducive to tunnel structure is stable with Environmental security, is unfavorable for project investment control, as shield tunnel project in all parts of the country is advised The drawbacks of mould grows stronger day by day, and conventional grouting process is brought also is more and more obvious.
Summary of the invention
The object of the present invention is to provide a kind of pipe-plate lining grouting system based on externally embedded type channel and extensibility pouch and Method realizes that the big partial size stratum shield tunnel shield tail gap three-dimensional cyclic space of rich water is effectively filled by slurries, utmostly really It protects between shield tunnel and surrounding formations and effectively contacts, realize that tunnel structure and surrounding formations are stablized, it is ensured that safety of surrounding environment.
The technical scheme adopted by the invention is as follows:
Pipe-plate lining grouting system based on externally embedded type channel Yu extensibility pouch, including the tunnel knot being made of pipe-plate lining Structure, it is characterised in that:
Pipe-plate lining centre is embedded with the injected hole for also serving as hole for hoist, and pipe-plate lining extrados is logical equipped with transverse and longitudinal externally embedded type Road, along section of jurisdiction circumferential direction be slurries diffusion main channel, along tunnel longitudinal direction be slurries diffusion subchannel, slurries spread main channel and Injected hole is connected directly;
Externally embedded type channel uses pre-buried channel flow, and the pouch of high extensibility is equipped in pre-buried channel flow.
It is equipped with plain concrete layer between slip casting bore ends and pre-buried channel flow, is inserted during slip casting using the Grouting Pipe with non-return valve Enter injected hole, carries out instant slip casting and secondary grouting after breaking plain concrete layer.
Pouch layering is pressed in pre-buried channel flow, interior, and pouch upper surface is not higher than pre-buried channel flow opening height.
When the pipe-plate lining of assembled cyclization deviates from shield tail, shield tail gap is formed between pipe-plate lining and the stratum on periphery;
Shield tail gap while pipe-plate lining deviates from shield tail, filled at the first time by slurries it is closely knit, it is then de- in pipe-plate lining Out when shield tail, using the further grouting filling of second pulp feeding form.
The pipe-plate lining of tunnel structure includes bind block, the adjacent block of block two sides that binds and the calibrated bolck of rest part, It is longitudinal spliced after circumferential direction assembling;Ring longitudinal bolt hole and hand hole are designed on every piece of section of jurisdiction, bolt hole is in seam two sides adjacent tubes It is passed through in the hand hole of sheet built;
Connection is docked in the slurries diffusion main channel of circumferential each adjacent pipe-plate lining, and ring longitudinal direction slurries are spread in main channel and subchannel After upholding completely, shield tail gap is fully filled under the action of grouting pressure for extensibility pouch.
Pipe-plate lining grouting method based on externally embedded type channel Yu extensibility pouch, it is characterised in that:
The following steps are included:
Step 1: the layering of high extensibility pouch is compressed, is laid in pre-buried channel flow, transverse and longitudinal slurries diffusion admittance quantity is based on With status requirement, pre-buried channel flow is set on segment die, sufficiently fix by pre-buried channel flow using fixture, meets section of jurisdiction lining Build the requirement for not being subjected to displacement or deforming during pouring;
Step 2: pre-buried injected hole pours pipe-plate lining, main logical in the slurries diffusion that pipe-plate lining forms transverse and longitudinal distribution behind Road and slurries spread subchannel;
Step 3: pipe-plate lining is transported to scene, carries out tunnel piercing and pipe sheet assembling, forms shield tunnel lining structure;
Step 4: the pipe-plate lining of assembled cyclization deviates from shield tail, and shield tail gap is formed between pipe-plate lining and surrounding formations;
Step 5: while pipe-plate lining abjection shield tail forms shield tail gap, pass through the Grouting Pipe with grouting stop-valve at the first time Instant slip casting is carried out, slurries are flowed along slurries diffusion main channel, and during slurries flowing, slurries spread the pouch in main channel It is gradually expanded, while slurries gradually flow to slurries diffusion subchannel, the pouch in slurries diffusion subchannel is gradually expanded;
Step 6: by lasting slip casting, under the protection and limitation of pouch, slurries can not arbitrarily flow, and can only be limited to pouch Expanded range in, will not be diluted by underground water, surrounding formations will not be flowed into, more be not in local running pulp phenomenon;
Step 7: with the initial set of slurries, final set, slurry volume is reduced, and carries out secondary grouting in time, it is ensured that limited range Shield tail gap be fully populated with, the available guarantee of the stability of DRIFT AND SEPARATION-PILE.
Injected hole is synchronized during pipe-plate lining pours using threaded sleeve pre-buried.
Instant slip casting is carried out after breaking plain concrete layer using the Grouting Pipe with non-return valve, maximum grouting pressure should be with tunnel 1.5~2 times of stratum Water And Earth Pressures are controlled at vault, utmostly reduce slip casting disturbance and pouch differentially expanding;
During carrying out instant slip casting or secondary grouting by Grouting Pipe, since slurries diffusion admittance is small in size, it should use High pressure, intermittent grouting mode are conducive to the abundant expansion of extensibility pouch in slurries diffusion admittance.
The maximum grouting amount control of slurries is at 1.1~1.2 times of theoretical shield tail voidage.
The maximum extension volume of pouch meets the requirement of 2 times of shield tail voidages.
The invention has the following advantages that
The present invention provides a kind of novel shield tunnel shield tail gap three-dimensional cyclic gap grouting system design concepts, enrich Water rich strata shield tunnel grouting method.Either which kind of stratum, conventional grouting process, which has shield tail structure void, to be obtained To effective the drawbacks of filling, using section of jurisdiction extrados pre-buried channel flow (slurries diffusion admittance) in such a way that extensibility pouch combines Slip casting is carried out, filling for the effective range in slurries flowing in a limited space and shield tail gap three-dimensional cyclic gap can be met It fills out, reaches the target that slurries are not leaked to stratum other than shield tail gap, not only meet tunnel structure safety and wanted with stratum stabilization It asks, and utmostly reduces slurries grouting amount, saved construction investment.
Shield tunnel segment lining, built-in injected hole, section of jurisdiction extrados pre-buried channel flow and its built-in extensibility pouch, slip casting Steel, cement slurry, water-proof concrete and the injected hole that pipe and pressure injection slurries etc. are related to block processing mechanical equipment used Etc. being conventional material (equipment), corresponding size is general type, manufacture easy to process;The arrangement of pre-buried grouting pipe should be with Section of jurisdiction extrados pre-buried slurries diffusion main channel is corresponding;Along the circumferentially distributed slurries diffusion main channel in section of jurisdiction and along tunnel longitudinal direction The slurries diffusion subchannel of distribution is, it can be achieved that free-flowing of the slurries in channel, the interior high extensibility capsule being arranged of diffusion admittance Bag has slurry pressure and acts on the performance freely upheld, and the extension degree of slurries diffusion admittance quantity and pouch should meet shield tail The demand that gap is fully populated with.And then ensure that pipe-plate lining is contacted with the effective of surrounding formations, realize tunnel structure and stratum (country rock) sharing lood.Significant increase Inspection of Tunnel Quality and risk management and control are horizontal, have high economic benefit and society Benefit has wide practical use in the engineerings such as urban track traffic, railway, highway.
Detailed description of the invention
Fig. 1 is pipe-plate lining ring optimal crosssection figure.
Fig. 2 is calibrated bolck front elevation view.
Fig. 3 is calibrated bolck bottom surface expanded view.
Fig. 4 is I-I cross-section diagram (before slip casting).
Fig. 5 is I-I cross-section diagram (after slip casting).
In figure, 1- pipe-plate lining, 2- injected hole, 3- slurries diffusion main channel, 4- slurries diffusion subchannel, 5- built-in groove Road, 6- pouch, 7- Grouting Pipe, the stratum 8-, 9- shield tail gap, 10- slurries, 11- bolt hole, 12- hand hole.
Specific embodiment
The present invention will be described in detail With reference to embodiment.
The pipe-plate lining grouting system based on externally embedded type channel Yu extensibility pouch that the present invention relates to a kind of, including by section of jurisdiction The tunnel structure that lining cutting 1 forms, 1 centre of pipe-plate lining is embedded with the injected hole 2 for also serving as hole for hoist, 1 outer arc of pipe-plate lining Face is equipped with transverse and longitudinal externally embedded type channel, and along section of jurisdiction, circumferential direction is slurries diffusion main channel 3, is slurries diffusion time along tunnel longitudinal direction Channel 4, slurries diffusion main channel 3 are connected with injected hole 2.The pipe-plate lining 1 of tunnel structure is circumferential include bind block, bind block two The adjacent block of side and the calibrated bolck of rest part, it is longitudinal spliced after circumferential direction assembling;The slurries of circumferential each adjacent pipe-plate lining 1 It spreads main channel 3 and docks connection, work of the extensibility pouch 6 in grouting pressure in ring longitudinal direction slurries diffusion main channel 3 and subchannel 4 Under, after upholding completely, shield tail gap 9 can be fully filled with.Externally embedded type channel uses pre-buried channel flow 5, sets in pre-buried channel flow 5 There is the pouch 6 of high extensibility, the layering of pouch 6 is pressed in pre-buried channel flow 5.
Slurries spread the arrangement of main channel 3 and the quantity of slurries diffusion subchannel 4, are based on after the sufficiently expansion of pouch 6 effectively Coverage area unanimously accounts for.
Certain thickness plain concrete layer is equipped between 2 end of injected hole and pre-buried channel flow 5, using band check during slip casting The Grouting Pipe 7 of valve is inserted into injected hole 2, carries out instant slip casting after breaking plain concrete layer.
When the pipe-plate lining 1 of assembled cyclization deviates from shield tail, shield tail is formd between the stratum 8 on pipe-plate lining 1 and periphery Gap 9, space are fully populated with by slurries 10.
The pipe-plate lining grouting method based on externally embedded type channel Yu extensibility pouch based on above structure, including following step It is rapid:
Step 1: the layering of high extensibility pouch 6 is compressed, is laid in pre-buried channel flow 5, transverse and longitudinal slurries diffusion admittance number is based on Pre-buried channel flow 5 is arranged on segment die, is sufficiently fixed pre-buried channel flow 5 using fixture for amount and status requirement, meets pipe The requirement that sheet built 1 is not subjected to displacement or deforms during pouring;
Step 2: pre-buried injected hole 2 pours pipe-plate lining 1, forms the slurries diffusion of transverse and longitudinal distribution behind in pipe-plate lining 1 Main channel 3 and slurries spread subchannel 4;
Step 3: pipe-plate lining 1 is transported to scene, carries out tunnel piercing and pipe sheet assembling, forms shield tunnel lining structure;
Step 4: the pipe-plate lining 1 of assembled cyclization deviates from shield tail, and shield tail gap is formed between pipe-plate lining 1 and surrounding formations 8 9;
Step 5: while forming shield tail gap 9 after pipe-plate lining 1 deviates from shield tail, pass through the note with grouting stop-valve at the first time Slurry pipe 7 carries out instant slip casting, and slurries 10 are flowed along slurries diffusion main channel 3, and in 10 flow process of slurries, slurries diffusion is main logical Pouch 6 in road 3 is gradually expanded, while slurries gradually flow to slurries diffusion subchannel 4, and slurries spread the capsule in subchannel 4 Bag 6 is gradually expanded;
Step 6: by lasting slip casting, under the protection and limitation of pouch 6, slurries 10 can not arbitrarily flow, and can only be limited to capsule Flowing, will not be diluted by underground water, will not flow into surrounding formations in the expanded range of bag 6, more be not in that local running pulp is existing As;
Step 7: with the initial set of slurries 10, final set, slurry volume is reduced, and carries out secondary grouting in time, it is ensured that limited model The shield tail gap 9 enclosed is fully populated with, the available guarantee of the stability of DRIFT AND SEPARATION-PILE 8.
Injected hole 2 is synchronized during pipe-plate lining 1 pours using threaded sleeve pre-buried.
It is equipped with plain concrete layer between 2 end of injected hole and pre-buried channel flow 5, the Grouting Pipe with non-return valve is used during slip casting 7 insertion injected holes 2, carry out instant slip casting after breaking plain concrete layer.
The injection of slurries 10 is controlled with grouting amount and grouting pressure double standards, and maximum grouting amount control is in theoretical shield 1.1~1.2 times of 9 volume of tail gap, final grouting pressure are reference with stratum Water And Earth Pressures numerical value.The extensibility of pouch 6 needs full The needs gradually expanded under the effect of sufficient grouting pressure, while pouch 6 is most in slurries diffusion main channel 3 and slurries diffusion subchannel 4 Big bulked volume should at least meet the requirement of 2 times of 9 volumes of shield tail gap.
Maximum grouting pressure should be controlled with 1.5~2 times of stratum Water And Earth Pressures at tunnel vault, utmostly be reduced Slip casting disturbance and pouch differentially expanding.
During carrying out instant slip casting or secondary grouting by Grouting Pipe 7, since slurries diffusion admittance is small in size, answer Using high pressure, intermittent grouting mode, be conducive to the abundant expansion of extensibility pouch 6 in slurries diffusion admittance.
The mobility of slurries 10 and presetting period need to meet pouch 6 in main channel and subchannel and are gradually filled, expanded , and the demand in shield tail gap 9 is filled up, while the localized voids that grout cures, volume contraction are formed, it is carried out by Grouting Pipe 7 Secondary grouting.
Further detailed description is done referring to Fig. 1-5 pairs of structural systems of the invention:
Be prefbricated tunnel lining structure the system comprises the tunnel structure being made of shield tunnel segment lining 1, every endless tube piece by Several pieces of pipe sheet assemblings form, it is however generally that can according to calibrated bolck+adjacent block+form for the block that binds is combined, every piece of section of jurisdiction Centre is equipped with injected hole 2, while having both tunnel segment hanging hole function, and injected hole 2 is generally adopted during pipe-plate lining 1 pours It is synchronized with threaded sleeve pre-buried.Section of jurisdiction extrados is equipped with pre-buried channel flow 5, forms circumferential slurries diffusion main channel 3 and longitudinal direction Slurries spread subchannel 4, and conduit embeds the pouch 6 of high extensibility, and slurries are by pre-buried injected hole 2 and with the slip casting of non-return valve Pipe 7 persistently injects.5 close alignment of pre-buried channel flow of injected hole 2 and the setting of section of jurisdiction extrados.Include the built-in groove including pouch 6 Road 5, the injected hole 2 with non-return valve and pipe-plate lining synchronize pour.Transverse and longitudinal slurries diffusion admittance size, quantity, with capsule The volume and extension performance of bag need to meet the needs of 9 three-dimensional cyclic gap of shield tail gap is effectively filled, and meet tunnel structure Whole stress and formation stability requirement.On the one hand 5 inside headroom size of pre-buried channel flow needs to meet layering is pressed in channel Pouch 6 needs, and is on the other hand also required to meet 1 structure stress needs of pipe-plate lining that (6 apparent height of pouch is slightly below conduit 5 and opens Open height), cannot have to 1 structural strength of pipe-plate lining and obviously weaken the influence.Comprising the pre-buried channel flow 5 including pouch 6 in section of jurisdiction It is effectively fixed on mold, synchronizes and pour in pipe-plate lining 1.
Under the limitation of pre-buried channel flow 5 and pouch 6, flow range of the slurries 10 in shield tail gap 9 suffers restraints, simultaneously 10 characteristic of slurries will not be influenced by periphery underground water is diluted, and the setting time of slurries 10 is controllable (with laboratory test situation base This is consistent), it can ensure that effectively contacting between stratum 8 and pipe-plate lining 1 substantially, meet tunnel structure and stratum is stablized, realize Surrounding enviroment protect target.
There are the plain concretes of 10mm thickness or so between pre-buried injected hole 2 and extrados pre-buried channel flow 5 in pipe-plate lining 1 Layer needs to meet the stability of the position before slip casting on the outside under the effect of 8 Water And Earth Pressures of stratum, while being also required to meet the slip casting phase Between, Grouting Pipe 7 carries out instant slip casting after conveniently breaking, it is ensured that slurries 10 can smoothly enter into pouch 6.Pre-buried 2 other end of injected hole with Shield tunnel synchronous grouting system is connected directly, and is deviate from the first time of shield tail in pipe-plate lining 1, is carried out instant slip casting.
The influence of volume contraction after slurries 10 solidify can carry out secondary grouting by injected hole 2, and then ensure shield tail gap 9 are completely filled in, it is ensured that the stability of pipe-plate lining 1 and stratum 8, and then ensure safety of surrounding environment.
The injection of slurries 10 is executed with grouting amount and grouting pressure double control standard, and maximum grouting amount control is in theoretical shield 1.1~1.2 times of tail gap, final grouting pressure are reference with stratum Water And Earth Pressures.
Specific construction step are as follows:
Step 1: according to design requirement, the layering of pouch 6 is compressed, is laid in conduit, transverse and longitudinal slurries diffusion admittance number is based on Amount and status requirement, according to the direction of transverse and longitudinal slurries diffusion admittance and quantity pre-buried channel flow 5 on segment die, using fixture Pre-buried channel flow 5 is sufficiently fixed, the requirement for not being subjected to displacement or deforming during pipe-plate lining 1 pours is met;
Step 2: pouring pipe-plate lining 1 by duct pieces of shield tunnel production precision and structure durability requirement, pre-buried injected hole 2, Slurries diffusion main channel and the subchannel of transverse and longitudinal distribution are formed behind in pipe-plate lining 1;
Step 3: arrangement and live schedule requirement are raised according to work, pipe-plate lining 1 is transported to scene, carries out tunnel piercing and section of jurisdiction Assembly forms shield tunnel liner structure;
Step 4: the pipe-plate lining 1 of assembled cyclization deviates from shield tail, and shield tail gap is formed between pipe-plate lining 1 and surrounding formations 8 9;
Step 5: while pipe-plate lining 1 deviates from shield tail and forms shield tail gap 9, pass through the slip casting with grouting stop-valve at the first time Pipe 7 carries out instant slip casting, and slurries 10 are flowed along diffusion main channel 3, in 10 flow process of slip casting, 6 quilt of pouch in main channel It gradually expands, while slurries gradually flow to time diffusion admittance, the pouch 6 in secondary diffusion admittance is gradually expanded;
Step 6: by lasting slip casting, slurries 10 are by injection shield tail gap 9, under the protection and limitation of pouch 6,10 nothing of slurries Method arbitrarily flows, and can only be limited to flowing in the expanded range of pouch 6, will not be diluted, will not be flowed into circumferentially by underground water Layer, is more not in local running pulp phenomenon;
Step 7: with the initial set of slurries 10, final set, slurry volume is reduced, and carries out two in time according to slurry material attribute Secondary slip casting, it can be ensured that the shield tail gap 9 of limited range is fully populated with, the available guarantee of the stability of DRIFT AND SEPARATION-PILE 8.
The shield tail gap 9 formed during shield tunnel driving is often formed since shield turning or stratum are backbreak The gap of irregular distribution, concurrently injected slurries can be taken away by the underground water that underground water is sparse or is flowed, and add slip casting Pressure is unevenly distributed weighing apparatus, can further disturb 9 surrounding formations of shield tail gap during slip casting, so can aggravate slurries loss or Running pulp scene, these can all cause this limited three-dimensional space of shield tail gap 9 to be unable to get effective filling, and pass through extensibility The timely injection of slurries 10 in pouch 6, it is ensured that this confined space of shield tail gap 9 is full of in time, it is ensured that pipe-plate lining 1 is carried on the back Closely knit afterwards, tunnel structure and surrounding formations 8 are stablized.
It tunnels to form different shape, the shield tail of irregular distribution building in rich water, big grain size pebble layer shield tunnel Gap, slurries inject behind shield tail gap by underground water dilution, the underground water flowed are taken away, Local Layer is loose or region of backbreaking Phenomena such as slurries leak is more universal, and the slurries diffusion admittance and extensibility pouch formed using pre-buried channel flow is defined range Slip casting, it can be achieved that shield tail gap limits effective filling in range, and then ensure that shield tail gap is full of by slurries, realize tunnel Effective contact between structure and stratum (country rock).
Shield tunnel driving, pipe sheet assembling and mortar depositing construction etc. are all common process, related pipe-plate lining and other Auxiliary equipment is all conventional machinery arrangement;Reinforcing bar that pre-buried channel flow 5, extensibility pouch 6 and slip casting use, water-proof concrete, Steel form, waterproof material, Grouting Pipe 7 etc. are conventional material, and steel bar stress is general using three-level anti-seismic steel bar, water-proof concrete Using P10 or P12, steel form uses Q235 steel;The pre-buried channel flow of 1 extrados of pipe-plate lining setting uses high hardness and corrosion resistance Rubber material, embedded extensibility head use high resiliency PVC material.
Shield tunnel tunnel during be related to pipe-plate lining (C50 waterproof reinforced concrete), seam waterproof material (EPDM EPDM), segment bolt (M30) and injecting paste material (single liquid cement slurry) are common process and conventional material, and pipe-plate lining pours Pre-buried injected hole 2 is with casing using pvc pipe during building.
Flowing and filling of the slurries 10 in transverse and longitudinal diffusion admittance and extensibility pouch 6, can not be by groundwater pressure Influence, while will not effectively be filled to 8 running pulp of surrounding formations, utmostly realize slurries in 8 range of shield tail gap 10 It fills out, while grouting amount that can also utmostly on realization theory, not only may be implemented between pipe-plate lining 1 and surrounding formations 8 It is closely connected, it realizes the stabilization of stratum 8 and safety of surrounding environment, can also utmostly save grouting amount, cost saving.
The contents of the present invention are not limited to cited by embodiment, and those of ordinary skill in the art are by reading description of the invention And to any equivalent transformation that technical solution of the present invention is taken, all are covered by the claims of the invention.

Claims (10)

1. the pipe-plate lining grouting system based on externally embedded type channel Yu extensibility pouch, including the tunnel being made of pipe-plate lining (1) Road structure, it is characterised in that:
Pipe-plate lining (1) centre is embedded with the injected hole (2) for also serving as hole for hoist, and pipe-plate lining (1) extrados is equipped with transverse and longitudinal To externally embedded type channel, it is slurries diffusion subchannel (4) along tunnel longitudinal direction that along section of jurisdiction, circumferential direction, which is slurries diffusion main channel (3), Slurries diffusion main channel (3) is connected directly with injected hole (2);
Externally embedded type channel uses pre-buried channel flow (5), and the pouch (6) of high extensibility is equipped in pre-buried channel flow (5).
2. the pipe-plate lining grouting system according to claim 1 based on externally embedded type channel Yu extensibility pouch, feature It is:
It is equipped with plain concrete layer between injected hole (2) end and pre-buried channel flow (5), the Grouting Pipe with non-return valve is used during slip casting (7) injected hole (2) are inserted into, carry out instant slip casting and secondary grouting after breaking plain concrete layer.
3. the pipe-plate lining grouting system according to claim 2 based on externally embedded type channel Yu extensibility pouch, feature It is:
Pouch (6) layering is pressed in pre-buried channel flow (5), interior, and pouch (6) upper surface is not higher than pre-buried channel flow (5) opening height.
4. the pipe-plate lining grouting system according to claim 3 based on externally embedded type channel Yu extensibility pouch, feature It is:
When the pipe-plate lining (1) of assembled cyclization deviates from shield tail, shield tail is formed between the stratum (8) on pipe-plate lining (1) and periphery Gap (9);
Shield tail gap (9) is closely knit by slurries (10) filling at the first time while pipe-plate lining (1) deviates from shield tail, then exists When pipe-plate lining (1) deviates from shield tail, using the further grouting filling of second pulp feeding form.
5. the pipe-plate lining grouting system according to claim 4 based on externally embedded type channel Yu extensibility pouch, feature It is:
The pipe-plate lining (1) of tunnel structure includes bind block, the adjacent block of block two sides that binds and the calibrated bolck of rest part, It is longitudinal spliced after circumferential direction assembling;Ring longitudinal bolt hole (11) and hand hole (12) are designed on every piece of section of jurisdiction, bolt hole (11) is connecing It is passed through in the hand hole (12) of the adjacent pipe-plate lining (1) in seam two sides;
Connection is docked in slurries diffusion main channel (3) of circumferential each adjacent pipe-plate lining (1), and ring longitudinal direction slurries spread main channel (3) With the interior extensibility pouch (6) of subchannel (4) under the action of grouting pressure, after upholding completely, shield tail gap (9) are filled out completely It is full.
6. the pipe-plate lining grouting method based on externally embedded type channel Yu extensibility pouch, it is characterised in that:
The following steps are included:
Step 1: the layering of high extensibility pouch (6) being compressed, is laid in pre-buried channel flow (5), logical based on the diffusion of transverse and longitudinal slurries Pre-buried channel flow (5) are arranged on segment die in road quantity and status requirement, using fixture that pre-buried channel flow (5) progress is sufficiently solid It is fixed, meet the requirement for not being subjected to displacement or deforming during pipe-plate lining (1) pours;
Step 2: pre-buried injected hole (2) pours pipe-plate lining (1), forms the slurry of transverse and longitudinal distribution behind in pipe-plate lining (1) Liquid spreads main channel (3) and slurries diffusion subchannel (4);
Step 3: pipe-plate lining (1) is transported to scene, carries out tunnel piercing and pipe sheet assembling, forms shield tunnel lining structure;
Step 4: the pipe-plate lining (1) of assembled cyclization deviates from shield tail, forms shield between pipe-plate lining (1) and surrounding formations (8) Tail gap (9);
Step 5: while pipe-plate lining (1) abjection shield tail forms shield tail gap (9), at the first time by with grouting stop-valve Grouting Pipe (7) carries out instant slip casting, and slurries (10) are flowed along slurries diffusion main channel (3), in slurries (10) flow process, slurry Pouch (6) in liquid diffusion main channel (3) is gradually expanded, while slurries gradually flow to slurries diffusion subchannel (4), and slurries expand The pouch (6) dissipated in subchannel (4) is gradually expanded;
Step 6: by lasting slip casting, under the protection and limitation of pouch (6), slurries (10) can not arbitrarily flow, and can only limit It in the expanded range of pouch (6), will not be diluted by underground water, surrounding formations will not be flowed into, more be not in local running pulp Phenomenon;
Step 7: with the initial set of slurries (10), final set, slurry volume is reduced, and carries out secondary grouting in time, it is ensured that limited The shield tail gap (9) of range is fully populated with, the available guarantee of stability of DRIFT AND SEPARATION-PILE (8).
7. the pipe-plate lining grouting method according to claim 6 based on externally embedded type channel Yu extensibility pouch, feature It is:
Injected hole (2) is synchronized during pipe-plate lining (1) pours using threaded sleeve pre-buried.
8. the pipe-plate lining grouting method according to claim 7 based on externally embedded type channel Yu extensibility pouch, feature It is:
Instant slip casting is carried out after breaking plain concrete layer using the Grouting Pipe (7) with non-return valve, maximum grouting pressure should be with tunnel 1.5~2 times of stratum Water And Earth Pressures are controlled at vault, utmostly reduce slip casting disturbance and pouch differentially expanding;
During carrying out instant slip casting or secondary grouting by Grouting Pipe (7), since slurries diffusion admittance is small in size, it should adopt With high pressure, intermittent grouting mode, be conducive to the abundant expansion of extensibility pouch (6) in slurries diffusion admittance.
9. the pipe-plate lining grouting method according to claim 8 based on externally embedded type channel Yu extensibility pouch, feature It is:
The maximum grouting amount control of slurries (10) is at 1.1~1.2 times of theoretical shield tail gap (9) volume.
10. the pipe-plate lining grouting method according to claim 9 based on externally embedded type channel Yu extensibility pouch, feature It is:
The maximum extension volume of pouch (6) meets the requirement of 2 times of shield tail gap (9) volumes.
CN201910317110.3A 2019-04-19 2019-04-19 Segment lining grouting system and method based on externally embedded channel and stretchable bag Active CN110005441B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910317110.3A CN110005441B (en) 2019-04-19 2019-04-19 Segment lining grouting system and method based on externally embedded channel and stretchable bag

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910317110.3A CN110005441B (en) 2019-04-19 2019-04-19 Segment lining grouting system and method based on externally embedded channel and stretchable bag

Publications (2)

Publication Number Publication Date
CN110005441A true CN110005441A (en) 2019-07-12
CN110005441B CN110005441B (en) 2024-05-03

Family

ID=67173047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910317110.3A Active CN110005441B (en) 2019-04-19 2019-04-19 Segment lining grouting system and method based on externally embedded channel and stretchable bag

Country Status (1)

Country Link
CN (1) CN110005441B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111305872A (en) * 2020-03-10 2020-06-19 天津大学 TBM shield tunnel segment and operation method thereof
CN112172030A (en) * 2020-07-22 2021-01-05 中铁第一勘察设计院集团有限公司 Wire outlet sleeve mold, wire outlet sleeve and processing method thereof
CN112343082A (en) * 2019-08-09 2021-02-09 张继红 Real-time control method for displacement of protected object in underground engineering crossing process
CN113700504A (en) * 2021-09-08 2021-11-26 安徽理工大学 Tunnel lining pre-buried grouting pipeline system and grouting method thereof
CN113802570A (en) * 2021-08-30 2021-12-17 北京工业大学 Circular foundation ditch steel corrugated plate-mould bag concrete supporting structure
CN114776323A (en) * 2022-04-01 2022-07-22 成都未来智隧科技有限公司 Method for controlling double compensation of stratum and stress loss of shield tunnel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007239372A (en) * 2006-03-10 2007-09-20 Penta Ocean Constr Co Ltd Shield machine
CN104389623A (en) * 2014-11-12 2015-03-04 中铁二院工程集团有限责任公司 Shield tunnel prefabricated tunnel segment lining back stratum grouting device
CN107130979A (en) * 2017-05-31 2017-09-05 广州市市政工程设计研究总院 A kind of shield sky pushes through the section of jurisdiction float Structure and construction method of Tunneling by mining method
CN107191197A (en) * 2017-06-14 2017-09-22 中铁第四勘察设计院集团有限公司 A kind of shield duct piece and its pushed away in shield sky by the application in Tunneling by mining method
CN210033461U (en) * 2019-04-19 2020-02-07 中铁第一勘察设计院集团有限公司 Segment lining grouting system based on externally-embedded channel and stretchable bag

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007239372A (en) * 2006-03-10 2007-09-20 Penta Ocean Constr Co Ltd Shield machine
CN104389623A (en) * 2014-11-12 2015-03-04 中铁二院工程集团有限责任公司 Shield tunnel prefabricated tunnel segment lining back stratum grouting device
CN107130979A (en) * 2017-05-31 2017-09-05 广州市市政工程设计研究总院 A kind of shield sky pushes through the section of jurisdiction float Structure and construction method of Tunneling by mining method
CN107191197A (en) * 2017-06-14 2017-09-22 中铁第四勘察设计院集团有限公司 A kind of shield duct piece and its pushed away in shield sky by the application in Tunneling by mining method
CN210033461U (en) * 2019-04-19 2020-02-07 中铁第一勘察设计院集团有限公司 Segment lining grouting system based on externally-embedded channel and stretchable bag

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112343082A (en) * 2019-08-09 2021-02-09 张继红 Real-time control method for displacement of protected object in underground engineering crossing process
CN111305872A (en) * 2020-03-10 2020-06-19 天津大学 TBM shield tunnel segment and operation method thereof
CN111305872B (en) * 2020-03-10 2020-12-01 天津大学 TBM shield tunnel segment and operation method thereof
CN112172030A (en) * 2020-07-22 2021-01-05 中铁第一勘察设计院集团有限公司 Wire outlet sleeve mold, wire outlet sleeve and processing method thereof
CN113802570A (en) * 2021-08-30 2021-12-17 北京工业大学 Circular foundation ditch steel corrugated plate-mould bag concrete supporting structure
CN113700504A (en) * 2021-09-08 2021-11-26 安徽理工大学 Tunnel lining pre-buried grouting pipeline system and grouting method thereof
CN114776323A (en) * 2022-04-01 2022-07-22 成都未来智隧科技有限公司 Method for controlling double compensation of stratum and stress loss of shield tunnel

Also Published As

Publication number Publication date
CN110005441B (en) 2024-05-03

Similar Documents

Publication Publication Date Title
CN110005441A (en) Pipe-plate lining grouting system and method based on externally embedded type channel Yu extensibility pouch
CN106930777B (en) The construction method that Bored Section of Metro main track assembled two serves as a contrast
CN101270582B (en) Method for setting bracing column in underground cavity
CN209924998U (en) Shallow earthing shield tunnel is worn road reinforcement protection architecture down
CN105041325A (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN103089275A (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN110617067B (en) Low-risk construction method for full-section boundary advanced pipe shed of extremely-soft surrounding rock tunnel
CN104500082A (en) Mining-method tunnel inner shield receiving construction method
CN101709651A (en) Grouting water blocking method for undersea tunnel
CN109083682A (en) A kind of construction method of mine working antiseepage high intensity fire dam
CN210509175U (en) Reinforced structure of building is worn to shield closely side
CN107091101A (en) Mine shield handing-over tunnel folded type joint design and construction method in the middle part of marine site
CN103216247B (en) Prestressing force Shield tunnel and construction method
CN107794942A (en) Riverbed comprehensive pipe gallery structure and its construction method are worn under one kind
CN108412506A (en) Ground fissure region tunnel lining structure based on shield tunnel and its construction method
CN102425155B (en) Method for reinforcing overlying shallow rockmass in mined-out area
CN104533432A (en) Construction method for shield to penetrate through buildings in old town of downtown in complex stratums
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN208040386U (en) A kind of ground fissure region tunnel lining structure based on shield tunnel
CN109853477A (en) Change the concentrative seepage plugging structure and method that dynamic water is hydrostatic in gallery
CN108914911A (en) A kind of stratum prestress advanced excavation stability control method
CN105605335A (en) Large-caliber prestressed steel cylinder concrete pipe for jacking construction
Zhao et al. Discussion on the waterproof and drainage system of the coastal tunnel and analysis of water pressure law outside lining: A case study of the Gongbei Tunnel
CN209603062U (en) Change the concentrative seepage plugging structure that dynamic water is hydrostatic in gallery
CN210033461U (en) Segment lining grouting system based on externally-embedded channel and stretchable bag

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant