CN109958460A - The multi-functional anchoring waterproof construction of one kind and its anchoring process - Google Patents
The multi-functional anchoring waterproof construction of one kind and its anchoring process Download PDFInfo
- Publication number
- CN109958460A CN109958460A CN201910184330.3A CN201910184330A CN109958460A CN 109958460 A CN109958460 A CN 109958460A CN 201910184330 A CN201910184330 A CN 201910184330A CN 109958460 A CN109958460 A CN 109958460A
- Authority
- CN
- China
- Prior art keywords
- anchor rod
- old
- splash guard
- waterproof
- threaded anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004873 anchoring Methods 0.000 title claims abstract description 29
- 238000010276 construction Methods 0.000 title claims abstract description 24
- 238000000034 method Methods 0.000 title claims abstract description 13
- 230000008569 process Effects 0.000 title claims abstract description 9
- 239000011435 rock Substances 0.000 claims abstract description 23
- 239000002184 metal Substances 0.000 claims abstract description 21
- 238000009434 installation Methods 0.000 claims description 14
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 7
- 239000000463 material Substances 0.000 claims description 4
- 238000005553 drilling Methods 0.000 claims description 3
- 239000011440 grout Substances 0.000 claims description 3
- 238000010438 heat treatment Methods 0.000 claims description 3
- 239000012943 hotmelt Substances 0.000 claims description 3
- 238000002347 injection Methods 0.000 claims description 3
- 239000007924 injection Substances 0.000 claims description 3
- 238000011017 operating method Methods 0.000 claims description 3
- 238000004078 waterproofing Methods 0.000 claims description 3
- 239000004568 cement Substances 0.000 claims description 2
- 239000002002 slurry Substances 0.000 claims description 2
- 238000009412 basement excavation Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/02—Setting anchoring-bolts with provisions for grouting
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/0026—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/0093—Accessories
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a kind of multi-functional anchoring waterproof construction and its anchoring process, multi-functional anchoring waterproof construction includes foundation pit country rock and threaded anchor rod, the surface of the foundation pit country rock has poured first time branch sheath, the surface of the first time branch sheath is equipped with old splash guard, one end of the threaded anchor rod sequentially passes through old splash guard, first time branch sheath and foundation pit country rock, the end of the threaded anchor rod is fixed in foundation pit country rock, waterproof washer and the first metal washer are successively pressed on the surface of old splash guard by the first nut on the threaded anchor rod, threaded sleeve has been connected through a screw thread on the threaded anchor rod, the other end of the threaded anchor rod is equipped with the second metal washer and the second nut.The configuration of the present invention is simple alleviates labor intensity of workers, foundation pit, and Lock gate liner is integrated, and whole stress is more firm, avoids applying waterproof roll when performing load bearing wall in the later period, accelerate construction progress.
Description
Technical field
The invention belongs to anchorage stake interconnection technique fields, and in particular to the multi-functional anchoring waterproof construction of one kind and its anchoring side
Method.
Background technique
Recently as expanding economy, the urban construction and development in China is also abnormal rapid.From high-rise, super high-rise building to
Construction of Urban Rail Traffic, relevant underground engineering is more and more, has emerged a large amount of deep-foundation pit engineering.Using anchor structure
Support system as foundation pit.Anchor structure is the novel technique that the realm of building construction generates in the past 20 years, is answered extensively
For underground structure construction supporting system and make the tensile member of permanent construction structure.Pulling and arching supporting structure is mainly by enclosing
Protection structure system and anchoring system two parts composition.Tensile anchor aground type needs enough place setting anchoring piles or other anchorings
Object.Anchor rod type needs foundation soil that can provide anchor pole biggish anchor force.Anchor rod type is relatively suitable for sand foundation or clay foundation.
In order to meet the force request in excavation of foundation pit stage, in excavation of foundation pit, the concrete support of first time is first done, is made
Work is excavated constantly to carry out.First time supporting only guarantees to excavate the ongoing safety measure of work.If foundation pit earth
When pressure is larger, also to apply second of supporting can guarantee the overall stability of foundation pit.When foundation pit is in rich water area,
Splash guard laying is also done between first time supporting and second of supporting.To guarantee second of the supporting applied and propping up for the first time
Horizontal reinforcement and pre-buried straight thread steel will be also arranged in the globality of shield and country rock in second of supporting and first time braced wall
Muscle connector, reinforcing bar is connected by connector with first time supporting reinforcing bar in second of supporting.
But a large amount of case history explanation, anchor pole country rock, first time supporting and second of supporting formed one it is stable
Meanwhile also splash guard is punched, water just along the radially and longitudinally percolating water of anchor pole, cause concrete guard wall strength reduction and
Drainage endangers building.Simultaneously when applying second of supporting, for guarantee concrete formation, need on the outside use pair
Pull rod and outer support fixed form, cause space in foundation pit largely to waste, using such connection type, not only construction efficiency
It is low, and material is wasted, it increases the labor intensity of workers.
Summary of the invention
The purpose of the present invention is to provide a kind of multi-functional anchoring waterproof construction and its anchoring process, to solve above-mentioned background
The problem of being proposed in technology.
To achieve the above object, the invention provides the following technical scheme: a kind of multi-functional anchoring waterproof construction, including foundation pit
Country rock and threaded anchor rod, the surface of the foundation pit country rock have poured first time branch sheath, and the surface of the first time branch sheath is set
It has been friends in the past splash guard, one end of the threaded anchor rod sequentially passes through old splash guard, first time branch sheath and foundation pit country rock, the screw thread
The end of anchor pole is fixed in foundation pit country rock, passes through the first nut on the threaded anchor rod for waterproof washer and the first metal washer
It is successively pressed on the surface of old splash guard, threaded sleeve, the threaded anchor rod has been connected through a screw thread on the threaded anchor rod
The other end the second metal washer and the second nut are installed.
Preferably, the waterproof washer is fitted closely with old splash guard.
Preferably, the old splash guard is integrally laid in first time supporting layer surface.
Meanwhile the invention also discloses a kind of anchoring process of multi-functional anchoring waterproof construction, including following operating procedure:
S1: installation threaded anchor rod successively drills out anchor in old splash guard, first time branch sheath and foundation pit country rock using drilling machine
Threaded anchor rod is inserted into rockbolt installation hole after grout injection, to cement slurry sets by bar mounting hole again in rockbolt installation hole
It completes to fix afterwards;
S2: water-proofing treatment is elapsed by collision mat snare on threaded anchor rod and by waterproof washer to old splash guard first
Surface is bonded, then is heated using flame gun to waterproof washer and old splash guard joint bright eruption so that waterproof washer and
Old splash guard hot melt fitting, is inserted in the first metal washer later and the first metal washer is pressed on collision mat using the first nut
On circle;
S3: threaded sleeve is rotated to the appropriate location of threaded anchor rod, then covers cope plate by installation template, passes through rotation the
Two nuts are fixed up the second metal washer and threaded sleeve template, carry out concrete pouring operation later.
Preferably, the heating temperature of step S2 Flame spray gun is 1000-2000 DEG C.
Preferably, old splash guard and waterproof washer are the identical waterproof roll of material in step S2.
Technical effect and advantage of the invention:
1, by this device, foundation pit country rock, first time branch sheath and second of branch sheath can closely be contacted one
It rises, whole stress is more firm;
2, by this device, foundation pit, Lock gate liner can be integrated, avoid when performing load bearing wall in the later period
Apply waterproof roll, accelerates construction progress;
3, by this device, it can save and need formwork because inner lining concrete pours and use to pull rod or template,
Construction space is saved, working efficiency is improved;
4, by this device, after inner lining concrete conserves, form removable can be recycled, saves cost.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
In figure: 1 foundation pit country rock, 2 first time branch sheaths, 3 old splash guards, 4 waterproof washers, 5 first metal washers, 6 first
Nut, 7 threaded sleeves, 8 second metal washers, 9 second nuts, 10 threaded anchor rods.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical scheme in the embodiment of the invention is clearly and completely described,
Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based in the present invention
Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all
Belong to the scope of protection of the invention.
As shown in Figure 1, a kind of multi-functional anchoring waterproof construction, including foundation pit country rock 1 and threaded anchor rod 10, the foundation pit enclose
The surface of rock 1 has poured first time branch sheath 2, and the surface of the first time branch sheath 2 is equipped with old splash guard 3, the threaded anchor
One end of bar 10 sequentially passes through old splash guard 3, first time branch sheath 2 and foundation pit country rock 1, and the end of the threaded anchor rod 10 is fixed
In foundation pit country rock 1, waterproof washer 4 and the first metal washer 5 are successively compressed by the first nut 6 on the threaded anchor rod 10
On the surface of old splash guard 3, threaded sleeve 7 has been connected through a screw thread on the threaded anchor rod 10, the threaded anchor rod 10
The other end is equipped with the second metal washer 8 and the second nut 9.
The waterproof washer 4 is fitted closely with old splash guard 3.It avoids penetrating 2 edge of first time branch sheath because of threaded anchor rod 10
Hole edge radially seep water.
The old splash guard 3 is whole to be laid on 2 surface of first time branch sheath.
Meanwhile the invention also discloses a kind of anchoring process of multi-functional anchoring waterproof construction, including following operating procedure:
S1: installation threaded anchor rod 10, using drilling machine successively in old splash guard 3, first time branch sheath 2 and foundation pit country rock 1
Rockbolt installation hole is drilled out, threaded anchor rod 10 is inserted into rockbolt installation hole again after grout injection in rockbolt installation hole, to water
It completes to fix after mud solidification;
S2: water-proofing treatment is elapsed by 4 sets of waterproof washer on threaded anchor rod 10 and by waterproof washer 4 to old waterproof first
The surface of plate 3 is bonded, then is heated using flame gun to waterproof washer 4 and 3 joint bright eruption of old splash guard, so that waterproof
Washer 4 and the hot melt fitting of old splash guard 3, are inserted in the first metal washer 5 later and use the first nut 6 by the first metal washer 5
It is pressed on waterproof washer 4;
S3: threaded sleeve 7 is rotated to the appropriate location of threaded anchor rod 10, then covers cope plate by installation template, passes through rotation
Second nut 9 is fixed up the second metal washer 9 and threaded sleeve 7 template, carries out concrete pouring operation later.
The heating temperature of step S2 Flame spray gun is 1000-2000 DEG C.
Old splash guard 3 and waterproof washer 4 are the identical waterproof roll of material in step S2.
When specific implementation
1, old splash guard 3 is penetrated when threaded anchor rod 10 being penetrated first time branch sheath 2, by heat-sealing technology collision mat
Circle 4 is fused together with old splash guard 3;
2, the first nut 6 is closely attached to old splash guard 3 for the first time by squeezing the first metal washer 5, waterproof washer 4
On branch sheath 2;
3, threaded sleeve 7 is rotated to the appropriate location of threaded anchor rod 10, then covers cope plate, by rotating the second nut 9
It compresses the second metal washer 8 and threaded sleeve 7 is fixed up template;
Old splash guard 3 can be fixed on diaphragm wall by operating above, while also the later period is needed to pour coagulation
The template used when native is also fixed up, and just forms a space between diaphragm wall and template at this time, mixed for pouring liner
Solidifying cob wall.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention,
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features,
All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention
Within protection scope.
Claims (6)
1. a kind of multi-functional anchoring waterproof construction, including foundation pit country rock (1) and threaded anchor rod (10), it is characterised in that: the base
The surface in hole country rock (1) has poured first time branch sheath (2), and the surface of the first time branch sheath (2) is equipped with old splash guard
(3), one end of the threaded anchor rod (10) sequentially passes through old splash guard (3), first time branch sheath (2) and foundation pit country rock (1), institute
The end for stating threaded anchor rod (10) is fixed in foundation pit country rock (1), will be prevented on the threaded anchor rod (10) by the first nut (6)
Water cushion circle (4) and the first metal washer (5) are successively pressed on the surface of old splash guard (3), are led on the threaded anchor rod (10)
It crosses and is threaded with threaded sleeve (7), the other end of the threaded anchor rod (10) is equipped with the second metal washer (8) and the second spiral shell
Female (9).
2. a kind of multi-functional anchoring waterproof construction according to claim 1, it is characterised in that: the waterproof washer (4) with
Old splash guard (3) fits closely.
3. a kind of multi-functional anchoring waterproof construction according to claim 1, it is characterised in that: the old splash guard (3) is whole
Body is laid on first time branch sheath (2) surface.
4. a kind of anchoring process of multi-functional anchoring waterproof construction described in -2 any one according to claim 1, feature exist
In: including following operating procedure:
S1: installation threaded anchor rod (10), using drilling machine successively in old splash guard (3), first time branch sheath (2) and foundation pit country rock
(1) rockbolt installation hole is drilled out, threaded anchor rod (10) are inserted into rockbolt installation hole again after grout injection in rockbolt installation hole,
It completes to fix after cement slurry sets;
S2: waterproof washer (4) is covered on threaded anchor rod (10) first and is prevented by waterproof washer (4) passage to old by water-proofing treatment
The surface of water plate (3) is bonded, then is heated using flame gun to waterproof washer (4) and old splash guard (3) joint bright eruption,
So that waterproof washer (4) and old splash guard (3) hot melt fitting, are inserted in the first metal washer (5) later and use the first nut (6)
First metal washer (5) is pressed on waterproof washer (4);
S3: threaded sleeve (7) is rotated to the appropriate location of threaded anchor rod (10), then covers cope plate by installation template, passes through rotation
Second nut (9) is fixed up the second metal washer (9) and threaded sleeve (7) template, carries out concreting work later
Industry.
5. the anchoring process of the multi-functional anchoring waterproof construction of one kind according to claim 4, it is characterised in that: in step S2
The heating temperature of flame gun is 1000-2000 DEG C.
6. the anchoring process of the multi-functional anchoring waterproof construction of one kind according to claim 4, it is characterised in that: in step S2
Old splash guard (3) and waterproof washer (4) are the identical waterproof roll of material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910184330.3A CN109958460A (en) | 2019-03-12 | 2019-03-12 | The multi-functional anchoring waterproof construction of one kind and its anchoring process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910184330.3A CN109958460A (en) | 2019-03-12 | 2019-03-12 | The multi-functional anchoring waterproof construction of one kind and its anchoring process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109958460A true CN109958460A (en) | 2019-07-02 |
Family
ID=67024286
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910184330.3A Pending CN109958460A (en) | 2019-03-12 | 2019-03-12 | The multi-functional anchoring waterproof construction of one kind and its anchoring process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109958460A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112483154A (en) * | 2020-11-30 | 2021-03-12 | 中国矿业大学 | Expandable prestressed anchor rod bundle for gob-side entry retaining and use method |
CN112922642A (en) * | 2021-02-01 | 2021-06-08 | 贵州大学 | Tunnel waterproof plate with fine-adjustment anti-vibration structure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2006054810A1 (en) * | 2004-11-17 | 2006-05-26 | Re-New System Co.,Ltd | Method of water-proofed injection for concrete construction with injection pipe using a melting liguified gum mixture of wastetire to water-proof agent |
KR101005837B1 (en) * | 2010-04-01 | 2011-01-05 | 주식회사 젠트로 | Waterproof structure |
CN104153401A (en) * | 2014-08-12 | 2014-11-19 | 中国十七冶集团有限公司 | Waterproof construction method for anti-floating anchor rods |
CN204282357U (en) * | 2014-10-31 | 2015-04-22 | 中工国际工程股份有限公司 | A kind of underground box structure anti-float anchor rod waterproofing system |
CN207775948U (en) * | 2018-01-04 | 2018-08-28 | 中国建筑第八工程局有限公司 | Pulling-Resistant Anchor Rod root waterproofing node structure |
-
2019
- 2019-03-12 CN CN201910184330.3A patent/CN109958460A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2006054810A1 (en) * | 2004-11-17 | 2006-05-26 | Re-New System Co.,Ltd | Method of water-proofed injection for concrete construction with injection pipe using a melting liguified gum mixture of wastetire to water-proof agent |
KR101005837B1 (en) * | 2010-04-01 | 2011-01-05 | 주식회사 젠트로 | Waterproof structure |
CN104153401A (en) * | 2014-08-12 | 2014-11-19 | 中国十七冶集团有限公司 | Waterproof construction method for anti-floating anchor rods |
CN204282357U (en) * | 2014-10-31 | 2015-04-22 | 中工国际工程股份有限公司 | A kind of underground box structure anti-float anchor rod waterproofing system |
CN207775948U (en) * | 2018-01-04 | 2018-08-28 | 中国建筑第八工程局有限公司 | Pulling-Resistant Anchor Rod root waterproofing node structure |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112483154A (en) * | 2020-11-30 | 2021-03-12 | 中国矿业大学 | Expandable prestressed anchor rod bundle for gob-side entry retaining and use method |
CN112483154B (en) * | 2020-11-30 | 2021-11-02 | 中国矿业大学 | Expandable prestressed anchor rod bundle for gob-side entry retaining and use method |
CN112922642A (en) * | 2021-02-01 | 2021-06-08 | 贵州大学 | Tunnel waterproof plate with fine-adjustment anti-vibration structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105178344A (en) | Built-in anti-floating anchor blocking structure used in foundation mat for deep-well dewatering well and construction method | |
CN103726503B (en) | Anchor rod pile reinforcing bearing platform structure used for reinforcing deformed bridge pile and construction method thereof | |
CN105804089A (en) | Locally-deepened supporting and protecting system used after original deep foundation pit is constructed and construction method of system | |
CN106498950A (en) | Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body | |
CN106320120A (en) | Construction process for pile slab type non-soil roadbed highway | |
CN110004991A (en) | Underground structure anti-floating system and construction method based on raised type tangs plate | |
CN108612110A (en) | A kind of Deep Foundation Pit of Metro Stations combined type construction method for supporting | |
CN107989034A (en) | A kind of manually digging hole filling pile and its construction method | |
CN1067453C (en) | Foundation pit slope flat anchor spray net supporting method | |
CN106065628B (en) | Based on the major diameter running water pipe security protection construction method faced forever with reference to theory | |
CN110106889A (en) | A kind of deep basal pit perfusion slope protection pile adds cable bolting construction | |
CN108914945A (en) | A kind of deep basal pit pile for prestressed pipe, prestress anchorage cable combined supporting construction method | |
CN108867690A (en) | The reverse construction of peg board barricade of big foundation pit | |
CN109958460A (en) | The multi-functional anchoring waterproof construction of one kind and its anchoring process | |
CN112031814A (en) | Cave-entering construction method for crossing shallow-layer high-load highway | |
CN105937221A (en) | Manufacturing method for drilled grouting piles | |
CN206408630U (en) | Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body | |
CN101550693B (en) | Method for reinforcing base with bored pile in the underground structure of high groundwater level | |
CN107034894A (en) | Post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile and preparation method thereof and construction method | |
CN106917402B (en) | A kind of CFG pile precast pile head and CFG pile construction method | |
CN205576934U (en) | Part increases ramus profundus watch box system behind former deep foundation pit construction | |
CN112081118A (en) | Pile-anchor supporting foundation pit deepening reinforcing and supporting structure and construction method thereof | |
CN107100322A (en) | Post stretching vertical prestressing cast-in-place concrete rod structure and construction method | |
CN208803460U (en) | A kind of enhancing cement mixing method intercepts water the Prefabricated Concrete sheet pile of effect | |
KR20020022446A (en) | Repairing method of earth-fill dam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190702 |
|
RJ01 | Rejection of invention patent application after publication |