CN109958460A - The multi-functional anchoring waterproof construction of one kind and its anchoring process - Google Patents

The multi-functional anchoring waterproof construction of one kind and its anchoring process Download PDF

Info

Publication number
CN109958460A
CN109958460A CN201910184330.3A CN201910184330A CN109958460A CN 109958460 A CN109958460 A CN 109958460A CN 201910184330 A CN201910184330 A CN 201910184330A CN 109958460 A CN109958460 A CN 109958460A
Authority
CN
China
Prior art keywords
anchor rod
old
splash guard
waterproof
threaded anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910184330.3A
Other languages
Chinese (zh)
Inventor
张学富
廉常青
杨巍
向坤
王博
刘强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jiaotong University
Original Assignee
Chongqing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jiaotong University filed Critical Chongqing Jiaotong University
Priority to CN201910184330.3A priority Critical patent/CN109958460A/en
Publication of CN109958460A publication Critical patent/CN109958460A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0093Accessories

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of multi-functional anchoring waterproof construction and its anchoring process, multi-functional anchoring waterproof construction includes foundation pit country rock and threaded anchor rod, the surface of the foundation pit country rock has poured first time branch sheath, the surface of the first time branch sheath is equipped with old splash guard, one end of the threaded anchor rod sequentially passes through old splash guard, first time branch sheath and foundation pit country rock, the end of the threaded anchor rod is fixed in foundation pit country rock, waterproof washer and the first metal washer are successively pressed on the surface of old splash guard by the first nut on the threaded anchor rod, threaded sleeve has been connected through a screw thread on the threaded anchor rod, the other end of the threaded anchor rod is equipped with the second metal washer and the second nut.The configuration of the present invention is simple alleviates labor intensity of workers, foundation pit, and Lock gate liner is integrated, and whole stress is more firm, avoids applying waterproof roll when performing load bearing wall in the later period, accelerate construction progress.

Description

The multi-functional anchoring waterproof construction of one kind and its anchoring process
Technical field
The invention belongs to anchorage stake interconnection technique fields, and in particular to the multi-functional anchoring waterproof construction of one kind and its anchoring side Method.
Background technique
Recently as expanding economy, the urban construction and development in China is also abnormal rapid.From high-rise, super high-rise building to Construction of Urban Rail Traffic, relevant underground engineering is more and more, has emerged a large amount of deep-foundation pit engineering.Using anchor structure Support system as foundation pit.Anchor structure is the novel technique that the realm of building construction generates in the past 20 years, is answered extensively For underground structure construction supporting system and make the tensile member of permanent construction structure.Pulling and arching supporting structure is mainly by enclosing Protection structure system and anchoring system two parts composition.Tensile anchor aground type needs enough place setting anchoring piles or other anchorings Object.Anchor rod type needs foundation soil that can provide anchor pole biggish anchor force.Anchor rod type is relatively suitable for sand foundation or clay foundation.
In order to meet the force request in excavation of foundation pit stage, in excavation of foundation pit, the concrete support of first time is first done, is made Work is excavated constantly to carry out.First time supporting only guarantees to excavate the ongoing safety measure of work.If foundation pit earth When pressure is larger, also to apply second of supporting can guarantee the overall stability of foundation pit.When foundation pit is in rich water area, Splash guard laying is also done between first time supporting and second of supporting.To guarantee second of the supporting applied and propping up for the first time Horizontal reinforcement and pre-buried straight thread steel will be also arranged in the globality of shield and country rock in second of supporting and first time braced wall Muscle connector, reinforcing bar is connected by connector with first time supporting reinforcing bar in second of supporting.
But a large amount of case history explanation, anchor pole country rock, first time supporting and second of supporting formed one it is stable Meanwhile also splash guard is punched, water just along the radially and longitudinally percolating water of anchor pole, cause concrete guard wall strength reduction and Drainage endangers building.Simultaneously when applying second of supporting, for guarantee concrete formation, need on the outside use pair Pull rod and outer support fixed form, cause space in foundation pit largely to waste, using such connection type, not only construction efficiency It is low, and material is wasted, it increases the labor intensity of workers.
Summary of the invention
The purpose of the present invention is to provide a kind of multi-functional anchoring waterproof construction and its anchoring process, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the invention provides the following technical scheme: a kind of multi-functional anchoring waterproof construction, including foundation pit Country rock and threaded anchor rod, the surface of the foundation pit country rock have poured first time branch sheath, and the surface of the first time branch sheath is set It has been friends in the past splash guard, one end of the threaded anchor rod sequentially passes through old splash guard, first time branch sheath and foundation pit country rock, the screw thread The end of anchor pole is fixed in foundation pit country rock, passes through the first nut on the threaded anchor rod for waterproof washer and the first metal washer It is successively pressed on the surface of old splash guard, threaded sleeve, the threaded anchor rod has been connected through a screw thread on the threaded anchor rod The other end the second metal washer and the second nut are installed.
Preferably, the waterproof washer is fitted closely with old splash guard.
Preferably, the old splash guard is integrally laid in first time supporting layer surface.
Meanwhile the invention also discloses a kind of anchoring process of multi-functional anchoring waterproof construction, including following operating procedure:
S1: installation threaded anchor rod successively drills out anchor in old splash guard, first time branch sheath and foundation pit country rock using drilling machine Threaded anchor rod is inserted into rockbolt installation hole after grout injection, to cement slurry sets by bar mounting hole again in rockbolt installation hole It completes to fix afterwards;
S2: water-proofing treatment is elapsed by collision mat snare on threaded anchor rod and by waterproof washer to old splash guard first Surface is bonded, then is heated using flame gun to waterproof washer and old splash guard joint bright eruption so that waterproof washer and Old splash guard hot melt fitting, is inserted in the first metal washer later and the first metal washer is pressed on collision mat using the first nut On circle;
S3: threaded sleeve is rotated to the appropriate location of threaded anchor rod, then covers cope plate by installation template, passes through rotation the Two nuts are fixed up the second metal washer and threaded sleeve template, carry out concrete pouring operation later.
Preferably, the heating temperature of step S2 Flame spray gun is 1000-2000 DEG C.
Preferably, old splash guard and waterproof washer are the identical waterproof roll of material in step S2.
Technical effect and advantage of the invention:
1, by this device, foundation pit country rock, first time branch sheath and second of branch sheath can closely be contacted one It rises, whole stress is more firm;
2, by this device, foundation pit, Lock gate liner can be integrated, avoid when performing load bearing wall in the later period Apply waterproof roll, accelerates construction progress;
3, by this device, it can save and need formwork because inner lining concrete pours and use to pull rod or template, Construction space is saved, working efficiency is improved;
4, by this device, after inner lining concrete conserves, form removable can be recycled, saves cost.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
In figure: 1 foundation pit country rock, 2 first time branch sheaths, 3 old splash guards, 4 waterproof washers, 5 first metal washers, 6 first Nut, 7 threaded sleeves, 8 second metal washers, 9 second nuts, 10 threaded anchor rods.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical scheme in the embodiment of the invention is clearly and completely described, Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based in the present invention Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all Belong to the scope of protection of the invention.
As shown in Figure 1, a kind of multi-functional anchoring waterproof construction, including foundation pit country rock 1 and threaded anchor rod 10, the foundation pit enclose The surface of rock 1 has poured first time branch sheath 2, and the surface of the first time branch sheath 2 is equipped with old splash guard 3, the threaded anchor One end of bar 10 sequentially passes through old splash guard 3, first time branch sheath 2 and foundation pit country rock 1, and the end of the threaded anchor rod 10 is fixed In foundation pit country rock 1, waterproof washer 4 and the first metal washer 5 are successively compressed by the first nut 6 on the threaded anchor rod 10 On the surface of old splash guard 3, threaded sleeve 7 has been connected through a screw thread on the threaded anchor rod 10, the threaded anchor rod 10 The other end is equipped with the second metal washer 8 and the second nut 9.
The waterproof washer 4 is fitted closely with old splash guard 3.It avoids penetrating 2 edge of first time branch sheath because of threaded anchor rod 10 Hole edge radially seep water.
The old splash guard 3 is whole to be laid on 2 surface of first time branch sheath.
Meanwhile the invention also discloses a kind of anchoring process of multi-functional anchoring waterproof construction, including following operating procedure:
S1: installation threaded anchor rod 10, using drilling machine successively in old splash guard 3, first time branch sheath 2 and foundation pit country rock 1 Rockbolt installation hole is drilled out, threaded anchor rod 10 is inserted into rockbolt installation hole again after grout injection in rockbolt installation hole, to water It completes to fix after mud solidification;
S2: water-proofing treatment is elapsed by 4 sets of waterproof washer on threaded anchor rod 10 and by waterproof washer 4 to old waterproof first The surface of plate 3 is bonded, then is heated using flame gun to waterproof washer 4 and 3 joint bright eruption of old splash guard, so that waterproof Washer 4 and the hot melt fitting of old splash guard 3, are inserted in the first metal washer 5 later and use the first nut 6 by the first metal washer 5 It is pressed on waterproof washer 4;
S3: threaded sleeve 7 is rotated to the appropriate location of threaded anchor rod 10, then covers cope plate by installation template, passes through rotation Second nut 9 is fixed up the second metal washer 9 and threaded sleeve 7 template, carries out concrete pouring operation later.
The heating temperature of step S2 Flame spray gun is 1000-2000 DEG C.
Old splash guard 3 and waterproof washer 4 are the identical waterproof roll of material in step S2.
When specific implementation
1, old splash guard 3 is penetrated when threaded anchor rod 10 being penetrated first time branch sheath 2, by heat-sealing technology collision mat Circle 4 is fused together with old splash guard 3;
2, the first nut 6 is closely attached to old splash guard 3 for the first time by squeezing the first metal washer 5, waterproof washer 4 On branch sheath 2;
3, threaded sleeve 7 is rotated to the appropriate location of threaded anchor rod 10, then covers cope plate, by rotating the second nut 9 It compresses the second metal washer 8 and threaded sleeve 7 is fixed up template;
Old splash guard 3 can be fixed on diaphragm wall by operating above, while also the later period is needed to pour coagulation The template used when native is also fixed up, and just forms a space between diaphragm wall and template at this time, mixed for pouring liner Solidifying cob wall.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features, All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention Within protection scope.

Claims (6)

1. a kind of multi-functional anchoring waterproof construction, including foundation pit country rock (1) and threaded anchor rod (10), it is characterised in that: the base The surface in hole country rock (1) has poured first time branch sheath (2), and the surface of the first time branch sheath (2) is equipped with old splash guard (3), one end of the threaded anchor rod (10) sequentially passes through old splash guard (3), first time branch sheath (2) and foundation pit country rock (1), institute The end for stating threaded anchor rod (10) is fixed in foundation pit country rock (1), will be prevented on the threaded anchor rod (10) by the first nut (6) Water cushion circle (4) and the first metal washer (5) are successively pressed on the surface of old splash guard (3), are led on the threaded anchor rod (10) It crosses and is threaded with threaded sleeve (7), the other end of the threaded anchor rod (10) is equipped with the second metal washer (8) and the second spiral shell Female (9).
2. a kind of multi-functional anchoring waterproof construction according to claim 1, it is characterised in that: the waterproof washer (4) with Old splash guard (3) fits closely.
3. a kind of multi-functional anchoring waterproof construction according to claim 1, it is characterised in that: the old splash guard (3) is whole Body is laid on first time branch sheath (2) surface.
4. a kind of anchoring process of multi-functional anchoring waterproof construction described in -2 any one according to claim 1, feature exist In: including following operating procedure:
S1: installation threaded anchor rod (10), using drilling machine successively in old splash guard (3), first time branch sheath (2) and foundation pit country rock (1) rockbolt installation hole is drilled out, threaded anchor rod (10) are inserted into rockbolt installation hole again after grout injection in rockbolt installation hole, It completes to fix after cement slurry sets;
S2: waterproof washer (4) is covered on threaded anchor rod (10) first and is prevented by waterproof washer (4) passage to old by water-proofing treatment The surface of water plate (3) is bonded, then is heated using flame gun to waterproof washer (4) and old splash guard (3) joint bright eruption, So that waterproof washer (4) and old splash guard (3) hot melt fitting, are inserted in the first metal washer (5) later and use the first nut (6) First metal washer (5) is pressed on waterproof washer (4);
S3: threaded sleeve (7) is rotated to the appropriate location of threaded anchor rod (10), then covers cope plate by installation template, passes through rotation Second nut (9) is fixed up the second metal washer (9) and threaded sleeve (7) template, carries out concreting work later Industry.
5. the anchoring process of the multi-functional anchoring waterproof construction of one kind according to claim 4, it is characterised in that: in step S2 The heating temperature of flame gun is 1000-2000 DEG C.
6. the anchoring process of the multi-functional anchoring waterproof construction of one kind according to claim 4, it is characterised in that: in step S2 Old splash guard (3) and waterproof washer (4) are the identical waterproof roll of material.
CN201910184330.3A 2019-03-12 2019-03-12 The multi-functional anchoring waterproof construction of one kind and its anchoring process Pending CN109958460A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910184330.3A CN109958460A (en) 2019-03-12 2019-03-12 The multi-functional anchoring waterproof construction of one kind and its anchoring process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910184330.3A CN109958460A (en) 2019-03-12 2019-03-12 The multi-functional anchoring waterproof construction of one kind and its anchoring process

Publications (1)

Publication Number Publication Date
CN109958460A true CN109958460A (en) 2019-07-02

Family

ID=67024286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910184330.3A Pending CN109958460A (en) 2019-03-12 2019-03-12 The multi-functional anchoring waterproof construction of one kind and its anchoring process

Country Status (1)

Country Link
CN (1) CN109958460A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112483154A (en) * 2020-11-30 2021-03-12 中国矿业大学 Expandable prestressed anchor rod bundle for gob-side entry retaining and use method
CN112922642A (en) * 2021-02-01 2021-06-08 贵州大学 Tunnel waterproof plate with fine-adjustment anti-vibration structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006054810A1 (en) * 2004-11-17 2006-05-26 Re-New System Co.,Ltd Method of water-proofed injection for concrete construction with injection pipe using a melting liguified gum mixture of wastetire to water-proof agent
KR101005837B1 (en) * 2010-04-01 2011-01-05 주식회사 젠트로 Waterproof structure
CN104153401A (en) * 2014-08-12 2014-11-19 中国十七冶集团有限公司 Waterproof construction method for anti-floating anchor rods
CN204282357U (en) * 2014-10-31 2015-04-22 中工国际工程股份有限公司 A kind of underground box structure anti-float anchor rod waterproofing system
CN207775948U (en) * 2018-01-04 2018-08-28 中国建筑第八工程局有限公司 Pulling-Resistant Anchor Rod root waterproofing node structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006054810A1 (en) * 2004-11-17 2006-05-26 Re-New System Co.,Ltd Method of water-proofed injection for concrete construction with injection pipe using a melting liguified gum mixture of wastetire to water-proof agent
KR101005837B1 (en) * 2010-04-01 2011-01-05 주식회사 젠트로 Waterproof structure
CN104153401A (en) * 2014-08-12 2014-11-19 中国十七冶集团有限公司 Waterproof construction method for anti-floating anchor rods
CN204282357U (en) * 2014-10-31 2015-04-22 中工国际工程股份有限公司 A kind of underground box structure anti-float anchor rod waterproofing system
CN207775948U (en) * 2018-01-04 2018-08-28 中国建筑第八工程局有限公司 Pulling-Resistant Anchor Rod root waterproofing node structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112483154A (en) * 2020-11-30 2021-03-12 中国矿业大学 Expandable prestressed anchor rod bundle for gob-side entry retaining and use method
CN112483154B (en) * 2020-11-30 2021-11-02 中国矿业大学 Expandable prestressed anchor rod bundle for gob-side entry retaining and use method
CN112922642A (en) * 2021-02-01 2021-06-08 贵州大学 Tunnel waterproof plate with fine-adjustment anti-vibration structure

Similar Documents

Publication Publication Date Title
CN105178344A (en) Built-in anti-floating anchor blocking structure used in foundation mat for deep-well dewatering well and construction method
CN103726503B (en) Anchor rod pile reinforcing bearing platform structure used for reinforcing deformed bridge pile and construction method thereof
CN105804089A (en) Locally-deepened supporting and protecting system used after original deep foundation pit is constructed and construction method of system
CN106498950A (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body
CN106320120A (en) Construction process for pile slab type non-soil roadbed highway
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN108612110A (en) A kind of Deep Foundation Pit of Metro Stations combined type construction method for supporting
CN107989034A (en) A kind of manually digging hole filling pile and its construction method
CN1067453C (en) Foundation pit slope flat anchor spray net supporting method
CN106065628B (en) Based on the major diameter running water pipe security protection construction method faced forever with reference to theory
CN110106889A (en) A kind of deep basal pit perfusion slope protection pile adds cable bolting construction
CN108914945A (en) A kind of deep basal pit pile for prestressed pipe, prestress anchorage cable combined supporting construction method
CN108867690A (en) The reverse construction of peg board barricade of big foundation pit
CN109958460A (en) The multi-functional anchoring waterproof construction of one kind and its anchoring process
CN112031814A (en) Cave-entering construction method for crossing shallow-layer high-load highway
CN105937221A (en) Manufacturing method for drilled grouting piles
CN206408630U (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body
CN101550693B (en) Method for reinforcing base with bored pile in the underground structure of high groundwater level
CN107034894A (en) Post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile and preparation method thereof and construction method
CN106917402B (en) A kind of CFG pile precast pile head and CFG pile construction method
CN205576934U (en) Part increases ramus profundus watch box system behind former deep foundation pit construction
CN112081118A (en) Pile-anchor supporting foundation pit deepening reinforcing and supporting structure and construction method thereof
CN107100322A (en) Post stretching vertical prestressing cast-in-place concrete rod structure and construction method
CN208803460U (en) A kind of enhancing cement mixing method intercepts water the Prefabricated Concrete sheet pile of effect
KR20020022446A (en) Repairing method of earth-fill dam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190702

RJ01 Rejection of invention patent application after publication