CN109958100A CN201910300325.4A CN201910300325A CN109958100A CN 109958100 A CN109958100 A CN 109958100A CN 201910300325 A CN201910300325 A CN 201910300325A CN 109958100 A CN109958100 A CN 109958100A
Authority
CN
China
Prior art keywords
baffle
slope protection
card slot
fixedly connected
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910300325.4A
Other languages
Chinese (zh)
Other versions
CN109958100B (en
Inventor
陈兵
曾荣福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201910300325.4A priority Critical patent/CN109958100B/en
Publication of CN109958100A publication Critical patent/CN109958100A/en
Application granted granted Critical
Publication of CN109958100B publication Critical patent/CN109958100B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/14Preformed blocks or slabs for forming essentially continuous surfaces; Arrangements thereof
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • E03F3/046Open sewage channels

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)
  • Revetment (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of slope protection structure of hydraulic and hydroelectric engineering and means of defences, including slope protection body, the slope protection body offers rhone close to the side at top, the side of the slope protection body is fixedly connected with the first buried plate, the side of first buried plate is fixedly connected with first baffle, the side of the first baffle offers the first card slot, the first baffle offers first sliding groove close to the side of the first card slot, the first baffle offers the second card slot far from the side of the first card slot, the first baffle offers second sliding slot close to the side of the second card slot.The present invention can solve the slope protection structure of existing hydraulic and hydroelectric engineering, install inconvenient problem.

Description

A kind of slope protection structure and means of defence of hydraulic and hydroelectric engineering
Technical field
The present invention relates to reinforcing side slope technique field, a kind of slope protection structure of hydraulic and hydroelectric engineering and protection side Method.
Background technique
The common safeguard procedures of slope project have plant protection, engineering protection (sash protection, cover protection, shotcrete with steel bar nets Protection, stone-laying protection etc.) and geotextile protection etc. measures.Practical Project utilization in, can be located according to side slope position, The factors such as matter condition select one of side slope treatment or combined use, but take when sash protective device installation fee Power, it is therefore desirable to improve.
Summary of the invention
The object of the present invention is to provide a kind of slope protection structure of hydraulic and hydroelectric engineering and means of defences, existing to solve The slope protection structure of some hydraulic and hydroelectric engineerings installs inconvenient problem.
To achieve the above object, the invention provides the following technical scheme:
A kind of slope protection structure of hydraulic and hydroelectric engineering, including slope protection body, the slope protection body is close to top Side offers rhone, and the side of the slope protection body is fixedly connected with the first buried plate, and the side of first buried plate is fixed Be connected with first baffle, the side of the first baffle offers the first card slot, the first baffle close to the first card slot one Side offers first sliding groove, and the first baffle offers the second card slot far from the side of the first card slot, and the first baffle leans on The side of nearly second card slot offers second sliding slot.
Optionally, the internal activity of the first baffle is connected with the first connecting plate and the second connecting plate, and described first connects The side of fishplate bar and the second connecting plate has been respectively fixedly connected with the first fixture block and the second fixture block, and first fixture block is connected in first The inside of card slot.
Optionally, second fixture block is connected in the inside of the second card slot, and the side of first connecting plate is fixed respectively It is connected with the first cross board and the second cross board.
Optionally, the one end of first cross board and the second cross board far from the first connecting plate is fixed with the second connecting plate Prefabricated board block is fixedly connected at the center of connection, first cross board and the second cross board.
Optionally, the side of the prefabricated board block is fixedly connected with prefabricated post, the slope protection body close to bottom one Side is fixedly connected with the second buried plate, is fixedly connected with second baffle at the top of second buried plate.
Optionally, first buried plate, first baffle, the first connecting plate and two connecting plates, the first fixture block, the second fixture block, First cross board, the second cross board, prefabricated board block, prefabricated post, the material of the second buried plate and second baffle are reinforced concrete The joint angle of soil, first buried plate and first baffle be obtuse angle, the first baffle is vertical with slope surface, second buried plate and The angle of second baffle connection is 90 degree.
Included the following steps: using the means of defence of the structure
When in use, the inside of the first buried plate embedment slope protection body is fixed, first baffle is vertical with slope surface, then First connecting plate and the second connecting plate are put into the inside of first sliding groove and second sliding slot, the first fixture block and the second fixture block block respectively Enter the inside of the first card slot and the second card slot, the company that clamping is entered is fixedly connected with by prefabricated post and slope protection body when use Fishplate bar and cross board are fixed, and the rainwater of top of the slope can be discharged by rhone, by the second buried plate embedment slope protection body when use Bottom, second baffle can stop on slope protection toward dirty rainwater.
The present invention has following technical effect that
(1) slope protection structure of the hydraulic and hydroelectric engineering, by the way that first baffle is arranged, the side of the first buried plate is fixed The inside for being connected with first baffle is opened up there are two card slot and two sliding slots, and the first buried plate is embedded in slope protection body by when use Portion is fixed, and first baffle is vertical with slope surface, and the first connecting plate and the second connecting plate are then put into first sliding groove and second The inside of sliding slot, the first fixture block and the second fixture block are respectively clamped into the inside of the first card slot and the second card slot, and the mode of clamping is more Convenient, it is time saving and energy saving to have achieved the purpose that, by being arranged prefabricated post, being fixedly connected by prefabricated post and slope protection body when use Connecting plate and cross board that clamping is entered are fixed, achieve the purpose that reduce rain drop erosion.
(2) slope protection structure of the hydraulic and hydroelectric engineering is leaned on by setting rhone and second baffle, slope protection body The side at nearly top offers rhone, and the rainwater of top of the slope can be discharged by rhone, achievees the purpose that reduce and wash away, and second It is fixedly connected with second baffle at the top of buried plate, by the bottom of the second buried plate embedment slope protection body when use, second baffle can be with Stop on slope protection toward dirty rainwater, reduces soil erosion.
Detailed description of the invention
Fig. 1 is schematic perspective view of the invention;
Fig. 2 is side structure schematic view of the invention;
Fig. 3 is the structural schematic diagram of first baffle of the present invention;
Fig. 4 is the structural schematic diagram of the first connecting plate of the invention.
Description of symbols: 1- slope protection body, 2- rhone, the first buried plate of 3-, 4- first baffle, 5- first sliding groove, 6- Second card slot, 7- second sliding slot, the first connecting plate of 8-, the second connecting plate of 9-, the first fixture block of 10-, the second fixture block of 11-, 12- first Cross board, the second cross board of 13-, 14- prefabricated board block, 15- prefabricated post, the second buried plate of 16-, 17- second baffle, 18- first Card slot.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation " " is set Be equipped with ", " be arranged/connect ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, be also possible to removable Connection is unloaded, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be in Between medium be indirectly connected, can be the connection inside two elements.It for the ordinary skill in the art, can be specific Situation understands the concrete meaning of above-mentioned term in the present invention.
Embodiment 1:
A kind of slope protection structure of hydraulic and hydroelectric engineering, including slope protection body 1, slope protection body 1 close to top one Side offers rhone 2, and the rainwater of top of the slope can be discharged by rhone 2, achievees the purpose that reduce and wash away, slope protection body 1 Side is fixedly connected with the first buried plate 3, and when use, the inside of the first buried plate 3 embedment slope protection body 1 was fixed, the first buried plate 3 side is fixedly connected with first baffle 4, and first baffle 4 is vertical with slope surface, and the side of first baffle 4 offers the first card slot 18, first baffle 4 offers first sliding groove 5, side of the first baffle 4 far from the first card slot 18 close to the side of the first card slot 18 The second card slot 6 is offered, first baffle 4 offers second sliding slot 7 close to the side of the second card slot 6, by the first connecting plate 8 and Two connecting plates 9 are put into the inside of first sliding groove 5 and second sliding slot 7, and the first fixture block 10 and the second fixture block 11 are respectively clamped into the first card The inside of slot 18 and the second card slot 6.
As a kind of optional technical solution of the invention:
The internal activity of first baffle 4 is connected with the first connecting plate 8 and the second connecting plate 9, and the first connecting plate 8 and second connects The side of fishplate bar 9 has been respectively fixedly connected with the first fixture block 10 and the second fixture block 11, and the first fixture block 10 is connected in the first card slot 18 It is internal.
As a kind of optional technical solution of the invention:
Second fixture block 11 is connected in the inside of the second card slot 6, and the side of the first connecting plate 8 has been respectively fixedly connected with the first friendship Fork plate 12 and the second cross board 13.
As a kind of optional technical solution of the invention:
The one end of first cross board 12 and the second cross board 13 far from the first connecting plate 8 is fixedly connected with the second connecting plate 9, Prefabricated board block 14 is fixedly connected at the center of first cross board 12 and the second cross board 13.
As a kind of optional technical solution of the invention:
The side of prefabricated board block 14 is fixedly connected with prefabricated post 15, and when use passes through prefabricated post 15 and slope protection body 1 It is fixedly connected and fixes the connecting plate and cross board that clamping is entered, slope protection body 1 is fixedly connected with second close to the side of bottom Buried plate 16, the top of the second buried plate 16 are fixedly connected with second baffle 17, by the second buried plate 16 embedment slope protection body 1 when use Bottom, second baffle 17 can stop on slope protection toward dirty rainwater, reduce soil erosion.
As a kind of optional technical solution of the invention:
First buried plate 3, first baffle 4, the first connecting plate 8 and two connecting plates 9, the first fixture block 10, the second fixture block 11, One cross board 12, the second cross board 13, prefabricated board block 14, prefabricated post 15, the material of the second buried plate 16 and second baffle 17 are equal Joint angle for armored concrete, the first buried plate 3 and first baffle 4 is obtuse angle, and first baffle 4 is vertical with slope surface, the second buried plate 16 angles connecting with second baffle 17 are 90 degree.
When in use, the inside of the first buried plate 3 embedment slope protection body 1 being fixed, first baffle 4 is vertical with slope surface, Then first connecting plate 8 and the second connecting plate 9 are put into the inside of first sliding groove 5 and second sliding slot 7, the first fixture block 10 and second Fixture block 11 is respectively clamped into the inside of the first card slot 18 and the second card slot 6, passes through the fixation of prefabricated post 15 and slope protection body 1 when use The connecting plate entered of clamping and cross board are fixed in connection, and the rainwater of top of the slope can be discharged by rhone 2, by second when use Buried plate 16 is embedded to the bottom of slope protection body 1, and second baffle 17 can stop on slope protection toward dirty rainwater.
In conclusion the slope protection structure of the hydraulic and hydroelectric engineering, in use, by setting first baffle 4, first The inside that the side of buried plate 3 is fixedly connected with first baffle 4 is opened up there are two card slot and two sliding slots, by the first buried plate when use The inside of 3 embedment slope protection bodies 1 is fixed, and first baffle 4 is vertical with slope surface, then by the first connecting plate 8 and the second connection Plate 9 is put into the inside of first sliding groove 5 and second sliding slot 7, and the first fixture block 10 and the second fixture block 11 are respectively clamped into 18 He of the first card slot The inside of second card slot 6, the mode of clamping is more convenient, and it is time saving and energy saving to have achieved the purpose that, by the way that prefabricated post 15 is arranged, uses When connecting plate that clamping is entered and cross board are fixed by being fixedly connected for prefabricated post 15 and slope protection body 1, reach reduction rain The purpose that water washes away offers rhone close to the side at top by setting rhone 2 and second baffle 17, slope protection body 1 2, the rainwater of top of the slope can be discharged by rhone 2, achieved the purpose that reduce and be washed away, the top of the second buried plate 16 is fixedly connected with Second baffle 17, by the bottom of the second buried plate 16 embedment slope protection body 1 when use, second baffle 17 can on slope protection toward flowing down Rainwater stopped, reduce soil erosion.
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, It is still possible to modify the technical solutions described in the foregoing embodiments, or part of technical characteristic is carried out etc. With replacement, all within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in this Within the protection scope of invention.

Claims (7)

1. a kind of slope protection structure of hydraulic and hydroelectric engineering, including protection ontology (1), it is characterised in that: the slope protection sheet Body (1) offers rhone (2) close to the side at top, and the side of the slope protection body (1) is fixedly connected with the first buried plate (3), the side of first buried plate (3) is fixedly connected with first baffle (4), and the side of the first baffle (4) offers One card slot (18), the first baffle (4) offer first sliding groove (5), the first gear close to the side of the first card slot (18) Plate (4) offers the second card slot (6) far from the side of the first card slot (18), and the first baffle (4) is close to the second card slot (6) Side offers second sliding slot (7).
2. the slope protection structure of hydraulic and hydroelectric engineering according to claim 1, it is characterised in that: the first baffle (4) internal activity is connected with the first connecting plate (8) and the second connecting plate (9), first connecting plate (8) and the second connecting plate (9) side has been respectively fixedly connected with the first fixture block (10) and the second fixture block (11), and first fixture block (10) is connected in first The inside of card slot (18).
3. the slope protection structure of hydraulic and hydroelectric engineering according to claim 1, it is characterised in that: second fixture block (11) it is connected in the inside of the second card slot (6), the side of first connecting plate (8) has been respectively fixedly connected with the first cross board (12) and the second cross board (13).
4. the slope protection structure of hydraulic and hydroelectric engineering according to claim 1, it is characterised in that: described first intersects Plate (12) and the second cross board (13) are fixedly connected far from the one end of the first connecting plate (8) with the second connecting plate (9), and described first Prefabricated board block (14) is fixedly connected at the center of cross board (12) and the second cross board (13).
5. the slope protection structure of hydraulic and hydroelectric engineering according to claim 1, it is characterised in that: the prefabricated board gear The side of block (14) is fixedly connected with prefabricated post (15), and the slope protection body (1) is fixedly connected with second close to the side of bottom Buried plate (16) is fixedly connected with second baffle (17) at the top of second buried plate (16).
6. the slope protection structure of hydraulic and hydroelectric engineering according to claim 1, it is characterised in that: first buried plate (3), first baffle (4), the first connecting plate (8) and two connecting plates (9), the first fixture block (10), the second fixture block (11), first are handed over Fork plate (12), the second cross board (13), prefabricated board block (14), prefabricated post (15), the second buried plate (16) and second baffle (17) Material be armored concrete, the joint angle of first buried plate (3) and first baffle (4) is obtuse angle, the first baffle (4) vertical with slope surface, the angle that second buried plate (16) connect with second baffle (17) is 90 degree.
7. a kind of method of the hydraulic and hydroelectric engineering using structure described in any one of claim 1-6, It is characterized in that including the following steps: when in use, the inside of the first buried plate (3) embedment slope protection body (1) being fixed, first Baffle (4) is vertical with slope surface, and the first connecting plate (8) and the second connecting plate (9) are then put into first sliding groove (5) and second sliding slot (7) inside, the first fixture block (10) and the second fixture block (11) are respectively clamped into the inside of the first card slot (18) and the second card slot (6), The connecting plate and cross board that clamping is entered are fixed with being fixedly connected for slope protection body (1) by prefabricated post (15) when use, slope The rainwater on top can be discharged by rhone (2), by the bottom of the second buried plate (16) embedment slope protection body (1) when use, second Baffle (17) can stop on slope protection toward dirty rainwater.
CN201910300325.4A 2019-04-15 2019-04-15 Side slope protection structure and protection method for hydraulic and hydroelectric engineering Active CN109958100B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910300325.4A CN109958100B (en) 2019-04-15 2019-04-15 Side slope protection structure and protection method for hydraulic and hydroelectric engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910300325.4A CN109958100B (en) 2019-04-15 2019-04-15 Side slope protection structure and protection method for hydraulic and hydroelectric engineering

Publications (2)

Publication Number Publication Date
CN109958100A true CN109958100A (en) 2019-07-02
CN109958100B CN109958100B (en) 2024-03-01

Family

ID=67026197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910300325.4A Active CN109958100B (en) 2019-04-15 2019-04-15 Side slope protection structure and protection method for hydraulic and hydroelectric engineering

Country Status (1)

Country Link
CN (1) CN109958100B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809566A (en) * 2020-07-22 2020-10-23 湖北凯耀宏建设工程有限公司 Slope protection structure for water conservancy and hydropower engineering and construction method thereof
CN113152319A (en) * 2021-05-11 2021-07-23 安徽省交通规划设计研究总院股份有限公司 Assembly type flexible drainage structure and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3167684U (en) * 2011-02-21 2011-05-12 宇順 張 Slope reinforced greening structure
CN207228055U (en) * 2017-09-01 2018-04-13 吕敬玲 A kind of Novel water conservancy project ecological revetment
CN207277283U (en) * 2017-09-13 2018-04-27 王红霞 A kind of hydraulic engineering ecological revetment
CN208594530U (en) * 2018-08-15 2019-03-12 李道霞 A kind of novel water conservancy ecosystem slope protection
CN210151664U (en) * 2019-04-15 2020-03-17 中国电建集团贵阳勘测设计研究院有限公司 Slope protective structure for hydraulic and hydroelectric engineering

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3167684U (en) * 2011-02-21 2011-05-12 宇順 張 Slope reinforced greening structure
CN207228055U (en) * 2017-09-01 2018-04-13 吕敬玲 A kind of Novel water conservancy project ecological revetment
CN207277283U (en) * 2017-09-13 2018-04-27 王红霞 A kind of hydraulic engineering ecological revetment
CN208594530U (en) * 2018-08-15 2019-03-12 李道霞 A kind of novel water conservancy ecosystem slope protection
CN210151664U (en) * 2019-04-15 2020-03-17 中国电建集团贵阳勘测设计研究院有限公司 Slope protective structure for hydraulic and hydroelectric engineering

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809566A (en) * 2020-07-22 2020-10-23 湖北凯耀宏建设工程有限公司 Slope protection structure for water conservancy and hydropower engineering and construction method thereof
CN113152319A (en) * 2021-05-11 2021-07-23 安徽省交通规划设计研究总院股份有限公司 Assembly type flexible drainage structure and construction method thereof
CN113152319B (en) * 2021-05-11 2022-07-12 安徽省交通规划设计研究总院股份有限公司 Assembly type flexible drainage structure and construction method thereof

Also Published As

Publication number Publication date
CN109958100B (en) 2024-03-01

Similar Documents

Publication Publication Date Title
CN109958100A (en) A kind of slope protection structure and means of defence of hydraulic and hydroelectric engineering
CN215482411U (en) Road and bridge crack processing apparatus
CN208502103U (en) A kind of sizing awning
CN207847039U (en) Welding hanging basket
CN206859238U (en) A kind of road prevention slope
CN210151664U (en) Slope protective structure for hydraulic and hydroelectric engineering
CN212505840U (en) A drainage structures for public road bridge roof beam
CN109371947A (en) A kind of ocean engineering platform anticorrosion shell structure and construction method
CN211948246U (en) River levee greening slope protection device capable of preventing water and soil loss
CN211200755U (en) Basement roof movement joint waterproof construction structure
CN210263093U (en) Highway bridge construction cofferdam device
CN209368988U (en) A kind of gardens construction construction temporary drainage structure
CN212926365U (en) Chute that hydraulic engineering used
CN217174607U (en) River bank protection based on prevention and control of reservoir water and soil loss
CN208072929U (en) Scaffold wall connecting piece
CN216379571U (en) Gravel slope bevel covering mechanism
CN221001306U (en) Assembled UHPC drainage structures for underground garage
CN208738800U (en) Large span arch high voltage power cable gantry
CN214884493U (en) Building outer wall structure that blocks water
CN215167314U (en) Novel steel structure externally hung gutter
CN216041338U (en) Take protective structure's municipal administration well lid
CN210597555U (en) Cement concrete structure
CN216515655U (en) Slope body bearing structure for hydraulic engineering
CN214089707U (en) Water conservancy building ecological protection slope
CN214993954U (en) Drainage and guide slope protection system for high and steep rock slope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant