CN109958060A - The erection and regulating device of asymmetric finished main cable shape of self-anchored suspension Datum Strand - Google Patents

The erection and regulating device of asymmetric finished main cable shape of self-anchored suspension Datum Strand Download PDF

Info

Publication number
CN109958060A
CN109958060A CN201910278525.4A CN201910278525A CN109958060A CN 109958060 A CN109958060 A CN 109958060A CN 201910278525 A CN201910278525 A CN 201910278525A CN 109958060 A CN109958060 A CN 109958060A
Authority
CN
China
Prior art keywords
strand
datum strand
datum
erection
main cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910278525.4A
Other languages
Chinese (zh)
Inventor
金强
金玲玲
王瀚
祝文斌
孙纯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201910278525.4A priority Critical patent/CN109958060A/en
Publication of CN109958060A publication Critical patent/CN109958060A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The present invention is the erection and regulating device of a kind of asymmetric finished main cable shape of self-anchored suspension Datum Strand, belong to the erection of bridge construction, regulating device, it is characterized in that the erection and regulating device further include Datum Strand, fixed pulley group, chain block, temperature patch, temperature measuring device, total station system, limit the lumps of wood and hoist engine, fixed pulley group is uniformly arranged on the track cable in cat road, hoist engine is set on left anchorage, on a left side, chain block is respectively set in right anchor room, the Datum Strand enters saddle after sequentially passing through fixed pulley group by the traction of hoist engine, the middle section of the Datum Strand is fixed on main cable saddle with the limit lumps of wood, a left side for the Datum Strand, right end section correspondence is anchored at a left side, in right anchor room, a left side for the Datum Strand, right part is connected with chain block, observation point is set on Datum Strand, observation point is checked using total station , it is segmented and adjusts one by one, it is ensured that the precision of Datum Strand Erection is saved human and material resources and financial resources, improved work efficiency.

Description

The erection and regulating device of asymmetric finished main cable shape of self-anchored suspension Datum Strand
Technical field
The invention belongs to the erections of bridge construction, regulating device, are specifically related to a kind of asymmetric self-anchored type suspension cable of only tower The erection and regulating device of bridge main push-towing rope.
Background technique
In the work progress of suspension bridge, the erection construction of main push-towing rope is one of important process, and main push-towing rope Datum Strand Setting up is the key that main cable erection again, and every plain stock has number, and first strand in cable is its Datum Strand, because other The position of general strand set up one by one as according to the relative position of Datum Strand, so must be strictly controlled hanging down for Datum Strand Straight degree and position precision, and asymmetric self-anchored suspension bridge enters saddle (main cable saddle) in Datum Strand because main end bay stress is asymmetric Afterwards, it needs to carry out (also known as linear) adjustment of line style to main end bay Datum Strand respectively, but in construction, there is Datum Strand line style tune Disadvantage not in place is saved, the precision of Datum Strand Erection is affected.
Summary of the invention
The object of the present invention is to provide the erection and regulating device of a kind of asymmetric finished main cable shape of self-anchored suspension Datum Strand, It is not only structurally reasonable, it is easy to operate, it is safe and reliable, and construction efficiency and quality can be improved, save construction cost.
The object of the present invention is achieved like this: a kind of erection of asymmetric finished main cable shape of self-anchored suspension Datum Strand and Regulating device (referred to as erection and regulating device), king-tower, main cable saddle, bridge floor, left anchorage including suspension bridge, left anchor room, right anchor Heavy stone used as an anchor, the right road Mao Shihemao, wherein the cat road is overhead working sidewalk, which includes track cable, mesh sheet again And handrail, the king-tower are located at the middle part of bridge floor, the main cable saddle is located at the top of king-tower, it is described with left anchor case, The left anchorage of left anchor room is located at the left part of bridge floor, and the right anchorage with right anchor case, right anchor room is located at the right end of bridge floor Portion, the track cable are erected at the top of king-tower, and the left end section of the track cable is fixed on left anchorage, the load-bearing The right end section of rope is fixed on right anchorage, mesh sheet and installation handrail is laid on the track cable, it is characterized in that: this is asymmetric The erection of finished main cable shape of self-anchored suspension Datum Strand and regulating device further include Datum Strand, fixed pulley group, chain block, temperature Patch, temperature measuring device, total station system, the limit lumps of wood and hoist engine, on the track cable in the cat road along its length It is uniformly arranged fixed pulley group, hoist engine is set on the left anchorage, in the left anchor room on the left anchorage and on the right side Chain block is respectively set in right anchor room on anchorage, the Datum Strand determines cunning through sequentially passing through by the traction of hoist engine Enter after wheel group saddle (i.e. main cable saddle), the middle section of the Datum Strand is fixed on main cable saddle with the limit lumps of wood, the benchmark Strand left end section pass through left anchor case in scattered cable saddle, dissipate noose after be anchored in left anchor room, the left end of the Datum Strand Portion is connected with the chain block in left anchor room, and the right end section of the Datum Strand passes through scattered cable saddle, scattered rope in right anchor case It is anchored at after set in right anchor room, the right part of the Datum Strand is connected with the chain block in right anchor room, described Observation point is positioned apart from left section of Datum Strand, and uniformly along its length to be above located at length in left section of the Datum Strand Three observation points are arranged altogether on 1/2,1/4 position in degree direction to be preferred, along length side on right section of the Datum Strand To being uniformly positioned apart from observation point, and in right section of upper 1/2,1/4 position positioned at length direction of the Datum Strand It sets three observation points of setting altogether to be preferred, temperature patch is installed on the Datum Strand, temperature is set on the bridge floor Tester is spent, the temperature measuring device is connected with conducting wire with temperature patch, and the total station system (two sets) is mounted on The side of bridge.
When using this erection and regulating device, first have to determine Datum Strand sky by FEM calculation and analogue simulation Temperature patch first (is tightly attached to base with the temperature of temperature measuring device test benchmark strand before adjusting every time by the line style under cable state On quasi- strand), guarantee Datum Strand in temperature constant state, be generally selected in the progress of constant temperature period at night, two sets of total station systems are mutual Each observation point on Datum Strand is checked, according to total station observation as a result, with anchor head position in chain block adjustment anchor room The exposed amount of Datum Strand, one by one sectional-regulated master, end bay Datum Strand verticality and line style, until meet design requirement, It ensures the erection precision of Datum Strand, saves manpower, improve work efficiency, ensure that the erection of other general strands, be The erection of subsequent main push-towing rope, the positioning for completing empty cable stress and cord clip, which are constructed, provides guarantee, in the essence for guaranteeing main cable erection Degree aspect has biggish superiority.
The erection and regulating device of asymmetric finished main cable shape of self-anchored suspension Datum Strand proposed by the invention, not only structure Rationally, easy to operate, it is safe and reliable, and construction efficiency and quality are improved, save construction cost.
Presently in connection with drawings and examples to asymmetric finished main cable shape of self-anchored suspension Datum Strand proposed by the invention It sets up and regulating device is described further.
Detailed description of the invention
Fig. 1 is the erection of asymmetric finished main cable shape of self-anchored suspension Datum Strand proposed by the invention and the master of regulating device Depending on schematic diagram.
In Fig. 1:
1, fixed pulley group 2, chain block 3, temperature patch 4, temperature measuring device 5, total station system 6, the limit lumps of wood 7, hoist engine 8, king-tower 9, main cable saddle 10, bridge floor 11, left anchorage 12, left anchor room 13, right anchorage 14, right anchor room 15, Cat road 16, Datum Strand
Specific embodiment
As can be seen from Figure 1: a kind of erection and regulating device (letter of asymmetric finished main cable shape of self-anchored suspension Datum Strand Claim erection and regulating device), king-tower 8, main cable saddle 9, bridge floor 10 including suspension bridge, left anchorage 11, left anchor room 12, right anchorage 13, the road right anchor Shi14He Mao 15, wherein the cat road 15 is overhead working sidewalk, which includes load-bearing again Rope, mesh sheet and handrail, the king-tower 8 are located at the middle part of bridge floor 10, and the main cable saddle 9 is located at the top of king-tower 8, described Left anchorage 11 with left anchor case, left anchor room 12 is located at the left part of bridge floor 10, the right side with right anchor case, right anchor room 14 Anchorage 13 is located at the right part of bridge floor 10, and the track cable is erected at the top of king-tower 8, the left end Duan Gu of the track cable It is scheduled on left anchorage 11, the right end section of the track cable is fixed on right anchorage 13, is laid with mesh sheet on the track cable With installation handrail, it is characterized in that: the erection of the asymmetric finished main cable shape of self-anchored suspension Datum Strand and regulating device further include base Quasi- strand 16, fixed pulley group 1, chain block 2, temperature patch 3, temperature measuring device 4, total station system 5, the limit lumps of wood 6 and volume Machine 7 is raised, is uniformly arranged fixed pulley group 1 along its length on the track cable in the cat road 15, on the left anchorage 11 Hoist engine 7 is set, is respectively set in the left anchor room 12 on the left anchorage 11 and right anchor room 14 on right anchorage 13 Chain block 2, the Datum Strand 16 enter saddle (i.e. main cable saddle after being sequentially passed through fixed pulley group 1 by the traction of hoist engine 7 9), the middle section limit lumps of wood 6 of the Datum Strand 16 is fixed on main cable saddle 9, the left end section of the Datum Strand 16 It is anchored in left anchor room 12 after scattered cable saddle, scattered noose in left anchor case, the left part of the Datum Strand 16 and left anchor Chain block 2 in room 12 is connected, after the right end section of the Datum Strand 16 passes through scattered cable saddle in right anchor case, dissipates noose It is anchored in right anchor room 14, the right part of the Datum Strand 16 is connected with the chain block 2 in right anchor room 14, described Left section of Datum Strand 16 on be uniformly positioned apart from observation point along its length, and on left section of the Datum Strand 16 Three observation points are arranged altogether on the 1/2 of length direction, 1/4 position to be preferred, on right section of the Datum Strand 16 It is positioned apart from observation point, and uniformly along its length to be above located at the 1/ of length direction in right section of the Datum Strand 16 2, three observation points are arranged on 1/4 position altogether to be preferred, temperature patch 3 are installed on the Datum Strand 16, described Temperature measuring device 4 is set on bridge floor 10, and the temperature measuring device 4 is connected with conducting wire with temperature patch 3, the total station System 5 (two sets) is mounted on the side of bridge.
When using this erection and regulating device, first have to determine Datum Strand sky by FEM calculation and analogue simulation Temperature patch 3 first (is close to the temperature of 4 test benchmark strand 16 of temperature measuring device by the line style under cable state before adjusting every time On Datum Strand 16), guarantee Datum Strand 16 in temperature constant state, is generally selected in the progress of constant temperature period at night, two sets of total station systems System 5 mutually checks each observation point on Datum Strand, according to the observation of total station 5 as a result, adjusting anchor in anchor room with chain block 2 The exposed amount of the Datum Strand 16 of head position, one by one sectional-regulated master, end bay Datum Strand 16 verticality and line style, until full Sufficient design requirement, it is ensured that the erection precision of Datum Strand 16 is saved manpower, improved work efficiency, and ensure that other general The erection of strand, the positioning construction for the empty cable stress of erection, completion and cord clip of subsequent main push-towing rope provide guarantee, are guaranteeing The precision aspect of main cable erection has biggish superiority.

Claims (3)

1. a kind of erection and regulating device of asymmetric finished main cable shape of self-anchored suspension Datum Strand, king-tower (8) including suspension bridge, Main cable saddle (9), bridge floor (10), left anchorage (11), left anchor room (12), right anchorage (13), right anchor room (14) and cat road (15), wherein The cat road (15) is overhead working sidewalk, which includes track cable, mesh sheet and handrail again, described King-tower (8) is located at the middle part of bridge floor (10), and the main cable saddle (9) is located at the top of king-tower (8), it is described with left anchor case, The left anchorage (11) of left anchor room (12) is located at the left part of bridge floor (10), the right anchor with right anchor case, right anchor room (14) Heavy stone used as an anchor (13) is located at the right part of bridge floor (10), and the track cable is erected at the top of king-tower (8), the left end of the track cable Section is fixed on left anchorage (11), and the right end section of the track cable is fixed on right anchorage (13), on the track cable It is laid with mesh sheet and installation handrail, it is characterized in that: the erection and regulating device of the asymmetric finished main cable shape of self-anchored suspension Datum Strand It further include Datum Strand (16), fixed pulley group (1), chain block (2), temperature patch (3), temperature measuring device (4), total station system It unites (5), limit the lumps of wood (6) and hoist engine (7), be uniformly arranged along its length on the track cable in the cat road (15) and determine cunning Hoist engine (7) are arranged on the left anchorage (11) in wheel group (1), in the left anchor room (12) on the left anchorage (11) It is respectively set chain block (2) in the right anchor room (14) on right anchorage (13), the Datum Strand (16) passes through elevator The traction of machine (7) enters saddle i.e. main cable saddle (9) after sequentially passing through fixed pulley group (1), the middle section limit of the Datum Strand (16) The position lumps of wood (6) is fixed on main cable saddle (9), and the left end of the Datum Strand (16) section passes through scattered cable saddle in left anchor case, dissipates It is anchored at after noose in left anchor room (12), the chain block in the left part of the Datum Strand (16) and left anchor room (12) (2) be connected, the right end section of the Datum Strand (16) passes through scattered cable saddle in right anchor case, dissipate noose after be anchored at right anchor room (14) in, the right part of the Datum Strand (16) is connected with the chain block (2) in right anchor room (14), in the base It is uniformly positioned apart from observation point along its length on left section of quasi- strand (16), on right section of the Datum Strand (16) It is uniformly positioned apart from observation point along its length, temperature patch (3) are installed on the Datum Strand (16), described Temperature measuring device (4) are set on bridge floor (10), the temperature measuring device (4) is connected with conducting wire with temperature patch (3), described Two sets of total station systems (5) be mounted on the side of bridge.
2. the erection and regulating device of asymmetric finished main cable shape of self-anchored suspension Datum Strand according to claim 1, special Sign is that three observation points are arranged altogether on left section of upper 1/2,1/4 position positioned at length direction of the Datum Strand (16).
3. the erection and regulating device of asymmetric finished main cable shape of self-anchored suspension Datum Strand according to claim 1, special Sign is that three observations are arranged altogether on right section of upper 1/2,1/4 position positioned at length direction of the Datum Strand (16) Point.
CN201910278525.4A 2019-04-09 2019-04-09 The erection and regulating device of asymmetric finished main cable shape of self-anchored suspension Datum Strand Pending CN109958060A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910278525.4A CN109958060A (en) 2019-04-09 2019-04-09 The erection and regulating device of asymmetric finished main cable shape of self-anchored suspension Datum Strand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910278525.4A CN109958060A (en) 2019-04-09 2019-04-09 The erection and regulating device of asymmetric finished main cable shape of self-anchored suspension Datum Strand

Publications (1)

Publication Number Publication Date
CN109958060A true CN109958060A (en) 2019-07-02

Family

ID=67025783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910278525.4A Pending CN109958060A (en) 2019-04-09 2019-04-09 The erection and regulating device of asymmetric finished main cable shape of self-anchored suspension Datum Strand

Country Status (1)

Country Link
CN (1) CN109958060A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258292A (en) * 2019-07-17 2019-09-20 中国电建集团成都勘测设计研究院有限公司 The continuous cable way bridge of unequal span
CN110565523A (en) * 2019-09-17 2019-12-13 广东迈诺工业技术有限公司 Suspension bridge main push-towing rope preforming strand manufacturing and saddle entering system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102839605A (en) * 2012-09-25 2012-12-26 长沙理工大学 Sag control method for small-sag datum strand
ES2395596B1 (en) * 2010-03-24 2013-12-23 Structural Research S.L. BRIDGE BRIDGED WITH PREFABRICATED CONCRETE ELEMENTS.
CN106758767A (en) * 2016-11-25 2017-05-31 中铁大桥局集团有限公司 A kind of suspension bridge segmented cat road and its construction method
CN109137758A (en) * 2018-11-23 2019-01-04 中交第三航务工程局有限公司 A kind of self-anchored suspension bridge cable construction technology
CN109242068A (en) * 2018-09-20 2019-01-18 广东省长大公路工程有限公司 Can automatic reporting position information suspension bridge strand trailer system and monitor supervision platform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2395596B1 (en) * 2010-03-24 2013-12-23 Structural Research S.L. BRIDGE BRIDGED WITH PREFABRICATED CONCRETE ELEMENTS.
CN102839605A (en) * 2012-09-25 2012-12-26 长沙理工大学 Sag control method for small-sag datum strand
CN106758767A (en) * 2016-11-25 2017-05-31 中铁大桥局集团有限公司 A kind of suspension bridge segmented cat road and its construction method
CN106758767B (en) * 2016-11-25 2018-10-30 中铁大桥局集团有限公司 A kind of suspension bridge segmented cat road and its construction method
CN109242068A (en) * 2018-09-20 2019-01-18 广东省长大公路工程有限公司 Can automatic reporting position information suspension bridge strand trailer system and monitor supervision platform
CN109137758A (en) * 2018-11-23 2019-01-04 中交第三航务工程局有限公司 A kind of self-anchored suspension bridge cable construction technology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨沙沙: "大跨度自锚式悬索桥主缆架设施工技术", 《企业科技与发展》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258292A (en) * 2019-07-17 2019-09-20 中国电建集团成都勘测设计研究院有限公司 The continuous cable way bridge of unequal span
CN110258292B (en) * 2019-07-17 2024-03-26 中国电建集团成都勘测设计研究院有限公司 Unequal-span continuous cableway bridge
CN110565523A (en) * 2019-09-17 2019-12-13 广东迈诺工业技术有限公司 Suspension bridge main push-towing rope preforming strand manufacturing and saddle entering system

Similar Documents

Publication Publication Date Title
CN101418542B (en) Cable system construction method of spatial self-anchored rope-suspension bridge
CN202090286U (en) Traction system suitable for self-anchored type double cable plane suspension bridge
CN101781879B (en) Construction method of single-pylon cable-stayed bridge without dorsal cables
CN104060544B (en) The construction technology that a kind of pipeline suspension crossing bridge body of a bridge is installed
KR200411341Y1 (en) The elevated bridge
CN105421248A (en) Swivel and closure construction method for large-span continuous beam crossing existing station
CN107447665B (en) A kind of laying method of self-anchored suspension bridge construction cat road carrying rope
CN109958060A (en) The erection and regulating device of asymmetric finished main cable shape of self-anchored suspension Datum Strand
CN104947592B (en) The tensioning of cable-styled bridge sling and tune rope construction method
CN106758767B (en) A kind of suspension bridge segmented cat road and its construction method
CN104631329B (en) A kind of suspension bridge continuous way cat road integral linear method of adjustment
CN105648926A (en) Swivel construction method for large span continuous beam which spans existing station
CN104695715A (en) Construction method of beam string structure of roof
CN108505623B (en) A kind of overhead cable construction method suitable for flexible double rope net system
CN105586832A (en) Suspension type catwalk surface net mounting system
CN102409619B (en) Method for improving cross integrity of bridge deck structure of multi-girder type combined small box girder bridge
CN102926332A (en) Derrick arrangement of tools for replacing steel arch bridge suspender and replacing method thereof
CN108221694B (en) The method for installing long-span arch bridge tie-rod
CN106884371B (en) A kind of non-uniform beam and suspension cable combined bridge structural system
CN108487039A (en) Self-anchored suspension bridge and its cat road separate type construction method
CN207933868U (en) Self-anchored suspension bridge
CN105603879A (en) Construction technology for large-diameter pipeline crossing construction catwalk
CN107419667B (en) A kind of self-anchored suspension bridge installing Cable-clamp method
CN207775734U (en) A kind of balance regulator of single-cantilever assembly
CN203923907U (en) The pre-integer unit cable strand of main rope of suspension bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190702