CN106758767A - A kind of suspension bridge segmented cat road and its construction method - Google Patents
A kind of suspension bridge segmented cat road and its construction method Download PDFInfo
- Publication number
- CN106758767A CN106758767A CN201611055259.1A CN201611055259A CN106758767A CN 106758767 A CN106758767 A CN 106758767A CN 201611055259 A CN201611055259 A CN 201611055259A CN 106758767 A CN106758767 A CN 106758767A
- Authority
- CN
- China
- Prior art keywords
- cable
- main
- suspension bridge
- catwalk
- bearing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D11/00—Suspension or cable-stayed bridges
- E01D11/02—Suspension bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种悬索桥分段式猫道及其施工方法,涉及悬索桥施工领域,其用于连接分别位于悬索桥主跨两侧的两个主塔和位于悬索桥两侧的锚碇,主塔两侧各固定有一第一锚固装置,同一主塔的两个第一锚固装置之间通过预埋在主塔内的对拉装置连接,两个主塔间相对的两个第一锚固装置间连接有一主跨承重索;锚碇上设有第二锚固装置,第二锚固装置和其相对的主塔的第一锚固装置之间连接有边跨承重索。
The invention discloses a segmented catwalk of a suspension bridge and a construction method thereof, relating to the field of suspension bridge construction, which is used to connect two main towers respectively located on both sides of the main span of the suspension bridge and anchorages located on both sides of the suspension bridge. Each side is fixed with a first anchoring device, and the two first anchoring devices of the same main tower are connected by a tensioning device embedded in the main tower, and the two first anchoring devices opposite to each other are connected with a The main span load-bearing cable; the second anchoring device is provided on the anchorage, and the side-span load-bearing cable is connected between the second anchoring device and the first anchoring device of the opposite main tower.
Description
本发明涉及悬索桥施工领域,具体涉及一种悬索桥分段式猫道及其施工方法。The invention relates to the field of suspension bridge construction, in particular to a segmented catwalk for a suspension bridge and a construction method thereof.
背景技术Background technique
悬索桥施工猫道是架设在主缆之下、平行于主缆线形布置、让施工人员进行施工作业的高空脚手架,是主缆系统乃至悬索桥整个上部结构的施工平台,担负着索股牵引、调索、整形入鞍、紧缆、索夹及吊索安装、主梁吊装及工地连接、主缆缠丝、防护涂装等重要任务。目前悬索桥施工所采用的猫道中猫道承重索在两岸锚碇及主塔之间是连续的,通过在塔顶设置转向索鞍跨越主塔结构,由于承重索需跨越主塔塔顶区域,同时为保证猫道承重索在主塔两侧线形要满足设计要求,需在主塔两侧设置承重索下拉装置,使得猫道结构在主塔区域构造复杂,作业空间狭小,主缆索股架设施工不方便;另外由于单根承重索仅在两岸锚碇位置处设置线形调索装置,同时在主塔两侧均设有下拉装置,使得承重索在安装及使用过程中线形调整困难,后期猫道吊挂和拆除也不方便。The construction catwalk of the suspension bridge is a high-altitude scaffold erected under the main cable and arranged parallel to the main cable to allow construction personnel to carry out construction work. , Saddle shaping, cable tightening, cable clamp and sling installation, main girder hoisting and site connection, main cable winding, protective coating and other important tasks. At present, the load-bearing cables of the catwalk used in the construction of the suspension bridge are continuous between the anchorage on both sides and the main tower. By setting the steering cable saddle on the top of the tower to cross the main tower structure, since the load-bearing cable needs to cross the top area of the main tower, at the same time In order to ensure that the catwalk load-bearing cables meet the design requirements on both sides of the main tower, load-bearing cable pull-down devices need to be installed on both sides of the main tower, making the structure of the catwalk in the main tower area complex, the working space is narrow, and the construction of the main cable strands is difficult. Convenience; in addition, because a single load-bearing cable is only provided with a linear cable adjustment device at the anchorage position on both banks, and at the same time there are pull-down devices on both sides of the main tower, it is difficult to adjust the linear shape of the load-bearing cable during installation and use. It is also inconvenient to hang and remove.
发明内容Contents of the invention
针对现有技术中存在的缺陷,本发明的目的在于提供一种悬索桥分段式猫道及其施工方法,使悬索桥猫道承重索在安装及使用过程中可以快速、方便地调整线形和后期拆除,同时简化猫道在塔顶区域的布置,方便相关施工作业。Aiming at the defects existing in the prior art, the object of the present invention is to provide a segmented catwalk of a suspension bridge and its construction method, so that the load-bearing cables of the catwalk of the suspension bridge can be quickly and conveniently adjusted in alignment and later dismantled during installation and use. , while simplifying the layout of the catwalk at the top of the tower to facilitate related construction operations.
为达到以上目的,本发明采取的技术方案是:For achieving above object, the technical scheme that the present invention takes is:
一种悬索桥分段式猫道,其用于连接分别位于悬索桥主跨两侧的两个主塔和位于悬索桥两侧的锚碇,A segmented catwalk of a suspension bridge, which is used to connect two main towers located on both sides of the main span of the suspension bridge and anchorages located on both sides of the suspension bridge,
所述主塔两侧各固定有一第一锚固装置,同一主塔的两个第一锚固装置之间通过预埋在主塔内的对拉装置连接,两个主塔间相对的两个第一锚固装置间连接有一主跨承重索;A first anchoring device is fixed on both sides of the main tower, and the two first anchoring devices of the same main tower are connected by a tensioning device embedded in the main tower. There is a main span load-bearing cable connected between the anchorage devices;
所述锚碇上设有第二锚固装置,所述第二锚固装置和其相对的所述主塔的第一锚固装置之间连接有边跨承重索。The anchor is provided with a second anchoring device, and a side span load-bearing cable is connected between the second anchoring device and the first anchoring device of the main tower opposite to it.
在上述技术方案的基础上,所述第一锚固装置旁的主跨承重索和所述第二锚固装置旁的边跨承重索上均设有用于调整承重索线型的调索装置。On the basis of the above technical solution, the main span load-bearing cables next to the first anchoring device and the side-span load-bearing cables next to the second anchorage device are equipped with cable adjustment devices for adjusting the line shape of the load-bearing cables.
在上述技术方案的基础上,所述对拉装置为预埋在主塔内的对拉精轧螺纹钢筋。On the basis of the above-mentioned technical solution, the said tensioning device is a tensioning finish-rolled threaded steel bar pre-buried in the main tower.
本发明还提供一种上述悬索桥分段式猫道的施工方法,方法中包括以下步骤:The present invention also provides a construction method for the sectioned catwalk of the above-mentioned suspension bridge, which comprises the following steps:
S1、在悬索桥两侧主塔上安装主索鞍,在两侧锚碇上安装散索鞍;随后安装塔顶门架、散索鞍门架、第一锚固装置、第二锚固装置和调索装置;S1. Install the main cable saddles on the main towers on both sides of the suspension bridge, and loose cable saddles on the anchorages on both sides; then install the tower top gantry, loose cable saddle gantry, first anchor device, second anchor device and cable adjustment device ;
S2、架设先导索,使其形成单向往复式牵引系统,利用该牵引系统先安装两根边跨承重索,然后安装主跨承重索,最后安装门架索及牵引索;S2. Erection of the pilot cable to form a one-way reciprocating traction system. Using this traction system, first install two side span load-bearing cables, then install the main span load-bearing cables, and finally install the portal cable and the traction cable;
S3、安装猫道承重索变位钢架结构、猫道面层结构和横向天桥结构。S3. Install catwalk load-bearing cable displacement steel frame structure, catwalk surface structure and horizontal bridge structure.
在上述技术方案的基础上,在安装所述第一锚固装置时,通过设置对拉装置进行预拉。On the basis of the above technical solution, when the first anchoring device is installed, the pulling device is pre-tensioned by setting.
在上述技术方案的基础上,所述主跨承重索和所述边跨承重索的线形调整分别进行。On the basis of the above technical solution, the linear adjustment of the load-bearing cables of the main span and the load-bearing cables of the side spans is carried out separately.
在上述技术方案的基础上,所述步骤S2中还包括,通过调索装置将先导索线形调整至空索状态下设计线形。On the basis of the above technical solution, the step S2 also includes adjusting the line shape of the pilot cable to the design line shape in the state of empty cable through the cable adjustment device.
在上述技术方案的基础上,所述步骤S3中还包括,通过调索装置分别将主跨承重索和边跨承重索线形调整至设计位置。On the basis of the above technical solution, the step S3 also includes adjusting the alignment of the main-span load-bearing cables and the side-span load-bearing cables to the designed positions through the cable adjustment device.
与现有技术相比,本发明的优点在于:Compared with the prior art, the present invention has the advantages of:
(1)本发明的分段式猫道中猫道承重索在主塔处断开,边跨和中跨承重索可分开进行安装及调试,使得承重索受温度和下料长度影响小,现场施工组织简单、施工效率高,具有很强的适用性和经济性。(1) In the segmented catwalk of the present invention, the load-bearing cables of the catwalk are disconnected at the main tower, and the side-span and mid-span load-bearing cables can be installed and debugged separately, so that the load-bearing cables are less affected by the temperature and the length of the blanking material, and the on-site construction Simple organization, high construction efficiency, strong applicability and economy.
(2)本发明的分段式猫道中猫道承重索在主塔处断开,极大地简化猫道索架设及线形调整工序,缩短架设时间、节省工程造价,同时使塔顶布置更为简单,方便悬索桥主缆索股架设施工,同时后期猫道结构拆除更加方便,同时猫道承重索在安装及使用过程中线形调整更为方便。(2) In the segmented catwalk of the present invention, the load-bearing cables of the catwalk are disconnected at the main tower, which greatly simplifies the catwalk cable erection and alignment adjustment process, shortens the erection time, saves the engineering cost, and makes the tower top layout simpler , to facilitate the erection of the main cable strands of the suspension bridge. At the same time, it is more convenient to dismantle the catwalk structure in the later stage. At the same time, it is more convenient to adjust the line shape of the catwalk load-bearing cables during installation and use.
附图说明Description of drawings
图1为本发明实施例中悬索桥分段式猫道的结构示意图;Fig. 1 is the structural representation of suspension bridge section catwalk in the embodiment of the present invention;
图2为本发明实施例中边跨锚碇位置处猫道的结构示意图;Fig. 2 is the schematic structural view of the catwalk at the side span anchorage position in the embodiment of the present invention;
图3为本发明实施例中主塔顶部猫道的结构示意图;Fig. 3 is the structural representation of catwalk at the top of main tower in the embodiment of the present invention;
图4为本发明实施例中施工步骤S1示意图;Fig. 4 is the schematic diagram of construction step S1 in the embodiment of the present invention;
图5为本发明实施例中施工步骤S2示意图;Fig. 5 is the schematic diagram of construction step S2 in the embodiment of the present invention;
图6为本发明实施例中施工步骤S3示意图;Fig. 6 is the schematic diagram of construction step S3 in the embodiment of the present invention;
图中:1-主塔,2-锚碇,3-主跨承重索,4-边跨承重索,5-第一锚固装置,501-对拉装置,6-第二锚固装置,7-调索装置,8-先导索,9-门架索,10-牵引索,11-塔顶门架,12-散索鞍门架。In the figure: 1-main tower, 2-anchor, 3-main span load-bearing cable, 4-side span load-bearing cable, 5-first anchoring device, 501-pair pull device, 6-second anchoring device, 7-adjustment Cable device, 8-pilot cable, 9-gantry cable, 10-drawing cable, 11-tower gantry, 12-scattering saddle gantry.
具体实施方式detailed description
以下结合附图及实施例对本发明作进一步详细说明。The present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments.
参见图1至图3所示,本发明实施例提供一种悬索桥分段式猫道,其用于连接分别位于悬索桥主跨两侧的两个主塔1和位于悬索桥两侧的锚碇2,Referring to Fig. 1 to Fig. 3, an embodiment of the present invention provides a segmented catwalk of a suspension bridge, which is used to connect two main towers 1 located on both sides of the main span of the suspension bridge and anchorages 2 located on both sides of the suspension bridge,
所述主塔1两侧各固定有一第一锚固装置5,同一主塔的两个第一锚固装置5之间通过预埋在主塔1内的对拉装置501连接,两个主塔1间相对的两个第一锚固装置5间连接有一主跨承重索3;A first anchoring device 5 is fixed on both sides of the main tower 1, and the two first anchoring devices 5 of the same main tower are connected by a tensioning device 501 embedded in the main tower 1. A main span load-bearing cable 3 is connected between the two opposite first anchoring devices 5;
所述锚碇2上设有第二锚固装置6,所述第二锚固装置6和其相对的所述主塔1的第一锚固装置5之间连接有边跨承重索4。The anchorage 2 is provided with a second anchoring device 6, and a side span load-bearing cable 4 is connected between the second anchoring device 6 and the first anchoring device 5 of the main tower 1 opposite to it.
本发明悬索桥分段式猫道还可设置数个调索装置7,调索装置7可设于第一锚固装置5旁的主跨承重索3上以及所述第二锚固装置6旁的边跨承重索4上,通过对承重索进行张紧或松弛,调整已固定的承重索线型。通过设置调索装置7,可在已将主跨承重索3和边跨承重索4锚固的情况下,对承重索线型进行调整,方便施工操作。The segmental catwalk of the suspension bridge of the present invention can also be provided with several cable adjustment devices 7, and the cable adjustment devices 7 can be arranged on the main span load-bearing cables 3 next to the first anchor device 5 and the side spans next to the second anchor device 6 On the load-bearing cable 4, by tensioning or relaxing the load-bearing cable, the fixed load-bearing cable line shape is adjusted. By arranging the cable adjusting device 7 , the line shape of the load-bearing cable can be adjusted under the condition that the main-span load-bearing cable 3 and the side-span load-bearing cable 4 have been anchored, so as to facilitate the construction operation.
可将同一主塔1的两个第一锚固装置5之间的对拉装置501设置为预埋在主塔1内的对拉精轧螺纹钢筋,并固定连接,进一步加强了主跨承重索3和边跨承重索4与主塔1的固定结构,保证其抗拉承载力,从而加强了悬索桥结构的稳定性。The tensioning device 501 between the two first anchoring devices 5 of the same main tower 1 can be set as a tensioning finish-rolled threaded steel bar pre-embedded in the main tower 1, and fixedly connected, further strengthening the main span load-bearing cable 3 The fixed structure of the side-span load-bearing cables 4 and the main tower 1 ensures its tensile bearing capacity, thereby enhancing the stability of the suspension bridge structure.
本发明的分段式猫道中猫道承重索在主塔1处断开,边跨承重索3和中跨承重索4可分开进行安装及调试,使得承重索受温度和下料长度影响小,现场施工组织简单、施工效率高,具有很强的适用性和经济性。In the segmented catwalk of the present invention, the load-bearing cable of the catwalk is disconnected at the main tower 1, and the side-span load-bearing cable 3 and the mid-span load-bearing cable 4 can be installed and debugged separately, so that the load-bearing cable is less affected by the temperature and the length of the blanking material. The on-site construction organization is simple, the construction efficiency is high, and it has strong applicability and economy.
本发明实施例还提供一种前述悬索桥分段式猫道的施工方法,下面分步进行详述:The embodiment of the present invention also provides a construction method for the segmental catwalk of the aforementioned suspension bridge, which will be described in detail step by step below:
参见图4所示,首先在悬索桥两侧主塔1上安装主索鞍,在两侧锚碇2上安装散索鞍;随后安装塔顶门架11、散索鞍门架12、第一锚固装置5、第二锚固装置6和调索装置7;Referring to Fig. 4, first install the main cable saddles on the main towers 1 on both sides of the suspension bridge, and install the loose cable saddles on the anchorages 2 on both sides; then install the tower top gantry 11, the loose cable saddle gantry 12, and the first anchoring device 5. The second anchoring device 6 and the cable adjusting device 7;
参见图5所示,第二步架设先导索8,使其形成单向往复式牵引系统,利用该牵引系统先安装两根边跨承重索4,然后安装主跨承重索3,最后安装门架索9及牵引索10;As shown in Figure 5, the second step is to erect the pilot cable 8 to form a one-way reciprocating traction system. Using this traction system, first install two side span load-bearing cables 4, then install the main span load-bearing cables 3, and finally install the door frame Cable 9 and traction cable 10;
在此步骤中,还可通过调索装置7将猫道索线形调整至空索状态下设计线形。In this step, the line shape of the catwalk cable can also be adjusted to the design line shape under the empty cable state through the cable adjustment device 7 .
参见图6所示,第三步安装猫道承重索变位钢架结构、猫道面层结构和横向天桥结构。As shown in Figure 6, the third step is to install the catwalk load-bearing cable displacement steel frame structure, catwalk surface structure and horizontal bridge structure.
可在施工时将第一锚固装置5通过设置对拉装置501进行预拉,保证其抗拉承载力,使悬索桥结构更加稳固。During construction, the first anchoring device 5 can be pre-tensioned by setting the tensioning device 501 to ensure its tensile bearing capacity and make the suspension bridge structure more stable.
可在施工时调整承重索线型时,对主跨承重索3和所述边跨承重索4的线形调整分别进行,互不干涉。在简化了施工难度的同时也提高了施工效率。When adjusting the alignment of the load-bearing cables during construction, the alignment adjustments of the main-span load-bearing cables 3 and the side-span load-bearing cables 4 are performed separately without interfering with each other. While simplifying the construction difficulty, it also improves the construction efficiency.
可在第二步施工中,通过调索装置7将先导索8线形调整至空索状态下设计线形。In the second step of construction, the line shape of the pilot cable 8 can be adjusted to the design line shape under the empty cable state through the cable adjustment device 7 .
可在第三步施工中,利用调索装置7分别将主跨承重索3和边跨承重索4线形调整至设计位置。In the third step of construction, the line shape of the main span load-bearing cables 3 and side-span load-bearing cables 4 can be adjusted to the design positions by using the cable adjustment device 7 .
本发明不局限于上述实施方式,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也视为本发明的保护范围之内。本说明书中未作详细描述的内容属于本领域专业技术人员公知的现有技术。The present invention is not limited to the above-mentioned embodiments. For those of ordinary skill in the art, without departing from the principle of the present invention, some improvements and modifications can also be made, and these improvements and modifications are also considered protection of the present invention. within range. The content not described in detail in this specification belongs to the prior art known to those skilled in the art.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611055259.1A CN106758767B (en) | 2016-11-25 | 2016-11-25 | A kind of suspension bridge segmented cat road and its construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611055259.1A CN106758767B (en) | 2016-11-25 | 2016-11-25 | A kind of suspension bridge segmented cat road and its construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106758767A true CN106758767A (en) | 2017-05-31 |
| CN106758767B CN106758767B (en) | 2018-10-30 |
Family
ID=58911436
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201611055259.1A Active CN106758767B (en) | 2016-11-25 | 2016-11-25 | A kind of suspension bridge segmented cat road and its construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106758767B (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109958060A (en) * | 2019-04-09 | 2019-07-02 | 中国十七冶集团有限公司 | The erection and regulating device of asymmetric finished main cable shape of self-anchored suspension Datum Strand |
| CN110939069A (en) * | 2019-12-11 | 2020-03-31 | 湖北省路桥集团有限公司 | Construction method of catwalk for suspension bridge |
| CN111441594A (en) * | 2020-04-21 | 2020-07-24 | 中铁大桥局第七工程有限公司 | Construction method of multilayer sectional type main cable |
| CN112064508A (en) * | 2020-08-21 | 2020-12-11 | 中铁大桥局集团第六工程有限公司 | Method for adjusting linear shape of continuous catwalk of suspension bridge |
| CN113605230A (en) * | 2021-07-12 | 2021-11-05 | 中交二公局第二工程有限公司 | Main cable traction system and method suitable for suspension bridge two-bank tunnel anchor |
| CN113789725A (en) * | 2021-09-10 | 2021-12-14 | 中国水利水电第八工程局有限公司 | Suspension bridge construction method and hoisting device |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102392418A (en) * | 2011-12-01 | 2012-03-28 | 中交二公局第二工程有限公司 | Span-division erection construction method of construction catwalk of multi-tower suspension bridge |
| KR101171039B1 (en) * | 2010-09-02 | 2012-08-06 | 오베아룹코리아(주) | Partially and fully earth-anchored cable-stayed bridge using main span prestressing appratus and construction method for the same |
| CN104278635A (en) * | 2014-09-03 | 2015-01-14 | 中铁大桥局股份有限公司 | Steering method of ground anchor type suspension bridge catwalk load bearing cable |
| CN104631329A (en) * | 2014-12-30 | 2015-05-20 | 中铁大桥局集团有限公司 | Method for adjusting overall line shape of continuous catwalk of suspension bridge |
| CN205576743U (en) * | 2016-03-08 | 2016-09-14 | 贵州中交贵瓮高速公路有限公司 | A mechanism that is used for suspension bridge catwalk main rope to put cable |
-
2016
- 2016-11-25 CN CN201611055259.1A patent/CN106758767B/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101171039B1 (en) * | 2010-09-02 | 2012-08-06 | 오베아룹코리아(주) | Partially and fully earth-anchored cable-stayed bridge using main span prestressing appratus and construction method for the same |
| CN102392418A (en) * | 2011-12-01 | 2012-03-28 | 中交二公局第二工程有限公司 | Span-division erection construction method of construction catwalk of multi-tower suspension bridge |
| CN104278635A (en) * | 2014-09-03 | 2015-01-14 | 中铁大桥局股份有限公司 | Steering method of ground anchor type suspension bridge catwalk load bearing cable |
| CN104631329A (en) * | 2014-12-30 | 2015-05-20 | 中铁大桥局集团有限公司 | Method for adjusting overall line shape of continuous catwalk of suspension bridge |
| CN205576743U (en) * | 2016-03-08 | 2016-09-14 | 贵州中交贵瓮高速公路有限公司 | A mechanism that is used for suspension bridge catwalk main rope to put cable |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109958060A (en) * | 2019-04-09 | 2019-07-02 | 中国十七冶集团有限公司 | The erection and regulating device of asymmetric finished main cable shape of self-anchored suspension Datum Strand |
| CN110939069A (en) * | 2019-12-11 | 2020-03-31 | 湖北省路桥集团有限公司 | Construction method of catwalk for suspension bridge |
| CN110939069B (en) * | 2019-12-11 | 2022-02-08 | 湖北省路桥集团有限公司 | Construction method of suspension bridge catwalk |
| CN111441594A (en) * | 2020-04-21 | 2020-07-24 | 中铁大桥局第七工程有限公司 | Construction method of multilayer sectional type main cable |
| CN111441594B (en) * | 2020-04-21 | 2021-10-26 | 中铁大桥局第七工程有限公司 | Construction method of multilayer sectional type main cable |
| CN112064508A (en) * | 2020-08-21 | 2020-12-11 | 中铁大桥局集团第六工程有限公司 | Method for adjusting linear shape of continuous catwalk of suspension bridge |
| CN113605230A (en) * | 2021-07-12 | 2021-11-05 | 中交二公局第二工程有限公司 | Main cable traction system and method suitable for suspension bridge two-bank tunnel anchor |
| CN113789725A (en) * | 2021-09-10 | 2021-12-14 | 中国水利水电第八工程局有限公司 | Suspension bridge construction method and hoisting device |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106758767B (en) | 2018-10-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106758767B (en) | A kind of suspension bridge segmented cat road and its construction method | |
| CN104060540B (en) | A kind of cable of space cable suspension bridge false stull and construction method for hanging thereof | |
| CN108374347A (en) | A kind of high-speed railway large span cable-carried arch bridge steel lagging jack buckling and hanging system construction method | |
| CN203377546U (en) | High speed railway spanning construction apparatus | |
| CN104213508B (en) | A kind of method utilizing stull and external tendon to control king-post displacement | |
| CN108532465A (en) | A kind of construction method of Through Steel case arch bridge | |
| CN104631329B (en) | A kind of suspension bridge continuous way cat road integral linear method of adjustment | |
| CN106592441A (en) | Installation method of cable-stayed bridge | |
| CN106758883B (en) | The interim pocket device for hoisting of steel wire rope for steel pipe truss concrete arch-type bridge suspender replacement and its for the method for suspender replacement | |
| CN105113803B (en) | A high-altitude sliding hoisting device and its implementation method for a mountain corridor truss | |
| CN109339458A (en) | A cast-in-place beam reinforcement cage binding installation multifunctional trolley | |
| CN109680619A (en) | A kind of steel truss beam sling Arch Bridge Construction method big suitable for environmental restrictions | |
| CN102561669A (en) | Cantilever scaffold and construction method thereof | |
| CN203890895U (en) | Space cable suspension bridge false stull | |
| CN207159827U (en) | No. 1 plate installation and positioning structure in No. 0 block of Wavelike steel webplate bridge | |
| CN105714682B (en) | Operating system for cable tensioning in small-space towers | |
| CN205443901U (en) | Suspension bridge laterally stable wind brace system | |
| CN205116014U (en) | Soft draw gear of suspension cable | |
| CN108086168A (en) | Ride cable-styled erection crane | |
| CN204079226U (en) | A kind of movable beam string hanging apparatus that can increase rigidity when tubular truss lifts | |
| CN101210417B (en) | Two-way Simply Supported Non-torsion Tower Top Tension Anchorage Method of Buckle and Anchor Cable System | |
| CN206346120U (en) | A kind of pin-connected panel tower with suspended cable system | |
| CN209779465U (en) | main tower erects cable-stay bridge's string cable construction system that changes | |
| CN204983693U (en) | Hoist device slides in mountain area corridor truss high altitude | |
| CN204039898U (en) | Can be used for the suspension trestle waterborne of pumping of concrete |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |