CN109948853A - A method of based on BIM technology automatic clinker-removing device transported material - Google Patents

A method of based on BIM technology automatic clinker-removing device transported material Download PDF

Info

Publication number
CN109948853A
CN109948853A CN201910215266.0A CN201910215266A CN109948853A CN 109948853 A CN109948853 A CN 109948853A CN 201910215266 A CN201910215266 A CN 201910215266A CN 109948853 A CN109948853 A CN 109948853A
Authority
CN
China
Prior art keywords
database
removing device
transported material
bim
automatic clinker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910215266.0A
Other languages
Chinese (zh)
Inventor
邹贻权
张佳毅
徐梦妮
陈小杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei University of Technology
Original Assignee
Hubei University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei University of Technology filed Critical Hubei University of Technology
Priority to CN201910215266.0A priority Critical patent/CN109948853A/en
Publication of CN109948853A publication Critical patent/CN109948853A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Design building technical field of construction of the present invention, spy are related to a kind of method based on BIM technology automatic clinker-removing device transported material.The present invention obtains relevant data by analog information, and need to look for optimal data in modeling, and finally obtains Production database and execute corresponding operation.The present invention reduces the probability having an accident in construction, promotes working efficiency by simulating and optimizing building data.

Description

A method of based on BIM technology automatic clinker-removing device transported material
Technical field
Design building technical field of construction of the present invention, and in particular to a kind of pile foundation based on BIM technology is anti-and skyscraper Material transport system and method.
Background technique
In Modernized City Construction, the height of building is higher and higher, therefore, can usually be related in construction Deep basal pit and skyscraper can be related to material transportation in construction and transport to high level or from foundation pit by waste material, transport Material is not only had during material on the way to fall with certain risk, but also is easy to happen failure, and efficiency is lower.
Summary of the invention
In view of the deficiencies of the prior art, the present invention provides a kind of based on BIM technology automatic clinker-removing device transported material Method.The present invention obtains relevant data by analog information, and need to look for optimal data in modeling, and finally obtain creation data Library 2 executes corresponding operation.The present invention is reduced and is had an accident in construction by simulating and optimizing building data Probability promotes working efficiency.
The technical scheme is that a kind of method based on BIM technology automatic clinker-removing device transported material, feature exist In: the following steps are included:
1), construction site layout situation and form of construction work are simulated using BIM technology;
2) it, obtains the height of skyscraper or hollows out the depth and Ground arrangement information of stake, judging to have under the height can The danger that can occur and fault message;
3) information of transported material, is obtained;
4) database 1, is generated using parameterized digital technology, is filled in database 1 comprising establishing mechanical arm and automatic ash ejector Battery block needed for putting the BIM model of seated position and transit route;
5), in conjunction with step 1), 2), 3), obtain information, enter information into database 1, the battery in database 1 Block will carry out automatic connection and carry out visual programming, establish mechanical arm and automatic clinker-removing device placement location and transit route and side The different BIM models of formula, obtain the analog result of all BIM models;
6), database 1 filters out several optimal embodiments, lists the specific value of each scheme time cost for making User's selection;
7), in the operational process of device, find that operation problem will adjust automatically emergency and anti-in time by inductor It is fed to database 2, then by the feedback of database 2 to controller;
8), in the operational process of device, find that operation problem will adjust automatically emergency and anti-in time by inductor Database 2 is presented, then by the feedback of database 2 to controller.
According to a kind of method based on BIM technology automatic clinker-removing device transported material as described above, it is characterised in that: also It include mobile terminal controller including prison control system, transport device and conveying mechanism, monitoring system, controller is connected with display Screen, camera, alarm;
According to a kind of method based on BIM technology automatic clinker-removing device transported material as described above, it is characterised in that: fortune Defeated device includes Transport Machinery arm assembly, enclosure device, automatic clinker-removing device.
According to a kind of method based on BIM technology automatic clinker-removing device transported material as described above, it is characterised in that: fortune The different BIM models of defeated device and conveying mechanism placement location and the method for operation, are simulated by construction simulation software.
Compared with prior art, the present invention having the following advantages and benefits:
The present invention is by utilizing BIM technology field cloth model, and the embodiment by BIM technology applied to automatic clinker-removing device And on position, then optimal result is selected to be implemented, material is not only had during transported material with solution and is existed It is fallen on the way with certain risk, and is easy to happen failure, the lower problem of efficiency.
Detailed description of the invention
Fig. 1 is course of work schematic diagram of the present invention.
Fig. 2 is flow chart of the invention.
Specific embodiment
Technical solution of the present invention is described further below in conjunction with attached drawing.
A method of based on BIM technology automatic clinker-removing device transported material,
It is described the following steps are included:
1) the arrangement and method for construction planning that, CAD diagram paper and construction party provide in conjunction with given by design side utilizes oblique photograph skill Art is scanned place while using revit or Sketch Up and other professional construction field cloth simulation softwards to construction site Deployment scenarios and form of construction work are simulated;
2) it, obtains the height of skyscraper or hollows out the depth and Ground arrangement information of stake, judging to have under the height can The danger that can occur and fault message;
3) information of transported material, is obtained;
4) database 1, is generated using parameterized digital technology, is filled in database 1 comprising establishing mechanical arm and automatic ash ejector Battery block needed for putting seated position and transit route and the BIM model of mode;
5), in conjunction with step 1), 2), 3), obtain information, enter information into database 1, the battery in database 1 Block will carry out automatic connection and carry out visual programming, establish mechanical arm and automatic clinker-removing device placement location and transit route and side The different BIM models of formula, obtain the analog result of all BIM models;
6), database 1 will filter out several optimal embodiments, optimal scheme include the minimum scheme of cost, The shortest scheme of required time, time and cost is average, the shortest scheme of transportation route, and list each scheme time cost Specific value is selected for user;
7), in the operational process of device, find that operation problem will adjust automatically emergency and anti-in time by inductor It is fed to database 2, then by the feedback of database 2 to controller.
Device in step 7) includes prison control system, transport device and conveying mechanism, and prison control system includes mobile whole Side controller, controller are connected with display screen, camera, alarm;
Transport device includes Transport Machinery arm assembly, enclosure device, automatic clinker-removing device.
Construction site deployment scenarios are arranged according to the arrangement and method for construction that designing institute provides.
The present invention establishes the different BIM models of transport device and conveying mechanism placement location and the method for operation, by The construction simulations software such as Navisworks is simulated.

Claims (4)

1. a kind of method based on BIM technology automatic clinker-removing device transported material, it is characterised in that: the following steps are included:
1), construction site layout situation and form of construction work are simulated using BIM technology;
2) height of skyscraper or the depth and Ground arrangement information of caisson, are obtained, judges to be possible to out under the height Existing danger and fault message;
3) information of transported material, is obtained;
4) database 1, is generated using parameterized digital technology, comprising establishing mechanical arm and automatic clinker-removing device is put in database 1 Battery block needed for the BIM model of seated position and transit route;
5), in conjunction with step 1), 2), 3), the information that obtains, enter information into database 1, battery block in database 1 will It carries out automatic connection and carries out visual programming, establish mechanical arm and automatic clinker-removing device placement location and transit route and mode Different BIM models obtain the analog result of all BIM models;
6), database 1 filters out several optimal embodiments, lists the specific value of each scheme time cost for user Selection;
7), in the operational process of device, by inductor find operation problem will adjust automatically meet an urgent need and be timely fed back to Database 2, then by the feedback of database 2 to controller;
8), in the operational process of device, by inductor find operation problem will adjust automatically meet an urgent need and timely feedback number According to library 2, then by the feedback of database 2 to controller.
2. according to benefit require 1 described in a kind of method based on BIM technology automatic clinker-removing device transported material, it is characterised in that: Including prison control system, transport device and conveying mechanism, prison control system includes mobile terminal controller, and controller is connected with aobvious Display screen, camera, alarm.
3. according to benefit require 2 described in a kind of method based on BIM technology automatic clinker-removing device transported material, it is characterised in that: Transport device includes Transport Machinery arm assembly, enclosure device, automatic clinker-removing device.
4. a kind of method based on BIM technology automatic clinker-removing device transported material according to claim 2, feature exist In: the different BIM models of transport device and conveying mechanism placement location and the method for operation are simulated by construction simulation software.
CN201910215266.0A 2019-03-21 2019-03-21 A method of based on BIM technology automatic clinker-removing device transported material Pending CN109948853A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910215266.0A CN109948853A (en) 2019-03-21 2019-03-21 A method of based on BIM technology automatic clinker-removing device transported material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910215266.0A CN109948853A (en) 2019-03-21 2019-03-21 A method of based on BIM technology automatic clinker-removing device transported material

Publications (1)

Publication Number Publication Date
CN109948853A true CN109948853A (en) 2019-06-28

Family

ID=67011039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910215266.0A Pending CN109948853A (en) 2019-03-21 2019-03-21 A method of based on BIM technology automatic clinker-removing device transported material

Country Status (1)

Country Link
CN (1) CN109948853A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111321898A (en) * 2020-02-28 2020-06-23 广东博智林机器人有限公司 Cloth path planning method, device, equipment and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107255981A (en) * 2017-06-14 2017-10-17 成都智建新业建筑设计咨询有限公司 A kind of super high rise building transport of materials management system based on BIM
CN109344439A (en) * 2018-09-01 2019-02-15 鼎宸建设科技有限公司 A kind of modeling of building block formula and its simulative construction method based on BIM

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107255981A (en) * 2017-06-14 2017-10-17 成都智建新业建筑设计咨询有限公司 A kind of super high rise building transport of materials management system based on BIM
CN109344439A (en) * 2018-09-01 2019-02-15 鼎宸建设科技有限公司 A kind of modeling of building block formula and its simulative construction method based on BIM

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
尹龙等: "基于BIM技术的仿真模拟在地铁暗挖隧道施工中的应用", 《土木建筑工程信息技术》 *
张立茂等: "基于BIM的工程施工安全关键技术研究", 《建筑经济》 *
高震等: "基于BIM技术的项目管理系统平台构建与应用研究", 《安徽建筑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111321898A (en) * 2020-02-28 2020-06-23 广东博智林机器人有限公司 Cloth path planning method, device, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN109543233A (en) A kind of electromechanical pipeline assembly construction method based on BIM technology
Chatzimichailidou et al. Using BIM in the safety risk management of modular construction
Hu et al. Smart building demolition and waste management frame with image-to-BIM
CN108109204B (en) Method and system for manufacturing and rendering large-scale terrain
CN107818198A (en) A kind of science of bridge building management platform based on BIM technology
US10095817B2 (en) Determining wind loading of structures through wind flow simulation
CN204463529U (en) For training the system of operator
CN109736319A (en) Excavation of foundation pit and anti-float anchor rod construction method based on BIM
CN108140218A (en) Integrity decision maker, integrity determination method and integrity decision procedure
CN109948853A (en) A method of based on BIM technology automatic clinker-removing device transported material
CN107423455A (en) A kind of highway method for automatic modeling and system
CN113505418A (en) Bridge construction method based on BIM
CN111985031B (en) Construction method and device of roadbed three-dimensional model, computer equipment and storage medium
CN113700053A (en) BIM-based construction process foundation pit deformation monitoring and early warning method and system
CN114782005A (en) BIM planning and construction management method combined with oblique photography
CN109376404A (en) Build outer profile model generating method, system, device and readable storage medium storing program for executing
CN111126691B (en) Project management method and related products
CN106203969A (en) A kind of prison check system of steel-making boiler tubing based on BIM
CN113204284A (en) Virtual construction comprehensive pipeline installation and acceptance method based on BIM and MR technology
KR102112749B1 (en) Method for managing of the tower crane using construction management plan and computer readable media thereof
CN113464197B (en) Mine water disaster emergency management method and system
CN112487531A (en) Method for optimizing subway station earth excavation scheme based on BIM technology
CN112613856A (en) Three-dimensional technology intersection method and device of railway BIM system based on web real-time modeling
CN115659440B (en) Construction organization and traffic organization simulation method based on Unity platform
CN115953510A (en) Construction simulation animation manufacturing method for iron-involved swivel bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190628

RJ01 Rejection of invention patent application after publication