CN109948853A - A method of based on BIM technology automatic clinker-removing device transported material - Google Patents
A method of based on BIM technology automatic clinker-removing device transported material Download PDFInfo
- Publication number
- CN109948853A CN109948853A CN201910215266.0A CN201910215266A CN109948853A CN 109948853 A CN109948853 A CN 109948853A CN 201910215266 A CN201910215266 A CN 201910215266A CN 109948853 A CN109948853 A CN 109948853A
- Authority
- CN
- China
- Prior art keywords
- database
- removing device
- transported material
- bim
- automatic clinker
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 25
- 239000000463 material Substances 0.000 title claims abstract description 22
- 238000005516 engineering process Methods 0.000 title claims abstract description 21
- 238000010276 construction Methods 0.000 claims abstract description 21
- 230000000007 visual effect Effects 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Design building technical field of construction of the present invention, spy are related to a kind of method based on BIM technology automatic clinker-removing device transported material.The present invention obtains relevant data by analog information, and need to look for optimal data in modeling, and finally obtains Production database and execute corresponding operation.The present invention reduces the probability having an accident in construction, promotes working efficiency by simulating and optimizing building data.
Description
Technical field
Design building technical field of construction of the present invention, and in particular to a kind of pile foundation based on BIM technology is anti-and skyscraper
Material transport system and method.
Background technique
In Modernized City Construction, the height of building is higher and higher, therefore, can usually be related in construction
Deep basal pit and skyscraper can be related to material transportation in construction and transport to high level or from foundation pit by waste material, transport
Material is not only had during material on the way to fall with certain risk, but also is easy to happen failure, and efficiency is lower.
Summary of the invention
In view of the deficiencies of the prior art, the present invention provides a kind of based on BIM technology automatic clinker-removing device transported material
Method.The present invention obtains relevant data by analog information, and need to look for optimal data in modeling, and finally obtain creation data
Library 2 executes corresponding operation.The present invention is reduced and is had an accident in construction by simulating and optimizing building data
Probability promotes working efficiency.
The technical scheme is that a kind of method based on BIM technology automatic clinker-removing device transported material, feature exist
In: the following steps are included:
1), construction site layout situation and form of construction work are simulated using BIM technology;
2) it, obtains the height of skyscraper or hollows out the depth and Ground arrangement information of stake, judging to have under the height can
The danger that can occur and fault message;
3) information of transported material, is obtained;
4) database 1, is generated using parameterized digital technology, is filled in database 1 comprising establishing mechanical arm and automatic ash ejector
Battery block needed for putting the BIM model of seated position and transit route;
5), in conjunction with step 1), 2), 3), obtain information, enter information into database 1, the battery in database 1
Block will carry out automatic connection and carry out visual programming, establish mechanical arm and automatic clinker-removing device placement location and transit route and side
The different BIM models of formula, obtain the analog result of all BIM models;
6), database 1 filters out several optimal embodiments, lists the specific value of each scheme time cost for making
User's selection;
7), in the operational process of device, find that operation problem will adjust automatically emergency and anti-in time by inductor
It is fed to database 2, then by the feedback of database 2 to controller;
8), in the operational process of device, find that operation problem will adjust automatically emergency and anti-in time by inductor
Database 2 is presented, then by the feedback of database 2 to controller.
According to a kind of method based on BIM technology automatic clinker-removing device transported material as described above, it is characterised in that: also
It include mobile terminal controller including prison control system, transport device and conveying mechanism, monitoring system, controller is connected with display
Screen, camera, alarm;
According to a kind of method based on BIM technology automatic clinker-removing device transported material as described above, it is characterised in that: fortune
Defeated device includes Transport Machinery arm assembly, enclosure device, automatic clinker-removing device.
According to a kind of method based on BIM technology automatic clinker-removing device transported material as described above, it is characterised in that: fortune
The different BIM models of defeated device and conveying mechanism placement location and the method for operation, are simulated by construction simulation software.
Compared with prior art, the present invention having the following advantages and benefits:
The present invention is by utilizing BIM technology field cloth model, and the embodiment by BIM technology applied to automatic clinker-removing device
And on position, then optimal result is selected to be implemented, material is not only had during transported material with solution and is existed
It is fallen on the way with certain risk, and is easy to happen failure, the lower problem of efficiency.
Detailed description of the invention
Fig. 1 is course of work schematic diagram of the present invention.
Fig. 2 is flow chart of the invention.
Specific embodiment
Technical solution of the present invention is described further below in conjunction with attached drawing.
A method of based on BIM technology automatic clinker-removing device transported material,
It is described the following steps are included:
1) the arrangement and method for construction planning that, CAD diagram paper and construction party provide in conjunction with given by design side utilizes oblique photograph skill
Art is scanned place while using revit or Sketch Up and other professional construction field cloth simulation softwards to construction site
Deployment scenarios and form of construction work are simulated;
2) it, obtains the height of skyscraper or hollows out the depth and Ground arrangement information of stake, judging to have under the height can
The danger that can occur and fault message;
3) information of transported material, is obtained;
4) database 1, is generated using parameterized digital technology, is filled in database 1 comprising establishing mechanical arm and automatic ash ejector
Battery block needed for putting seated position and transit route and the BIM model of mode;
5), in conjunction with step 1), 2), 3), obtain information, enter information into database 1, the battery in database 1
Block will carry out automatic connection and carry out visual programming, establish mechanical arm and automatic clinker-removing device placement location and transit route and side
The different BIM models of formula, obtain the analog result of all BIM models;
6), database 1 will filter out several optimal embodiments, optimal scheme include the minimum scheme of cost,
The shortest scheme of required time, time and cost is average, the shortest scheme of transportation route, and list each scheme time cost
Specific value is selected for user;
7), in the operational process of device, find that operation problem will adjust automatically emergency and anti-in time by inductor
It is fed to database 2, then by the feedback of database 2 to controller.
Device in step 7) includes prison control system, transport device and conveying mechanism, and prison control system includes mobile whole
Side controller, controller are connected with display screen, camera, alarm;
Transport device includes Transport Machinery arm assembly, enclosure device, automatic clinker-removing device.
Construction site deployment scenarios are arranged according to the arrangement and method for construction that designing institute provides.
The present invention establishes the different BIM models of transport device and conveying mechanism placement location and the method for operation, by
The construction simulations software such as Navisworks is simulated.
Claims (4)
1. a kind of method based on BIM technology automatic clinker-removing device transported material, it is characterised in that: the following steps are included:
1), construction site layout situation and form of construction work are simulated using BIM technology;
2) height of skyscraper or the depth and Ground arrangement information of caisson, are obtained, judges to be possible to out under the height
Existing danger and fault message;
3) information of transported material, is obtained;
4) database 1, is generated using parameterized digital technology, comprising establishing mechanical arm and automatic clinker-removing device is put in database 1
Battery block needed for the BIM model of seated position and transit route;
5), in conjunction with step 1), 2), 3), the information that obtains, enter information into database 1, battery block in database 1 will
It carries out automatic connection and carries out visual programming, establish mechanical arm and automatic clinker-removing device placement location and transit route and mode
Different BIM models obtain the analog result of all BIM models;
6), database 1 filters out several optimal embodiments, lists the specific value of each scheme time cost for user
Selection;
7), in the operational process of device, by inductor find operation problem will adjust automatically meet an urgent need and be timely fed back to
Database 2, then by the feedback of database 2 to controller;
8), in the operational process of device, by inductor find operation problem will adjust automatically meet an urgent need and timely feedback number
According to library 2, then by the feedback of database 2 to controller.
2. according to benefit require 1 described in a kind of method based on BIM technology automatic clinker-removing device transported material, it is characterised in that:
Including prison control system, transport device and conveying mechanism, prison control system includes mobile terminal controller, and controller is connected with aobvious
Display screen, camera, alarm.
3. according to benefit require 2 described in a kind of method based on BIM technology automatic clinker-removing device transported material, it is characterised in that:
Transport device includes Transport Machinery arm assembly, enclosure device, automatic clinker-removing device.
4. a kind of method based on BIM technology automatic clinker-removing device transported material according to claim 2, feature exist
In: the different BIM models of transport device and conveying mechanism placement location and the method for operation are simulated by construction simulation software.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910215266.0A CN109948853A (en) | 2019-03-21 | 2019-03-21 | A method of based on BIM technology automatic clinker-removing device transported material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910215266.0A CN109948853A (en) | 2019-03-21 | 2019-03-21 | A method of based on BIM technology automatic clinker-removing device transported material |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109948853A true CN109948853A (en) | 2019-06-28 |
Family
ID=67011039
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910215266.0A Pending CN109948853A (en) | 2019-03-21 | 2019-03-21 | A method of based on BIM technology automatic clinker-removing device transported material |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109948853A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111321898A (en) * | 2020-02-28 | 2020-06-23 | 广东博智林机器人有限公司 | Cloth path planning method, device, equipment and storage medium |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107255981A (en) * | 2017-06-14 | 2017-10-17 | 成都智建新业建筑设计咨询有限公司 | A kind of super high rise building transport of materials management system based on BIM |
CN109344439A (en) * | 2018-09-01 | 2019-02-15 | 鼎宸建设科技有限公司 | A kind of modeling of building block formula and its simulative construction method based on BIM |
-
2019
- 2019-03-21 CN CN201910215266.0A patent/CN109948853A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107255981A (en) * | 2017-06-14 | 2017-10-17 | 成都智建新业建筑设计咨询有限公司 | A kind of super high rise building transport of materials management system based on BIM |
CN109344439A (en) * | 2018-09-01 | 2019-02-15 | 鼎宸建设科技有限公司 | A kind of modeling of building block formula and its simulative construction method based on BIM |
Non-Patent Citations (3)
Title |
---|
尹龙等: "基于BIM技术的仿真模拟在地铁暗挖隧道施工中的应用", 《土木建筑工程信息技术》 * |
张立茂等: "基于BIM的工程施工安全关键技术研究", 《建筑经济》 * |
高震等: "基于BIM技术的项目管理系统平台构建与应用研究", 《安徽建筑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111321898A (en) * | 2020-02-28 | 2020-06-23 | 广东博智林机器人有限公司 | Cloth path planning method, device, equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109543233A (en) | A kind of electromechanical pipeline assembly construction method based on BIM technology | |
Chatzimichailidou et al. | Using BIM in the safety risk management of modular construction | |
Hu et al. | Smart building demolition and waste management frame with image-to-BIM | |
CN108109204B (en) | Method and system for manufacturing and rendering large-scale terrain | |
CN107818198A (en) | A kind of science of bridge building management platform based on BIM technology | |
US10095817B2 (en) | Determining wind loading of structures through wind flow simulation | |
CN204463529U (en) | For training the system of operator | |
CN109736319A (en) | Excavation of foundation pit and anti-float anchor rod construction method based on BIM | |
CN108140218A (en) | Integrity decision maker, integrity determination method and integrity decision procedure | |
CN109948853A (en) | A method of based on BIM technology automatic clinker-removing device transported material | |
CN107423455A (en) | A kind of highway method for automatic modeling and system | |
CN113505418A (en) | Bridge construction method based on BIM | |
CN111985031B (en) | Construction method and device of roadbed three-dimensional model, computer equipment and storage medium | |
CN113700053A (en) | BIM-based construction process foundation pit deformation monitoring and early warning method and system | |
CN114782005A (en) | BIM planning and construction management method combined with oblique photography | |
CN109376404A (en) | Build outer profile model generating method, system, device and readable storage medium storing program for executing | |
CN111126691B (en) | Project management method and related products | |
CN106203969A (en) | A kind of prison check system of steel-making boiler tubing based on BIM | |
CN113204284A (en) | Virtual construction comprehensive pipeline installation and acceptance method based on BIM and MR technology | |
KR102112749B1 (en) | Method for managing of the tower crane using construction management plan and computer readable media thereof | |
CN113464197B (en) | Mine water disaster emergency management method and system | |
CN112487531A (en) | Method for optimizing subway station earth excavation scheme based on BIM technology | |
CN112613856A (en) | Three-dimensional technology intersection method and device of railway BIM system based on web real-time modeling | |
CN115659440B (en) | Construction organization and traffic organization simulation method based on Unity platform | |
CN115953510A (en) | Construction simulation animation manufacturing method for iron-involved swivel bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190628 |
|
RJ01 | Rejection of invention patent application after publication |