CN109944336A - Steel concrete compound shear wall and the combination assembled structural system of reinforced concrete shear wall - Google Patents

Steel concrete compound shear wall and the combination assembled structural system of reinforced concrete shear wall Download PDF

Info

Publication number
CN109944336A
CN109944336A CN201910272693.2A CN201910272693A CN109944336A CN 109944336 A CN109944336 A CN 109944336A CN 201910272693 A CN201910272693 A CN 201910272693A CN 109944336 A CN109944336 A CN 109944336A
Authority
CN
China
Prior art keywords
steel
shear wall
steel concrete
concrete compound
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910272693.2A
Other languages
Chinese (zh)
Inventor
何志强
雷红兵
杨文超
师国良
庞瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Lyujian Building Technology Co Ltd
Original Assignee
Henan Lyujian Building Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Lyujian Building Technology Co Ltd filed Critical Henan Lyujian Building Technology Co Ltd
Priority to CN201910272693.2A priority Critical patent/CN109944336A/en
Publication of CN109944336A publication Critical patent/CN109944336A/en
Pending legal-status Critical Current

Links

Abstract

Steel concrete compound shear wall and the combination assembled structural system of reinforced concrete shear wall, including several segments steel concrete compound shear wall and reinforced concrete shear wall, between adjacent two sections of steel concrete compound shear wall, horizontally disposed between adjacent steel concrete compound shear wall and reinforced concrete shear wall and between adjacent two sections of reinforced concrete shear walls there is Vierendeel girder;It is vertically installed with frame secondary beam between parallel Vierendeel girder, secondary structure wall is filled with below frame secondary beam and below Vierendeel girder;The present invention is greatly improved the bonding strength between two steel concrete compound tubes at L-type node, it is cast-in-place to be combined with prefabricated, convenient for construction, construction efficiency is high, and construction quality can be guaranteed, fully meet the requirements such as the whole stress of modern assembled architecture, energy conservation, antidetonation, and compact-sized and intensity is high, avoids deformation in the handling process, and have good heat insulation effect, reduce concrete amount, reduces construction cost.

Description

Steel concrete compound shear wall and the combination assembled structural system of reinforced concrete shear wall
Technical field
The invention belongs to assembled architecture system technical field of construction, and in particular to a kind of steel concrete compound shear wall and reinforcing bar The combination assembled structural system of concrete shear force wall.
Background technique
In recent years, due to the jumping up of the raising of energy-saving and emission-reduction policy requirements and the price of labour power, simultaneously by In popularity of the advanced technology in fabricated construction, the trend of fabricated construction risen rapidly using presentation.Assembled Building is primarily adapted for use in non-Aseismic Design at present and seismic fortification intensity is the Class B and Class B in 6-8 degree Aseismic Design area All kinds of civil buildings below.During assembled architecture shear wall system promotes and applies, the component of shear wall system is main It is to transport after factory is processed to construction site to be assembled, is had the following deficiencies: in the steel concrete compound tube of factory process 1, existing assembled architecture, which promotes and applies maximum problem, can not exactly form stable unified system, this key to the issue just exists Node connection between steel concrete compound tube, L-type node is one of most common node of assembled architecture, existing L-type node Construction mostly have structural integrity not strong, shock resistance is poor, be easy to cause assembled deformation of wall, generate crack the shortcomings that, Its type of attachment is also unable to satisfy the use function of assembled architecture requirements at the higher level;2, steel concrete compound tube structure in the handling process Intensity is poor, is easy to produce deformation;3, the bonding strength for the node connecting between beam in work progress at the scene is not firm enough It leans on;4, formation shear wall thermal insulation performance is poor after casting concrete in center cavity for steel concrete compound tube at the construction field (site), does not save Energy;5, casting concrete is more, and construction cost is higher.
Summary of the invention
The present invention provides that a kind of structural strength is high, stability is strong, node connects to solve shortcoming in the prior art Connect the low steel concrete compound shear wall of intensity height, good heat preservation performance, construction cost and the combination assembled structure of reinforced concrete shear wall System.
In order to solve the above technical problems, the present invention adopts the following technical scheme: steel concrete compound shear wall and armored concrete The combination assembled structural system of shear wall, including several segments steel concrete compound shear wall and reinforced concrete shear wall, adjacent two sections Between steel concrete compound shear wall, between adjacent steel concrete compound shear wall and reinforced concrete shear wall and adjacent two sections of reinforcing bars are mixed It is horizontally disposed between solidifying soil shear wall to have Vierendeel girder;Frame secondary beam is vertically installed between parallel Vierendeel girder, in frame Secondary structure wall is filled with below secondary beam and below Vierendeel girder;
The cross section that steel concrete compound shear wall is is "-" type or L-type;The steel concrete compound shear wall of L-type is by vertically arranged two sections "-" type steel concrete compound shear wall docks;
The steel concrete compound shear wall of L-type includes orthogonal first steel concrete compound tube and the second steel concrete compound tube, the second steel concrete Compound tube is located on the right side of the first steel concrete compound tube, and the first steel concrete compound tube outside portion has poured the first concrete layer, the second steel concrete Compound tube outside portion has poured the second concrete layer, and the first channel steel right side on the right side of the first steel concrete compound tube is exposed outside, the The second channel steel trailing flank on rear side of two steel concrete compound tubes is exposed outside, on the right side of the first steel concrete compound tube and after the second steel concrete compound tube The installation space that cross section is in rectangle is formed between side, is provided with reinforcing bar mesh skeleton in installation space;
Reinforcing bar mesh skeleton includes vertical reinforcement, the first U-shaped shearing resistance stirrup, the second U-shaped shearing resistance stirrup and rectangle shearing resistance stirrup, is erected It being arranged in vertical to reinforcing bar, the first U-shaped shearing resistance stirrup, the second U-shaped shearing resistance stirrup and rectangle shearing resistance stirrup are horizontally disposed, Vertical reinforcement is provided at least eight, wherein four vertical reinforcements are separately positioned on the four corners of installation space, at least two perpendicular To steel-bar arrangement in the vertical plane where two vertical reinforcements of rear side, at least two vertical reinforcement settings are perpendicular two, right side Into the vertical plane where reinforcing bar,
The right side of first channel steel is vertically uniformly provided with several the first perforation, and the both ends of the first U-shaped shearing resistance stirrup are horizontal It passes through the first perforation towards a left side to extend into inside the first steel concrete compound tube, the right side of the first U-shaped shearing resistance stirrup is perpendicular around at least two It is integrated to reinforcing bar and with the vertical reinforcement spot welding or binding closed on;The rear side of second channel steel is vertically uniformly provided with several Second perforation, the both ends of the second U-shaped shearing resistance stirrup are horizontal to be extend into inside the second steel concrete compound tube across the second perforation forward, The rear side of second U-shaped shearing resistance stirrup is integrated around at least two vertical reinforcements and with the vertical reinforcement spot welding or binding closed on; Rectangle shearing resistance stirrup covers outside all vertical reinforcements and corresponds spot welding or binding with vertical reinforcement.
The horizontal bending in the left side both ends of first U-shaped shearing resistance stirrup forms the first U-shaped anchorage head;Second U-shaped shearing resistance stirrup The horizontal bending of rear side both ends form the second U-shaped anchorage head;First U-shaped shearing resistance stirrup, the second U-shaped shearing resistance stirrup and rectangle are anti- Cutting stirrup, vertically the length direction of reinforcing bar is provided with several layers.
The first drawknot cracking resistance mesh sheet, the first drawknot cracking resistance are embedded in the first concrete layer outside first steel concrete compound tube The right edge of mesh sheet is located at outside the first exposed channel steel, is welded as one on rear side of the first drawknot cracking resistance mesh sheet and rectangle shearing resistance stirrup Body;
The second drawknot cracking resistance mesh sheet, the second drawknot cracking resistance mesh sheet are embedded in the second concrete layer outside second steel concrete compound tube Back side edge be located at outside the second exposed channel steel, after the second leftward or rightward bending of drawknot cracking resistance mesh sheet back side edge in left side with It is welded as a whole on front side of rectangle shearing resistance stirrup, is welded on the right side of the second drawknot cracking resistance mesh sheet back side edge and rectangle shearing resistance stirrup on right side It is integrated.
In reinforcing bar mesh skeleton and the first exposed drawknot cracking resistance mesh sheet and the second drawknot cracking resistance mesh sheet in installation space Outside poured concrete block, the lateral surface of concrete block is respectively and outside the first concrete layer outer surface and the second concrete layer Surface is corresponding to be connected and keeps flushing, and the inside of the first steel concrete compound tube and the second steel concrete compound tube has poured inner concrete, mixes Solidifying soil block is connected as one by the first perforation and the second perforation with inner concrete.
Foam heat-insulating board is embedded with inside the inner concrete of all or part of steel concrete compound shear wall.
It is welded with several reinforcement steel pipes inside first steel concrete compound tube and the second steel concrete compound tube, reinforces steel pipe and passes through bubble Foam insulation board, the reinforcement steel pipe both ends inside the first steel concrete compound tube are embedded in the first concrete layer, the second steel concrete compound tube Internal reinforcement steel pipe both ends are embedded in the second concrete layer.
By adopting the above technical scheme, reinforced concrete shear wall in the present invention is cast-in-place at the construction field (site) to be formed, and reinforcing bar is mixed The fewer solidifying soil shear wall the better in system, and reinforced concrete shear wall is used at the not position of primary steel concrete compound tube, such as Arc-shaped or other special-shaped walls.The steel concrete compound tube that steel concrete compound shear wall is made by factory transport to construction site after in steel Inner concrete is poured in concrete compound tube to form.Steel concrete compound shear wall is used in system as much as possible, it is especially internal pre- It buries foam heat-insulating board and the steel concrete compound tube of steel pipe is reinforced in setting.
Connecting bracket is embedded in steel concrete compound shear wall and reinforced concrete shear wall, construct at the scene Vierendeel girder and frame When sortie beam, Vierendeel girder and frame secondary beam are supported in connecting bracket and pass through bolt with connecting bracket or be welded as a whole.
The first concrete layer outside the first steel concrete compound tube and the first pre-buried drawknot cracking resistance mesh sheet in the present invention And second the second concrete layer outside steel concrete compound tube and the second pre-buried drawknot cracking resistance mesh sheet it is prefabricated in the factory It forms.When being prefabricated in the factory the first channel steel, the right-hand end of the first drawknot cracking resistance mesh sheet and the second channel steel and with the second drawknot The rear end of cracking resistance mesh sheet it is exposed outside.
First steel concrete compound tube and the second steel concrete compound tube are transported to after construction site and carry out assembling construction, first by the One steel concrete compound tube and the second steel concrete compound tube are arranged vertically, the installation between exposed first channel steel and the second channel steel Space layout reinforcing bar mesh skeleton,
Part vertical reinforcement and the first channel steel are connected as one by the first U-shaped shearing resistance stirrup, and the second U-shaped shearing resistance stirrup portion is vertical Reinforcing bar is connected as one with the second channel steel, and all Vertical bar connections are integrated by rectangle shearing resistance stirrup, finally empty in installation Interior casting concrete is solidified as concrete block, thus securely connects the first steel concrete compound tube and the second steel concrete compound tube It is integrated.First drawknot cracking resistance mesh sheet and the second drawknot cracking resistance mesh sheet are also poured into concrete block, guarantee that first is mixed in this way Solidifying soil layer and concrete block do not crack in the appearance of junction, the second concrete layer and concrete block in junction.It is mixed pouring Inner concrete is poured respectively in the inside of the first steel concrete compound tube and the second steel concrete compound tube while solidifying soil block, is made first U-shaped Anchorage head and the first U-shaped shearing resistance stirrup are connected as one with the first steel concrete compound tube, make the second U-shaped anchorage head and second U-shaped anti- It cuts stirrup to be connected as one with the second steel concrete compound tube, in addition, the first perforation, the second perforation are much larger than and penetrate shearing resistance stirrup Diameter can be such that the inner concrete of concrete block and left side and the inner concrete of front side is connected as one in this way, further promote L-type Bonding strength at node.
First U-shaped shearing resistance stirrup left end bending forms the first U-shaped anchorage head, and the is formed after the second U-shaped shearing resistance stirrup bending Two U-shaped anchorage heads, the first U-shaped anchorage head and the second U-shaped anchorage head are cast in inner concrete, have extremely strong connection strong Degree, it is ensured that the unfailing performance connected between two adjacent sections steel concrete compound tube.
Foam heat-insulating board plays the heat insulation effect for improving steel concrete compound tube shear wall;And reduce the dosage of concrete, Reduce construction cost.
Reinforce the effect that steel pipe improves bonding strength between front spring and rear steel plate to play and keep away when carrying the present invention Exempt from the effect that steel concrete compound tube generates torsional deformation.
In conclusion the present invention is greatly improved the bonding strength between two steel concrete compound tubes at L-type node, and ensure The reliability of connection, cast-in-place to combine with prefabricated, convenient for construction, construction efficiency is high, and construction quality can be guaranteed, completely full The requirements such as the whole stress of sufficient modern assembled architecture, energy conservation, antidetonation, and compact-sized and intensity is high, is carrying Deformation is avoided in journey, and there is good heat insulation effect, is reduced concrete amount, is reduced construction cost.
Detailed description of the invention
Fig. 1 is floor plan of the invention;
Fig. 2 is plan view of the steel concrete compound shear wall of L-type in the present invention at L-type connecting node;
Fig. 3 is the schematic diagram of the first steel concrete compound tube and the first U-shaped shearing resistance stirrup connection in Fig. 2;
Fig. 4 is the schematic diagram of the second steel concrete compound tube and the second U-shaped shearing resistance stirrup connection in Fig. 2;
Fig. 5 is the schematic diagram of rectangle shearing resistance stirrup in Fig. 2;
Fig. 6 is the left view of the first steel concrete compound tube in Fig. 2;
Fig. 7 is built-in foam heat-insulating board and the first steel concrete compound tube structural schematic diagram for reinforcing steel pipe.
Specific embodiment
As shown in figs 1 to 6, punched holes type steel concrete compound tube L-type node on channel steel of the invention, including several segments steel concrete group Combination shearing wall 15 and reinforced concrete shear wall 16, between adjacent two sections of steel concretes compound shear wall 15, adjacent steel concrete combined shear It is horizontally disposed between wall 15 and reinforced concrete shear wall 16 and between adjacent two sections of reinforced concrete shear walls 16 framed Set a roof beam in place 17;It is vertically installed with frame secondary beam 18 between parallel Vierendeel girder 17, below frame secondary beam 18 and Vierendeel girder 17 Lower section is filled with secondary structure wall;
The cross section that steel concrete compound shear wall 15 is is "-" type or L-type;The steel concrete compound shear wall 15 of L-type is by vertically arranged Two sections of "-" type steel concrete compound shear walls 15 dock.
The steel concrete compound shear wall 15 of L-type includes orthogonal first steel concrete compound tube and the second steel concrete compound tube, the Two steel concrete compound tubes are located on the right side of the first steel concrete compound tube, and the first steel concrete compound tube outside portion has poured the first concrete layer 1, the Two steel concrete compound tube outside portions have poured the second concrete layer 2, and 3 right side of the first channel steel on the right side of the first steel concrete compound tube is exposed Outside, 4 trailing flank of the second channel steel on rear side of the second steel concrete compound tube is exposed outside, the first steel concrete compound tube right side and the second steel concrete The installation space 5 that cross section is in rectangle is formed between on rear side of compound tube, is provided with reinforcing bar mesh skeleton in installation space 5;
Reinforcing bar mesh skeleton includes vertical reinforcement 6, the first U-shaped shearing resistance stirrup 7, the second U-shaped shearing resistance stirrup 8 and rectangle shearing resistance stirrup 9, vertical reinforcement 6 is arranged in vertical, and the first U-shaped shearing resistance stirrup 7, the second U-shaped shearing resistance stirrup 8 and rectangle shearing resistance stirrup 9 are equal Horizontally disposed, vertical reinforcement 6 is provided at least eight, wherein four vertical reinforcements 6 are separately positioned on the quadrangle of installation space 5 Place, at least two vertical reinforcements 6 are arranged in the vertical plane at two vertical reinforcements of rear side, 6 place, at least two vertical reinforcements 6 It is arranged in the vertical plane at two, right side vertical reinforcement, 6 place,
The right side of first channel steel 3 is vertically uniformly provided with several the first perforation 10, the both ends of the first U-shaped shearing resistance stirrup 7 Level passes through the first perforation 10 towards a left side and extend into inside the first steel concrete compound tube, and the right side of the first U-shaped shearing resistance stirrup 7 is around at least Two vertical reinforcements 6 are simultaneously integrated with 6 spot welding of vertical reinforcement or binding closed on;The rear side of second channel steel 4 is vertically uniformly opened Equipped with several the second perforation (identical as the first 10 structures of perforation on the first channel steel 3, to be not shown in the figure), the second U-shaped shearing resistance The both ends of stirrup 8 are horizontal to be extend into inside the second steel concrete compound tube across the second perforation forward, the second U-shaped shearing resistance stirrup 8 Rear side is integrated around at least two vertical reinforcements 6 and with 6 spot welding of vertical reinforcement or binding closed on;9 sets of rectangle shearing resistance stirrup In all 6 outsides of vertical reinforcement and spot welding or binding are corresponded with vertical reinforcement 6.
The horizontal bending in the left side both ends of first U-shaped shearing resistance stirrup 7 forms the first U-shaped anchorage head 11;Second U-shaped shearing resistance hoop The horizontal bending in the rear side both ends of muscle 8 forms the second U-shaped anchorage head 12.
First U-shaped shearing resistance stirrup 7, the second U-shaped shearing resistance stirrup 8 and rectangle shearing resistance the stirrup 9 vertically length side of reinforcing bar 6 To being provided with several layers.
The first drawknot cracking resistance mesh sheet 13, the first drawknot are embedded in the first concrete layer 1 outside first steel concrete compound tube The right edge of cracking resistance mesh sheet 13 is located at outside the first exposed channel steel 3, after the first drawknot cracking resistance mesh sheet 13 and rectangle shearing resistance stirrup 9 Side is welded as a whole.
The second drawknot cracking resistance mesh sheet 14, the second drawknot are embedded in the second concrete layer 2 outside second steel concrete compound tube The back side edge of cracking resistance mesh sheet 14 is located at outside the second exposed channel steel 4, and 14 back side edge of the second drawknot cracking resistance mesh sheet in left side is to the left Or be welded as a whole on front side of rectangle shearing resistance stirrup 9 after bending to the right, 14 back side edge of the second drawknot cracking resistance mesh sheet and square on right side It is welded as a whole on the right side of shape shearing resistance stirrup 9.
In reinforcing bar mesh skeleton and the first exposed drawknot cracking resistance mesh sheet 13 and the second drawknot anti-crack net in installation space 5 The outside of piece 14 has poured concrete block (not shown), the lateral surface of concrete block respectively with 1 appearance of the first concrete layer The corresponding linking in face and 2 outer surface of the second concrete layer and keep flushing, the first steel concrete compound tube and the second steel concrete compound tube it is interior Portion has poured inner concrete (not shown), and concrete block is connected as by the first perforation 10 and the second perforation with inner concrete One.
As shown in fig. 7, being embedded with foam heat-insulating board inside the inner concrete of all or part of steel concrete compound shear wall 15 20。
It is welded with several reinforcement steel pipes 21 inside first steel concrete compound tube and the second steel concrete compound tube, reinforces steel pipe 21 and wears Foam heat-insulating board 20 is crossed, 21 both ends of reinforcement steel pipe inside the first steel concrete compound tube are embedded in the first concrete layer 1, the second steel 21 both ends of reinforcement steel pipe inside concrete compound tube are embedded in the second concrete layer 2.
Reinforced concrete shear wall 16 in the present invention is cast-in-place at the construction field (site) to be formed, and reinforced concrete shear wall 16 is in body More fewer better in system, reinforced concrete shear wall 16 is used in not at the position of primary steel concrete compound tube, for example, it is arc-shaped or other Special-shaped wall.Steel concrete compound shear wall 15 transported by the steel concrete compound tube that factory makes to construction site after in steel concrete compound tube Inner concrete is poured to form.Steel concrete compound shear wall 15 is used in system as much as possible, especially internal pre-buried foam is protected The steel concrete compound tube of steel pipe 21 is reinforced in warm plate 20 and setting.
Connecting bracket 19 is embedded in steel concrete compound shear wall 15,20 side of foam heat-insulating board is offered for accommodating connection The groove 22 of bracket 19, the setting of groove 22, can make in steel concrete compound tube casting concrete in groove 22 with connecting bracket 15 Solidification is integrated, it is ensured that the strength and stability of connecting bracket 15, connecting bracket 15 are constructed Vierendeel girder 17 and frame time at the scene When beam 18, Vierendeel girder 17 and frame secondary beam 18 are supported in connecting bracket 19 and by bolt or are welded as one with connecting bracket 19 Body.
The first concrete layer 1 outside the first steel concrete compound tube and the first pre-buried drawknot cracking resistance mesh sheet in the present invention 13 and second the second concrete layer 2 outside steel concrete compound tube and the second pre-buried drawknot cracking resistance mesh sheet 14 in the factory It is prefabricated to form.When being prefabricated in the factory the first channel steel 3, the right-hand end of the first drawknot cracking resistance mesh sheet 13 and the second channel steel 4 and and The rear end of second drawknot cracking resistance mesh sheet 14 it is exposed outside.
First steel concrete compound tube and the second steel concrete compound tube are transported to after construction site and carry out assembling construction, first by the One steel concrete compound tube and the second steel concrete compound tube are arranged vertically, the peace between exposed first channel steel 3 and the second channel steel 4 It fills space 5 and arranges reinforcing bar mesh skeleton,
Part vertical reinforcement 6 and the first channel steel 3 are connected as one by the first U-shaped shearing resistance stirrup 7, the second U-shaped 8 part of shearing resistance stirrup Vertical reinforcement 6 is connected as one with the second channel steel 4, and all vertical reinforcements 6 are connected as one by rectangle shearing resistance stirrup 9, finally Casting concrete is solidified as concrete block in installation space 5, thus by the first steel concrete compound tube and the second steel concrete compound tube Securely it is connected as one.First drawknot cracking resistance mesh sheet 13 and the second drawknot cracking resistance mesh sheet 14 are also poured into concrete block, Guarantee the appearance of the first concrete layer 1 and concrete block in junction, the second concrete layer 2 and concrete block in junction in this way It does not crack.Interior mix is poured respectively in the inside of the first steel concrete compound tube and the second steel concrete compound tube while casting concrete block Solidifying soil, is connected as one the first U-shaped anchorage head 11 and the first U-shaped shearing resistance stirrup 7 with the first steel concrete compound tube, makes second U-shaped Anchorage head 12 and the second U-shaped shearing resistance stirrup 8 are connected as one with the second steel concrete compound tube, in addition, first the 10, second perforation of perforation Much larger than the diameter for penetrating shearing resistance stirrup, the inner concrete of the inner concrete and front side that can make concrete block and left side in this way connects It is connected in one, further promotes the bonding strength at L-type node.
First U-shaped 7 left end bending of shearing resistance stirrup forms the first U-shaped anchorage head 11, shape after the second U-shaped 8 bending of shearing resistance stirrup At the second U-shaped anchorage head 12, the first U-shaped anchorage head 11 and the second U-shaped anchorage head 12 are cast in inner concrete, are had extremely strong Bonding strength, it is ensured that the unfailing performance connected between two adjacent sections steel concrete compound tube.
The present embodiment not makes any form of restriction shape of the invention, material, structure etc., all according to this hair Bright technical spirit any simple modification, equivalent change and modification to the above embodiments, belong to the technology of the present invention side The protection scope of case.

Claims (6)

1. steel concrete compound shear wall and the combination assembled structural system of reinforced concrete shear wall, it is characterised in that: including several Section steel concrete compound shear wall and reinforced concrete shear wall, between adjacent two sections of steel concrete compound shear wall, the combination of adjacent steel concrete cuts Being horizontally disposed between power wall and reinforced concrete shear wall and between adjacent two sections of reinforced concrete shear walls has Vierendeel girder; Frame secondary beam is vertically installed between parallel Vierendeel girder, filled with secondary below frame secondary beam and below Vierendeel girder Structure wall;
The cross section that steel concrete compound shear wall is is "-" type or L-type;The steel concrete compound shear wall of L-type is by vertically arranged two sections "-" type steel concrete compound shear wall docks;
The steel concrete compound shear wall of L-type includes orthogonal first steel concrete compound tube and the second steel concrete compound tube, the second steel concrete Compound tube is located on the right side of the first steel concrete compound tube, and the first steel concrete compound tube outside portion has poured the first concrete layer, the second steel concrete Compound tube outside portion has poured the second concrete layer, and the first channel steel right side on the right side of the first steel concrete compound tube is exposed outside, the The second channel steel trailing flank on rear side of two steel concrete compound tubes is exposed outside, on the right side of the first steel concrete compound tube and after the second steel concrete compound tube The installation space that cross section is in rectangle is formed between side, is provided with reinforcing bar mesh skeleton in installation space;
Reinforcing bar mesh skeleton includes vertical reinforcement, the first U-shaped shearing resistance stirrup, the second U-shaped shearing resistance stirrup and rectangle shearing resistance stirrup, is erected It being arranged in vertical to reinforcing bar, the first U-shaped shearing resistance stirrup, the second U-shaped shearing resistance stirrup and rectangle shearing resistance stirrup are horizontally disposed, Vertical reinforcement is provided at least eight, wherein four vertical reinforcements are separately positioned on the four corners of installation space, at least two perpendicular To steel-bar arrangement in the vertical plane where two vertical reinforcements of rear side, at least two vertical reinforcement settings are perpendicular two, right side Into the vertical plane where reinforcing bar,
The right side of first channel steel is vertically uniformly provided with several the first perforation, and the both ends of the first U-shaped shearing resistance stirrup are horizontal It passes through the first perforation towards a left side to extend into inside the first steel concrete compound tube, the right side of the first U-shaped shearing resistance stirrup is perpendicular around at least two It is integrated to reinforcing bar and with the vertical reinforcement spot welding or binding closed on;The rear side of second channel steel is vertically uniformly provided with several Second perforation, the both ends of the second U-shaped shearing resistance stirrup are horizontal to be extend into inside the second steel concrete compound tube across the second perforation forward, The rear side of second U-shaped shearing resistance stirrup is integrated around at least two vertical reinforcements and with the vertical reinforcement spot welding or binding closed on; Rectangle shearing resistance stirrup covers outside all vertical reinforcements and corresponds spot welding or binding with vertical reinforcement.
2. steel concrete compound shear wall according to claim 1 and the combination assembled structural system of reinforced concrete shear wall, It is characterized by: the horizontal bending in the left side both ends of the first U-shaped shearing resistance stirrup forms the first U-shaped anchorage head;Second U-shaped shearing resistance hoop The horizontal bending in the rear side both ends of muscle forms the second U-shaped anchorage head;First U-shaped shearing resistance stirrup, the second U-shaped shearing resistance stirrup and rectangle Vertically the length direction of reinforcing bar is provided with several layers to shearing resistance stirrup.
3. steel concrete compound shear wall according to claim 1 and the combination assembled structural system of reinforced concrete shear wall, It is characterized by: being embedded with the first drawknot cracking resistance mesh sheet, the first drawknot in the first concrete layer outside the first steel concrete compound tube The right edge of cracking resistance mesh sheet is located at outside the first exposed channel steel, welds on rear side of the first drawknot cracking resistance mesh sheet and rectangle shearing resistance stirrup It is integrated;
The second drawknot cracking resistance mesh sheet, the second drawknot cracking resistance mesh sheet are embedded in the second concrete layer outside second steel concrete compound tube Back side edge be located at outside the second exposed channel steel, after the second leftward or rightward bending of drawknot cracking resistance mesh sheet back side edge in left side with It is welded as a whole on front side of rectangle shearing resistance stirrup, is welded on the right side of the second drawknot cracking resistance mesh sheet back side edge and rectangle shearing resistance stirrup on right side It is integrated.
4. steel concrete compound shear wall according to claim 1 and the combination assembled structural system of reinforced concrete shear wall, It is characterized by: in reinforcing bar mesh skeleton and the first exposed drawknot cracking resistance mesh sheet and the second drawknot anti-crack net in installation space The outside of piece has poured concrete block, the lateral surface of concrete block respectively with the first concrete layer outer surface and the second concrete layer Outer surface is corresponding to be connected and keeps flushing, and the inside of the first steel concrete compound tube and the second steel concrete compound tube has poured inner concrete, Concrete block is connected as one by the first perforation and the second perforation with inner concrete.
5. steel concrete compound shear wall according to claim 4 and the combination assembled structural system of reinforced concrete shear wall, It is characterized by: being embedded with foam heat-insulating board inside the inner concrete of all or part of steel concrete compound shear wall.
6. steel concrete compound shear wall according to claim 5 and the combination assembled structural system of reinforced concrete shear wall, It is characterized by: being welded with several reinforcement steel pipes inside the first steel concrete compound tube and the second steel concrete compound tube, reinforces steel pipe and wear Foam heat-insulating board is crossed, the reinforcement steel pipe both ends inside the first steel concrete compound tube are embedded in the first concrete layer, the second steel concrete group The reinforcement steel pipe both ends inside pipe are closed to be embedded in the second concrete layer.
CN201910272693.2A 2019-04-04 2019-04-04 Steel concrete compound shear wall and the combination assembled structural system of reinforced concrete shear wall Pending CN109944336A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910272693.2A CN109944336A (en) 2019-04-04 2019-04-04 Steel concrete compound shear wall and the combination assembled structural system of reinforced concrete shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910272693.2A CN109944336A (en) 2019-04-04 2019-04-04 Steel concrete compound shear wall and the combination assembled structural system of reinforced concrete shear wall

Publications (1)

Publication Number Publication Date
CN109944336A true CN109944336A (en) 2019-06-28

Family

ID=67013862

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910272693.2A Pending CN109944336A (en) 2019-04-04 2019-04-04 Steel concrete compound shear wall and the combination assembled structural system of reinforced concrete shear wall

Country Status (1)

Country Link
CN (1) CN109944336A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113775044A (en) * 2021-11-11 2021-12-10 广州三乐集成房屋科技有限公司佛山分公司 Assembly type steel shell composite cement board formwork-dismantling-free building system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196146A (en) * 2014-08-19 2014-12-10 南京长江都市建筑设计股份有限公司 Connecting structure of thin wall type reinforced concrete shear wall and lower reinforced concrete shear wall
WO2019056716A1 (en) * 2017-09-21 2019-03-28 中国建筑股份有限公司 Fully-assembled prestress concrete frame anti-seismic energy dissipation member system and construction method
CN210049402U (en) * 2019-04-04 2020-02-11 河南绿建建筑科技有限公司 Steel concrete combined shear wall and steel concrete shear wall combined assembly type structure system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196146A (en) * 2014-08-19 2014-12-10 南京长江都市建筑设计股份有限公司 Connecting structure of thin wall type reinforced concrete shear wall and lower reinforced concrete shear wall
WO2019056716A1 (en) * 2017-09-21 2019-03-28 中国建筑股份有限公司 Fully-assembled prestress concrete frame anti-seismic energy dissipation member system and construction method
CN210049402U (en) * 2019-04-04 2020-02-11 河南绿建建筑科技有限公司 Steel concrete combined shear wall and steel concrete shear wall combined assembly type structure system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113775044A (en) * 2021-11-11 2021-12-10 广州三乐集成房屋科技有限公司佛山分公司 Assembly type steel shell composite cement board formwork-dismantling-free building system

Similar Documents

Publication Publication Date Title
CN105256917B (en) A kind of precast shear wall perps combined connecting structure and its construction method
CN205604473U (en) Assembled shear force wall tooth's socket formula connection structure who combines coincide floor
CN105780923A (en) Assembly structure of prefabricated concrete beam and concrete-filled steel tube column
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN105804255B (en) Precast concrete beam and composite steel tube concrete column assembling structure and its construction method
CN107447901A (en) Anti-seismic prefabricated floor and floor antidetonation splicing construction
CN109680841A (en) Hybrid prefabricated multi-cavity reinforced concrete wall, underground space structure system and construction method
CN108571063A (en) A kind of shear wall structure building assembly System Design
CN108118802A (en) A kind of fabricated shear wall horizontal connection energy-dissipation structure and its construction method
CN106760036B (en) A kind of prefabricated steel-combined concrete shear wall
CN110439142A (en) A kind of assembly concrete shear wall and construction method with H profile steel diagonal brace
CN110512765A (en) A kind of fabricated shear wall and construction method with steel plate peg combined type diagonal brace
CN209429323U (en) A kind of prefabricated overlapping coupled shear walls
CN208455907U (en) A kind of prefabricated laminated floor slab
CN109944336A (en) Steel concrete compound shear wall and the combination assembled structural system of reinforced concrete shear wall
CN202925730U (en) Assembling integrated type floor
CN109944337A (en) Frame and the combination assembled structural system of shear wall
CN205857531U (en) A kind of aspect is than the stirrup attachment structure of combined steel and concrete column
CN210049402U (en) Steel concrete combined shear wall and steel concrete shear wall combined assembly type structure system
CN210049435U (en) T-shaped node of upper punch type steel concrete combined pipe of channel steel
CN209228135U (en) A kind of reinforced concrete precast assembling movie theatre stand structure
CN209163035U (en) A kind of assembled group frame beam column construction
CN210049427U (en) L-shaped node of upper punch type steel concrete combined pipe of channel steel
KR101219459B1 (en) The water-storage tank of assembly type and method for constructing thereof
CN209353466U (en) A kind of assembled steel reinforced concrete frame building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination