CN109934551A - Offshore wind turbine delivery system - Google Patents

Offshore wind turbine delivery system Download PDF

Info

Publication number
CN109934551A
CN109934551A CN201711375112.5A CN201711375112A CN109934551A CN 109934551 A CN109934551 A CN 109934551A CN 201711375112 A CN201711375112 A CN 201711375112A CN 109934551 A CN109934551 A CN 109934551A
Authority
CN
China
Prior art keywords
equipment
duration
installation
server
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711375112.5A
Other languages
Chinese (zh)
Inventor
滕华灯
杨春
张竹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Goldwind Science and Technology Co Ltd
Original Assignee
Jiangsu Goldwind Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Goldwind Science and Technology Co Ltd filed Critical Jiangsu Goldwind Science and Technology Co Ltd
Priority to CN201711375112.5A priority Critical patent/CN109934551A/en
Publication of CN109934551A publication Critical patent/CN109934551A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the present invention provides a kind of offshore wind turbine delivery system, the system includes: the data processing centre and client terminal with device fabrication side's server and installation side's server communication connection, and data processing centre includes: input unit, equipment time of making the product determining device, loading and unloading duration determining device, transport duration determining device, installation ship navigation duration determining device, delivery time determining device and output device.The offshore wind turbine delivery system of the embodiment of the present invention, it can determine the delivery time of the equipment of offshore wind turbine, can accurately at sea seat in the plane point carry out offshore wind turbine equipment delivery, the probability that ship is caused danger by stormy waves is reduced, and is reduced costs.

Description

Offshore wind turbine delivery system
Technical field
The present invention relates to technical field of wind power generation, more particularly to a kind of offshore wind turbine delivery system.
Background technique
Wind-power electricity generation refers to the generation mode that electric energy is converted wind energy into using wind power generating set, is the main benefit of wind energy Use form.
Offshore wind energy resource is sufficient, generally bigger than land by 20% with height sea wind speed;Marine rare quiet wind phase, wind-force Generating set utilization efficiency is higher;Oversea wind power generation is not take up soil, dirty to surrounding enviroment noise far from cities and towns and residential block It contaminates small;In addition, sea is smooth, turbulent flow is slightly small, it is possible to reduce wind power generating set fatigue extends the wind power generating set service life. In view of the advantage of these Oversea wind power generations, Oversea wind power generation avoids the restriction of land wind-force development, and achieves prominent fly The development pushed ahead vigorously.
Currently, the delivery method that the equipment of offshore wind turbine uses is varied, some equipment are delivered in factory, Some equipment are delivered at harbour or harbour, some equipment are delivered in stockyard, the machine of some equipment at sea wind power generating set Site (also referred to as installation site) delivery etc..The equipment that point delivers wind power generating set in land seat in the plane, can in advance very Equipment is delivered to seat in the plane point for a long time, then starts to install again.It is delivered different from land seat in the plane point, due to Oversea wind power generation The seat in the plane point of unit is located at sea, and at sea seat in the plane point deliver and means to install at once, and delivery etc. cannot be made to be installed, Installation etc. cannot be made to be delivered.The reason is that, if the ship of transporting equipment reaches marine seat in the plane point, but it is used for Oversea wind power generation The installation ship of units' installation does not reach marine seat in the plane point, and marine stormy waves can make the ship moment of transporting equipment be in danger In, and great amount of cost can be expended during the ship waiting installation ship of transporting equipment;Furthermore if installation ship reaches marine seat in the plane The ship of point but transporting equipment does not reach marine seat in the plane point, can expend during the ship of installation ship waiting transporting equipment a large amount of yet Cost.
Therefore, the delivery that how accurately at sea seat in the plane point carries out the equipment of offshore wind turbine is urgently to be resolved The problem of.
Summary of the invention
The embodiment of the present invention provides a kind of offshore wind turbine delivery system, determines setting for offshore wind turbine The standby delivery time, can accurately at sea seat in the plane point carry out offshore wind turbine equipment delivery, reduce ship The probability only caused danger by stormy waves, and reduce costs.
The embodiment of the present invention provides a kind of offshore wind turbine delivery system, and system may include: and device fabrication The data processing centre and client terminal, data processing centre of square server and installation side's server communication connection may include: For receiving the input unit of the data sent from device fabrication side's server and installation side's server, for determining sea turn The dress of the equipment time of making the product determining device at the time of making the product of the equipment of power generator group, loading and unloading duration for determining equipment Unloading duration determining device, for determine equipment be transported to the transport duration of marine seat in the plane point transport duration determining device, For determining that installation ship reaches the installation ship navigation duration determining device of the navigation duration of marine seat in the plane point, for determining equipment The delivery time determining device of delivery time and output device for the delivery time to be output to client terminal.
In one embodiment of the invention, equipment time of making the product determining device receiving device manufacturer's server is sent The current inventory data of device fabrication side, current order number accordingly and historical Device creation data, calculate the time of making the product of equipment.
In one embodiment of the invention, what loading and unloading duration determining device receiving device manufacturer's server was sent sets The historical Device loading and unloading data of standby manufacturer, calculate the loading and unloading duration of equipment.
In one embodiment of the invention, the equipment that transport duration determining device receiving device manufacturer's server is sent The historical Device transportation data of manufacturer calculates the transport duration that equipment is transported to marine seat in the plane point.
In one embodiment of the invention, installation ship navigation duration determining device can specifically be serviced according to installation side The history aeronautical data for the installation ship that device is sent determines that installation ship reaches the navigation duration of marine seat in the plane point.
In one embodiment of the invention, data processing centre can also include:
The history installation data for receiving the installation ship that installation side's server is sent, calculates the installation of offshore wind turbine The installation duration determining device of duration;And
For determining the installation for being installed the time of offshore wind turbine according to delivery time and installation duration Deadline determining device.
In one embodiment of the invention, data processing centre can also include:
The practical time of making the product of equipment for being sent according to installation side's server, practical loading and unloading duration and practical fortune The delivery time of defeated duration adjustment delivery time adjusts device.
In one embodiment of the invention, loading and unloading duration may include:
The duration that equipment is loaded on transport vehicle, equipment is unloaded from transport vehicle under duration and equipment is loaded Duration on to cargo ship.
In one embodiment of the invention, duration is transported, may include:
By the duration of equipment conveying to harbour and by equipment conveying to the duration of marine seat in the plane point.
In one embodiment of the invention, which can also include: device fabrication side's server and the service of installation side Device.
The offshore wind turbine delivery system of the embodiment of the present invention, the equipment that can determine offshore wind turbine Delivery time, can accurately at sea seat in the plane point carry out offshore wind turbine equipment delivery, reduce ship By the probability that stormy waves is caused danger, and reduce costs.
Detailed description of the invention
The feature, advantage and technical effect of exemplary embodiment of the present described below with reference to the accompanying drawings.
Fig. 1 shows the first structural schematic diagram of the offshore wind turbine delivery system of the embodiment of the present invention;
Fig. 2 shows second of structural schematic diagrams of the offshore wind turbine delivery system of the embodiment of the present invention;
Fig. 3 shows the third structural schematic diagram of the offshore wind turbine delivery system of the embodiment of the present invention.
Specific embodiment
Embodiments of the present invention are described in further detail with reference to the accompanying drawings and examples.Following embodiment it is detailed Thin description and attached drawing cannot be used to limit the scope of the invention for illustratively illustrating the principle of the present invention, i.e., of the invention It is not limited to described embodiment.
In the description of the present invention, it should be noted that term " on ", "lower", "inner", "outside", " bottom end ", " top " etc. The orientation or positional relationship of instruction is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of the description present invention and letter Change description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific orientation construct and Operation, therefore be not considered as limiting the invention.In addition, term " first ", " second " etc. are used for description purposes only, without It can be interpreted as indication or suggestion relative importance.In the description of the present invention, it is also necessary to explanation, unless otherwise specific rule Fixed and restriction, term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, being also possible to can Dismantling connection, or be integrally connected;It can be directly connected, it can also be indirectly connected through an intermediary.For this field For those of ordinary skill, visual concrete condition understands the concrete meaning of above-mentioned term in the present invention.
Fig. 1 shows the first structural schematic diagram of the offshore wind turbine delivery system of the embodiment of the present invention.Sea Upper wind power generating set delivery system may include:
With the data processing centre 1 and client terminal 2 of device fabrication side's server and installation side's server communication connection.
Data processing centre 1 may include: to send for receiving from device fabrication side's server and installation side's server The input units 11 of data, equipment for determining offshore wind turbine equipment time of making the product at the time of making the product determine Device 12, the loading and unloading duration determining device 13 of loading and unloading duration for determining equipment, for determining that equipment is transported to sea The transport duration determining device 14 of the transport duration of upper seat in the plane point, the navigation duration for determining the marine seat in the plane point of installation ship arrival Installation ship navigation duration determining device 15, the delivery time determining device 16 of delivery time for determining equipment and be used for Delivery time is output to the output device 17 of client terminal 2.
It is understood that the equipment of offshore wind turbine includes: tower, generator bay, wheel hub and blade.
It will also be appreciated that device fabrication side's server is stored with the equipment for determining offshore wind turbine The data at the time of making the product, the data of the loading and unloading duration of equipment for determining offshore wind turbine and for determining sea The data of the transport duration of the equipment of upper wind power generating set.Installation side's server is stored with for determining that it is marine that installation ship reaches The data of the navigation duration of seat in the plane point.The data that input equipment 11 receives include above equipment manufacturer server and installation side The data of server storage.
In one embodiment of the invention, 12 receiving device manufacturer's server of equipment time of making the product determining device is sent The current inventory data of device fabrication side, current order number accordingly and historical Device creation data, when calculating the factory of equipment Between.
Illustratively, it is assumed that client needs 5 wind power generating sets, is stored in the Current warehouse of device fabrication side many It, then can be true in the equipment and current device manufacturer that can be assembled into 5 wind power generating sets without the order of other clients The time of making the product of equipment is made as after current time.
Assuming that client needs 5 wind power generating sets, can be assembled by being stored in the Current warehouse of device fabrication side by 3 The equipment of wind power generating set, current device manufacturer without other clients order and be currently used in the material of production equipment and fill Foot, historical Device creation data is 5 days a length of when being needed for producing the equipment of 1 wind power generating set, then can determine equipment The time of making the product be (5-3) * 5=10 days after.
Assuming that client needs 5 wind power generating sets, can be assembled by being stored in the Current warehouse of device fabrication side by 3 The equipment of wind power generating set, current device manufacturer without other clients order and be currently used in the material of production equipment only A wind power generating set can be produced, according to the data of stocking up of device fabrication side, determines when 3 days a length of, the history for completing stock Equipment creation data is 5 days a length of when being needed for producing the equipment of 1 wind power generating set, at this time can be to stock up in production, then After can determining that the time of making the product of equipment is 5* (5-3)=10 day.
Assuming that client needs 5 wind power generating sets, can be assembled by being stored in the Current warehouse of device fabrication side by 3 The equipment of wind power generating set, current device manufacturer without other clients order and be currently used in the material of production equipment only A wind power generating set can be produced, according to the data of stocking up of device fabrication side, determines when 6 days a length of, the history for completing stock Equipment creation data is 5 days a length of when being needed for producing the equipment of 1 wind power generating set, at this time can be to stock up in production, then The time of making the product that can determine equipment is after 6+5=11 days.
Assuming that client needs 5 wind power generating sets, can be assembled by being stored in the Current warehouse of device fabrication side by 3 The equipment of wind power generating set, current device manufacturer have the order of other clients to assume to need 4 wind power generating sets, and work as The preceding material for production equipment is sufficient, and historical Device creation data is duration needed for producing the equipment of 1 wind power generating set It is 5 days, then after can determining that the time of making the product of equipment is 5* (4-3+5)=30 day.
It is understood that the time of making the product of above-mentioned determined equipment is the time that equipment can dispatch from the factory earliest.
In one embodiment of the invention, scale and production of the time of making the product of equipment also with the workshop of device fabrication side Mode is related.For example, the workshop of device fabrication side is larger, then multiple equipment can be produced simultaneously.For another example, equipment system Make can parallel production equipment, then while generating blade, also simultaneously in production tower, generator bay and wheel hub.Wherein, raw The duration for producing leaf temporal, tower, generator bay and wheel hub is respectively 1 day, 2 days, 2.5 days and 2 days, then production can be assembled into A length of 2.5 days when needed for the equipment of 1 wind power generating set.
In one embodiment of the invention, 13 receiving device manufacturer's server of loading and unloading duration determining device is sent The historical Device loading and unloading data of device fabrication side, calculate the loading and unloading duration of equipment.
It is understood that the workshop of device manufacturer is located at land, and seat in the plane point is located at sea, is based on this, Loading and unloading duration may include: the duration being loaded into equipment on transport vehicle, unload equipment from transport vehicle under duration with And equipment is loaded into the duration on cargo ship.
Illustratively, it is assumed that the equipment of wind power generating set is individually dispatched from the factory, and historical Device loading and unloading data are that fine day is calm Under the conditions of, by the equipment of 1 wind power generating set be loaded on transport vehicle when it is 3 hours a length of, from transport vehicle unload under Shi Changwei 2 hours, be loaded on cargo ship when it is 2 hours a length of.When then total needed for the equipment of 1 wind power generating set of loading and unloading A length of 7 hours, total duration needed for the equipment of 5 wind power generating sets of loading and unloading was 5*7=35 hours.
Assuming that the equipment of wind power generating set is individually dispatched from the factory, historical Device loading and unloading data are under fine day windy condition, by 1 The equipment of platform wind power generating set be loaded on transport vehicle when it is 3.5 hours a length of, unloaded from transport vehicle under when a length of 2.5 Hour, be loaded on cargo ship when it is 2.5 hours a length of.Then total duration needed for the equipment of 1 wind power generating set of loading and unloading is 8.5 hours, total duration needed for the equipment of 5 wind power generating sets of loading and unloading was 5*8.5=42.5 hours.
Assuming that the equipment of wind power generating set is individually dispatched from the factory, historical Device loading and unloading data are under rainy day calm condition, by 1 The equipment of platform wind power generating set be loaded on transport vehicle when it is 5 hours a length of, unloaded from transport vehicle under when it is a length of 3 small When, be loaded on cargo ship when it is 3 hours a length of.Then total duration needed for the equipment of 1 wind power generating set of loading and unloading is 11 small When, total duration needed for the equipment of 5 wind power generating sets of loading and unloading is 5*11=55 hours.
Assuming that the equipment of wind power generating set is individually dispatched from the factory, historical Device loading and unloading data are under rainy day windy condition, by 1 The equipment of platform wind power generating set be loaded on transport vehicle when it is 7 hours a length of, unloaded from transport vehicle under when it is a length of 4 small When, be loaded on cargo ship when it is 4 hours a length of.Then total duration needed for the equipment of 1 wind power generating set of loading and unloading is 15 small When, total duration needed for the equipment of 5 wind power generating sets of loading and unloading is 5*15=75 hours.
Assuming that combining factory after the equipment integral assembling of wind power generating set, historical Device loading and unloading data are that fine day is calm Under the conditions of, it assembles 1 wind power generating set and needs 10 hours, serial 5 wind power generating sets of assembling need 50 hours, parallel group It fills (assembling simultaneously) 5 wind power generating sets and needs 10 hours;The equipment of 1 wind power generating set is loaded on transport vehicle Shi Changwei 3 hours, unloaded from transport vehicle under when it is 2 hours a length of, be loaded on cargo ship when it is 2 hours a length of.Then load and unload Total duration needed for carrying the equipment of 1 wind power generating set is 7 hours, when total needed for the equipment of 5 wind power generating sets of loading and unloading It is 5*7=35 hours a length of.Then in serial assembling, loading and unloading total duration is 50+35=85 hours (including assembling duration); In parallel composition, loading and unloading total duration is 10+35=45 hours (including assembling duration).
The equipment integral assembling of fine day windy condition, rainy day calm condition and rainy day windy condition apparatus for lower wind generating set Combine afterwards factory process and the equipment integral assembling of fine day calm condition apparatus for lower wind generating set after combine the process phase of factory Seemingly, only each phases-time is different, and the embodiment of the present invention does not repeat it herein.
Assuming that combine factory after the environment division of wind power generating set is assembled, i.e., generator bay, wheel hub and two blades into Row combination.Historical Device loading and unloading data are under fine day calm condition, and assembling generator bay, wheel hub and two blades needs 8 are small When, the generator bay, wheel hub and two blades for serially assembling 5 wind power generating sets need 40 hours, 5 typhoon power of parallel composition Generator bay, wheel hub and two blades of generating set need 8 hours;The equipment of 1 wind power generating set is loaded into transport On vehicle when it is 3 hours a length of, unloaded from transport vehicle under when it is 2 hours a length of, be loaded on cargo ship when it is 2 hours a length of. Then total duration needed for 1 wind power generating set of loading and unloading is 7 hours, when total needed for the equipment of 5 wind power generating sets of loading and unloading It is 5*7=35 hours a length of.Then when part assembles, loading and unloading total duration is 40+35=75 hours (including assembling duration); In parallel composition, loading and unloading total duration is 8+35=43 hours (including assembling duration).
The environment division of fine day windy condition, rainy day calm condition and rainy day windy condition apparatus for lower wind generating set is assembled The process phase of factory is combined after the environment division of the process and fine day calm condition apparatus for lower wind generating set that combine factory afterwards is assembled Seemingly, only each phases-time is different, and the embodiment of the present invention does not repeat it herein.
It should be noted that above-mentioned have wind with fine day calm condition, fine day windy condition, rainy day calm condition and rainy day It is illustrated for condition, only of the invention one is specific, and does not constitute a limitation of the invention.In practical applications, may be used also To determine loading and unloading duration according to rainfall, wind speed, wind-force, snowfall etc..
It should be understood that when at sea carrying out wind power generating set installation, being not necessarily to after the equipment assembling of wind power generating set Equipment is assembled again.When the equipment of wind power generating set is unassembled, when at sea carrying out wind power generating set installation, need Assembling installation is carried out to equipment.The factory mode of the equipment of wind power generating set influence at sea to install wind power generating set when Between and installation cost.
In one embodiment of the invention, what transport 14 receiving device manufacturer's server of duration determining device was sent sets The historical Device transportation data of standby manufacturer calculates the transport duration that equipment is transported to marine seat in the plane point.
It is understood that the workshop of device manufacturer is located at land, and seat in the plane point is located at sea, is based on this, Transport duration may include: by the duration of equipment conveying to harbour and duration by equipment conveying to sea seat in the plane point.
Illustratively, it is assumed that historical Device transportation data are as follows: under fine day calm condition, from plant area by equipment conveying to A code It is 2 days the time required to head, 500 kilometers of plant area's distance A harbour;To be the time required to equipment conveying to marine seat in the plane point B from A harbour 2 days, A harbour distance sea seat in the plane point B100 was in the sea.
Assuming that device manufacturer is also from A quay transportation equipment, wherein marine seat in the plane point M150 sea of the A harbour apart from client In, then equipment conveying to A harbour is needed 2 days, equipment is needed 3 days from A quay transportation to marine seat in the plane point M, always when transport A length of 5 days.
Assuming that device manufacturer is from N quay transportation equipment, wherein 1000 kilometers of plant area's distance N harbour, N harbour distance sea Upper seat in the plane point M50 is in the sea.Equipment conveying to N harbour is then needed 4 days, equipment is needed from N quay transportation to marine seat in the plane point M 1 day, total duration of transporting also was 5 days.
In one embodiment of the invention, installation ship navigation duration determining device 15 receives what installation side's server was sent The history aeronautical data of installation ship calculates the navigation duration that installation ship reaches marine seat in the plane point.
Illustratively, it is assumed that history aeronautical data are as follows: under fine day calm condition, reach marine seat in the plane point B from A harbour Required time is 2 days, and A harbour distance sea seat in the plane point B100 is in the sea.
Assuming that marine 200 nautical miles of harbour of seat in the plane point M distance A of client, then it can determine that installation ship reaches marine seat in the plane It is 4 days a length of when the navigation of point.
It in one embodiment of the invention, can be with when determining that installation ship reaches the navigation duration of marine seat in the plane point It is determined in conjunction with the installation order information of the installation ship of installation side's server transmission.
Illustratively, it is assumed that installation ship needs to install the wind power generating set of 5 marine wind electric fields, installs 5 seas A length of 23 days when needed for wind power plant.It can then determine 23+4=27 days a length of when installation ship reaches the navigation of marine seat in the plane point.
It should be noted that above-mentioned have wind with fine day calm condition, fine day windy condition, rainy day calm condition and rainy day Under the conditions of every historical data for be illustrated, only of the invention one is specific, and does not constitute a limitation of the invention.On The every historical data stated, which is not limited only to fine day calm condition, fine day windy condition, rainy day calm condition and rainy day, wind item Part.
After the navigation duration of the time of making the product of equipment, loading and unloading duration, transport duration and installation ship determines, when delivery Between determining device 16 according to the time of making the product of equipment, loading and unloading duration, transport duration and installation ship navigation duration, determination set The standby delivery time.
Illustratively, it is assumed that equipment can dispatch from the factory after 10 days, and whens loading and unloading is 5 days a length of, 5 days a length of, installation when transport A length of 23 days when the navigation of ship, then by the delivery time for being determined as equipment on the 23rd day after current time.At this time client to Device fabrication side and installation side place an order, and by identified delivery time annunciator manufacturer and installation side.It is understood that , according to the description above, the corresponding winding interval of different factory modes is different, and the corresponding transport duration of different routes is not yet It is identical.When client places an order to device fabrication side, while needing the time of making the product of annunciator manufacture method, apparatus, factory mode And route is loaded and unloaded so that device fabrication side delivers according to the time of making the product received according to the factory mode received, It is transported according to the route received, to guarantee to deliver on time.When client places an order to installation side, while needing to inform peace The time that dress side's installation ship sets out.
After the delivery time being output to client terminal 2, when user can know delivery by the display screen of client terminal 2 Between.It is understood that the identified delivery time is different when the equipment of wind power generating set is dispatched from the factory using different form, Therefore, the delivery time finally determined can be multiple delivery times of corresponding different schemes.User can be according to from multiple friendships Paying in the time selects a delivery time as the final delivery time, the delivery of the delivery time based on the selection and the selection Time at the corresponding equipment time of making the product, factory mode and transit route etc. place an order to device fabrication side.
The offshore wind turbine delivery system of the embodiment of the present invention, the equipment that can determine offshore wind turbine Delivery time, can accurately at sea seat in the plane point carry out offshore wind turbine equipment delivery, reduce ship By the probability that stormy waves is caused danger, and reduce costs.
Fig. 2 shows second of structural schematic diagrams of the offshore wind turbine delivery system of the embodiment of the present invention.This On the basis of invention embodiment illustrated in fig. 2 embodiment shown in Fig. 1, data processing centre 1 can also include: to receive installation side's clothes The history installation data for the installation ship that business device is sent, the installation duration for calculating the installation duration of offshore wind turbine determine dress Set 18.
Illustratively, it is assumed that a length of 0.5 when the history installation data of installation ship is needed for 1 wind power generating set of installation It.Client needs to install 6 wind power generating sets, then a length of 3 days when installing.
In one embodiment of the invention, offshore wind turbine delivery system further include: when for according to delivering Between and installation duration, determine offshore wind turbine be installed the time be installed time determining device 19.
Illustratively, it is assumed that the delivery time is the 23rd day after current time, it is determined that goes out wind power generating set Being installed the time is the 26th day after current time.
Fig. 3 shows the third structural schematic diagram of the offshore wind turbine delivery system of the embodiment of the present invention.This On the basis of invention embodiment illustrated in fig. 3 embodiment shown in Fig. 1, data processing centre 1 can also include: for according to installation The practical time of making the product, practical loading and unloading duration and the actual shipment duration for the equipment that square server is sent adjust the delivery time Delivery time adjusts device 20.
Illustratively, it is assumed that the delivery time of predetermined equipment be the 23rd day after current time wherein, if Standby to dispatch from the factory behind the 13rd day after current time, whens loading and unloading, is 5 days a length of, and when transport is 5 days a length of.When installation ship follow Between reach marine seat in the plane point the time required to be 4 days.The installation ship departure time is the 19th day after current time.
For some reason, such as: factory's power failure, GLESS Gearless etc., cause equipment evening 1 day dispatch from the factory, then adjust equipment Delivery time be the 24th day after current time, and the delivery time adjusted is sent to installation side, and install Ship set out the 20th day after current time.
For another example, device fabrication Fang Xin buys handling facilities, so that loading and unloading duration shortens 1 day, then adjusts the friendship of equipment Paying the time is the 22nd day after current time, and the delivery time adjusted is sent to installation side and installation ship exists It sets out within the 18th day after current time.
For another example, in transportational process, transport vehicle breaks down, and the spent duration of maintenance transport vehicle amounts to 1 day.Then adjustment is set The standby delivery time is the 24th day after current time, and the delivery time adjusted is sent to installation side, Yi Jian Shipment was set out the 20th day after current time.
Under normal conditions, it when equipment is transported to harbour, can not be loaded on cargo ship in time, but need first to Equipment is stored in the stockyard of harbour, then is loaded on cargo ship from the stockyard of harbour.Therefore, when carrying out delivery time adjustment, It is also conceivable to storage duration of the equipment in stockyard.Currently in practical applications, when determining the delivery time, it is also contemplated that setting Whether equipment is first discharged in stockyard for manufacturer, then is loaded on cargo ship from stockyard by equipment.
It is understood that whether device fabrication side by equipment is first discharged in stockyard, then fortune is loaded into from stockyard by equipment On defeated ship, equipment is all stored in device fabrication side's server in historical datas such as the resting periods in stockyard.
In one embodiment of the invention, offshore wind turbine delivery system can also include: device fabrication side Server and installation side's server.
Although by reference to preferred embodiment, invention has been described, the case where not departing from the scope of the present invention Under, various improvement can be carried out to it and can replace component therein with equivalent.Especially, as long as there is no structures to rush Prominent, items technical characteristic mentioned in the various embodiments can be combined in any way.The invention is not limited to texts Disclosed in specific embodiment, but include all technical solutions falling within the scope of the claims.

Claims (10)

1. a kind of offshore wind turbine delivery system, which is characterized in that the system comprises: with device fabrication side's server Data processing centre and client terminal with installation side's server communication connection, the data processing centre includes: for receiving The input unit of the data sent from device fabrication side's server and installation side's server, for determining sea turn Equipment time of making the product determining device, the loading and unloading duration for determining the equipment at the time of making the product of the equipment of power generator group Loading and unloading duration determining device, for determine the equipment be transported to the transport duration of marine seat in the plane point transport duration it is true Determine device, for determining that installation ship reaches installation ship navigation duration determining device, the use of the navigation duration of the marine seat in the plane point In the delivery time determining device for the delivery time for determining the equipment and for the delivery time to be output to the visitor The output device of family terminal.
2. system according to claim 1, which is characterized in that the equipment time of making the product determining device receives the equipment The current inventory data of device fabrication side that manufacturer's server is sent, current order number accordingly and historical Device creation data, Calculate the time of making the product of the equipment.
3. system according to claim 1, which is characterized in that the loading and unloading duration determining device receives the equipment system The historical Device loading and unloading data for the device fabrication side that the side's of making server is sent, calculate the loading and unloading duration of the equipment.
4. system according to claim 1, which is characterized in that the transport duration determining device receives the device fabrication The historical Device transportation data for the device fabrication side that square server is sent calculates the equipment and is transported to the marine seat in the plane point Transport duration.
5. system according to claim 1, which is characterized in that the installation ship navigation duration determining device receives the peace The history aeronautical data for the installation ship that dress side's server is sent calculates the navigation duration that installation ship reaches the marine seat in the plane point.
6. system according to claim 1, which is characterized in that the data processing centre further include:
The history installation data for receiving the installation ship that installation side's server is sent, calculates the installation of the offshore wind turbine The installation duration determining device of duration;And
For calculating when being installed of the offshore wind turbine according to the delivery time and the installation duration Between be installed time determining device.
7. system according to claim 1, which is characterized in that the data processing centre further include:
The practical time of making the product, practical loading and unloading duration and the practical fortune of equipment for being sent according to installation side's server Defeated duration adjusts the delivery time adjustment device of the delivery time.
8. system according to claim 1, which is characterized in that the loading and unloading duration, comprising:
The duration that the equipment is loaded on transport vehicle, the equipment is unloaded from transport vehicle under duration and will be described Equipment is loaded into the duration on cargo ship.
9. system according to claim 1, which is characterized in that the transport duration, comprising:
By the duration of the equipment conveying to harbour and by the equipment conveying to the duration of the marine seat in the plane point.
10. system according to any one of claims 1 to 9, which is characterized in that the system also includes:
Device fabrication side's server and installation side's server.
CN201711375112.5A 2017-12-19 2017-12-19 Offshore wind turbine delivery system Pending CN109934551A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711375112.5A CN109934551A (en) 2017-12-19 2017-12-19 Offshore wind turbine delivery system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711375112.5A CN109934551A (en) 2017-12-19 2017-12-19 Offshore wind turbine delivery system

Publications (1)

Publication Number Publication Date
CN109934551A true CN109934551A (en) 2019-06-25

Family

ID=66983676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711375112.5A Pending CN109934551A (en) 2017-12-19 2017-12-19 Offshore wind turbine delivery system

Country Status (1)

Country Link
CN (1) CN109934551A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113822620A (en) * 2021-08-17 2021-12-21 上海电气风电集团股份有限公司 Supervision method, equipment and medium for logistics transportation of offshore wind turbine equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1494697A (en) * 2000-02-29 2004-05-05 ��ϰ�� Delivery system and method for vehicles and the like
CN101359380A (en) * 2008-09-02 2009-02-04 浙江理工大学 Model building and optimizing method for mass customization of two-dimension time-space correlation
CN102800563A (en) * 2011-05-26 2012-11-28 中芯国际集成电路制造(上海)有限公司 Wafer feeding method and wafer feeding device
CN103246950A (en) * 2012-10-30 2013-08-14 中国科学院沈阳自动化研究所 Method for promising order of semiconductor assembly and test enterprise
CN104751240A (en) * 2015-03-24 2015-07-01 北京首钢自动化信息技术有限公司 Delivery period predication method based on static production cycle sheet
CN105184573A (en) * 2014-05-27 2015-12-23 三星Sds株式会社 Method And Device For Reflecting Real-time Supply Information

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1494697A (en) * 2000-02-29 2004-05-05 ��ϰ�� Delivery system and method for vehicles and the like
CN101359380A (en) * 2008-09-02 2009-02-04 浙江理工大学 Model building and optimizing method for mass customization of two-dimension time-space correlation
CN102800563A (en) * 2011-05-26 2012-11-28 中芯国际集成电路制造(上海)有限公司 Wafer feeding method and wafer feeding device
CN103246950A (en) * 2012-10-30 2013-08-14 中国科学院沈阳自动化研究所 Method for promising order of semiconductor assembly and test enterprise
CN105184573A (en) * 2014-05-27 2015-12-23 三星Sds株式会社 Method And Device For Reflecting Real-time Supply Information
CN104751240A (en) * 2015-03-24 2015-07-01 北京首钢自动化信息技术有限公司 Delivery period predication method based on static production cycle sheet

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113822620A (en) * 2021-08-17 2021-12-21 上海电气风电集团股份有限公司 Supervision method, equipment and medium for logistics transportation of offshore wind turbine equipment

Similar Documents

Publication Publication Date Title
US11783276B2 (en) Concepts for monitoring shipments
US20140324495A1 (en) Wind turbine maintenance optimizer
Besnard et al. A model for the optimization of the maintenance support organization for offshore wind farms
US10553122B1 (en) Unmanned aerial vehicle data collection for routing
AU2013100225A4 (en) Tethered Gyroglider control systems
Dinh et al. Offshore wind energy: technology opportunities and challenges
JP2010223639A (en) Ocean current data assimilation method and assimilation system
Muhabie et al. A discrete-event simulation approach to evaluate the effect of stochastic parameters on offshore wind farms assembly strategies
KR101721575B1 (en) System for assisting voyage of ship by monitoring a ship state and supplying safety and optimal navigation path and voyage pattern of a ship considering the sea state based on multi communication and the method thereof
US10879702B2 (en) System and method for performing wind forecasting
US10755225B2 (en) Concepts for monitoring shipments
US20140244328A1 (en) Wind turbine maintenance optimizer
Lange et al. Planning maritime logistics concepts for offshore wind farms: a newly developed decision support system
US20150101401A1 (en) Method And System For Determining Wind Turbine Reliability
CN108843497B (en) Yaw control method and equipment of wind generating set
KR20090091277A (en) Information recording medium on which a computer-readable program for ship's sailing order optimization system
EP3081958B1 (en) Marine weather radar and sea state data aggregating system
US11573353B2 (en) System and method for performing wind forecasting
JP2014119356A (en) Marine navigation simulation device
KR20190054410A (en) The System for Providing Optimun Seaway Using Big Data Related to Weather and Ocean Inteligence of Coast
Lütjen et al. Approach of a port inventory control system for the offshore installation of wind turbines
Scholz-Reiter et al. Planning and control of logistics for offshore wind farms
Theuer et al. Minute-scale power forecast of offshore wind turbines using single-Doppler long-range lidar measurements
CN109934551A (en) Offshore wind turbine delivery system
CN112465194A (en) Intelligent meteorological service system and method for offshore wind farm based on meteorological big data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190625

RJ01 Rejection of invention patent application after publication