CN109917839A - A kind of agricultural greenhouse temperature and humidity intelligent control system - Google Patents

A kind of agricultural greenhouse temperature and humidity intelligent control system Download PDF

Info

Publication number
CN109917839A
CN109917839A CN201910340758.2A CN201910340758A CN109917839A CN 109917839 A CN109917839 A CN 109917839A CN 201910340758 A CN201910340758 A CN 201910340758A CN 109917839 A CN109917839 A CN 109917839A
Authority
CN
China
Prior art keywords
signal
voltage
cycle
point
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910340758.2A
Other languages
Chinese (zh)
Inventor
张金木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou Alignment Mdt Infotech Ltd
Original Assignee
Fuzhou Alignment Mdt Infotech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou Alignment Mdt Infotech Ltd filed Critical Fuzhou Alignment Mdt Infotech Ltd
Publication of CN109917839A publication Critical patent/CN109917839A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D27/00Simultaneous control of variables covered by two or more of main groups G05D1/00 - G05D25/00
    • G05D27/02Simultaneous control of variables covered by two or more of main groups G05D1/00 - G05D25/00 characterised by the use of electric means

Abstract

The present invention relates to a kind of agricultural greenhouse temperature and humidity intelligent control systems, are made of zone controller and total station control, and each zone controller controls one or several agricultural greenhouses, and each zone controller includes multiple data collectors, multiple appliance controllers.Each data collector connects one or several Temperature Humidity Sensors, data collector sends the data of the temperature and humidity of acquisition to zone controller processing by power line communication, appliance controller executes electrical work by power line communication receiving area controller instruction control furnace, pump etc., and the operation of cell phone application control system also can be used in administrator.

Description

A kind of agricultural greenhouse temperature and humidity intelligent control system
(1) technical field:
The present invention relates to a kind of agricultural greenhouse temperature and humidity intelligent control system, inclusion region controller and the acquisition of each data Device, appliance controller are crossed 0 area's specified point to grid cyclic wave voltage and are sent wide pulse signal generation using power line communication method Mutation current, as the position value of signal, zone controller device receives the data of each data collector, appliance controller acquisition, And 4G mobile radio communication network is accessed by wireless router, from regardless of mobile phone, computer and hand all can be used in where It holds mobile device and realizes Wireless Networking.
(2) background technique:
Current power line communication refers mainly to power line carrier communication and bi-directional Glenn shunt.Power line carrier communication PLC benefit Signal is transmitted by carrier system with existing power line.But distribution transformer has barrier action to power carrier signal, simultaneously Transmission has the very big loss of signal again between three-phase power line, so power carrier signal can only be in a distribution transformer platform area Transmission, and can only be transmitted in single-phase electricity line.In practical application, when power line zero load, point-to-point carrier signal can be transferred to Several kilometers, but when load is very heavy on power line, tens meters can only be transmitted, therefore power line carrier communication is only applied remote at present In journey meter reading, also need to cooperate other means of communication.
Bi-directional Glenn shunt TWACS, which is utilized, is added modulated signal in power-frequency voltage fundamental wave zero passage area, with the electricity in this region The distorted signal of pressure or current waveform carries information.TWACS system equipment exists only in substation and user terminal.Wherein by power transformation Standing to the channel of user terminal transmission is output channel, carries information using the modulation of voltage waveform, is passed from user terminal to substation Defeated channel is input channel, transmits information using the variation of current waveform.Its receiving and transmitting signal passes through coupling transformer and electricity The crosslinking of power net.
The detection of TW A CS signal is mainly based upon time-domain difference technology, these methods mostly data processing complex, in real time Property it is poor, equipment cost is high, needs to acquire a large amount of signal of multiple cycles relatively and carries out A/D conversion respectively, then carries out complicated meter It calculates, just can determine that the signal position is " 1 " or " 0 ", due to the preciseness of calculating, interference signal can seriously affect detected signal Judgement as a result, therefore original method be difficult China apply.
Clock timer and synchrotimer is arranged in the present invention, and the true and false judgement of synchrotimer and cycle signal is screened With reference to my 2016 yearly correlation patents.
(3) summary of the invention:
Power line bi-directional Glenn shunt be when silicon-controlled 30 ° of triggering and conductings before zero crossing of modulation circuit, by every Modulated signal is generated from transformer, makes grid cyclic wave that short circuit distortion occur, exports the frequency of modulated signal in 200~600Hz Range, receiving end demodulate useful letter by acquisition, A/D conversion and the series of computation to multiple groups cycle distorted signal Breath.But China's power network uses isolated neutral or small current neutral grounding system, electricity consumption situation is complicated, the two-way power frequency of power line Communication can hardly find practical applications in China.
The present invention relates to a kind of agricultural greenhouse temperature and humidity intelligent control systems, by zone controller and total station control group One or several agricultural greenhouses are controlled at, each zone controller, and each zone controller includes multiple data collectors, multiple Appliance controller.Each data collector connects one or several Temperature Humidity Sensors, and data collector is by the temperature and humidity of acquisition Data by power line communication send to zone controller processing, it is interior by standard installation Three-hole socket for data collector, electricity Device controller uses.Appliance controller executes electric appliance work by power line communication receiving area controller instruction control furnace, pump etc. Make, wiring installation is reduced using power line communication.Zone controller accesses 4G mobile radio communication network by wireless router Each zone controller and total station control is set to network.The operation of cell phone application control system also can be used in administrator.Work as data collector Detect temperature and humidity parameter-beyond-limit, appliance controller is to start corresponding furnace, the heating for pumping electric appliance, sprinkling irrigation load power source, to protect Green house temperature-humidity is held in control range.Appliance controller output is through Phototube Coupling, bidirectional triode thyristor control or relay contact circuit Control, is concatenated into socket power circuit, controls load energized power and time, socket power on its socket and is connected to outside system On alternating current, the socket is for electrical equipments power supplys such as furnace, pumps.Microcontroller passes through serial ports and 4G wireless routing in zone controller Device communication, and mobile radio communication network is accessed by 4G wireless router.
The power line communication of use is the essence by the signal sending point and signal receiving point that set to grid cyclic wave voltage It determines that communication is realized in position, sends a rectangular wave broad pulse of communication positive or negative pole in the signal sending point of setting to produce Raw mutation current, the mutation current cause a voltage drop to be superimposed on grid voltage waveform on the short-circuit impedance of distribution transformer On, to complete a signal modulation process, the signal receiving point demodulated signal that receiving end is set in grid cyclic wave voltage;It is described One positive rectangular wave broad pulse refers to that the high level part of pulse returns 0 from 0 to height.Because only sending single rectangular wave Broad pulse is to electric network influencing very little, and structure simple signal recall rate is high.The microcontroller STC15F2K60S of system, is adopted With external crystal-controlled oscillation, frequency 35MHz, signal procedure is write with assembler language, to reduce communication instruction holding time.Or using other Model High Speed Microcontroller.
The setting of signal transmitting and receiving position: it is crossed at 0 in the voltage of grid cyclic wave positive half cycle and 0 voltage comparator was set, in electricity A setting cycle voltage location setting signal voltage comparator between voltage 21V -40V of net week wave positive half cycle.In this way, The output of signal voltage comparator realizes overturning in two positions of all wave voltages of setting of a cycle positive half cycle.Cycle just The position of the setting week wave voltage of half cycle ascent stage is as the first signal location, all wave voltages of setting signal transmitting-receiving point Position is known as the first signal set point, cycle positive half cycle descending branch the setting week wave voltage position as second signal The cycle voltage location of position, setting signal transmitting-receiving point is known as second signal set point.Microcontroller STC15F2K60S can be with It is that rising edge triggers or failing edge triggers that external interrupt, which is arranged, has served as 0 voltage comparator and signal voltage comparator in power grid week The ascent stage of wave positive half cycle or descending branch, which generate after overturning triggering is interrupted, changes down trigger mode, or and by different interruptions Source generates interruption.
The condition that signal transmitting and receiving has: 0 voltage comparator of mistake and signal voltage comparator are all made of ns grades of height Fast voltage comparator.The time mistake that overturning and triggering are interrupted can reduce using High Speed Microcontroller and high speed voltage comparator Difference, and have the resolution ratio of sufficiently high detection overturning triggering break period, cooperate the position of signal to wipe the skill with synchrotimer Art means improve the recall rate that grid cyclic wave carries information.It needs to transmit by ns grades of high-speed power control switch basis signal Distance it is tests determined by transmitted positive 35V to a setting rectangular wave broad pulse voltage-drop loading between 60V in power grid Signal sending point on cycle, the rectangular wave broad pulse voltage are higher than the voltage for the grid cyclic wave position being loaded.Basis signal The width of the tests determined rectangular wave broad pulse voltage of the distance that need to be transmitted is 0.3ms~0.5ms, can provide signal code 1A- 20A.It is displaced all wave voltages in the time of the signal location, so that the high speed voltage comparator of receiving end be made to connect in signal Sink is not overturn, is taken " 0 " to send as the position (BIT) in signal, is otherwise taken " 1 " to send for the position (BIT) in signal.Therefore only When the position value in signal overturn signal voltage comparator should in signal receiving point, due to interference be not flipped just have by Interference effect.
Signal receiving end setting: signal receiving end is by twin voltage comparator, High-speed Control switch and signal voltage comparator It constitutes, grid cyclic wave connects after electric resistance partial pressure with twin voltage comparator input terminal, and the setting of twin voltage comparator is rationed the power supply by wealthy family The low-voltage window region that the threshold range of pressure and low threshold voltage is constituted.Under microcontroller control, when all wave voltages of input When falling in the low-voltage window region of twin voltage comparator setting, make High-speed Control switch in an ON state, signal voltage compares Device directly receives position in the signal of all wave voltages and receives signal and measurement cycle time parameter, whether determines received signal In the signal receiving point error range of setting, make High-speed Control switch in an off state other than low-voltage window region.Cause This, grid cyclic wave voltage is only directly conditioned in two low-voltage window regions of cycle positive half cycle through High-speed Control switch control Filtering is followed by signal voltage comparator input terminal, is filtered out High-frequency Interference and is passed through fundamental frequency signal re-demodulation signal of communication, every From grid cyclic wave high voltage, the error as caused by bleeder circuit is reduced.Low-voltage window region is arranged in twin voltage comparator When, it need to guarantee that the first signal location and second signal position are fallen in always in the low-voltage window region.
The erasing and repeating transmission of position value in signal: in the signal receiving point demodulated signal of setting, comprising confirmation or wipe from The signal that the signal sending point of setting is sent after high-speed power control switch is opened, is sent during transmitting terminal sends signal The signal voltage comparator reception of the transmitted signal in end while receiving end, if the position of received position value information and transmission Value information is different, then then sends the erasing signal of this.The erasable repeating transmission of each data bit in each frame information uses Control bit transmitting-receiving erasing signal, if wipe twice in succession it is unsuccessful, that is, send erasing frame signal, thus improve signal inspection Extracting rate.Only when the quantity for being wiped free of position is more than setting value, just wipe and retransmission of information frame.
Information frame generates: system is the communication of two machines or principal and subordinate's multi-computer communication, is allocated in advance when for principal and subordinate's multi-computer communication Synchronization time is used in the communication of each machine, and setting section synchronization time can communicate one or many, communicates multiple information frames every time, synchronization Period timing terminates, and synchrotimer resets and restarts timing.
Institute's rheme is binary digit.Each information frame is made of start bit, data bit, stop bits.Every bit occupancy one In the period, data bit totally 8, position value does not overturn the overturning to send position signal " 0 " in signal receiving point with signal voltage comparator To send position signal " 1 ".Microcontroller records valid data digit and erase process occupied digit during transmitting-receiving, Middle valid data digit shows that data bit transmission terminates when reaching 8 digit of setting.Wherein the first signal set point of data bit For sending and receiving data, second signal set point is confirmation or the data that the first signal set point of erasing is sent, and sending " 1 " is confirmation, Sending " 0 " is erasing.It is to start to send that signal voltage comparator, which sends " 0 " in the first signal set point, in start bit, stop bits In the first signal set point to send " 1 " end.The second signal set point of start bit and stop bits does not have to.
The compensation of signal transmitting and receiving location error: China's sinusoidal ac mains frequency be 50Hz, voltage effective value 220V, Its instantaneous voltage u is calculated by following formula:
U=Umsin100 π t;………………….………….1
In formula: UmFor China's network voltage peak value
As shown in Figure 1, system is crossed at 0 using the voltage of cycle positive half cycle ascent stage as start time to the first signal set point Time interval be nominal value Tm1;The voltage of cycle positive half cycle ascent stage is crossed at 0 as start time to second signal set point Time interval is nominal value Tm2.The Tm1And Tm2It is calculated by 1 formula, u is to set all wave voltages in formula.
Simultaneously measured 0 voltage comparator the cycle positive half cycle ascent stage mistake 0 overturn when time arrived for start time The real-time measurement values T of time interval of the signal voltage comparator when the first signal location is overturnc1;This spent for 0 flip-flop transition when being Between starting point to signal voltage comparator second signal position overturn when time interval real-time measurement values Tc2;Signal voltage ratio It was arrived when second signal position is overturn between time of 0 voltage comparator when the mistake 0 of cycle positive half cycle descending branch is overturn compared with device Every real-time measurement values Tc3;Cross 0 voltage comparator the cycle positive half cycle ascent stage of two adjacent cycles mistake 0 overturn when Between between be divided into cycle period real-time measurement values Tzu.
Since power grid crosses the left and right shake that 0 error showed as at 0 point, but sending and receiving end synchronized 0 and to cross 0 overturning as base Locating tab assembly cycle time parameter, crossing 0 shake influences very little to measurement cycle time parameter, therefore ignores 0 voltage comparator and cross 0 Overturning and timing error.When the cycle and its two adjacent cycles that detect are cycle period reality that is true, being detected simultaneously by When measured value Tzu in 20ms and its error range, measure the cycle to cross 0 voltage comparator in the cycle positive half cycle ascent stage The a reference value T of time interval when crossing 0 overturning for start time to signal voltage comparator when the first signal location is overturnc01 The a reference value that 0 overturning is time interval of the start time to signal voltage comparator when second signal position is overturn is crossed with this Tc02, save the obtained a reference value T of continuously measurement of a setting number in 30 to 50c01And Tc02And it calculates and is saved Tc01Average value Tp1With the T savedc02Average value Tp2, by Tp1And Tp2It is stored in corresponding storage unit.
The then error compensation value T of signal voltage comparator flip-flop transitionbIt is determined by following formula:
Tb={ (Tm2- Tm1)-(Tp2- Tp1)}÷2;……………2
By TbIt saves.TbIllustrate that the position of actual signal transmitting-receiving point is higher for timing.
Measurement described above, wherein Tc1Or Tc01It is to cross 0 voltage comparator and signal voltage comparator in cycle just half Week crossed on the basis of the flip-flop transition of 0 position and signal location, but actual measurement is after overturning triggering interruption with voltage comparator On the basis of the timing time of timer, in this way, having served as triggering after mistake 0 of 0 voltage comparator in the cycle positive half cycle ascent stage is overturn The process for interrupting and starting timer, there are time for each instructions, it need to be added in the timing time of the measurement;Meanwhile institute The timing time for stating measurement, which need to subtract the triggering after the overturning of the first signal location, to interrupt and reads the instruction of process of timer and hold The row time.The execution time for also needing an instruction being carrying out comprising microcontroller after overturning is interrupted in triggering after wherein overturning, It can postpone interruption, and microcontroller STC15F2K60S is the single-chip microcontroller of 1T, this is easy to obtain the instruction time.Second Signal location measures Tc2Or Tc02Similarly, T is measuredc3When be also similar to above.
The judgement of the cycle true and false: by Tc1With Tp1;Tc2With Tp2;Tzu makes comparisons respectively with 20ms, if fair at it respectively Perhaps in cycle error range, then the cycle signal detected is very, otherwise to there is more overproof, the cycle detected Signal is false.Not in communication period and in the T of communication periodc1With Tp1;Tc2With Tp2Difference is respectively set when making comparisons respectively Cycle error range, since the first signal location of communication period and second signal position are shifted, and biggish cycle is taken to miss Poor range.
Clock timer and synchrotimer is arranged in system, and wherein synchrotimer saves each cycle period and counted with 20ms The cycle period aggregate-value of calculation is as synchronization time.When above-mentioned judgement cycle signal is true, saves Tzu and take 20ms and synchronometer When device timing time be added, the value that will add up restores in synchrotimer, if the cycle signal detected be it is false, will be all Wave signal is timing time during the vacation compared with 20ms is multiplied by the product for cycle during the vacation, if in error range, 20ms is taken to be added multiplied by the product for cycle during the vacation with synchrotimer timing time, when detecting that cycle signal is again The time synchronisation time is accurately corrected when true, and otherwise using cycle signal is timing time and synchrotimer timing during the vacation Time is added.It is ± 0.1Hz when generally running, when the relative error since power system frequency deviation allowable value is 0.2Hz When more than 6ms, illustrate that power grid has occurred compared with major break down.
The synchronization of signal transmitting and receiving: communication is realized under control synchronization time.Communication transmits multiple information frames each time, often Use synchronization time at the beginning of secondary communication, be preset or instructed and arrange by zone controller device, according to power grid quality and Signal structure needs the data bit occupancy in each frame information 1 to multiple setting byte numbers, and power grid quality takes well biggish Set byte number.The clock timer time there are two cycle period is stayed after each frame traffic, for updating Tc1、Tc2With Tc3.Start the communication of next frame later, if detecting that cycle signal is vacation in a frame traffic, retransmits the information frame.
Realize that the cycle in communication sequentially synchronizes by the start bit of each frame information, stop bits in the sending and receiving end of the communication information It connects.Zone controller device or data collector, appliance controller in the call duration time gap of described two frames, respectively measurement and Store Tc1、Tc2And Tc3, and calculate separately two real-time measurement values Tc1Average value Tk1、Tc2Average value Tk2And Tc3Be averaged Value Tk3, and it is stored in two groups of storage units, i.e. T respectivelyc1、Tc2And Tc3Storage unit and Tk1、Tk2And Tk3Storage unit, when from depositing Storage unit takes out Tk1、Tk2And Tk3After reset two groups of storage units.The storage unit can store 16 real-time measurement values Tc1、Tc2 And Tc3.Not in communication period, continuous 16 real-time measurement values T are measured respectivelyc1、Tc2And Tc3It is if screened to cycle signal Vacation then resets the Tc1、Tc2And Tc3Respective storage unit, continue measurement and storage when screening to cycle signal is true, deposit One T of every deposit when fullc1、Tc2And Tc3, first remove a T being stored at firstc1、Tc2And Tc3, while pressing one in 2 to 15 Number is taken out in setting, takes out one group of T being finally stored inc1、Tc2And Tc3, when power grid quality difference, number is taken out in the smaller setting of choosing, calculates institute Each group of the T taken outc1Average value Tk1、Tc2Average value Tk2And Tc3Average value Tk3And replace the T originally savedk1、Tk2 And Tk3, using average value Tk1、Tk2And Tk3Reduce the influence of network voltage and frequency fluctuation.
Send the determination of signal time: communication is implemented in the single-phase phase line in a transformer platform area of power grid, And it makes an appointment by the synchrotimer time and starts call duration time.It is first broadcasted by zone controller device with address information when communication Handshake, when zone controller device requires some data collector, appliance controller to zone controller device feedback information, The data collector, appliance controller just send information to zone controller device.Zone controller device or data collector, electric appliance Controller is before the communication synchronization time made an appointment receives and sends messages, it is necessary to screen out continuous no less than 16 power grids week Wave has no less than 16 T in real-time measurement storage unitc1、Tc2And Tc3If continuous 16 T are not detectedc1、 Tc2And Tc3It is then sequentially delayed until detecting 16.Transmitting terminal takes out T from storage unitk1、Tk2And Tk3Value difference In addition Tb, obtain the practical transmitting-receiving point T of the first signal with error compensationd1With the practical sending point T of second signald2:
Td1=Tk1-Tb;………………………………………3
Td2=Tk2+Tb;………………………………………4
The practical receiving point T of second signal with error compensationd3:
Td3=Tk3-Tb;………………………………………5
Save Td1、Td2And Td3In respective storage unit.Send T after each frame informationk1、Tk2And Tk3All it is updated.
When sending signal, microcontroller uses T respectivelyd1And Td2As switching signal timer timing midpoint and according to Used rectangular wave broad pulse voltage levels take certain offset, then using the spaced time of rectangular wave broad pulse as switch The timing length of signal timing device is easy to calculate high-speed power control switch turn-on time point, that is, is used for Td1Point sends rectangle The setting sending time T of wave broad pulsef1And Td2The setting sending time T of the rectangular wave broad pulse of pointf2:
Tf1=Td1(Tm/ 2)-Tan;…………………………6
Tf2=Td2(Tm/ 2)-Tan;…………………………7
T in formulamFor signal rectangular wave broad pulse width, TanFor the offset.
In the cycle positive half cycle ascent stage, since rectangular wave broad pulse loads on the initial stage of cycle positive half cycle, the wide arteries and veins of rectangular wave Rush that the voltage more therefore transmitted rectangular wave broad pulses high relative to all wave voltages are more powerful, the signal of generation receives Point displacement is more, sets turnover voltage in the other time segment signal voltage comparator of loading procedure, has been moved off signal reception It is uneven to generate displacement for the voltage location of point;Cycle positive half cycle descending branch is then to load on cycle process in rectangular wave broad pulse The signal receiving point displacement that generates of latter stage it is more, in this way, according to the rectangular wave broad pulse voltage actually used through test measurement Receiving point shifts the midpoint for determining the switching signal timer time of transmitting terminal and Td1Or Td2Between offset Tan, make Signal receives more reliable.
Signal transmission process: transmitting terminal is crossed the overturning of 0 voltage comparator in cycle positive half cycle ascent stage cycle and was generated in 0 It is disconnected, through the T that is delayedi1Or Ti2Afterwards, the time after making it be delayed falls in the signal sending point of all wave voltage settings, firing switch signal Timer simultaneously connects high-speed power control switch, by single rectangular wave broad pulse voltage superposition on grid cyclic wave, can make work Frequency fundamental wave is in Td1Or Td2Voltage generate small displacement on a timeline, and certain harmonic wave can be injected to system.
If crossing interrupt handling routine after 0 interruption, starting measurement Tc1Timer with connect switching signal timer instruction The execution time is Tin
When to Td1When sending signal:
Ti=Tf1-Tin;…………………………………………8
When to Td2When sending signal:
Ti2=Tf2-Tin.………………………………………9
TiAnd Ti2Signaling point displacement of the value also according to receiving end how many adjust in real time.
Closing high-speed power control switch in the interrupt service program when interrupting is overflowed in switching signal timer timing, thus Complete a signal modulation process.
In view of the decaying of signals transmission, and demodulation is using cycle voltage over zero as time reference, in this way In Long Distant Transmit, the cycle voltage phase difference of sending and receiving end will cause setting and receives signal time position and actual signal signal Occur deviation between time location and shadow communication performance, therefore when not taking the method for eliminating deviation, communication distance is limited System is in same transformer platform area.
The demodulation of signal: signal voltage comparator of the receiving end when receiving signal is in the first signal location real-time measurement Tc1Subtract TbRear value and the T being finally stored in is taken out from memoryc1Previous Tc1Subtract TbValue afterwards make comparisons whether Within the scope of the signal errors of permission, determine that the first signal location receives position value in signal;Signal voltage comparator is second The T of signal location real-time measurementc3Subtract TbRear value and the T being finally stored in is taken out from memoryc3Previous Tc3Subtract Tb Whether value afterwards makes comparisons within the scope of the signal errors of permission, determines that second signal position receives position value in signal.
The control of signal transmitting power: when transmitting terminal switching signal timer fires and high-speed power control switch is connected Afterwards, the external interrupt mouth of microcontroller opening signal receiving end immediately detects signal voltage comparator in cycle positive half cycle first The flip-flop transition of signal location and second signal position, with Td1And Td3It compares and whether shifts and its shift amount, if signal is electric Press comparator flip-flop transition closer to Td1, illustrate to send rectangular wave broad pulse energy is relatively smaller or electric network impedance relatively It is low.If signal voltage comparator flip-flop transition is closer to Td1, then increase TiTime, if rectangular wave broad pulse voltage comparator Flip-flop transition is closer to Td2Then reduce Ti2Time.
(4) Detailed description of the invention:
Fig. 1 is grid cyclic wave receiving and transmitting signal position data relation schematic diagram;
Fig. 2 is a kind of circuit structure block diagram of agricultural greenhouse temperature and humidity intelligent control system.
(5) specific embodiment:
A kind of circuit structure block diagram of agricultural greenhouse temperature and humidity intelligent control system is as shown in Figure 2.By zone controller It is constituted with multiple data collectors, appliance controller.Zone controller is by signal sending end A, signal receiving end B, 4G without route It is made of device 2, keyboard display module 10 and micro controller module 1.Data collector and appliance controller include that signal is sent A, signal receiving end B and micro controller module 1 are held, wherein data collector also includes Temperature Humidity Sensor 11.Appliance controller It is that control executes electrical work, zone controller and data collector, appliance controller use the power line communication.Master station's control Device processed is to be made of positioned at the computer management system of top layer 4G wireless router, micro controller module and computer.
Signal sending end A, the signal of power line communication described in zone controller device and data collector, appliance controller Receiving end B and micro controller module 1 are identical with the hardware configuration of power module 4.
The signal sending end A of the power line communication is made of high-speed power control switch 5, switching signal timer 3, electricity Net voltage is connected to high-speed power control switch output end.
The signal receiving end B of the power line communication is compared by twin voltage comparator 7, High-speed Control switch 6,0 voltage excessively Device 8 and signal voltage comparator 9 are constituted.Grid cyclic wave connects after electric resistance partial pressure with 7 input terminal of twin voltage comparator, crosses 0 electricity Pressure comparator 8 and signal voltage comparator 9 are all made of ns grades of high speed voltage comparator MAX319.
Micro controller module 1 uses High Speed Microcontroller STC15F2K60S, this is a kind of single clock/machine cycle (1T) Single-chip microcontroller, speed ratio STC12 also fast 20% is high speed/low-power consumption/superpower jamproof 8051 single-chip microcontroller of new generation, no AD Conversion.
The single-phase firewire and zero curve of power grid connect the input port of signal sending end output port and receiving end, wherein power grid Zero line grounding end.The window region network voltage control is in 55V voltage range, machine shell protective grounding, and has high voltage The security warning in area, trouble hunting should install the isolating transformer that no-load voltage ratio is 1:1 additional, avoid because of failure accidental shock.
2 model F3836 of 4G wireless router, can also select other model routers.F3836 is industrial built in one kind Grade 32 bit processors and technical grade wireless module provide 1 RS232 (or RS485/ using embedded real-time operating system RS422) 4 ethernet lans, 1 Ethernet WAN and 1 WIFI interface, can connect WIFI equipment, ethernet device simultaneously Data transparent transmission and routing function are realized with serial equipment.

Claims (10)

1. a kind of implementation method of agricultural greenhouse temperature and humidity intelligent control system, zone controller receive each number through power line communication According to the data that collector acquires, control appliance controller operation, and 4G mobile radio communication network is accessed by wireless router, It is characterized by:
The power line communication of use is that the signal sending point and the accurate of signal receiving point by setting to grid cyclic wave voltage are determined Communication is realized in position, and it is prominent to generate to send a rectangular wave broad pulse of communication positive or negative pole in the signal sending point of setting Time-dependent current, the mutation current cause a voltage drop to be superimposed on grid voltage waveform on the short-circuit impedance of distribution transformer, To complete a signal modulation process, the signal receiving point demodulated signal that receiving end is set in grid cyclic wave voltage;Described one A anode rectangular wave broad pulse refers to that the high level part of pulse returns 0 from 0 to height.
2. the method according to claim 1, wherein the setting signal sending point in grid cyclic wave voltage and The modulating and demodulating signal step of setting signal receiving point includes:
It sends: crossing the overturning of 0 voltage comparator when the cycle that the cycle positive half cycle ascent stage is arranged in and generated 0 interruption, after being delayed Time after making it be delayed falls in the signal sending point of all wave voltage settings, and firing switch signal timing device simultaneously connects high-speed power Control switch, by single positive pulse voltage Signal averaging on grid cyclic wave;
It receives: by the low-voltage window region being made of the threshold range of high threshold voltage and low threshold voltage being arranged, in micro-control Under device control processed, when all wave voltages of input fall in the low-voltage window region of twin voltage comparator setting, open High-speed Control It closes in an ON state, signal voltage comparator is directly when the signal of all wave voltages receives position and receives signal and measurement cycle Between parameter, determine that received signal whether in the signal receiving point error range of setting, makes other than low-voltage window region High-speed Control switch is in an off state.
3. according to the method described in claim 2, it is characterized in that, the signal sending point and signal receiving point of setting are in power grid The voltage of cycle positive half cycle, which is crossed at 0, was arranged 0 voltage comparator, in a setting cycle voltage location of grid cyclic wave positive half cycle Setting signal voltage comparator, the output of the signal voltage comparator a cycle positive half cycle all wave voltages of setting two Realize overturning in a position;The cycle positive half cycle ascent stage the setting week wave voltage position as the first signal location, The cycle voltage location of setting signal transmitting-receiving point is known as the first signal set point, in the setting week of cycle positive half cycle descending branch As second signal position, the cycle voltage location of setting signal transmitting-receiving point is known as second signal setting for the position of wave voltage Point;
Specifically, the signal voltage comparator is that one be arranged between voltage 21V -40V of grid cyclic wave positive half cycle sets Determine cycle voltage location.
4. according to the method described in claim 1, it is characterized by:
Rectangular wave broad pulse voltage-drop loading is set in the positive 35V of the signal sending point on grid cyclic wave to the voltage value between 60V; The width value of rectangular wave broad pulse voltage is 0.3ms~0.5ms;Signal code value 1A -20A can be provided.
5. the method according to claim 1, wherein including confirmation in the signal receiving point demodulated signal of setting Or the signal that erasing is sent from the signal sending point of setting, during transmitting terminal sends signal, signal transmitted by transmitting terminal is same When receiving end receive, if received position value information is different from the position value information of transmission, then send the wiping of this Except signal, each data bit is erasable in each frame information and retransmits, if wiping unsuccessful, i.e. transmission erasing twice in succession The signal of frame.
6. according to the method described in claim 5, it is characterized in that, institute's rheme value is received with signal voltage comparator in signal Point does not overturn to send position signal " 0 ", overturns to send position signal " 1 ", and wherein the first signal set point of data bit is transmitting-receiving Data, second signal set point are confirmation or the data that the first signal set point of erasing is sent, and sending " 1 " is confirmation, is sent " 0 " It is to start to send that wipe, in start bit, signal voltage comparator, which sends " 0 " in the first signal set point, and stop bits is in the first letter To send " 1 " end, the second signal set point of start bit and stop bits does not have to for number set point.
7. the method according to claim 1, wherein the signal sending point of setting and the accurate of signal receiving point are determined Position includes the error compensation of set signal sending point and signal receiving point, while crossing 0 voltage comparator and signal voltage ratio Ns grades of high speed voltage comparators and High Speed Microcontroller are all made of compared with device.
8. according to claim 1 and method of claim 7, which is characterized in that signal sending point and signal receiving point It is accurately positioned and its compensation method of error is that first computing system is crossed at 0 using the voltage of cycle positive half cycle ascent stage as start time Time interval to the first signal set point is nominal value Tm1;The voltage of cycle positive half cycle ascent stage is crossed at 0 to be arrived for start time The time interval of second signal set point is nominal value Tm2
And time of 0 voltage comparator when the mistake 0 of cycle positive half cycle ascent stage overturns was measured as start time to signal electricity Press the real-time measurement values T of time interval of the comparator when the first signal location is overturnc1;This spent for 0 flip-flop transition as start time To the real-time measurement values T of time interval of the signal voltage comparator when second signal position is overturnc2;Signal voltage comparator exists The reality of time interval of 0 voltage comparator when the mistake 0 of cycle positive half cycle descending branch is overturn was arrived in second signal position when overturning When measured value Tc3;Cross time interval of 0 voltage comparator when the mistake 0 of the cycle positive half cycle ascent stage of two adjacent cycles is overturn For cycle period real-time measurement values Tzu;
When the cycle and its two adjacent cycles that detect are true, the cycle period real-time measurement values Tzu being detected simultaneously by In 20ms and its error range, the cycle is measured to cross 0 voltage comparator when the mistake 0 of cycle positive half cycle ascent stage is overturn and be The a reference value T of time interval of the start time to signal voltage comparator when the first signal location is overturnc010 overturning is crossed with this For a reference value T of time interval of the start time to signal voltage comparator when second signal position is overturnc02, save 30 to The obtained a reference value T of continuously measurement of a setting number in 50c01And Tc02And calculate saved Tc01Average value Tp1 With the T savedc02Average value Tp2, by Tp1And Tp2It is stored in corresponding storage unit;
The then error compensation value T of signal voltage comparator flip-flop transitionbIt is determined by following formula:
Tb={ (Tm2- Tm1)-(Tp2- Tp1)}÷2;
By TbIt saves, TbIllustrate that the position of actual signal transmitting-receiving point is higher for timing;
The extremely multiple setting byte number of the data bit occupancy in each frame information 1 is needed according to power grid quality and signal structure, The clock timer time there are two cycle period is stayed after each frame traffic, for updating Tc1、Tc2And Tc3, start later The communication of next frame retransmits the information frame if detecting that cycle signal is vacation in a frame traffic;
It realizes that the cycle in communication sequentially synchronizes by the start bit of each frame information, stop bits and connects in the sending and receiving end of the communication information Continuous, zone controller or data collector measure respectively and store T in the call duration time gap of described two framesc1、Tc2And Tc3, And calculate separately two real-time measurement values Tc1Average value Tk1、Tc2Average value Tk2And Tc3Average value Tk3, and be stored in respectively Two groups of storage units, i.e. Tc1、Tc2And Tc3Storage unit and Tk1、Tk2And Tk3Storage unit, when from storage unit take out Tk1、 Tk2And Tk3After reset two groups of storage units, the storage unit can store 16 real-time measurement values Tc1、Tc2And Tc3, do not communicating Period measures continuous 16 real-time measurement values T respectivelyc1、Tc2And Tc3If screen to cycle signal be it is false, described in clearing Tc1、Tc2And Tc3Respective storage unit, continue to measure when screening to cycle signal is true and store, it is every when being filled with to be stored in one A Tc1、Tc2And Tc3, first remove a T being stored at firstc1、Tc2And Tc3, while number is taken out by a setting in 2 to 15, Take out one group of T being finally stored inc1、Tc2And Tc3, when power grid quality difference, number is taken out in the smaller setting of choosing, and calculating is taken out each The T of groupc1Average value Tk1、Tc2Average value Tk2And Tc3Average value Tk3And replace the T originally savedk1、Tk2And Tk3
It sends the determination of signal time: continuous no less than 16 grid cyclic waves must be screened out before receiving and sending messages, i.e., in fact When measurement storage unit in have no less than 16 Tc1、Tc2And Tc3If continuous 16 T are not detectedc1、Tc2And Tc3 It is then sequentially delayed until detecting 16, transmitting terminal takes out T from storage unitk1、Tk2And Tk3Value add T respectivelyb, Obtain the practical transmitting-receiving point T of the first signal with error compensationd1With the practical sending point T of second signald2:
Td1=Tk1- Tb
Td2=Tk2+Tb
The practical receiving point T of second signal with error compensationd3:
Td3=Tk3- Tb
Save Td1、Td2And Td3In respective storage unit, T after each frame information is sentk1、Tk2And Tk3All it is updated;
When sending signal, microcontroller uses T respectivelyd1And Td2As switching signal timer timing midpoint and according to being used Rectangular wave broad pulse voltage levels take certain offset, then using the spaced time of rectangular wave broad pulse as switching signal determine When device timing length, be easy to calculate high-speed power control switch turn-on time point, that is, be used for Td1Point sends the wide arteries and veins of rectangular wave The setting sending time T of punchingf1And Td2The setting sending time T of the rectangular wave broad pulse of pointf2:
Tf1=Td1(Tm/ 2)-Tan
Tf2=Td2(Tm/ 2)-Tan
T in formulamFor signal rectangular wave broad pulse width, TanFor the offset;
Rectangular wave broad pulse loads on the initial stage of cycle positive half cycle, and rectangular wave broad pulse voltage is high more relative to all wave voltages More, the signal receiving point displacement of generation is more, and cycle positive half cycle descending branch is then to load on cycle process in rectangular wave broad pulse The signal receiving point displacement that generates of latter stage it is more, generate the uneven of the displacement, shift and determine through test measurement receiving point The midpoint of the switching signal timer time of transmitting terminal and Td1Or Td2Between offset Tan
Signal transmission process: grid cyclic wave voltage is connected to high-speed power control switch output port, when the cycle positive half cycle ascent stage Cycle cross 0 voltage comparator overturning generated 0 interruption, through be delayed Ti1Or Ti2Afterwards, firing switch signal timing device and height is connected Fast power control switch can make fundamental frequency in T by single positive pulse voltage Signal averaging on grid cyclic waved1Or Td2's Voltage generates small displacement on a timeline;
If crossing interrupt handling routine after 0 interruption, starting measurement Tc1Timer with connect switching signal timer instruction execution Time is Tin
When to Td1When sending signal:
Ti=Tf1- Tin;
When to Td2When sending signal:
Ti2=Tf2- Tin;
TiAnd Ti2Signaling point displacement of the value also according to receiving end how many adjust in real time;
Closing high-speed power control switch in the interrupt service program when interrupting is overflowed in switching signal timer timing, to complete Signal modulation process;
When transmitting terminal switching signal timer fires and after connect high-speed power control switch, microcontroller is received in signal immediately End detection signal voltage comparator is in the flip-flop transition of cycle positive half cycle the first signal location and second signal position, and and Td1With Td3It compares and whether shifts and its shift amount, if signal voltage comparator flip-flop transition is closer to Td1, then increase TiTime, such as Fruit signal voltage comparator flip-flop transition is closer to Td2Then reduce Ti2Time.
9. a kind of device of agricultural greenhouse temperature and humidity intelligent control system, it is characterised in that including,
Signal sending end, signal receiving end and the microcontroller mould of power line communication described in zone controller and data collector The hardware configuration of block is identical;
The signal sending end of the power line communication is made of high-speed power control switch, switching signal timer;
The signal receiving end of the power line communication is switched by twin voltage comparator, High-speed Control, crosses 0 voltage comparator and signal Voltage comparator is constituted.
10. device according to claim 9, it is characterised in that the signal receiving end of the power line communication is by power grid All wave voltages through High-speed Control switch control, cycle positive half cycle two low-voltage window regions directly after conditioning filtering be followed by Signal voltage comparator input terminal, High-speed Control switch only open by the low-voltage window region around signal transmitting and receiving point, isolation Grid cyclic wave high voltage, signal voltage comparator is directly when the signal of all wave voltages receives position and receives signal and measurement cycle Between parameter;
The signal sending end of the power line communication, network voltage are connected to high-speed power control switch output end, in cycle just half All ascent stage cycles cross the overturning of 0 voltage comparator and generated 0 interruption, through the T that is delayedi1Or Ti2Afterwards, firing switch signal timing device is simultaneously High-speed power control switch is connected, by single rectangular wave broad pulse voltage superposition on grid cyclic wave.
CN201910340758.2A 2018-06-10 2019-04-25 A kind of agricultural greenhouse temperature and humidity intelligent control system Withdrawn CN109917839A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201810591400 2018-06-10
CN2018105914002 2018-06-10

Publications (1)

Publication Number Publication Date
CN109917839A true CN109917839A (en) 2019-06-21

Family

ID=64305097

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201810822309.7A Withdrawn CN108873998A (en) 2018-06-10 2018-07-24 A kind of agricultural greenhouse temperature and humidity intelligent control system
CN201910340758.2A Withdrawn CN109917839A (en) 2018-06-10 2019-04-25 A kind of agricultural greenhouse temperature and humidity intelligent control system

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201810822309.7A Withdrawn CN108873998A (en) 2018-06-10 2018-07-24 A kind of agricultural greenhouse temperature and humidity intelligent control system

Country Status (1)

Country Link
CN (2) CN108873998A (en)

Also Published As

Publication number Publication date
CN108873998A (en) 2018-11-23

Similar Documents

Publication Publication Date Title
CN110011703A (en) A kind of analog quantity remote collection alarm system
CN109906834A (en) A kind of agricultural greenhouse artificial climate Experimental Control System
CN108897296A (en) A kind of wisdom agricultural greenhouse atmosphere control system
CN109920235A (en) A kind of residential area Water-flowmeter auto-recording
CN108958121A (en) A kind of agricultural greenhouse atmosphere control system
CN109921831A (en) A kind of factory and enterprise electric energy detection management system
CN108877192A (en) A kind of residential block Auto-recording System of Electrical Power Calculation
CN109917839A (en) A kind of agricultural greenhouse temperature and humidity intelligent control system
CN108983663A (en) A kind of intelligent domestic tele-control system
CN108831136A (en) A kind of Automatic meter reading system of tap water supply pipe network
CN108961705A (en) A kind of fire alarm control system
CN108897297A (en) A kind of household electric appliances tele-control system
CN108873999A (en) A kind of green house of vegetables temperature and humidity control system
CN109920234A (en) A kind of flow data collector system
CN108958120A (en) A kind of hotel intelligence control system
CN108897235A (en) A kind of restaurant electrical appliance intelligence control system
CN108931313A (en) A kind of multinode temperature monitoring system
CN108810287A (en) A kind of household cell phone intelligent control system
CN108964707A (en) A kind of chain store's customer queries system
CN108964710A (en) A kind of supermarket's commodity customer queries system
CN108964709A (en) A kind of residential block tap water meter Automatic meter reading system
CN109890108A (en) A kind of urban architecture LED clearance light decorations control system
CN108646643A (en) A kind of restaurant electric appliance remote control system
CN109921830A (en) A kind of air temperature distribution data collection system
CN110007705A (en) A kind of green house of vegetables atmosphere control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190621

WW01 Invention patent application withdrawn after publication