CN109914467A - A kind of foundation bolt positioning device convenient for adjusting - Google Patents

A kind of foundation bolt positioning device convenient for adjusting Download PDF

Info

Publication number
CN109914467A
CN109914467A CN201910269410.9A CN201910269410A CN109914467A CN 109914467 A CN109914467 A CN 109914467A CN 201910269410 A CN201910269410 A CN 201910269410A CN 109914467 A CN109914467 A CN 109914467A
Authority
CN
China
Prior art keywords
support
support frame
nut
fixed
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910269410.9A
Other languages
Chinese (zh)
Other versions
CN109914467B (en
Inventor
闫冬冬
杜国平
唐建华
肖晓东
陶正龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Cni Energy Engineering Co Ltd
Original Assignee
Nanjing Cni Energy Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Cni Energy Engineering Co Ltd filed Critical Nanjing Cni Energy Engineering Co Ltd
Priority to CN201910269410.9A priority Critical patent/CN109914467B/en
Publication of CN109914467A publication Critical patent/CN109914467A/en
Application granted granted Critical
Publication of CN109914467B publication Critical patent/CN109914467B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of foundation bolt positioning devices convenient for adjusting, it include: positioning panel, support frame, two support adjustment mechanisms, wherein positioning panel is fixed at the center of support frame, and several anchor bolt installation holes are arranged for the surface of positioning panel and small prism stands site;The two sides of support frame as described above are relatively fixed respectively to be arranged support adjustment mechanism, wherein each support adjustment mechanism includes a support rod, a locking screw, two support bases, two drill rods, two height adjustment screw rods, three horizontal directions adjusting screw rods;The side of support frame is plugged in it by each support rod, and in the overlapping region of support rod and support frame, setting inner wall is equipped with the through-hole of nut, and one end of the locking screw is protruded into through-hole after piercing into nut and its other end is fixedly connected with handle.The present invention can be achieved positioning panel plan-position and absolute altitude and arbitrarily adjust, and has the characteristics that installation and adjustment are convenient, precision is high, resists and pour impact.

Description

A kind of foundation bolt positioning device convenient for adjusting
Technical field
The present invention relates to a kind of foundation bolt positioning devices convenient for adjusting, belong to the technical field of fixed structure.
Background technique
Photo-thermal power generation is currently in the starting stage in China, in photo-thermal power generation industry, frequently encounters a large amount of linear arrays Or pile-type Equipment Foundations and the isolated footing of array type.It is high to the synteny requirement of each equipment according to the working principle of equipment, Therefore high to the pre-buried required precision of Equipment Foundations foundation bolt.
And in the Sun Island engineering construction of slot type photo-thermal power generation: slot type photo-thermal power generation principle is the reflection of heat collector reflecting mirror Sunlight precisely focuses on the thermal-collecting tube on reflecting mirror focal line, increase the thermally conductive oil temperature in thermal-collecting tube, to make conduction oil Temperature constantly rises to required temperature, and more heat collector linear patterns need to be connected, single such as in the photoelectricity fever project implementation It is arranged in a straight line to arrange 24 heat collectors, overall length 300m, to guarantee collecting efficiency, 24 heat collector focal lines need to be in same level straight line On.And 24 heat collector pile foundation pre-embedded anchoring bolts deviations from linearity are 5mm within the scope of 300m, and the foundation bolt must be primary It adjusts and completes.In conventional Equipment Foundations embedding anchor bolts, generally has the function of back-grouting adjusting, and consider room External environment, measuring device, concreting impact and the influence of dilation, are generally unable to reach this required precision.
Summary of the invention
Technical problem to be solved by the present invention lies in, solve existing embedding anchor bolts there are deviation, can not be accurately fast The problem of speed is adjusted, the present invention provide a kind of foundation bolt positioning device convenient for adjusting, are cooperated by positioning panel and are adjusted It saves mechanism and realizes adjusting, it can be ensured that foundation bolt position is accurate.
The present invention specifically uses following technical scheme to solve above-mentioned technical problem:
A kind of foundation bolt positioning device convenient for adjusting, comprising: positioning panel, support frame, two support adjustment mechanisms, wherein Positioning panel is fixed at the center of support frame, and several anchor bolt installation holes and small rib are arranged in the surface of positioning panel Mirror stands site;The two sides of support frame as described above are relatively fixed respectively to be arranged support adjustment mechanism, wherein each support adjustment mechanism packet Include a support rod, a locking screw, two support bases, two drill rods, two height adjustment screw rods, three Level tunes Screw rod;The side of support frame is plugged in it by each support rod, and in the overlapping region of support rod and support frame, setting is solid Surely it is equipped with the through-hole of nut, one end of the locking screw is protruded into through-hole after piercing into nut and its other end is fixedly connected with handle Hand;Two otic placodes are respectively set in the both ends of the support rod, and are fixed with nut on each otic placode, by each height adjustment silk One end of bar is inserted into round tube after passing through nut and is fixed by the nut of round tube nozzle, and the bottom of the round tube passes through support bottom It is fixedly connected behind the center of seat with drill rod, and the other end of each height adjustment screw rod is fixedly connected with handle;The support rod Two otic placodes are fixedly installed in inside respectively up and down, and setting is fixed with the through-hole of nut on each otic placode, by two of them One end of Level tune screw rod is each passed through after nut and offsets with the surface of support frame, and the outside of support rod is fixedly installed one Fixed cover, fixed cover top are provided with the through-hole of nut, and one end of a remaining Level tune screw rod is passed through fixed cover top It offsets after the through-hole in portion with the side of support frame and the other end of three Level tune screw rods is respectively fixedly connected with handle.
Further, as a preferred technical solution of the present invention: the quantity of the anchor bolt installation hole is four And it is symmetrical arranged two-by-two along positioning panel.
Further, as a preferred technical solution of the present invention: the quantity that the small prism stands site is five.
Further, as a preferred technical solution of the present invention: support frame as described above is made of two cross bars and vertical bar, It is fixed between the cross bar and vertical bar by vertically splicing.
Further, as a preferred technical solution of the present invention: the support rod uses rectangular shaft.
The present invention by adopting the above technical scheme, can have the following technical effects:
Foundation bolt positioning device of the invention, support adjustment mechanism are hammered into basic surrounding ground using drill rod, make to position work Dress can guarantee that position does not deviate when being impacted by external force, casting concrete etc.;Positioning panel is set up in regulating mechanism supported on both sides On, positioning panel center and four corners of the world direction respectively have 1 to accurately measure anchor point, stand position for the small prism of total station;Each Support regulating system contain 5 accurate adjustment screw rods and 1 locking screw, regulating system supported on both sides is used cooperatively, configuration it is multiple Screw rod can be such that the position in the horizontal or vertical direction of positioning panel height and plane precisely adjusts, and realize positioning panel plane position It sets and absolute altitude arbitrarily adjusts;And the locating template of finishing can ensure that foundation bolt position is accurate.
Therefore, foundation bolt positioning device of the invention can make foundation bolt once mounting precision reach ± 2mm, have spiral shell Bolt installation and adjustment are convenient, precision is high, anti-the characteristics of pouring impact.
Detailed description of the invention
Fig. 1 is the structural scheme of mechanism of foundation bolt positioning device of the present invention.
Wherein Symbol explanation: 1- support base, 2- drill rod, 3- height adjustment screw rod, 4- first level adjust screw rod, 5- the Two Level tune screw rods, 6- locking screw, 7- anchor bolt installation hole, the small prism of 8- stand site, 9- support frame, 10- support rod.
Specific embodiment
Embodiments of the present invention are described with reference to the accompanying drawings of the specification.
As shown in Figure 1, the present invention devises a kind of foundation bolt positioning device convenient for adjusting, comprising: positioning panel, branch 9, two support adjustment mechanisms of support.In the present embodiment, support frame as described above 9 is made of two cross bars and two vertical bars, the cross Bar and vertical bar pass through vertically splicing between any two to be fixed, but the present invention is not limited to this kind of structure, the support frame of other structures is same It is applicable in;Then positioning panel is fixed on to the middle position of two cross bars, fixed for foundation bolt installation.
Specifically, the positioning panel is fixed at the center of support frame, and several are arranged in the surface of positioning panel Anchor bolt installation hole 7 and small prism stand site 8, and the quantity of anchor bolt installation hole is four and two-by-two along fixed in the present embodiment Plane plate is symmetrical arranged, stable convenient for the installation of foundation bolt by being symmetrical arranged;Further, the small prism stands site Quantity is five, can be arranged in the side attachment where the central point, all directions four direction of positioning panel, convenient for four The data of different directions are accurately measured.
The identical support adjustment mechanism of structure of setting is fixed in the two sides of support frame as described above 9 relatively respectively, wherein each Supportting regulating mechanism includes 2, two, a drill rod height adjustment of support base 1, two of locking screw 6, two of support rod 10, one Screw rod 3 adjusts three Level tune screw rods that screw rod 4 and a second Level tune screw rod 5 form by two first levels;Its In, the side of support frame 9 is plugged in it by each support rod 10, in the overlapping region of support rod 10 and support frame 9 The through-hole for being fixed with nut is arranged in top, and one end of the locking screw 6 is protruded into through-hole after piercing into nut, and its other end It is fixedly connected with handle, drives locking screw 6 to lock on nut to screw-in on the inside of through-hole by rotating handles, it can also be to through-hole Outside, which screws out, unclamps;Two otic placodes are respectively set in the rear and front end of the support rod 10, and are fixed with nut on each otic placode, Can be directly by nut-welding on otic placode, but it is not limited to this kind of fixed form, one end of each height adjustment screw rod 3 is passed through into spiral shell Imperial mother is inserted into round tube and fixes by the nut of round tube nozzle, the bottom of the round tube behind the center of support base with steel Pricker 2 is fixedly connected, and the other end of each height adjustment screw rod is fixedly connected with handle, drives height adjustment silk by rotating handles One end of bar 3 upper and lower axle in round tube is dynamic, so that the adjustment up and down in height of entire support frame and support rod.In unilateral side, support is adjusted It saves and respectively welds 1 drill rod below 1 circular support pedestal within the organization, drill rod 2, which hammers into layer of ground soil, guarantees that overall structure is steady Gu guaranteeing that overall structure is not deviated when pouring vibrated concrete, being supported by support base 1 and pass through handle can band Dynamic height adjusts screw rod and rotates so that the drill rod of bottom can be inserted or rotate out of ground, realizes that the position of four direction is fixed.
Two otic placodes are fixedly installed in the inside of the support rod 10 respectively up and down, and are arranged on each otic placode and are fixed with One end that two of them first level adjusts screw rod 4 is each passed through the surface phase after nut with support frame 9 by the through-hole of nut It supports, and a fixed cover is fixedly installed in the outside of support rod 10, fixed cover top is provided with the through-hole of nut, will be one remaining One end of 5th Level tune screw rod 5 offsets after the through-hole at fixed cover top with the side of support frame 9 and three horizontal tune The other end of section screw rod is respectively fixedly connected with handle, first level can be made to adjust screw rod 4 to support frame by rotating handles Position up and down in the plane be adjusted.Horizontal direction is adjusted into side of the screw rod 5 after through-hole with support frame 9 Offset, by handle rotate drive horizontal direction adjust screw rod outwardly or inwardly rotate so that a side of the support frame to offset to Interior or outside progress position adjustment.Preferably, in the present apparatus, the support rod 10 can use rectangular shaft.
One embodiment of the present of invention is given below, to illustrate that foundation bolt positioning device of the present invention can be in different directions It precisely adjusts, realizes foot bolt position precise positioning.
Embodiment 1,
In the foundation bolt positioning device of the present embodiment, positioning panel is used for total station with 4 anchor bolt installation holes, 5 The small prism of measurement stands site;4 anchor bolt installation hole sizes are 0.6mm bigger than foundation bolt diameter, wear convenient for foundation bolt It inserts;5 small prisms found the pyramidal structure that site is diameter 3mm, depth 1mm.Anchor bolt installation hole and small prism stand site Position precision is 0.05mm, and positioning panel flatness is 0.2mm.Support frame uses two cross bars and two vertical bars, two cross bars It is all made of the square tube frame of 70*70*4.
Then, the support adjustment mechanism in the present embodiment, support base are processed using 8mm thick steel plate, are supported in ground, are prevented Only whole device is sunk;The drill rod made of round tube, perpendicular to the surface of support frame where positioning panel, one is welded in branch It supports below pedestal, one hammers into layer of ground soil, it is ensured that vertical position template position is firm.Two support rods are all made of the square of 60*30*3 The rectangular configuration that shape pipe is welded is used to support entire positioning panel structure, and integrated entire support regulating system;Two height Degree adjusts screw rod, by rotating handles height adjustment screw rod is rotated in nut, adjusts the level height of support frame, drives The adjusting of support frame whole height;Two Level tune screw rods are respectively perpendicular to the side of the cross bar of 70*70*4 and offset;One A Level tune screw rod, is arranged in the left sides of the cross bar of 70*70*4;Totally 5 screw rods can be realized each support adjustment mechanism The adjustment of positioning panel omnidirectional.The overlapping bit of support rod and support frame is arranged in perpendicular to positioning panel surface in one locking screw It sets, after positioning panel position determines, passes through the position of locking screw stationary positioned panel.
The working principle of the present apparatus is:
Firstly, the drill rod of four bottoms is hammered into the figure layer of ground, support adjustment mechanism is stood on into branch by height adjustment screw rod It supports on pedestal, adjusts fixation and adjustment that height completes support frame.Then, 4 foundation bolts are mounted on positioning panel In anchor bolt installation hole, 4 foundation bolts are made to expose positioning panel height consistent, and with nut check, positioning panel is whole Body frame is inserted into the support rod of support adjustment mechanism.Remaining screw rod is installed in the support rod of support adjustment mechanism.Secondly, into It is fixed that row measuring phases, 4 anchor bolt installation holes and 5 small prisms as measurement point, which stand site relative position, if The theoretical coordinate of known 4 anchor bolt installation holes obtains each anchor bolt installation hole by measurement and small prism stands site The distance between, the theoretical coordinate that 5 measurement points can be obtained then is calculated according to the distance of calculating, after mounting by with entirely Instrument of standing measures the vertical site of 5 small prisms and obtains actual coordinate data, according to the theoretical coordinate and actual coordinate data of 5 points Difference, by it is each adjusting screw rod adjust positioning panel where plane height and level on position all around, make 5 small The actual coordinate data that prism stands site reach theoretical coordinate, then foundation bolt is the position for reaching theoretical coordinate, realize lower margin The precise positioning of bolt.
To sum up, the device of the invention can be used cooperatively by positioning panel, support frame, regulating mechanism supported on both sides, be realized Positioning panel plan-position and absolute altitude arbitrarily adjust.The foundation bolt positioning device can be such that foundation bolt once mounting precision reaches ± 2mm has the characteristics that bolt installation and adjustment are convenient, precision is high, anti-pours impact.
Embodiments of the present invention are explained in detail above in conjunction with attached drawing, but the present invention is not limited to above-mentioned implementations Mode within the knowledge of a person skilled in the art can also be without departing from the purpose of the present invention It makes a variety of changes.

Claims (5)

1. a kind of foundation bolt positioning device convenient for adjusting characterized by comprising positioning panel, support frame, two supports Regulating mechanism, wherein positioning panel is fixed at the center of support frame, and several lower margin spiral shells are arranged in the surface of positioning panel Bolt mounting hole and small prism stand site;The two sides of support frame as described above are relatively fixed respectively to be arranged support adjustment mechanism, wherein each Support adjustment mechanism includes a support rod, a locking screw, two support bases, two drill rods, two height adjustment silks Bar, three Level tune screw rods;The side of support frame is plugged in it by each support rod, in support rod and support frame The through-hole for being fixed with nut is arranged in overlapping region, and one end of the locking screw is protruded into through-hole after piercing into nut and its is another End is fixedly connected with handle;Two otic placodes are respectively set in the both ends of the support rod, and are fixed with nut on each otic placode, will be every One end of a height adjustment screw rod is inserted into round tube and is fixed by the nut of round tube nozzle, the bottom of the round tube after passing through nut Portion is fixedly connected behind the center of support base with drill rod, and the other end of each height adjustment screw rod is fixedly connected with handle; Two otic placodes are fixedly installed in the inside of the support rod respectively up and down, and setting is fixed with the logical of nut on each otic placode One end of two of them Level tune screw rod is each passed through after nut and offsets with the surface of support frame by hole, and support rod is outer A fixed cover is fixedly installed in side, and fixed cover top is provided with the through-hole of nut, by the one of a remaining Level tune screw rod End offsets after the through-hole at fixed cover top with the side of support frame and the other end of three Level tune screw rods is fixed respectively Connect handle.
2. the foundation bolt positioning device convenient for adjusting according to claim 1, it is characterised in that: the foundation bolt installation The quantity in hole is four and is symmetrical arranged two-by-two along positioning panel.
3. the foundation bolt positioning device convenient for adjusting according to claim 1, it is characterised in that: the small prism stands site Quantity be five.
4. the foundation bolt positioning device convenient for adjusting according to claim 1, it is characterised in that: support frame as described above is by two Cross bar and vertical bar composition, are fixed between the cross bar and vertical bar by vertically splicing.
5. the foundation bolt positioning device convenient for adjusting according to claim 1, it is characterised in that: the support rod uses square Shape bar.
CN201910269410.9A 2019-04-04 2019-04-04 Rag bolt positioner convenient to adjust Active CN109914467B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910269410.9A CN109914467B (en) 2019-04-04 2019-04-04 Rag bolt positioner convenient to adjust

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910269410.9A CN109914467B (en) 2019-04-04 2019-04-04 Rag bolt positioner convenient to adjust

Publications (2)

Publication Number Publication Date
CN109914467A true CN109914467A (en) 2019-06-21
CN109914467B CN109914467B (en) 2023-12-01

Family

ID=66968594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910269410.9A Active CN109914467B (en) 2019-04-04 2019-04-04 Rag bolt positioner convenient to adjust

Country Status (1)

Country Link
CN (1) CN109914467B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761419A (en) * 2019-10-29 2020-02-07 袁建华 Construction method for three-dimensional positioning accuracy of prefabricated house foundation connecting piece
CN112064665A (en) * 2020-08-14 2020-12-11 中国十七冶集团有限公司 Pre-buried screw rod positioner
CN112962658A (en) * 2021-02-04 2021-06-15 山东正顺建设集团有限公司 Fixing device for foundation bolt and positioning method for foundation bolt

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20308354U1 (en) * 2003-05-26 2003-07-31 Homag Holzbearbeitungssysteme Aid to positioning a suction clamp column of a CNC woodworking machine along a traverse rail, has an indicating system in the rail and prismatic horizontal viewing of the position
JP2010043468A (en) * 2008-08-12 2010-02-25 Yukiyasu Nakajima Anchor bolt setting apparatus and construction method of foundation
CN105040717A (en) * 2015-07-24 2015-11-11 中国十九冶集团有限公司 Foundation bolt fixing support and installation method
CN209958389U (en) * 2019-04-04 2020-01-17 南京中核能源工程有限公司 Foundation bolt positioning device convenient to adjust

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20308354U1 (en) * 2003-05-26 2003-07-31 Homag Holzbearbeitungssysteme Aid to positioning a suction clamp column of a CNC woodworking machine along a traverse rail, has an indicating system in the rail and prismatic horizontal viewing of the position
JP2010043468A (en) * 2008-08-12 2010-02-25 Yukiyasu Nakajima Anchor bolt setting apparatus and construction method of foundation
CN105040717A (en) * 2015-07-24 2015-11-11 中国十九冶集团有限公司 Foundation bolt fixing support and installation method
CN209958389U (en) * 2019-04-04 2020-01-17 南京中核能源工程有限公司 Foundation bolt positioning device convenient to adjust

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761419A (en) * 2019-10-29 2020-02-07 袁建华 Construction method for three-dimensional positioning accuracy of prefabricated house foundation connecting piece
CN112064665A (en) * 2020-08-14 2020-12-11 中国十七冶集团有限公司 Pre-buried screw rod positioner
CN112064665B (en) * 2020-08-14 2022-01-14 中国十七冶集团有限公司 Embedded screw positioning device and using method thereof
CN112962658A (en) * 2021-02-04 2021-06-15 山东正顺建设集团有限公司 Fixing device for foundation bolt and positioning method for foundation bolt

Also Published As

Publication number Publication date
CN109914467B (en) 2023-12-01

Similar Documents

Publication Publication Date Title
CN109914467A (en) A kind of foundation bolt positioning device convenient for adjusting
CN206709845U (en) A kind of forced centering pedestal of levelling
CN212158607U (en) Surveying and mapping device for construction
CN209958389U (en) Foundation bolt positioning device convenient to adjust
KR101531025B1 (en) Apparatus for protecting tripod in geodetic survey
KR101403476B1 (en) Height adjustment apparatus for bench mark surveying of unified control point and triangulation point
CN214333641U (en) Land supervision measurement area measuring device
CN206113922U (en) Automatic perpendicular laser height finding levelling rod
CN215803300U (en) Ground leveling auxiliary device for building construction
CN206943752U (en) A kind of tripod for engineering mapping
CN215003581U (en) Quick measuring tool for perpendicularity of power system equipment pillar
CN214065988U (en) Building engineering manages with stake hole aperture measuring apparatu
CN210979108U (en) Civil engineering uses portable measuring apparatu
CN211085235U (en) Building engineering cost is with device for on-spot survey and drawing
CN212363190U (en) A adjust support that is used for building engineering quality to detect with spirit level
KR101566685B1 (en) Horizontal Level Maintaining Device of Laser Beam Pointing Apparatus
CN219954930U (en) Range finder for construction
CN214843256U (en) Geographic information engineering mapping device
KR100704430B1 (en) Measuring instrument of main squared timber in pylon
CN219934959U (en) Indoor range finder positioner
CN111156959A (en) Height difference auxiliary measuring device for level and using method
CN218156208U (en) Laser calibrator
CN211624690U (en) Real estate mapping device
CN218295029U (en) Actual measurement device for engineering cost
CN214147116U (en) Soil mapping support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant