CN109914175A - A kind of novel arrangement and method for construction of water feature design building - Google Patents

A kind of novel arrangement and method for construction of water feature design building Download PDF

Info

Publication number
CN109914175A
CN109914175A CN201811300345.3A CN201811300345A CN109914175A CN 109914175 A CN109914175 A CN 109914175A CN 201811300345 A CN201811300345 A CN 201811300345A CN 109914175 A CN109914175 A CN 109914175A
Authority
CN
China
Prior art keywords
basal plane
feature design
construction
cement
water feature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811300345.3A
Other languages
Chinese (zh)
Inventor
王喜
李政兴
黎长珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU LEJIANG BUILDING MATERIALS Co Ltd
Original Assignee
GUANGZHOU LEJIANG BUILDING MATERIALS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU LEJIANG BUILDING MATERIALS Co Ltd filed Critical GUANGZHOU LEJIANG BUILDING MATERIALS Co Ltd
Priority to CN201811300345.3A priority Critical patent/CN109914175A/en
Publication of CN109914175A publication Critical patent/CN109914175A/en
Pending legal-status Critical Current

Links

Abstract

The present invention relates to a kind of novel arrangement and method for construction of water feature design building, the operating procedure of the novel arrangement and method for construction of the water feature design building are as follows: casting basal plane, basal plane processing, the paving of brick material, brickwork joint processing, the casting basal plane top layer is cement mortar, and it need to be criticized on mortar foundation base when basal plane processing and scrape one of waterproof layer to be covered and be closed comprehensively, polymer-modified cement-based binder is used when the brick material paving, and water-fast, the weatherability pointing with the inhibition accumulation of salt in the surface soil is selected to carry out joint filling when the brickwork joint is handled.The novel arrangement and method for construction of water feature design building can effectively solve the problems, such as that water feature design landscape often exposes the accumulation of salt in the surface soil in practice, decorative stone hollowing falls off.This programme carries out water proof anti-seepage processing to basal plane by using happy craftsman's board " K66 Polymer cement materials ", using happy craftsman's board " A05 Polymer Mortar " progress tapestry brick material stickup, the FAQs such as the accumulation of salt in the surface soil and tapestry brick hollowing that can effectively solve water feature design building fall off.

Description

A kind of novel arrangement and method for construction of water feature design building
Technical field
The present invention relates to construction solution technique field, specially a kind of novel arrangement and method for construction of water feature design building.
Background technique
With the continuous improvement of people's living standards, requirement of the people to environment such as life, inhabitations is also higher and higher, gardens Water scenery decorates landscape as the emphasis of living area.The water feature designs facilities such as landscape construction, moulding fountain, man-made waterfall are throughout city Between square, park and the residence district in city, plant area, enterprise.As it can be seen that the life that us were interspersed and beautified to water feature design is empty Between, in traditional water feature design project, building body is divided into cement mortar base, cement adhesive layer, tapestry brick material and cement joint filling layer.
The common faults such as currently many water feature design landscapes often expose the accumulation of salt in the surface soil in practice, decorative stone hollowing falls off, greatly Reduce the beauty of water feature design greatly, and build the accumulation of salt in the surface soil, the problems such as brick material hollowing falls off the reason of mainly due to work progress The reason of selection of middle material and technique is improper caused, the water feature design building accumulation of salt in the surface soil is cement mortar base, cement bonds Layer and cement joint sealing material in all contain a large amount of alkaline chemical, meet water after, these alkaline chemicals can it is soluble in water simultaneously It is carried over, then generates chemical reaction with extraneous carbon dioxide, form carbonate not soluble in water, be adsorbed in brickwork joint and brick face etc. Place forms general phenomenon;The reason of water feature design building brick hollowing falls off usually selects cement net for the adhesive material of brick material Slurry or cement mortar, and the shrinkage of both materials is big, adhesion strength is low, leads to not for brick material being firmly bonded, and is formed de- It falls;The reason of waterproof layer fails usually selects common flexible waterproof coating on the market for the waterproof material of water feature design building, Reach waterproof and sealing effect by being painted on base surface one of film of formation, but the waterproof coating belongs to flexible, elasticity Material, strength of coating is extremely low, is unfavorable for surface mount tapestry brick material, in addition, its weatherability is poor, anti-aging and freeze thawing resistance circulation effect Fruit is bad, and immersion can be softened for a long time, eventually led to waterproof membrane and separated, peel off with basal plane, waterproof effect failure, so, Common flexible waterproof coating is not particularly suited for water feature design project in construction.
Summary of the invention
The purpose of the present invention is to provide a kind of novel arrangement and method for construction of water feature design building, to solve above-mentioned background technique The problem of water feature design accumulation of salt in the surface soil, the stone material hollowing of middle proposition fall off.
To achieve the above object, the invention provides the following technical scheme: a kind of water feature design building novel arrangement and method for construction, The operating procedure of the novel arrangement and method for construction of the water feature design building are as follows: casting basal plane, basal plane processing, the paving of brick material, brickwork joint Processing, the casting basal plane top layer be cement mortar, and basal plane processing when need to be criticized on mortar foundation base scrape one of waterproof layer with It is covered and is closed comprehensively, use polymer-modified cement-based binder when the brick material paving, when brickwork joint processing is selected Joint filling is carried out with water-fast, weatherability pointing with the inhibition accumulation of salt in the surface soil.
Preferably, the detailed process of the casting basal plane is to pour matrix using masonry brick or cement mortar, is then used Cement mortar carries out basal plane levelling.
Preferably, the detailed process of the basal plane processing is on basal plane with happy craftsman's board " K66 polymer cement waterproof sand Slurry " product does complete water-protected enclosure processing comprehensively.
Preferably, the detailed process of the brick material paving is to select the adhesive material of happy craftsman's board " A05 Polymer Mortar " The bricks material such as granite, Art Stone is pasted.
Preferably, the detailed process of the brickwork joint processing is to select as happy craftsman " true porcelain cement " product has the inhibition accumulation of salt in the surface soil Water-fast, weatherability pointing carries out joint filling, or the mode of selection not joint filling handles brickwork joint.
Compared with prior art, the beneficial effects of the present invention are: the novel arrangement and method for construction of water feature design building can have Effect solves the problems, such as that water feature design landscape often exposes the accumulation of salt in the surface soil in practice, decorative stone hollowing falls off.This programme is by making Water proof anti-seepage processing is carried out to basal plane with happy craftsman's board " K66 Polymer cement materials ", uses happy craftsman's board " A05 macromolecule Beneficial clay " carries out the stickup of tapestry brick material, then carries out joint filling with happy craftsman's board " true porcelain cement ", can effectively solve water feature design building The accumulation of salt in the surface soil and tapestry brick hollowing FAQs, this programme such as fall off cover one layer of happy craftsman's board " K66 on the cement mortar substrate that garden is built Polymer cement materials ", because " happy craftsman's board K66 Polymer cement materials " belong to novel polymer-modified cement Based waterproof mortar, waterproof performance and strength character meet JC/T984-2011 " polymer cement
Waterproof mortar " requirement of standard I type, and compatible with the mortar basal plane, the adhesive mortar that are all cement base etc., then happy craftsman's board " K66 Polymer cement materials " carry out comprehensive waterproof covering closing to cement mortar basal plane, have blocked water and basal plane sand The infiltration of slurry is in contact, so that the alkaline chemical in basal plane mortar can not flow out, so that the accumulation of salt in the surface soil will not be formed, therefore this programme The waterproof and impervious effect to substrate may be implemented, effectively prevent substrate mortar to form the accumulation of salt in the surface soil, while mentioning for the stickup of tapestry brick material For a compatible basal plane advantageously, and because brick material paving selects happy craftsman's board " A05 Polymer Mortar " as stickup material Material, and " A05 Polymer Mortar " belongs to polymer-modified cement-based binder, is the novel ceramic tile of one kind and stone material bonding Material has high adhesion strength, excellent toughness of material, extremely low shrinkage, good water-fast ageing-resistant and freeze-thawing resistant Cycle performance, therefore select happy craftsman's board " A05 Polymer Mortar " as the binding material of brick material and enable " A05 Polymer Mortar " Paste it is dry after, impregnate in water for a long time will not the accumulation of salt in the surface soil, the high cohesive force having by " A05 Polymer Mortar " The stronger of tile paste is enabled, solves the problems, such as that brick material hollowing falls off, when being also avoided that the binding material accumulation of salt in the surface soil, and being handled because of brickwork joint Happy craftsman " true porcelain cement " product or not joint filling are selected, happy craftsman's " true porcelain cement " product has the anti-accumulation of salt in the surface soil, resistant effect, enables between brickwork joint The case where being not in the accumulation of salt in the surface soil.
Detailed description of the invention
Fig. 1 is the present invention a kind of cement paste, cement mortar and the A05 of the novel arrangement and method for construction of water feature design building The cohesive force comparison diagram of Polymer Mortar.
Specific embodiment
Below in conjunction with following embodiment of the present invention, technical solution in the embodiment of the present invention is carried out clearly and completely Description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on this hair Embodiment in bright, every other implementation obtained by those of ordinary skill in the art without making creative efforts Example, shall fall within the protection scope of the present invention.
The present invention provides a kind of technical solution: a kind of novel arrangement and method for construction of water feature design building, it is characterised in that: described Water feature design building novel arrangement and method for construction operating procedure are as follows: casting basal plane, basal plane processing, the paving of brick material, brickwork joint handle, The casting basal plane top layer is cement mortar, and when basal plane processing
It need to be criticized on mortar foundation base and scrape one of waterproof layer to be covered and be closed comprehensively, when brick material paving uses polymerization Object modified cement-based binder selects water-fast, the weatherability pointing with the inhibition accumulation of salt in the surface soil to carry out joint filling when the brickwork joint is handled.
The detailed process of casting basal plane is to pour matrix using masonry brick or cement mortar, then using cement mortar to base Face carries out levelling.
The detailed process of basal plane processing is to make entirely on basal plane of happy craftsman's board " K66 Polymer cement materials " product The complete water-protected enclosure processing in face.
The detailed process of brick material paving is to select the adhesive material of happy craftsman's board " A05 Polymer Mortar " to granite, text The bricks material such as fossil is pasted.
The detailed process of brickwork joint processing is that such as happy craftsman's " true porcelain cement " product is selected to have water-fast, the weatherability for inhibiting the accumulation of salt in the surface soil Pointing carry out joint filling, or selection not joint filling mode handle brickwork joint.
It is done below by the beneficial effect of the novel arrangement and method for construction of 4 pairs of table 1- table water feature design buildings of the present invention detailed Explanation.
(1) happy craftsman's board " K66 Polymer cement materials " product meets JC/T984-2011 " polymer cement waterproof Mortar " requirement of standard I type, inspection result such as the following table 1
1 K66 Polymer cement materials testing result of table
(2) happy craftsman's board " A05 Polymer Mortar " product meets JC/T 547-2005 " ceramic wall and floor bricks adhesive " standard The requirement of C2 type, inspection result such as the following table 2.
2 A05 Polymer Mortar testing result of table
(3) material drying shrinkage contrast table
3 material drying shrinkage contrast table of table
Serial number experimental project cement paste cement mortar
1 28d does contraction/% 0.68 0.37
2 56d do contraction/% 0.75 0.42
(4) the cohesive force comparison diagram of cement paste, cement mortar and A05 Polymer Mortar, which is shown in, illustrates Confucian classics attached drawing 1.
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, It is still possible to modify the technical solutions described in the foregoing embodiments, or part of technical characteristic is carried out etc. With replacement, all within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in this Within the protection scope of invention.

Claims (5)

1. a kind of novel arrangement and method for construction of water feature design building, it is characterised in that: the novel construction of the water feature design building The operating procedure of scheme are as follows: casting basal plane, basal plane processing, the paving of brick material, brickwork joint processing, the casting basal plane top layer are cement bonded sand Slurry, and need to be criticized on mortar foundation base when basal plane processing and scrape one of waterproof layer to be covered and be closed comprehensively, the brick material is spread Polymer-modified cement-based binder is used when patch, selecting when the brickwork joint is handled, there is water-fast, the weatherability that inhibit the accumulation of salt in the surface soil to fill out It stitches material and carries out joint filling.
2. a kind of novel arrangement and method for construction of water feature design building according to claim 1, it is characterised in that: the casting base The detailed process in face is to pour matrix using masonry brick or cement mortar, is then carried out using cement mortar to basal plane levelling.
3. a kind of novel arrangement and method for construction of water feature design building according to claim 1, it is characterised in that: at the basal plane The detailed process of reason is to do comprehensive complete water-protected enclosure with happy craftsman's board " K66 Polymer cement materials " product on basal plane Processing.
4. a kind of novel arrangement and method for construction of water feature design building according to claim 1, it is characterised in that: the brick material paving The detailed process of patch is that the adhesive material of happy craftsman's board " A05 Polymer Mortar " is selected to carry out the bricks material such as granite, Art Stone It pastes.
5. a kind of novel arrangement and method for construction of water feature design building according to claim 1, it is characterised in that: at the brickwork joint The detailed process of reason is to select such as happy craftsman's " true porcelain cement " product that there is water-fast, weatherability the pointing for inhibiting the accumulation of salt in the surface soil to carry out Joint filling, or the mode of selection not joint filling handle brickwork joint.
CN201811300345.3A 2018-11-02 2018-11-02 A kind of novel arrangement and method for construction of water feature design building Pending CN109914175A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811300345.3A CN109914175A (en) 2018-11-02 2018-11-02 A kind of novel arrangement and method for construction of water feature design building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811300345.3A CN109914175A (en) 2018-11-02 2018-11-02 A kind of novel arrangement and method for construction of water feature design building

Publications (1)

Publication Number Publication Date
CN109914175A true CN109914175A (en) 2019-06-21

Family

ID=66959768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811300345.3A Pending CN109914175A (en) 2018-11-02 2018-11-02 A kind of novel arrangement and method for construction of water feature design building

Country Status (1)

Country Link
CN (1) CN109914175A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000008514A (en) * 1998-06-18 2000-01-11 Ribooru:Kk Manufacture of plastic block with tile-like irregular pattern
CN202596099U (en) * 2012-05-21 2012-12-12 张立功 Natural stone bonding structure for garden ponds
CN205857593U (en) * 2016-07-01 2017-01-04 棕榈生态城镇发展股份有限公司 A kind of stone material wet combining structure of anti-stone material pathological changes
CN206289911U (en) * 2016-08-06 2017-06-30 杭州赛石园林集团有限公司 A kind of anti-accumulation of salt in the surface soil structure of packaged finishing material

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000008514A (en) * 1998-06-18 2000-01-11 Ribooru:Kk Manufacture of plastic block with tile-like irregular pattern
CN202596099U (en) * 2012-05-21 2012-12-12 张立功 Natural stone bonding structure for garden ponds
CN205857593U (en) * 2016-07-01 2017-01-04 棕榈生态城镇发展股份有限公司 A kind of stone material wet combining structure of anti-stone material pathological changes
CN206289911U (en) * 2016-08-06 2017-06-30 杭州赛石园林集团有限公司 A kind of anti-accumulation of salt in the surface soil structure of packaged finishing material

Similar Documents

Publication Publication Date Title
CN102584133B (en) Emulsion bi-component interface agent and preparation method for emulsion bi-component interface agent
CN101935507A (en) Water-proof back adhesive for stone
CN108585684A (en) A kind of cement base Ceramic Tiles adhesive
CN102674769A (en) Waterproof gum for stone
CN103030425A (en) Interface waterproofing agent
CN207194343U (en) The tapestry brick paving structure of autoclave aerated concrete building block exterior wall
CN109914175A (en) A kind of novel arrangement and method for construction of water feature design building
CN107574936A (en) A kind of heat preserving exterior wall construction technology
CN105086821B (en) A kind of wall hydrophober and preparation method thereof
CN103790383A (en) Anti-cracking external heat-insulation mortar construction process
CN204040398U (en) A kind of ground self-leveling system
CN107955438A (en) Insulating water-proof composite coating coating and its construction technology
CN204040378U (en) A kind of stone material is pasted and protection system
CN209025331U (en) A kind of red tile roof parapet waterproof construction
CN107245258B (en) One kind is exempted to pound brick waterproof paint composition and ceramic tile waterproof construction method
CN208734141U (en) The pool wall of stainless steel swimming pool, bottom of pond structure
CN111960783A (en) Anti-permeability mortar and construction process thereof
CN206722265U (en) A kind of new super abrasive crystalline substance drilling area glass Mosaic
CN207063377U (en) Autoclave aerated concrete building block exterior wall base layer structure
CN213359186U (en) Gardens waterscape stone material infiltration waterproof construction
CN206538891U (en) A kind of rock cotton board insulation construction
CN206706993U (en) Underground space Dampproof water-drainage basal plane
CN104163593A (en) Dry powder mortar
CN104529343A (en) Gatepost decoration material
CN204804197U (en) Compound waterproof system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 510000 Room 101, building 33, Guomao Avenue South, Panyu District, Guangzhou City, Guangdong Province

Applicant after: Guangdong Lejiang New Material Co., Ltd

Address before: Panyu District, village of Guangzhou city in Guangdong province 510000 self lotus Wai Industrial Zone No. 8

Applicant before: GUANGZHOU LEJIANG BUILDING MATERIALS CO., LTD.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20190621

RJ01 Rejection of invention patent application after publication