CN209025331U - A kind of red tile roof parapet waterproof construction - Google Patents

A kind of red tile roof parapet waterproof construction Download PDF

Info

Publication number
CN209025331U
CN209025331U CN201820887733.5U CN201820887733U CN209025331U CN 209025331 U CN209025331 U CN 209025331U CN 201820887733 U CN201820887733 U CN 201820887733U CN 209025331 U CN209025331 U CN 209025331U
Authority
CN
China
Prior art keywords
parapet
waterproof
waterproof layer
layer
tile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820887733.5U
Other languages
Chinese (zh)
Inventor
胡昌林
鲍彩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820887733.5U priority Critical patent/CN209025331U/en
Application granted granted Critical
Publication of CN209025331U publication Critical patent/CN209025331U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model uses a kind of red tile roof parapet waterproof construction, includes SBS waterproof layer, ointment block, roof tile, cement screedn, waterproof coating layer;The SBS waterproof layer is arranged on roofing screed-coat, when waterproof roll is laid with to parapet, to turn over 15 centimetres;The ointment block is arranged at SBS waterproof layer closing in, makes to seal at waterproof layer closing in, keeps firm pasting at parapet and the closing in of SBS waterproof layer;The roof tile is arranged on SBS waterproof layer, and roof tile will be laid with to parapet inner edge;The cement screedn is arranged in roof tile and parapet junction, and cement mortar is required to be made into arc angle;The waterproof coating layer is made for twice of 851 coating application, which should brush to parapet since roof tile and cement mortar junction and bear down on one bottom height after cement mortar at arc angle is dry.

Description

A kind of red tile roof parapet waterproof construction
Technical field
The utility model belongs to buildings waterproof field more particularly to a kind of red tile roof parapet waterproof construction.
Background technique
Residential Building gradually adopts the red tile roof of European style, but roof building design requirement is beautiful, to section Point design construction brings certain difficulty, and design of joints is unsightly and percolating water, phenomena such as waterproof durability is poor are sent out often It is raw, so the processing of red tile roof connection detail construction is our problems to be solved.
Utility model content
Against the above deficiency, it may be considered that be laid with one layer of SBS waterproof roll between roofing screed-coat and roof tile, prevent Ointment adhesive seal can be used at water coiled material closing in, be made into arc angle with cement mortar in roof tile and parapet junction, then At arc angle cement mortar to parapet bear down on one bottom height place brush twice of 851 water-repellent paints, can effectively solve in this way Red tile roof parapet node percolating water, the problems such as waterproof durability is poor.
To achieve the above object, a kind of the technical solution adopted in the utility model are as follows: red tile roof parapet waterproof knot Structure includes SBS waterproof layer, ointment block, roof tile, cement screedn, waterproof coating layer;The SBS waterproof layer setting On roofing screed-coat, when waterproof roll is laid with to parapet, 15 centimetres are turned over;The ointment block is arranged in SBS waterproof At layer closing in, makes to seal at waterproof layer closing in, keep firm pasting at parapet and the closing in of SBS waterproof layer;The roof tile It is arranged on SBS waterproof layer, and roof tile will be laid with to parapet inner edge;The cement screedn is arranged in roofing tile Piece and parapet junction, and cement mortar is required to be made into arc angle;The waterproof coating layer is made for twice of 851 coating application, The waterproof coating layer should be brushed since roof tile and cement mortar junction to daughter after cement mortar at arc angle is dry Wall bears down on one bottom height.
Preferably, the height of the cement screedn is more than at SBS waterproof layer closing in.
Using the beneficial effects of the utility model are: being laid with one layer of SBS waterproof between roofing screed-coat and roof tile Coiled material can use ointment adhesive seal at waterproof roll closing in, be made into arc with cement mortar in roof tile and parapet junction Angle, then arc angle cement mortar to parapet bear down on one bottom height place brush twice of 851 water-repellent paints, in this way can be effective Solve red tile roof node percolating water, the problems such as waterproof durability is poor.
Detailed description of the invention
Further to illustrate the utility model, it is described further now in conjunction with attached drawing 1.
FIG. 1 is a schematic structural view of the utility model.
Wherein: 1 being SBS waterproof layer, 2 be ointment block, 3 be roof tile, 4 be cement screedn, 5 be water-repellent paint Layer.
Specific embodiment
Refering to fig. 1, a kind of red tile roof parapet waterproof construction includes SBS waterproof layer 1, ointment block 2, roofing tile Piece 3, cement screedn 4, waterproof coating layer 5;The SBS waterproof layer 1 is arranged on roofing screed-coat, and waterproof roll is laid with When to parapet, 15 centimetres are turned over;The ointment block 2 is arranged at 1 closing in of SBS waterproof layer, makes to seal at waterproof layer closing in, Keep firm pasting at parapet and 1 closing in of SBS waterproof layer;The roof tile 3 is arranged on SBS waterproof layer 1, and roofing Tile 3 will be laid with to parapet inner edge;The setting of cement screedn 4 is required in roof tile 3 and parapet junction Cement mortar is made into arc angle;The waterproof coating layer 5 is made for twice of 851 coating application, which should be at arc angle After cement mortar is dry, is brushed since roof tile and cement mortar junction to parapet and beared down on one bottom height.
In specific implementation, the height of the cement screedn 4 is more than at 1 closing in of SBS waterproof layer.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (2)

1. a kind of red tile roof parapet waterproof construction, it is characterised in that: include SBS waterproof layer, ointment block, roofing tile Piece, cement screedn, waterproof coating layer;The SBS waterproof layer is arranged on roofing screed-coat, and waterproof roll is laid with to female When youngster's wall, 15 centimetres are turned over;The ointment block is arranged at SBS waterproof layer closing in, makes to seal at waterproof layer closing in, keeps female Firm pasting at youngster's wall and the closing in of SBS waterproof layer;The roof tile is arranged on SBS waterproof layer, and roof tile will be spread If to parapet inner edge;The cement screedn is arranged in roof tile and parapet junction, and cement mortar is required to do At arc angle;The waterproof coating layer is made for twice of 851 coating application, which should the cement mortar drying at arc angle Afterwards, it brushes to parapet and bears down on one bottom height since roof tile and cement mortar junction.
2. a kind of red tile roof parapet waterproof construction according to claim 1, it is characterised in that: the cement mortar The height of surface layer is more than at SBS waterproof layer closing in.
CN201820887733.5U 2018-06-08 2018-06-08 A kind of red tile roof parapet waterproof construction Expired - Fee Related CN209025331U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820887733.5U CN209025331U (en) 2018-06-08 2018-06-08 A kind of red tile roof parapet waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820887733.5U CN209025331U (en) 2018-06-08 2018-06-08 A kind of red tile roof parapet waterproof construction

Publications (1)

Publication Number Publication Date
CN209025331U true CN209025331U (en) 2019-06-25

Family

ID=66868605

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820887733.5U Expired - Fee Related CN209025331U (en) 2018-06-08 2018-06-08 A kind of red tile roof parapet waterproof construction

Country Status (1)

Country Link
CN (1) CN209025331U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115306064A (en) * 2022-07-08 2022-11-08 中国建筑第八工程局有限公司 UHPC (ultra high performance polycarbonate) breast board embedded type water baffle waterproof node structure and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115306064A (en) * 2022-07-08 2022-11-08 中国建筑第八工程局有限公司 UHPC (ultra high performance polycarbonate) breast board embedded type water baffle waterproof node structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN209025331U (en) A kind of red tile roof parapet waterproof construction
CN208996333U (en) A kind of inverted roof balcony node waterproof structure
CN106193343A (en) STP vacuum insulation plate heat preserving system and construction method thereof
CN205875541U (en) Anti -drop's roof waterproof structure
CN203383446U (en) Thermal-insulation decorative integrated board
CN204152071U (en) A kind of thermal-insulating waterproof side fascia
CN204983447U (en) Building external tile face structure
CN207484709U (en) A kind of waterproof construction of building prefabrication overall assembled exterior wall transverse joint
CN205907921U (en) Waterproof structure of parapet wall
CN202500348U (en) Prefabricated part roofing waterproof leakage mending structure
CN104163593A (en) Dry powder mortar
CN213741930U (en) Roofing waterproof insulation integration tile
CN203320826U (en) Waterproof structure of parapet wall
CN203361498U (en) Elastic galling aggregate mortar outer wall
CN204876383U (en) Novel waterproofing membrane closes up for wall body device
CN203487714U (en) Light heat preserving and insulating composite plate for building
CN203145348U (en) Pitched roof waterproof eaves gutter
CN206144042U (en) Roof water -proof structure
CN209384532U (en) A kind of ridge waterproof construction in multifunction tile house face
CN206144049U (en) Sloping roofing eaves mouth waterproof construction of building is decorated to wood
CN202227593U (en) Waterproofing structure of concrete member and concrete roof structure
CN207905592U (en) A kind of bay window water-proof top plate
CN2507933Y (en) Composite water-proof layer
CN209244108U (en) A kind of whole spelling formula steel joist tile roofing of inclined slope roof
CN215978103U (en) Single-slope ridge tile structure of tile roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190625

Termination date: 20200608

CF01 Termination of patent right due to non-payment of annual fee