CN106193343A - STP vacuum insulation plate heat preserving system and construction method thereof - Google Patents

STP vacuum insulation plate heat preserving system and construction method thereof Download PDF

Info

Publication number
CN106193343A
CN106193343A CN201510213995.4A CN201510213995A CN106193343A CN 106193343 A CN106193343 A CN 106193343A CN 201510213995 A CN201510213995 A CN 201510213995A CN 106193343 A CN106193343 A CN 106193343A
Authority
CN
China
Prior art keywords
construction
stp
plate
coat
screen cloth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510213995.4A
Other languages
Chinese (zh)
Inventor
王发雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI NAXI INDUSTRIAL Co Ltd
Original Assignee
SHANGHAI NAXI INDUSTRIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI NAXI INDUSTRIAL Co Ltd filed Critical SHANGHAI NAXI INDUSTRIAL Co Ltd
Priority to CN201510213995.4A priority Critical patent/CN106193343A/en
Publication of CN106193343A publication Critical patent/CN106193343A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/242Slab shaped vacuum insulation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B80/00Architectural or constructional elements improving the thermal performance of buildings
    • Y02B80/10Insulation, e.g. vacuum or aerogel insulation

Landscapes

  • Floor Finish (AREA)

Abstract

The present invention relates to building material technical field, specifically a kind of STP vacuum insulation plate heat preserving system and construction method thereof, its step: should first determine during construction that horizontal and vertical datum line carries out snap the line, adhesive configures;HD-STP plate is installed, splicing position processes, HD-STP plate plate seam has processed 3d~5d and has carried out float coat construction, float coat is constructed, PVC corner protector, PVC drip are constructed after first finishing mucilage at exterior wall external corner completes again, in the range of finishing mucilage operable time, the most uniformly extrude viscous for PVC corner protector by hanging wire from the top down, and the screen cloth on square staff is pressed in rubber cement simultaneously, finishing mucilage to be extruded from the hole of corner protector, is struck off by unnecessary rubber cement, and second rubber cement should be fully embedded corner protector in finishing mucilage, the installation of anchoring piece, finish coat is constructed;Excellent thermal insulation performance of the present invention, has excellent heat-resisting, tolerance to cold.

Description

STP vacuum insulation plate heat preserving system and construction method thereof
[technical field]
The present invention relates to building material technical field, specifically a kind of STP vacuum insulation plate heat preserving system And construction method.
[background technology]
The world today, improves constantly saving the energy demand with protection environment, builds new material demand day Strong increasingly, with the fastest developing speed be incubated the most again. exterior wall insulated structure system is of a great variety, and form is each Different, the control of its performance and execute 3131 skills and the most increasingly cause the attention of people.
The research of STP material, from the beginning of 1972, is concentrated mainly on Japan, Europe country.Exist at present The refrigeration industries such as refrigerator are the most commonly used, and the refrigerator in Japan more than 90% have employed this kind of material insulation.Mesh Before, Europe country has begun to application, from the tracing detection result of Munich, Germany sample project architectural Display, finishes the engineering of insulation with STP, and its annual energy consumption is only the 1/10 of the average energy consumption in city, Munich.
[summary of the invention]
Present invention aim to solve above-mentioned deficiency, and provide a kind of STP vacuum heat-insulating plate to be incubated system System and construction method thereof.
The purpose of the present invention can be achieved through the following technical solutions:
The construction method of a kind of STP vacuum insulation plate heat preserving system is characterized in that, comprises the following steps:
1) should first determine that horizontal and vertical datum line carries out snap the line during construction;
2) adhesive configuration:
Adhesive should be in mass ratio for water: powder=1:4~1:5 allocates;Adhesive is according to difference Ambient temperature should complete in 4h;
3) HD-STP plate is installed:
(1) should treat that HD interfacial agents is dried in its external coating HD interfacial agents before pasting HD-STP plate Sheet material is pasted after 2h;
(2) use full bonding between HD-STP plate and base course wall screed-coat, hot edge seal portion void by The adhesive that STP back squeezes out is filled;
(3) HD-STP plate should carry out sticking construction along horizontal line from the bottom to top, first pastes the HD-STP of external corner Plate;
(4) HD-STP plate pastes and should uniformly extrude on metope metope, and limit flanging is glued, available rubber hammer Rap HD-STP plate;
(5) use negative and positive angle personality board at external corner part and be protected by with PVC corner protector, window use suitable for reading PVC drip;
4) splicing position processes:
(1) fill levelling at HD-STP plate overlap joint pressure position thermal insulation mortar, the lap width of seam≤ 15mm;
(2) preparation of thermal insulation mortar and use: the proportioning that should strictly provide by supplier and processing technology Carry out at the scene, have special people to prepare, control to use in 2h depending on varying environment temperature conditions Complete;
5) HD-STP plate plate seam has processed 3d~5d and has carried out float coat construction;
6) float coat construction:
(1) coating ornamental surface: to being built-in with the float coat of one layer of alkaline-resisting coating screen cloth, smearing of finishing mucilage Ash should point two-layer be carried out, ground floor thickness 2.0mm~3.0mm, and after plastering immediately Being pressed into 160g/ alkaline-resisting coating screen cloth with steamed bun cutter, the second layer is plastered and should be plastered at ground floor Carrying out after 24h, thickness is 1.0mm~2.0mm, so that alkaline-resisting coating screen cloth is completely covered Smearing aspect, finishing mucilage should be plastered in three times;
(2) decorating surface brick: plastering of finishing mucilage should be divided into two-layer to carry out, ground floor thickness 3.0mm~ 4.0mm, and after plastering, use steamed bun cutter press-in 300g/ alkaline-resisting coating screen cloth immediately, second Layer is plastered and should be carried out after ground floor plasters 24h, and thickness is 2.0mm~3.0mm, with complete The aspect of smearing of all standing alkaline-resisting coating screen cloth is advisable;
(3) float coat construction is complete, after maintenance 7d, can carry out next procedure construction;
7) PVC corner protector, PVC drip are constructed after first finishing mucilage at exterior wall external corner completes again, and are smearing In the range of the rubber cement operable time of face, the most uniformly extrude viscous for PVC corner protector by hanging wire from the top down, And the screen cloth on square staff is pressed in rubber cement simultaneously, finishing mucilage to be extruded from the hole of corner protector, will Unnecessary rubber cement strikes off, and second rubber cement should be fully embedded corner protector in finishing mucilage;
8) installation of anchoring piece:
Determine anchoring piece installation site according to by design requirement and do prominent metope before pasting HD-STP plate Mark, after screen cloth paving is complete, install anchoring piece;
9) finish coat construction:
(1) exterior coating wall construction:
After float coat completes, after maintenance 7d, carry out finish coat construction, when finish coat is coating, should smear Criticize embedding smooth rear swabbing with flexible waterproof putty on surface layer, when finish coat is for no insomnia mortar, wipe one's face Should brush priming coat on Ceng, facing mortar thickness is no less than 1.5mm and no more than 6mm, decorative mortar Construction should be carried out continuously, and construction interruption should be arranged on the positions such as movement joint, it is to avoid flushes generation aberration;
(2) facing tile Decorative Construction:
Float coat for binding face tile should be smooth, dry, and surface brick adherence should be laggard at float coat maintenance 14d OK, surface brick adherence knot layer thickness is preferably 4mm~8mm, stays seam (a width of 5mm~8mm), and jointing should be at face brick Pasting after 5d~7d and carry out, jointing should be continuous, smooth, smooth, flawless, without hollowing.
Compared with prior art, beneficial effects of the present invention:
1, excellent thermal insulation performance;
2 good mechanical performance, its obdurability is best in all thermoplastics, and tensile strength is with anti- Impact strength dimensionally stable more much higher than general thin film;
3, there is excellent heat-resisting, tolerance to cold.
[detailed description of the invention]
Below in conjunction with embodiment, the invention will be further described:
External thermal insulation system, curtain wall system:
1. should first determine that horizontal and vertical datum line carries out snap the line during construction.
2. adhesive configuration:
(1) adhesive should be in mass ratio for water: powder=1:4~1:5 allocates;
(2) adhesive should complete according to different ambient temperatures in 4h.
3.HD-STP plate is installed:
(6) should treat that HD interfacial agents is dried in its external coating HD interfacial agents before pasting HD-STP plate Sheet material is pasted after 2h;
(7) use full bonding between HD-STP plate and base course wall screed-coat, hot edge seal portion void by The adhesive that STP back squeezes out is filled;
(8) HD-STP plate should carry out sticking construction along horizontal line from the bottom to top, first pastes the HD-STP of external corner Plate;
(9) HD-STP plate pastes and should uniformly extrude on metope metope, and limit flanging is glued, available rubber hammer Rap HD-STP plate;
(10) use negative and positive angle personality board at external corner part and be protected by, on window with PVC corner protector Mouth uses PVC drip.
4. splicing position processes
(3) fill levelling at HD-STP plate overlap joint pressure position thermal insulation mortar, the lap width of seam≤ 15mm;
(4) preparation of thermal insulation mortar and use: the proportioning that should strictly provide by supplier and processing technology Carry out at the scene, have special people to prepare, control to use in 2h depending on varying environment temperature conditions Complete;
5.HD-STP plate plate seam has processed 3d~5d and has carried out float coat construction.
6. float coat construction
Coating ornamental surface: to being built-in with the float coat of one layer of alkaline-resisting coating screen cloth, plastering of finishing mucilage should divide Point two-layer is carried out, ground floor thickness 2.0mm~3.0mm, and is pressed into steamed bun cutter immediately after plastering 160g/ alkaline-resisting coating screen cloth, the second layer plasters and should carry out after ground floor plasters 24h, thickness For 1.0mm~2.0mm, so that the smear aspect of alkaline-resisting coating screen cloth is completely covered, finishing mucilage should divide Plaster for three times.
(4) decorating surface brick: plastering of finishing mucilage should be divided into two-layer to carry out, ground floor thickness 3.0mm~ 4.0mm, and after plastering, use steamed bun cutter press-in 300g/ alkaline-resisting coating screen cloth immediately, second Layer is plastered and should be carried out after ground floor plasters 24h, and thickness is 2.0mm~3.0mm, with complete The aspect of smearing of all standing alkaline-resisting coating screen cloth is advisable.
(5) float coat construction is complete, after maintenance 7d, can carry out next procedure construction.
7.PVC corner protector, PVC drip are constructed after first finishing mucilage at exterior wall external corner completes again, In the range of finishing mucilage operable time, the most uniformly squeeze viscous for PVC corner protector by hanging wire from the top down Pressure, and the screen cloth on square staff is pressed in rubber cement simultaneously, and finishing mucilage to be extruded from the hole of corner protector, Being struck off by unnecessary rubber cement, second rubber cement should be fully embedded corner protector in finishing mucilage.
8. the installation of anchoring piece
Determine anchoring piece installation site according to by design requirement and do prominent metope before pasting HD-STP plate Mark.After screen cloth paving is complete, anchoring piece is installed.
9. finish coat construction
(1) exterior coating wall construction:
After float coat completes, after maintenance 7d, carry out finish coat construction.When finish coat is coating, Ying Criticize embedding smooth rear swabbing with flexible waterproof putty on float coat, when finish coat is for no insomnia mortar, smear Should brush priming coat on surface layer, facing mortar thickness is no less than 1.5mm and no more than 6mm.Wipe one's face sand Slurry construction should be carried out continuously, and construction interruption should be arranged on the positions such as movement joint, it is to avoid flushes generation aberration.
(2) facing tile Decorative Construction:
Float coat for binding face tile should be smooth, dry.Surface brick adherence should be at float coat maintenance 14d After carry out, surface brick adherence knot layer thickness be preferably 4mm~8mm, stay seam (a width of 5mm~8mm).Jointing Should carry out after surface brick adherence 5d~7d, jointing should be continuous, smooth, smooth, flawless, without hollowing.
Exterior wall internal insulation system:
1. base course wall should be solid, smooth and the most qualified.Sash and all kinds of pipeline, built-in fitting etc. are pressed Design and installation is complete, and reserves surplus by heat preservation system inside thickness.
2. operating condition
(1) Structural Engineering acceptance(check);
(2) exterior wall sash installs;
(3) hot-water heating and decorative engineering need to pipe clamp hook and the embedded part such as curtain rod clamp embedding complete, electrician The hidden pipe of journey, rosette etc. should be embedding complete, and should complete the threading work of hidden pipe.
3. exterior wall internal insulation construction with external wall outer insulation construction and anchoring piece can not be installed, float coat thickness be 3mm~ 5mm;Coating ornamental surface uses alkaline-resisting coating screen cloth, and tile decorative surface uses alkali screen cloth.
Roof heat insulation system:
1. sloping layer: when roofing need to use material sloping layer, the gradient is preferably 3%, and thickness cannot be less than 20mm. Sloping layer should use hydrophobicity or the low light material of water absorption rate;Screed-coat, room, slope should be set on material sloping layer Screed-coat is directly done in face.
2. cement mortar screeding layer: cement mortar thickness of once constructing is about 20mm.
3. brushing or laying waterproof layer: waterproof layer preferably uses polymer cement waterproof paint or polymer cement waterproof The waterproof material that sand etc. are compatible with adhesive.
4.HD-STP plate is constructed: in waterproof layer brushing or laying completion, after surface cleans up, can be directly anti- HD-STP plate is laid on water layer.The hot edge seal of HD-STP plate should process, HD-STP plate by roofing around Lay to roofing center, natural piece.HD-STP plate bonding area is 80%.Carry out the construction of next procedure Time, walking shoes should be worn and construct on STP plate, the foreign material such as the grains of sand that are scattered in surface, floating ash should clean up.
5. plate seam and the way of finishing mucilage are with external thermal insulation thin-coat plaster system.
6. sealing coat (flat roof deck is if desired): sealing coat can take dry-laid plastic sheeting, geotextiles (non-woven fabrics) Deng.
7. protective layer construction should be designed and meet the requirement of country and industry standard by individual event.
8. reserved 30mm seam between rigid course and parapet, and pointing encapsulant.
Performance indications:
The present invention is not limited by above-mentioned embodiment, other any spirit without departing from the present invention With the change made under principle, modify, substitute, combine, simplify, all should be the substitute mode of equivalence, all Within being included in protection scope of the present invention.

Claims (1)

1. the construction method of a STP vacuum insulation plate heat preserving system is characterized in that, comprises the following steps:
1) should first determine that horizontal and vertical datum line carries out snap the line during construction;
2) adhesive configuration:
Adhesive should be in mass ratio for water: powder=1:4~1:5 allocates;Adhesive is according to difference Ambient temperature should complete in 4h;
3) HD-STP plate is installed:
(1) should treat that HD interfacial agents is dried in its external coating HD interfacial agents before pasting HD-STP plate Sheet material is pasted after 2h;
(2) use full bonding between HD-STP plate and base course wall screed-coat, hot edge seal portion void by The adhesive that STP back squeezes out is filled;
(3) HD-STP plate should carry out sticking construction along horizontal line from the bottom to top, first pastes the HD-STP of external corner Plate;
(4) HD-STP plate pastes and should uniformly extrude on metope metope, and limit flanging is glued, available rubber hammer Rap HD-STP plate;
(5) use negative and positive angle personality board at external corner part and be protected by with PVC corner protector, window use suitable for reading PVC drip;
4) splicing position processes:
(1) fill levelling at HD-STP plate overlap joint pressure position thermal insulation mortar, the lap width of seam≤ 15mm;
(2) preparation of thermal insulation mortar and use: the proportioning that should strictly provide by supplier and processing technology Carry out at the scene, have special people to prepare, control to use in 2h depending on varying environment temperature conditions Complete;
5) HD-STP plate plate seam has processed 3d~5d and has carried out float coat construction;
6) float coat construction:
(1) coating ornamental surface: to being built-in with the float coat of one layer of alkaline-resisting coating screen cloth, smearing of finishing mucilage Ash should point two-layer be carried out, ground floor thickness 2.0mm~3.0mm, and after plastering immediately Being pressed into 160g/ alkaline-resisting coating screen cloth with steamed bun cutter, the second layer is plastered and should be plastered at ground floor Carrying out after 24h, thickness is 1.0mm~2.0mm, so that alkaline-resisting coating screen cloth is completely covered Smearing aspect, finishing mucilage should be plastered in three times;
(2) decorating surface brick: plastering of finishing mucilage should be divided into two-layer to carry out, ground floor thickness 3.0mm~ 4.0mm, and after plastering, use steamed bun cutter press-in 300g/ alkaline-resisting coating screen cloth immediately, second Layer is plastered and should be carried out after ground floor plasters 24h, and thickness is 2.0mm~3.0mm, with complete The aspect of smearing of all standing alkaline-resisting coating screen cloth is advisable;
(3) float coat construction is complete, after maintenance 7d, can carry out next procedure construction;
7) PVC corner protector, PVC drip are constructed after first finishing mucilage at exterior wall external corner completes again, and are smearing In the range of the rubber cement operable time of face, the most uniformly extrude viscous for PVC corner protector by hanging wire from the top down, And the screen cloth on square staff is pressed in rubber cement simultaneously, finishing mucilage to be extruded from the hole of corner protector, will Unnecessary rubber cement strikes off, and second rubber cement should be fully embedded corner protector in finishing mucilage;
8) installation of anchoring piece:
Determine anchoring piece installation site according to by design requirement and do prominent metope before pasting HD-STP plate Mark, after screen cloth paving is complete, install anchoring piece;
9) finish coat construction:
(1) exterior coating wall construction:
After float coat completes, after maintenance 7d, carry out finish coat construction, when finish coat is coating, should smear Criticize embedding smooth rear swabbing with flexible waterproof putty on surface layer, when finish coat is for no insomnia mortar, smear Should brush priming coat on surface layer, facing mortar thickness is no less than 1.5mm and no more than 6mm, sand of wiping one's face Slurry construction should be carried out continuously, and construction interruption should be arranged on the positions such as movement joint, it is to avoid flushes generation aberration;
(2) facing tile Decorative Construction:
Float coat for binding face tile should be smooth, dry, and surface brick adherence should be after float coat maintenance 14d Carrying out, surface brick adherence knot layer thickness is preferably 4mm~8mm, stays seam (a width of 5mm~8mm), and jointing should Carrying out after surface brick adherence 5d~7d, jointing should be continuous, smooth, smooth, flawless, without hollowing.
CN201510213995.4A 2015-04-29 2015-04-29 STP vacuum insulation plate heat preserving system and construction method thereof Pending CN106193343A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510213995.4A CN106193343A (en) 2015-04-29 2015-04-29 STP vacuum insulation plate heat preserving system and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510213995.4A CN106193343A (en) 2015-04-29 2015-04-29 STP vacuum insulation plate heat preserving system and construction method thereof

Publications (1)

Publication Number Publication Date
CN106193343A true CN106193343A (en) 2016-12-07

Family

ID=57457529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510213995.4A Pending CN106193343A (en) 2015-04-29 2015-04-29 STP vacuum insulation plate heat preserving system and construction method thereof

Country Status (1)

Country Link
CN (1) CN106193343A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853760A (en) * 2019-01-18 2019-06-07 中如建工集团有限公司 The ultra-thin heat-insulation vacuum board exterior wall outer thermal insulation thin limed construction method of STP
CN110886430A (en) * 2019-12-04 2020-03-17 河南五方合创建筑设计有限公司 Thin type high-heat-insulation-performance sandwich wall plate for assembled type ultralow-energy-consumption building
CN112832393A (en) * 2021-02-19 2021-05-25 青岛科瑞新型环保材料集团有限公司 Construction method of passive ultra-low energy consumption building exterior wall external thermal insulation system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853760A (en) * 2019-01-18 2019-06-07 中如建工集团有限公司 The ultra-thin heat-insulation vacuum board exterior wall outer thermal insulation thin limed construction method of STP
CN110886430A (en) * 2019-12-04 2020-03-17 河南五方合创建筑设计有限公司 Thin type high-heat-insulation-performance sandwich wall plate for assembled type ultralow-energy-consumption building
CN110886430B (en) * 2019-12-04 2022-01-18 河南五方合创建筑设计有限公司 Thin type high-heat-insulation-performance sandwich wall plate for assembled type ultralow-energy-consumption building
CN112832393A (en) * 2021-02-19 2021-05-25 青岛科瑞新型环保材料集团有限公司 Construction method of passive ultra-low energy consumption building exterior wall external thermal insulation system

Similar Documents

Publication Publication Date Title
CN101158213B (en) Exterior outer-insulating system construction method for using direct-compress EPS inorganic clad plate
CN106284706A (en) The construction method of external wall outer insulation rock cotton board
CN101333858A (en) Polyphenyl plate exterior wall outer heat insulation technological process
CN103046714A (en) Construction method for double-sided inorganic composite phenolic aldehyde fire-proof heat-insulating decorating integration plates
CN206752862U (en) Inverted roof waterproof construction based on durability
CN102345352B (en) Multilayer structure of building outer wall in severe cold region and construction method of multilayer structure
CN103343578B (en) STP ultra-thin vacuum heat insulation heat preservation board and application of STP ultra-thin vacuum heat insulation heat preservation board in outer wall construction
CN106193343A (en) STP vacuum insulation plate heat preserving system and construction method thereof
CN2929033Y (en) External wall heat insulation structure of building water-proof and anti-cracks
CN102121279B (en) Extruded polystyrene panel external thermal insulation system and manufacturing process thereof
CN103964771A (en) Waterproof surface mortar for thermal insulation system outside building outer wall and application method thereof
CN103924696A (en) Aerogel insulation board thin plastering thermal insulation system and manufacture method thereof
CN105155697A (en) Exterior wall composite insulation structure and construction method thereof
CN201128995Y (en) Direct applying type ESP composite board and exterior wall external insulation system thereof
CN104652623B (en) A kind of composite thermal insulation mortar construction method
CN103526887B (en) A kind of construction technology of inversion type flat roof deck insulation construction
CN103806664A (en) Construction technology of external thermal insulation mortar
CN207761083U (en) A kind of insulating layer for building being provided with insulating brick
CN201762843U (en) Building outer wall multi-layer structure used in severe cold region
CN103711208A (en) Heat reflection heat-insulation energy-saving system for outer wall and manufacturing method thereof
CN204401809U (en) Surface has the skin insulation layer of simulated decorative effect
CN209413178U (en) A kind of rock wool external thermal insulation granitic stucco coating
CN208518097U (en) Shower cabinet waterproof construction
CN110424559A (en) The construction method of external wall insulation
CN209025331U (en) A kind of red tile roof parapet waterproof construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161207

WD01 Invention patent application deemed withdrawn after publication