CN109898755A - One kind setting standoff metal Roof - Google Patents
One kind setting standoff metal Roof Download PDFInfo
- Publication number
- CN109898755A CN109898755A CN201711306109.8A CN201711306109A CN109898755A CN 109898755 A CN109898755 A CN 109898755A CN 201711306109 A CN201711306109 A CN 201711306109A CN 109898755 A CN109898755 A CN 109898755A
- Authority
- CN
- China
- Prior art keywords
- roofing
- panel
- subpurlin
- roof
- connect
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
The present invention relates to one kind to set standoff metal Roof, including the main purlin of roofing, roof inner slab, roofing outside plate and roofing subpurlin, the roof inner slab is set up on the main purlin of roofing, the roofing subpurlin is set on roof inner slab, the roofing outside plate is set up on roofing subpurlin, π type bracket is additionally provided in the metal Roof, the upper end of the π type bracket is connect with roofing outside plate, and the lower end of the π type bracket is connect with roof inner slab.Compared with prior art, the present invention has many advantages, such as that easy for construction, heat insulation effect is good and security performance is high.
Description
Technical field
The present invention relates to building structure fields, set standoff metal Roof more particularly, to one kind.
Background technique
Common metal roofing is laid with outside plate by purlin top flange and does roofing, can be in purlin bottom wing if owner has requirements at the higher level
Edge is laid with inner panel.Purlin is encased by inner and outer plates in such cases, as hung hanger under purlin, then connects difficulty.
Therefore needing roofing at present is doubling plate, and in the case where needing purlin to hang equipment supporter, it generally can be using double
The double plate systems of purlin, i.e., beat inner panel on conventional roof purline, one layer of small purlin be then arranged again, beats roofing outside plate.This standard knot
Point need to carry out notch to small purlin, cause manufacture progress slack-off in the fabrication process in order to avoid roof inner slab.Simultaneously for industry
When thickness mainly being asked to be greater than the heat-preservation cotton of 75mm, it is limited by the height of small purlin, heat-preservation cotton is squeezed when will cause construction, reduces and protects
Temp effect.
To overcome the above disadvantages, presently, there are a kind of method be that will be connected between roofing outside plate and roof inner slab, from
Without small purlin is arranged, although however this setup can overcome disadvantages mentioned above, there is a problem of it is one very big
In if there is small purlin, worker can walk to facilitate construction on small purlin, and security performance is higher, if removed
Remove small purlin, then can due to safety reduction and lead to slowing down for whole work efficiency.
Summary of the invention
The purpose of the present invention is provide one kind regarding to the issue above to set standoff metal Roof.
The purpose of the present invention can be achieved through the following technical solutions:
One kind setting standoff metal Roof, including the main purlin of roofing, roof inner slab, roofing outside plate and roofing subpurlin,
The roof inner slab is set up on the main purlin of roofing, and the roofing subpurlin is set on roof inner slab, the outer grillage of the roofing
On roofing subpurlin, π type bracket is additionally provided in the metal Roof, the upper end of the π type bracket is connect with roofing outside plate,
The lower end of the π type bracket is connect with roof inner slab.
Preferably, the π type bracket includes that the top panel being integrally formed, side panel connect panel, the side with tail portion
The quantity of panel is 2, is located at the left and right sides of top panel, the quantity of the tail portion connection panel is two, with top
Portion's panel parallel and it is connected respectively with two side panels, the top panel is connect with roofing subpurlin, the tail portion connection
Panel is connect by structural fasteners with the main purlin of roofing.
Preferably, connection panel in the tail portion includes parallel mat and edge protection board, the parallel mat and top surface
Plate is parallel, and both ends are connect with side panel and edge plate respectively, and the parallel mat is connect with the main purlin of roofing.
Preferably, between the edge protection board and parallel mat in obtuse angle.
Preferably, the top panel is connect by first structure fastener with roofing subpurlin, and the parallel mat is logical
The second structural fasteners are crossed to connect with the main purlin of roofing.
Preferably, the first through hole matched with first structure fastener is offered on the top panel, described first
Structural fasteners pass through first through hole connection top panel and roofing subpurlin, offer and the second structure on the parallel mat
The second through-hole that fastener matches, second structural fasteners pass through the second through-hole connection parallel mat and the main purlin of roofing
Item.
Preferably, the structural fasteners include fastening bolt, the fastening bolt be separately connected tail portion connection panel and
Roof inner slab.
Preferably, between the top panel and side panel in obtuse angle, the size of angle and the structure of roof inner slab are mutually fitted
It answers.
Preferably, the angle between the top panel and side panel is 108 °.
Preferably, the distance between the roofing outside plate and roof inner slab are not less than 100mm.
Compared with prior art, the invention has the following advantages:
(1) metal Roof proposed by the present invention connects main purlin and subpurlin by π type bracket, without
So that subpurlin avoids roof inner slab again, inside and outside meeting owner and needing in the case where two layers of roof boarding, without to secondary purlin
Item opens up notch, simultaneously because being provided with π type bracket, has raised the height of subpurlin, has increased main purlin and subpurlin bracket
Distance, solve the problems, such as to squeeze heat-preservation cotton, to improve production efficiency and heat insulation effect, simultaneously because protecting
Subpurlin has been stayed, so that worker can walk in the construction process in the enterprising every trade of subpurlin, safety has both been enhanced, also improves
Production efficiency.
(2) π type bracket includes that top panel, side panel with tail portion connect panel, due to top panel and tail portion joint face
Plate is parallel, and the two is connected by side panel, therefore total has a stronger support force, and due to both ends be face by
Power, therefore degree of stability is high.
(3) connection panel in tail portion includes parallel mat and edge protection board, and edge protection board is connect with parallel mat and structure
At obtuse angle, which can be to avoid realizing parallel mat and the main purlin connection procedure of roofing passing through structural fasteners
In, structural fasteners improve the joint efficiency of entire roofing due to the case where having exceeded in the range of parallel mat.
(4) structural fasteners, stable connection and material is common are used as using fastening bolt, cost performance height can be fitted flexibly
For most of occasion.
(5) between top panel and side panel in obtuse angle, and the size of angle and the structure of roof inner slab are adapted, can be with
Further increase the stability and stress degree of entire connection structure.
(6) 108 ° of structure angles for being are relatively conventional in current assembling structure, therefore can use existing assembly
Structure is transformed, and obtains the π type supporting element in the application, to achieve the purpose that save cost.
(7) the distance between roofing outside plate and roof inner slab are not less than 100mm, to increase due to having added π type bracket
Roofing subpurlin provide sufficient space, so that further ensuring heat-preservation cotton will not be squeezed, improve heat preservation effect
Fruit.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that standoff metal Roof is set in the present invention;
Fig. 2 is the structural schematic diagram of conventional metals roofing;
Fig. 3 is the cross-section diagram of roofing subpurlin in conventional metals roofing;
Fig. 4 is the main view of π type bracket;
Fig. 5 is the top view of π type bracket;
Wherein, 1 is the main purlin of roofing, and 2 be roof inner slab, and 3 be structural fasteners, and 4 be roofing subpurlin, and 5 is outside roofings
Plate, 6 be π type bracket.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention
Premised on implemented, the detailed implementation method and specific operation process are given, but protection scope of the present invention is not limited to
Following embodiments.
As shown in Fig. 2, being the structural schematic diagram of conventional metals roofing, which is doubling plate, specifically includes roof inner slab 2
With roofing outside plate 5, roof inner slab 2 is after laying, then one to be arranged above by being laid on the main purlin 1 of roofing
Layer roofing subpurlin 4, and roofing outside plate 5 is laid on the roofing subpurlin 4, in order to avoid roof inner slab 2, roofing subpurlin 4
On need to carry out notch, as shown in figure 3, this will lead to, manufacture progress is slack-off, requires thickness greater than 75mm simultaneously for owner
When heat-preservation cotton, it is limited by the height of roofing subpurlin 4, heat-preservation cotton is squeezed when will cause construction, reduces heat insulation effect.
It there is a problem that based on the structure so many, the invention proposes one kind to set standoff metal Roof, including
The main purlin 1 of roofing, roof inner slab 2, roofing outside plate 5 and roofing subpurlin 4, roof inner slab 2 are set up on the main purlin 1 of roofing, room
Face subpurlin 4 is set on roof inner slab 2, and roofing outside plate 5 is set up on roofing subpurlin 4, and π type branch is additionally provided in metal Roof
The upper end of frame 6, π type bracket 6 is connect with roofing outside plate 5, and the lower end of π type bracket 6 is connect with roof inner slab 2.Wherein, π type bracket 6
As shown in Figure 4 and Figure 5, top panel, side panel and tail portion including being integrally formed connect panel, and the quantity of side panel is 2,
It is located at the left and right sides of top panel, the quantity that tail portion connects panel is two, parallel with top panel and respectively with two
A side panel is connected, and top panel is connect with roofing subpurlin 4, and tail portion connects panel and passes through structural fasteners 3 and roofing master
Purlin 1 connects.It can be seen from the figure that tail portion connection panel includes parallel mat and edge protection board, the two constitutes one
The structure of broken line, parallel mat is spatially parallel with top panel, and both ends are connect with side panel and edge plate respectively, parallel bottom
Plate is connect by structural fasteners 3 with roofing subpurlin 4.The through-hole matched with structural fasteners 3 is offered on parallel mat,
Structural fasteners 3 pass through through-hole and connect with roofing subpurlin 4.In general, in order to guarantee the barrier effect of edge protection board, together
When avoid edge barrier plate from causing to block for structural fasteners 3, therefore generally in blunt between edge protection board and parallel mat
Angle, in the present embodiment, the angle between edge protection board and parallel mat is 109 °.Edge protection board is set in this way, it can
Avoided during being fixed by structural fasteners 3 as far as possible, since plate is relatively sliding or other situations cause
Structural fasteners 3 the case where skidding off parallel mat, so as to improve the efficiency of entire metal Roof installation process.Similarly,
On top panel, through-hole is also offered, for realizing the connection of top panel and the main purlin 1 of roofing, in the present embodiment, the company
Connect is also to be realized by structural fasteners 3.
In addition to this, in order to guarantee the firm of π bracket, between top panel and side panel in obtuse angle, the size of angle
It is adapted with the structure of roof inner slab 2.In the present embodiment, the angle between top panel and side panel is 108 °, the angle at obtuse angle
Degree is equivalent to two sseparated supporting legs so that two side panels are openr for top panel, can play compared with
Good supporting role, to guarantee the stability of connection, the selection of the angle is based ultimately upon the factors such as the material of inner panel institute
It determines, can also can reach best adaptation effect with metal roofing structure while guaranteeing stability in this way.This reality
It applies in example, chooses 108 ° of this angles to be attached, be since the dog-ear angle of current most connection member is
108 °, such a common angle is selected, can be obtained on the basis of existing connection member by lesser change
π type bracket 6 in the present embodiment, had both saved cost and has also achieved the purpose for recycling material.
In the present embodiment, structural fasteners 3 use fastening bolt, and fastening bolt passes through on parallel mat and top panel
Through-hole realizes the connection between parallel mat and the main purlin 1 of roofing and top panel and roofing subpurlin 4, this is because fastening
Bolt has been a kind of more mature structural fasteners 3, is suitable for most of occasion, certainly, other than fastening bolt, is owned
The structural member that parallel mat and outside or inside panel are fixed may be implemented, can be used as structural fasteners 3, with specific reference to metal
The actual environment of roofing and structure determine.
In addition to this, the distance between roofing outside plate 5 and roof inner slab 2 are not less than 100mm, this distance in the present embodiment
Setting, can be increase π type bracket 6 and the roofing subpurlin 4 of elevated height leaves sufficient space, thus avoid due to
The reserved deficiency of height, cause bracket can not accommodate or the distance between major-minor purlin it is too short and caused by heat-preservation cotton it is extruded
Situation.
The build process of the metal Roof is as follows: roof inner slab 2 is laid with first on the main purlin 1 of roofing, later in roofing
π type bracket 6 is assumed on main purlin 1, and passes through the structural fasteners 3 such as bolt for the parallel mat of 6 lower section of π type bracket and roofing master
Purlin 1 is fixed;Roofing subpurlin 4 is set up again on the π type bracket 6, so that roofing subpurlin 4 is not straight with roof inner slab 2
Contact, also just without opening up notch on roofing subpurlin 4 to avoid roof inner slab 2, roofing subpurlin 4 equally passes through
The structural fasteners such as bolt 3 are connect with the top panel of π type bracket 6, and the structural fasteners 3 of 6 upper and lower ends of π type bracket have fastened
Cheng Hou, the connection being actually also achieved that between the main purlin 1 of roofing and roofing subpurlin 4, workpeople can be in roofing at this time
It walks on subpurlin 4, and sets up roofing outside plate 5 on roofing subpurlin 4, to realize building for entire metal Roof.
Claims (10)
1. one kind sets standoff metal Roof, including the main purlin of roofing, roof inner slab, roofing outside plate and roofing subpurlin, institute
It states roof inner slab to be set up on the main purlin of roofing, the roofing subpurlin is set on roof inner slab, and the roofing outside plate is set up
In on roofing subpurlin, which is characterized in that be additionally provided with π type bracket, the upper end of the π type bracket and roofing in the metal Roof
Outside plate connection, the lower end of the π type bracket is connect with roof inner slab.
2. according to claim 1 set standoff metal Roof, which is characterized in that the π type bracket includes integrated structure
At top panel, side panel connect panel with tail portion, the quantity of the side panel is 2, is located at a left side for top panel
The quantity of right two sides, tail portion connection panel is two, parallel with top panel and be connected respectively with two side panels, institute
It states top panel to connect with roofing subpurlin, the tail portion connection panel is connect by structural fasteners with the main purlin of roofing.
3. according to claim 2 set standoff metal Roof, which is characterized in that the tail portion connection panel includes flat
Row bottom plate and edge protection board, the parallel mat is parallel with top panel, and both ends are connect with side panel and edge plate respectively, institute
Parallel mat is stated to connect with the main purlin of roofing.
4. according to claim 3 set standoff metal Roof, which is characterized in that the edge protection board and parallel bottom
Between plate in obtuse angle.
5. according to claim 3 set standoff metal Roof, which is characterized in that the top panel passes through the first knot
Structure fastener is connect with roofing subpurlin, and the parallel mat is connect by the second structural fasteners with the main purlin of roofing.
6. according to claim 5 set standoff metal Roof, which is characterized in that offered on the top panel with
The first through hole that first structure fastener matches, the first structure fastener pass through first through hole connection top panel and room
Face subpurlin offers the second through-hole matched with the second structural fasteners on the parallel mat, and second structure is tight
Firmware passes through the second through-hole connection parallel mat and the main purlin of roofing.
7. according to claim 5 set standoff metal Roof, which is characterized in that the structural fasteners include fastening
Bolt, the fastening bolt are separately connected tail portion connection panel and roof inner slab.
8. according to claim 2 set standoff metal Roof, which is characterized in that the top panel and side panel it
Between in obtuse angle, the structure of the size of angle and roof inner slab is adapted.
9. according to claim 1 set standoff metal Roof, which is characterized in that the top panel and side panel it
Between angle be 108 °.
10. according to claim 1 set standoff metal Roof, which is characterized in that in the roofing outside plate and roofing
The distance between plate is not less than 100mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711306109.8A CN109898755A (en) | 2017-12-11 | 2017-12-11 | One kind setting standoff metal Roof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711306109.8A CN109898755A (en) | 2017-12-11 | 2017-12-11 | One kind setting standoff metal Roof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109898755A true CN109898755A (en) | 2019-06-18 |
Family
ID=66941983
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711306109.8A Pending CN109898755A (en) | 2017-12-11 | 2017-12-11 | One kind setting standoff metal Roof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109898755A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007093951A1 (en) * | 2006-02-14 | 2007-08-23 | Iscom Spa | Modular roof structure for buildings |
JP2010071046A (en) * | 2008-09-22 | 2010-04-02 | Sanko Metal Ind Co Ltd | Photovoltaic power generating system |
CN102409814A (en) * | 2011-11-30 | 2012-04-11 | 哈尔滨工业大学空间钢结构幕墙有限公司 | Double-layer waterproof noise-reducing heat-preserving sound-absorbing metal roof |
CN204098364U (en) * | 2014-09-19 | 2015-01-14 | 上海通用金属结构工程有限公司 | A kind of mounting structure of industrial premises roof lighting board |
CN104453102A (en) * | 2013-09-12 | 2015-03-25 | 美联钢结构建筑系统(上海)股份有限公司 | Structure of main purlin exposed type universal upright lock seam double-deck metal roof |
CN205894504U (en) * | 2016-08-09 | 2017-01-18 | 上海浚源建筑设计有限公司 | Double metal plank house face structure |
CN207761184U (en) * | 2017-12-11 | 2018-08-24 | 美建建筑系统(中国)有限公司 | One kind setting standoff metal Roof |
-
2017
- 2017-12-11 CN CN201711306109.8A patent/CN109898755A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007093951A1 (en) * | 2006-02-14 | 2007-08-23 | Iscom Spa | Modular roof structure for buildings |
JP2010071046A (en) * | 2008-09-22 | 2010-04-02 | Sanko Metal Ind Co Ltd | Photovoltaic power generating system |
CN102409814A (en) * | 2011-11-30 | 2012-04-11 | 哈尔滨工业大学空间钢结构幕墙有限公司 | Double-layer waterproof noise-reducing heat-preserving sound-absorbing metal roof |
CN104453102A (en) * | 2013-09-12 | 2015-03-25 | 美联钢结构建筑系统(上海)股份有限公司 | Structure of main purlin exposed type universal upright lock seam double-deck metal roof |
CN204098364U (en) * | 2014-09-19 | 2015-01-14 | 上海通用金属结构工程有限公司 | A kind of mounting structure of industrial premises roof lighting board |
CN205894504U (en) * | 2016-08-09 | 2017-01-18 | 上海浚源建筑设计有限公司 | Double metal plank house face structure |
CN207761184U (en) * | 2017-12-11 | 2018-08-24 | 美建建筑系统(中国)有限公司 | One kind setting standoff metal Roof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA1251056A (en) | Composite floor system | |
US6739105B2 (en) | Constructional elements | |
CN106121113A (en) | Truss floor support plate | |
CN105297886B (en) | Lightweight steel structure building frame system | |
CN207761184U (en) | One kind setting standoff metal Roof | |
CN204174953U (en) | Temporory structure integrated rain-proof is anti-pounds canopy | |
CN212773394U (en) | Automatic frame net of climbing for building | |
CN109898755A (en) | One kind setting standoff metal Roof | |
EP2900882B1 (en) | Composite steel joist | |
CN207582821U (en) | A kind of metal Roof | |
JPH1122099A (en) | Ceiling structure | |
CN208309945U (en) | A kind of composite floor plate applied to structure with assembled lightweight steel building | |
CN102121327A (en) | Connecting structure of transverse part and vertical part for welding joint free protective guard | |
CN106854903B (en) | A kind of removable disaster relief room of antidetonation fire prevention | |
RU2448224C2 (en) | Cleat for facing plate fastening | |
CN206256537U (en) | Big across steel vestibule with railing | |
CN205444708U (en) | Metal roof structure | |
CN102943526A (en) | Building combined pendant, building structure and construction method | |
CN212200955U (en) | Photovoltaic roof structure without screw connection | |
CN211949522U (en) | Guide sliding rail of climbing frame | |
CN217420653U (en) | Steel bar truss floor support plate supporting assembly | |
CN210887808U (en) | Building roof fire protection device | |
CN206987348U (en) | A kind of diagonal brace construction hanging basket | |
CN210563284U (en) | Building safety preassembles adapted packway | |
CN217711404U (en) | Metal roof board reinforcing anti-wind presss from both sides node |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |