CN109898498A - A kind of terrace settlement treatment method - Google Patents

A kind of terrace settlement treatment method Download PDF

Info

Publication number
CN109898498A
CN109898498A CN201910210851.1A CN201910210851A CN109898498A CN 109898498 A CN109898498 A CN 109898498A CN 201910210851 A CN201910210851 A CN 201910210851A CN 109898498 A CN109898498 A CN 109898498A
Authority
CN
China
Prior art keywords
slip casting
grouting
grouting pipe
pipe
terrace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910210851.1A
Other languages
Chinese (zh)
Inventor
张厚斌
程月红
李翠
宋德鑫
钱德良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyifeng Construction Group Co Ltd
Original Assignee
Zhongyifeng Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongyifeng Construction Group Co Ltd filed Critical Zhongyifeng Construction Group Co Ltd
Priority to CN201910210851.1A priority Critical patent/CN109898498A/en
Publication of CN109898498A publication Critical patent/CN109898498A/en
Pending legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of terrace settlement treatment methods, the processing method is that the preferred measurement according to Specific construction place and design calculate the associated technical parameters for determining basement process, basement process is carried out to construction site, and it is laid with mattress layer, built-in slip casting pipe again, slip casting pipe network system is constructed, floor structure layer is re-layed;The mounting foundation settlement monitoring device on floor structure layer;When monitoring device monitors that part sedimentation occurs in ground, slip casting official website unit of the slip casting pipe network system at this is enabled;Slurries are pressed into soil layer by the Grouting Pipe of pre-plugged using high-pressure injection pump;Grouting Pipe is rinsed with clear water after slip casting, and is extracted out water remaining in the Grouting Pipe after cleaning using high-pressure pump, completes terrace settlement treatment.The grouting pipe of the method for the present invention processing can be reused, and the trouble and worry settled again occur after solving basement process completion, while can enable in dust-free workshop, do not influence to produce.

Description

A kind of terrace settlement treatment method
Technical field
A kind of of the invention and a kind of basement process system, and in particular to adjustable terrace reply later period uneven settlement of foundation Control system.
Background technique
Basement process is mainly used for the field that subsoil is unable to satisfy top-out load requirement for bearing capacity or deformation requirements Ground, common method have preloading method, Deep Mixing Method, Sand Pile Method etc..Since formation is mostly non-uniform Soft Soil Layer, When formation condition changes greatly or upper load has change, treated, and terrace still will appear differential settlement, generally use note Slurry processes carry out ground restoration, but when workshop has come into operation, repair need to carry out indoors, be may require that sometimes in dustfree environment Middle construction, the technology for repairing use are restricted.Simultaneously after primary reparation, if later period terrace sinks again, need again Secondary independent carry out repairing construction, influences industrial production.
Summary of the invention
Based on above-mentioned technological deficiency, the present invention provides a kind of terrace settlement treatment method, by pre-buried under structure sheaf Grouting Pipe is expanded, solid soil volume by the slip casting under terrace using fracture grouting principle, swells terrace, with lifting Terrace reduces terrace sedimentation, can carry out slip casting at any time when differential settlement occurs for terrace, is lifted terrace, reduces sedimentation, and root According to the variation of optic foundation settlement detector Observable settlement of foundation, the differential settlement of ground is found in time, carries out ground restoration, And can construct indoors, meet dustless construction environment, solves the trouble and worry of basement process settlement after construction.
In order to reach above-mentioned technical effect, the technical solution adopted by the present invention is that:
A kind of terrace settlement treatment method, including following processing step:
S1. it constructs slip casting pipe network system: basement process being carried out to construction site, and is laid with mattress layer, then built-in slip casting pipe, It is built into slip casting pipe network system, is finally laid with floor structure layer, meanwhile, guarantee to be equipped in the middle part of Grouting Pipe to penetrate and starches hole, and both ends Nozzle exposes structure sheaf;
S2., monitoring system: mounting foundation settlement monitoring device is set;
S3. it enables slip casting pipe network system: when monitoring that part sedimentation occurs in ground, enabling slip casting pipe network system at this Grouting Pipe net unit;
S4. slip casting: slurries are pressed into soil layer by the Grouting Pipe of pre-plugged with high-pressure injection pump;
S5. it cleans slip casting pipe network system: rinsing Grouting Pipe with clear water after slip casting, complete terrace settlement treatment.
Further, the Grouting Pipe in the step S1 uses unidirectional grout valve pipe, and Grouting Pipe is laid with using horizontal, slip casting The both ends of pipe are bent upwards, and one end nozzle is grouting port, and other end nozzle is grout outlet, and by-level position offers multiple groups and penetrates Hole is starched, slurry hole is penetrated and is wrapped with rubber case.
Further, the length of the Grouting Pipe is 4-6m, and the Grouting Pipe net unit is that several Grouting Pipes are horizontal horizontal To or longitudinal successively overlap joint connection formed, several Grouting Pipe net units constitute slip casting pipe network system.
Further, the Grouting Pipe in the step S1 is closely affixed with mattress layer, and it is solid that fixing piece is added when there is gap Fixed, adjacent two Grouting Pipes are fixed in lap-joint using fastener.
Further, the Grouting Pipe uses the plastic tube of internal diameter 40-60mm, bores one group every 33-50cm and penetrates slurry hole.
Further, the burst pressure of the rubber case is 4.5MPa, and the slurry hole of penetrating of Grouting Pipe is diameter 8mm.
Further, the high-pressure injection pump in the step S4 is grouting pump, mortar pump, fine-stone concrete pump or concrete pump, slip casting Pressure 1-10MPa.
Further, the slurries in the step S4 are that discarded slurry adds filler to form in construction.
Further, the slurries in the step S4 are cement slurry, cement mortar, cement, flyash mud or lime white Liquid.
Further, the step S5 further includes being extracted out the water in the Grouting Pipe after cleaning using high-pressure pump.
Compared with prior art, the beneficial effects of the present invention are:
1, it is settled using monitoring device real-time monitoring terrace, can find uneven settlement of foundation in time, be handled early.
2, built-in slip casting pipe can prevent later period settlement of foundation progress injecting treatment, can construct, not influence under dustfree environment Production, reduces the loss that machine is moved and stops production.
3, Grouting Pipe is rinsed with clear water after slip casting, Grouting Pipe repeats slip casting and uses, and solves basement process completion Occurs the trouble and worry settled again afterwards.
The above description is only an overview of the technical scheme of the present invention, in order to better understand the technical means of the present invention, And it can be implemented in accordance with the contents of the specification, and in order to allow above and other objects, features and advantages of the invention can It is clearer and more comprehensible, the present invention is described in further details with reference to the accompanying drawings and examples, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.
Detailed description of the invention
Fig. 1 is adjustable terrace intelligence control system floor plan in embodiment one.
Fig. 2 is adjustable terrace intelligence control system sectional view in embodiment one.
Wherein: 1, structure sheaf;2, mattress layer;3, monitoring device;4, Grouting Pipe;5, rubber case;6, slurry hole is penetrated;7, slip casting Mouthful;8, grout outlet.
Specific embodiment
As depicted in figs. 1 and 2, a kind of terrace settlement treatment method, including following processing step:
S1. it constructs slip casting pipe network system: according to the measurement to Specific construction place and designing the determining basement process of calculating Associated technical parameters carry out basement process to construction site, and are laid with mattress layer 2, then built-in slip casting pipe 4, are built into Grouting Pipe Net unit and slip casting pipe network system are finally laid with floor structure layer 1;
S2., monitoring system is set: according to the measurement and design to Specific construction place, installing ground on floor structure layer 1 Base settlement monitoring device 3;
S3. it enables slip casting pipe network system: when monitoring device 3 monitors that part sedimentation occurs in ground, enabling slip casting pipe network Slip casting official website unit of the system at this;
S4. slip casting: slurries are pressed into soil layer by the Grouting Pipe 4 of pre-plugged using high-pressure injection pump;
S5. it cleans slip casting pipe network system: rinsing Grouting Pipe 4 with clear water after slip casting, and will be after cleaning using high-pressure pump Grouting Pipe 4 in the extraction of remaining water, complete terrace settlement treatment.
Wherein, the slip casting pipe network system in step S1 is parallel to each other or orthogonal Grouting Pipe net unit group by several At every Grouting Pipe net unit is that horizontal cross or several Grouting Pipes 4 being longitudinally laid with successively overlap connection and formed, Grouting Pipe 4 use unidirectional grout valve pipe, and one end nozzle is grouting port 7, and other end nozzle is grout outlet 8, and Grouting Pipe 4 is at 7 end of grouting port It is bent straight up with 8 end of grout outlet across structure sheaf 1, to facilitate from grouting port 7 by the injection of slurries and will be rushed from grout outlet 8 Wash rear ponding extraction;The by-level section of Grouting Pipe 4 offers multiple groups and penetrates slurry hole 6, penetrates slurry hole 6 and is wrapped with rubber case 5.Slip casting 4 horizontal segment of pipe is closely affixed with mattress layer 2, and fixing piece is added when there is gap and is fixed, and adjacent two Grouting Pipes 4 are in lap-joint It is fixed by the way of fastener or binding, adjacent two Grouting Pipe 4 is preferably staggeredly overlapped using head and the tail in overlap joint, i.e. a slip casting 7 end of grouting port of pipe 4 is mutually overlapped with 8 end of grout outlet of another Grouting Pipe 4.Grouting Pipe 4 is plastic tube, length in the present embodiment Degree is 4-6m, and the plastic tube of internal diameter 40-60mm bores one group every 33-50cm and penetrates slurry hole 6, penetrates the diameter 8mm in slurry hole 6, rubber case 5 burst pressure is 4.5MPa.
Wherein, Grouting Pipe net unit is generally near column net and differential settlement larger part is arranged, and in differential settlement Larger part centralized arrangement, the quantity of optic foundation settlement detector 3 is according to the measurement of construction site ground and design conditions and unevenness The area of even settling zone determines.
Wherein, the high-pressure injection pump in step S4 is grouting pump, mortar pump, fine-stone concrete pump or concrete pump, grouting pressure 1- 10MPa。
Wherein, the slurries in step S4 are that discarded slurry adds filler to form in construction, are also possible to cement slurry, cement bonded sand Slurry, cement, flyash mud or lime slurry.
Terrace settlement treatment method of the invention is, by the slip casting under terrace, to expand according to fracture grouting principle, is compacted Soil body volume, swells terrace, to achieve the purpose that being lifted terrace reduces and reply terrace sedimentation.By being used under terrace Pre-buried unidirectional grout pipe, while monitoring device is set in terrace, when differential settlement occurs in terrace, start pre-buried slip casting Pipe, using fracture grouting mode by using high-pressure injection pump by grouting port by slurries from penetrate slurry hole through rubber case and Grouting Pipe It is sprayed between outer wall and is pressed into soil layer (at this moment grout outlet is to block), flushing pipe after the completion of slip casting.To of the invention Grouting pipe can be reused, and the method for the present invention the trouble and worry settled again occurs after solving basement process completion, together When can be enabled in dust-free workshop, do not influence to produce, economic value and practical value with higher.
The present invention is not limited to above-mentioned specific embodiment, for those of ordinary skill in the art from above-mentioned structure Think of sets out, and without creative labor, made various transformation are within the scope of the present invention.

Claims (10)

1. a kind of terrace settlement treatment method, which is characterized in that including following processing step:
S1. it constructs slip casting pipe network system: basement process being carried out to construction site, and is laid with mattress layer, then built-in slip casting pipe, is constructed At Grouting Pipe net unit and slip casting pipe network system, it is finally laid with floor structure layer, meanwhile, guarantee to be equipped in the middle part of Grouting Pipe and penetrates slurry Hole, and the nozzle at both ends exposes structure sheaf;
S2., monitoring system: mounting foundation settlement monitoring device is set;
S3. it enables slip casting pipe network system: when monitoring that part sedimentation occurs in ground, enabling note of the slip casting pipe network system at this Starch pipe network unit;
S4. slip casting: slurries are pressed into soil layer by the Grouting Pipe of pre-plugged with high-pressure injection pump;
S5. it cleans slip casting pipe network system: rinsing Grouting Pipe with clear water after slip casting, complete terrace settlement treatment.
2. a kind of terrace settlement treatment method according to claim 1, which is characterized in that the Grouting Pipe in the step S1 Using unidirectional grout valve pipe, Grouting Pipe is laid with using horizontal, and the both ends of Grouting Pipe are bent upwards, and one end nozzle is grouting port, separately One end nozzle is grout outlet, and by-level position offers multiple groups and penetrates slurry hole, penetrates slurry hole and is wrapped with rubber case.
3. a kind of terrace settlement treatment method according to claim 2, which is characterized in that the length of the Grouting Pipe is 4- 6m, the Grouting Pipe net unit are that several Grouting Pipe horizontal cross or longitudinal successively overlap joint connection are formed, several Grouting Pipes Net unit constitutes slip casting pipe network system.
4. a kind of terrace settlement treatment method according to claim 3, which is characterized in that the Grouting Pipe in the step S1 It is closely affixed with mattress layer, fixing piece is added when there is gap and is fixed, adjacent two Grouting Pipes are solid using fastener in lap-joint It is fixed.
5. a kind of terrace settlement treatment method according to claim 3, which is characterized in that the Grouting Pipe uses internal diameter The plastic tube of 40-60mm bores one group every 33-50cm and penetrates slurry hole.
6. a kind of terrace settlement treatment method according to claim 4, which is characterized in that the burst pressure of the rubber case Slurry bore dia of penetrating for 4.5MPa, Grouting Pipe is 8mm.
7. a kind of terrace settlement treatment method according to claim 1, which is characterized in that the high pressure injection in the step S4 Stock pump is grouting pump, mortar pump, fine-stone concrete pump or concrete pump, grouting pressure 1-10MPa.
8. a kind of terrace settlement treatment method according to claim 1, which is characterized in that the slurries in the step S4 are Discarded slurry adds filler to form in construction.
9. a kind of terrace settlement treatment method according to claim 1, which is characterized in that the slurries in the step S4 are Cement slurry, cement mortar, cement, flyash mud or lime slurry.
10. a kind of terrace settlement treatment method according to claim 1, which is characterized in that the step S5 further includes adopting The water in the Grouting Pipe after cleaning is extracted out with high-pressure pump.
CN201910210851.1A 2019-03-20 2019-03-20 A kind of terrace settlement treatment method Pending CN109898498A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910210851.1A CN109898498A (en) 2019-03-20 2019-03-20 A kind of terrace settlement treatment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910210851.1A CN109898498A (en) 2019-03-20 2019-03-20 A kind of terrace settlement treatment method

Publications (1)

Publication Number Publication Date
CN109898498A true CN109898498A (en) 2019-06-18

Family

ID=66952739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910210851.1A Pending CN109898498A (en) 2019-03-20 2019-03-20 A kind of terrace settlement treatment method

Country Status (1)

Country Link
CN (1) CN109898498A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110804931A (en) * 2019-11-15 2020-02-18 上海公路桥梁(集团)有限公司 Treatment method for lifting road surface
CN111411909A (en) * 2020-04-23 2020-07-14 山东省煤田地质局第一勘探队 Artificial wall building method for treating drilling engineering in coal mining subsidence area

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204551430U (en) * 2015-04-01 2015-08-12 浙江宏宇工程勘察设计有限公司 A kind of pre-buried floral tube grouting and reinforcing device on soft foundation
CN105862721A (en) * 2016-03-29 2016-08-17 广东华固工程有限公司 Grouting composite ground suitable for consolidation and deviation rectification of high-rise building structure and provided with adjustable pre-buried steel pipe and construction method thereof
RU2015136332A (en) * 2015-08-27 2017-03-03 Игорь Яковлевич Харченко A solution for compensatory injection of soils into the soil while eliminating deformations of buildings and structures
US20170342730A1 (en) * 2016-05-31 2017-11-30 Upcon Corporation Method for modifying concrete slab on subsided ground

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204551430U (en) * 2015-04-01 2015-08-12 浙江宏宇工程勘察设计有限公司 A kind of pre-buried floral tube grouting and reinforcing device on soft foundation
RU2015136332A (en) * 2015-08-27 2017-03-03 Игорь Яковлевич Харченко A solution for compensatory injection of soils into the soil while eliminating deformations of buildings and structures
CN105862721A (en) * 2016-03-29 2016-08-17 广东华固工程有限公司 Grouting composite ground suitable for consolidation and deviation rectification of high-rise building structure and provided with adjustable pre-buried steel pipe and construction method thereof
US20170342730A1 (en) * 2016-05-31 2017-11-30 Upcon Corporation Method for modifying concrete slab on subsided ground

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
姚建平: "抬升法在房屋纠偏加固处理中的应用", 《铁道建筑》 *
黄生根等: "《灌注桩后注浆技术原理与工程实践》", 30 June 2016 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110804931A (en) * 2019-11-15 2020-02-18 上海公路桥梁(集团)有限公司 Treatment method for lifting road surface
CN111411909A (en) * 2020-04-23 2020-07-14 山东省煤田地质局第一勘探队 Artificial wall building method for treating drilling engineering in coal mining subsidence area

Similar Documents

Publication Publication Date Title
CN104805842B (en) Steel flower pipe segmented grouting system and construction method thereof
CN103821364A (en) Method for constructing reinforced concrete pond
CN103981782A (en) Method and structure for reinforcing flat hole grouting roadbed without damaging road surface
CN205369231U (en) Steel -pipe pile is filled in drilling
CN107130633A (en) A kind of steel tube concrete clay model bag stake is combined soil-baffling structure construction technology
CN109898498A (en) A kind of terrace settlement treatment method
CN103243713A (en) Method for planting prestressed pipe pile at one step
CN108487256A (en) A kind of ruggedized construction and method that foundation pit deepened is backbreak
CN109881668A (en) Foundation construction method for soft soil layer, filling soil and sand soil layer
CN103147707B (en) Complete treatment method for pile bottom sediment
CN104652606A (en) Underpinning device for ultra-wide wall body and underpinning method thereof
CN103469828A (en) Construction method of hydrophobic structure of post-cast strip of bottom plate of basement
CN105507336A (en) Method for forming composite foundation by using dewatering well
CN110863521A (en) Method and device for treating defects of pile foundation by grouting
CN103410529A (en) Tunnel supporting arch foot reinforced structure for soft surrounding rocks and construction method
CN103774645B (en) The construction method of a kind of soil cement and the stake of Combined concrete material
CN207959196U (en) A kind of three axis high pressure spray of long spire stirs device
CN103437345A (en) Method for construction of diameter-expanding pile on pile top
CN209836996U (en) Adjustable terrace intelligent control system
CN205999941U (en) A kind of underground continuous wall section attachment means
RU85495U1 (en) INJECTOR DESIGN FOR INJECTION PILES
CN103758122A (en) Environment-friendly modular concrete tubular column and construction method thereof
CN109137893A (en) Self-feeding anchor pile construction technology
CN204531004U (en) The underpinning device of ultra-wide body of wall
CN205188933U (en) Utilize composite foundation of precipitation well formation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190618