CN109896181A - Quick-mounting combined tank for fracturing and assembling method - Google Patents
Quick-mounting combined tank for fracturing and assembling method Download PDFInfo
- Publication number
- CN109896181A CN109896181A CN201910133509.6A CN201910133509A CN109896181A CN 109896181 A CN109896181 A CN 109896181A CN 201910133509 A CN201910133509 A CN 201910133509A CN 109896181 A CN109896181 A CN 109896181A
- Authority
- CN
- China
- Prior art keywords
- pressure break
- fast installation
- liner
- siding
- circular
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 14
- 239000002131 composite material Substances 0.000 claims description 14
- 238000009434 installation Methods 0.000 claims description 14
- 235000021152 breakfast Nutrition 0.000 claims description 11
- 239000004744 fabric Substances 0.000 claims description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 239000002253 acid Substances 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims 1
- 238000010586 diagram Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 4
- 239000007788 liquid Substances 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000178 monomer Substances 0.000 description 1
- 239000007901 soft capsule Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The invention discloses a quick-mounting combined tank for fracturing and an assembling method thereof. The invention has the following advantages: (1) several wall plates are folded together, so that the centralized transportation is facilitated, and vehicles are saved; (2) the folding and track mounting method is adopted, so that the folding and track mounting method is convenient and quick, and a large amount of time is saved.
Description
Technical field
The present invention relates to a kind of pressure break Fast Installation composite cans and assemble method.
Background technique
The shale gas exploitation prior art is the pressure break by horizontal well, improves gas production, is needed in fracturing process a large amount of
Water;Pressure break feed flow liquid storage complete set of equipments general at this stage is square tank, folding side's tank and soft capsule that steel plate is welded
Tank these types form is composed, and this fluid reservoir monomer storage ability is small, a usual construction site will place tens, on
Hundred tank bodies occupy a large amount of working spaces of operation field.On shale gas fracturing engineering there are also a kind of large size storage tank body, due to
Construction time length, not reproducible disassembly utilize, it is necessary to which site operation, difficulty of construction is big, and safety is poor;Key is not applicable pressure break
Construction time is short, frequent require of moving.
Feature small in order to adapt to shale gas fracturing work place, that required liquid storage amount is big, conversion process place is frequent, at present
Need it is a kind of can be quickly disassembled assembling, can reuse, liquid storage amount is big and the tank body equipment of convenient transportation.
Summary of the invention
In order to solve the problems in the existing technology, the present invention provides a kind of pressure break use that can be quickly disassembled assembling
Fast Installation composite can and assemble method.
The present invention solves technical solution provided by above-mentioned technical problem: a kind of pressure break Fast Installation composite can, packet
Circular orbit and several sidings being hinged are included, the siding bottom is equipped with 360 degree rotation wheel, and each siding passes through
360 degree rotation wheel is mounted on circular orbit and is formed circular tank, is equipped with liner in the circular tank.
Further technical solution is that the siding includes two perpendicular supports being vertically arranged and setting in two perpendicular supports
Between several crossbeams, the crossbeam both ends are equipped with articulated section, interior deposited steel plate are equipped between two neighboring crossbeam.
Further technical solution is that the siding lower half portion is additionally provided with vertical reinforcing rib.
Further technical solution is that the circular tank bottom is additionally provided with sealed bottom liner.
Further technical solution is that the material of the liner and sealed bottom liner is the canvas of acid and alkali-resistance.
Further technical solution is that the circular orbit bottom is successively arranged concrete work film layer, concrete work layer of cloth.
A kind of assemble method of pressure break Fast Installation composite can, comprising the following steps:
Step S10, concrete work layer of cloth, concrete work film layer are successively poured on the ground for needing to install tank body first;
Step S20, circular orbit then is installed in concrete work film layer;
Step S30, several sidings are successively carried out hingedly laying equal stress on and stacks to set to form hinged group;
Step S40, multiple hinged groups are placed on circular orbit again and are unfolded, using hinge between adjacent two hinged groups
Chain link together, forms circular tank after plurality of hinged group of expansion;
Step S50, sealed bottom liner, liner are finally installed additional respectively in circular tank.
The invention has the following advantages that
(1) it is folded using several pieces of sidings, is convenient for collective conveyance, save vehicle;
(2) convenient and efficient using folding and the installation method of track, save the plenty of time.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is overlooking structure diagram of the invention;
Fig. 3 is the schematic diagram of circular orbit in embodiment 1;
Fig. 4 is the structural schematic diagram that multiple sidings are hinged together in embodiment 1;
Fig. 5 is the structural schematic diagram of siding in embodiment 1.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and examples.
Embodiment 1
As illustrated in fig. 1 and 2, a kind of pressure break Fast Installation composite can of the invention, including circular orbit 2 is (such as Fig. 3 institute
Show) and several sidings 1 for being hinged, hinged good siding 1,1 bottom of siding are equipped with 360 degree rotation as shown in Figure 4
Wheel 3, each siding 1 are mounted on circular orbit 2 and are formed circular tank by 360 degree rotation wheel 3, in the circular tank
Equipped with liner 4, the circular tank bottom is additionally provided with sealed bottom liner 5, and 2 bottom of circular orbit is successively arranged concrete work film
Layer 6, concrete work layer of cloth 7, the circular tank also sets liquid in-out mouth 8.
As shown in figure 5, the siding 1 include two perpendicular supports 102 being vertically arranged and setting two perpendicular supports 102 it
Between several crossbeams 101,101 both ends of crossbeam are equipped with hinge hole 104, interior apply are equipped between two neighboring crossbeam 101
Steel plate 3,1 lower half portion of siding are additionally provided with vertical reinforcing rib 105.
Above-mentioned siding 1 is the individual unit of composite can, as shown in figure 4, using hinge type between siding 1 and siding Unit 1
Connection, to guarantee that connection reliably uses multiple hinge members, and siding unit can be freely rotated around articulated shaft.
Wherein the material of liner 4 and sealed bottom liner 5 is the canvas of acid and alkali-resistance.
The assemble method of the present embodiment, comprising the following steps:
Step S10, concrete work layer of cloth 5, concrete work film layer 6 are successively poured on the ground 9 for needing to install tank body first;
Step S20, then circular orbit 2 is installed in concrete work film layer 6;
Step S30, several sidings 1 are successively carried out hingedly laying equal stress on and stacks to set to form hinged group;
Step S40, multiple hinged groups are placed on circular orbit 2 again and are unfolded, used between adjacent two hinged groups
It is hingedly connected at together, forms circular tank after plurality of hinged group of expansion;
Step S50, sealed bottom liner 5, liner 4 are finally installed additional respectively in circular tank.
The above is not intended to limit the present invention in any form, although the present invention takes off through the foregoing embodiment
Show, however, it is not intended to limit the invention, any person skilled in the art, is not departing from technical solution of the present invention range
It is interior, made when the technology contents using the disclosure above and change or be modified to the equivalent embodiments of equivalent variations a bit, but it is all not
Be detached from technical solution of the present invention content, according to the technical essence of the invention it is to the above embodiments it is any it is simple modification,
Equivalent variations and modification, all of which are still within the scope of the technical scheme of the invention.
Claims (7)
1. a kind of pressure break Fast Installation composite can, which is characterized in that including circular orbit (2) and several walls being hinged
Plate (1), siding (1) bottom are equipped with 360 degree rotation wheel (3), and each siding (1) is mounted on by 360 degree rotation wheel (3)
On circular orbit (2) and circular tank is formed, is equipped with liner (4) in the circular tank.
2. a kind of pressure break Fast Installation composite can according to claim 1, which is characterized in that the siding (1) includes
Several crossbeams (101) of two perpendicular supports (102) being vertically arranged and setting between two perpendicular supports (102), the cross
Beam (101) both ends are equipped with hinge hole (104), and interior deposited steel plate (3) is equipped between two neighboring crossbeam (101).
3. a kind of pressure break Fast Installation composite can according to claim 2, which is characterized in that siding (1) lower half
Part is additionally provided with vertical reinforcing rib (105).
4. a kind of pressure break Fast Installation composite can according to claim 1, which is characterized in that the circular tank bottom
It is additionally provided with sealed bottom liner (5).
5. a kind of pressure break Fast Installation composite can according to claim 4, which is characterized in that the liner (4) and bottom
The material of portion's sealing inner container (5) is the canvas of acid and alkali-resistance.
6. a kind of pressure break Fast Installation composite can according to claim 1, which is characterized in that the circular orbit (2)
Bottom is successively arranged concrete work film layer (6), concrete work layer of cloth (7).
7. the pressure break as claimed in any one of claims 1 to 6 assemble method of Fast Installation composite can, which is characterized in that including
Following steps:
Step S10, concrete work layer of cloth (7), concrete work film layer (6) are successively poured on the ground for needing to install tank body first;
Step S20, circular orbit (2) then are installed in concrete work film layer (6);
Step S30, several sidings (1) are successively carried out hingedly laying equal stress on and stacks to set to form hinged group;
Step S40, multiple hinged groups are placed on circular orbit (2) again and are unfolded, using hinge between adjacent two hinged groups
Chain link together, forms circular tank after plurality of hinged group of expansion;
Step S50, sealed bottom liner (5), liner (4) are finally installed additional respectively in circular tank.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910133509.6A CN109896181A (en) | 2019-02-22 | 2019-02-22 | Quick-mounting combined tank for fracturing and assembling method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910133509.6A CN109896181A (en) | 2019-02-22 | 2019-02-22 | Quick-mounting combined tank for fracturing and assembling method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109896181A true CN109896181A (en) | 2019-06-18 |
Family
ID=66945357
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910133509.6A Pending CN109896181A (en) | 2019-02-22 | 2019-02-22 | Quick-mounting combined tank for fracturing and assembling method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109896181A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130186890A1 (en) * | 2012-01-23 | 2013-07-25 | Steven R. Moody | Tank panels and tanks formed therefrom |
CN106626015A (en) * | 2016-11-24 | 2017-05-10 | 中交天航滨海环保浚航工程有限公司 | Remodeled block forming mold |
CN108455109A (en) * | 2018-04-26 | 2018-08-28 | 汤树林 | Modular unlimited-volume combined tank |
CN207944728U (en) * | 2018-03-08 | 2018-10-09 | 中国五冶集团有限公司 | The circle haul of platen installation is seen for venue |
CN109230013A (en) * | 2018-09-30 | 2019-01-18 | 汤树林 | A kind of Quick Release dress unlimited volume combination tank of modularization |
CN209796397U (en) * | 2019-02-22 | 2019-12-17 | 汤树林 | quick-mounting combined tank for fracturing |
-
2019
- 2019-02-22 CN CN201910133509.6A patent/CN109896181A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130186890A1 (en) * | 2012-01-23 | 2013-07-25 | Steven R. Moody | Tank panels and tanks formed therefrom |
CN106626015A (en) * | 2016-11-24 | 2017-05-10 | 中交天航滨海环保浚航工程有限公司 | Remodeled block forming mold |
CN207944728U (en) * | 2018-03-08 | 2018-10-09 | 中国五冶集团有限公司 | The circle haul of platen installation is seen for venue |
CN108455109A (en) * | 2018-04-26 | 2018-08-28 | 汤树林 | Modular unlimited-volume combined tank |
CN109230013A (en) * | 2018-09-30 | 2019-01-18 | 汤树林 | A kind of Quick Release dress unlimited volume combination tank of modularization |
CN209796397U (en) * | 2019-02-22 | 2019-12-17 | 汤树林 | quick-mounting combined tank for fracturing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2003212370B2 (en) | Method of constructing large towers for wind turbines | |
CN100475517C (en) | Bridge deck panels and production method thereof | |
CN103161126A (en) | Road bridge variable section hollow high pier slip-form construction method | |
WO2019205704A1 (en) | Modular infinite volume combined tank | |
CN114109415A (en) | Construction method for disassembling tunnel of shield machine of non-expanding excavation chamber | |
CN108216956B (en) | Modularized combined spliced tank with good sealing performance | |
CN108868735A (en) | A kind of feed liquid method suitable for mountain area pressing crack construction | |
CN109896181A (en) | Quick-mounting combined tank for fracturing and assembling method | |
CN209796397U (en) | quick-mounting combined tank for fracturing | |
US5029426A (en) | Precast concrete panels, support pedestals constructed therefrom and an associated method | |
CN212534117U (en) | Subway deep and large foundation pit assembled support system | |
CN106969252B (en) | Single-section rubber film sealed gas holder reconstructed from regular polygon thin oil sealed gas holder | |
CN110863953A (en) | Annular steel pipe concrete combined wind turbine generator tower structure | |
US8782995B1 (en) | Collapsible storage container | |
CN108396961B (en) | Construction joint formwork erection method between a kind of dual wall | |
CN202831705U (en) | Steel structure electricity charging and switching station | |
CN206929551U (en) | The rubber diaphragm sealed gas holder of unistage type of regular polygon thin oil seal gas holder reconstruction | |
CN113431078B (en) | Tower crane foundation structure for transferring force to existing column and construction method thereof | |
CN206233115U (en) | A kind of supporting bracket of bridge construction | |
CN108313553A (en) | Modular combined assembling tank for acidizing and fracturing construction | |
CN205931909U (en) | Detachable multi -functional special container | |
CN103669925A (en) | Steel-structure charging station | |
CN209455204U (en) | Detachable transportation frame for Pipe rack module | |
CN102817321B (en) | Bridge girder erection machine set turn-around trolley | |
CN114150551A (en) | Synchronous sealing vehicle for spraying various media |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20220507 Address after: Room 902, floor 9, unit 1, building 4, No. 333, Yuying Road, Xindu District, Chengdu, Sichuan 610500 Applicant after: Tang Zhixiang Address before: 610500 Ma Chao, East Road, Xindu Xiangcheng Avenue, Xindu District, Chengdu, Sichuan, No. 1, 1, unit 1, No. 5, building No. 2. Applicant before: Tang Shulin |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190618 |