CN205931909U - Detachable multi -functional special container - Google Patents

Detachable multi -functional special container Download PDF

Info

Publication number
CN205931909U
CN205931909U CN201620507761.0U CN201620507761U CN205931909U CN 205931909 U CN205931909 U CN 205931909U CN 201620507761 U CN201620507761 U CN 201620507761U CN 205931909 U CN205931909 U CN 205931909U
Authority
CN
China
Prior art keywords
assembly
chassis assembly
chassis
ceiling
cross member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620507761.0U
Other languages
Chinese (zh)
Inventor
胡川
胡一川
陈国森
姜梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Zhongying Technology Co Ltd
Original Assignee
Hangzhou Zhongying Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Zhongying Technology Co Ltd filed Critical Hangzhou Zhongying Technology Co Ltd
Priority to CN201620507761.0U priority Critical patent/CN205931909U/en
Application granted granted Critical
Publication of CN205931909U publication Critical patent/CN205931909U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a detachable multi -functional special container. Mainly being formed by chassis assembly spare, roof arrangement, water treatment component, ramp subassembly, stand and side plate assembly detachably equipment, supporting through the stand between chassis assembly spare and the roof arrangement and connect, chassis assembly spare is followed with roof arrangement and is equipped with the curb plate between the fore -and -aft both sides of box, forms rectangular container from this, the container vertically link up and is used for the car to drive in into and roll away from along the box, and chassis assembly spare is connected with the ramp subassembly along box fore -and -aft both ends, installs water treatment component on the chassis assembly spare, and the pad foot is installed to chassis assembly spare bottom surface. The utility model discloses a dismantlement and equipment that the modularized design can conveniently realize being used for the carwash to repair the car container, the site work volume is little, compares the transportation of the available ordinary freight train of present structure, does not need the ground, is applicable to the mass production.

Description

A kind of detachable multifunctional special container
Technical field
The utility model relate to a kind of automobile-used container, has especially related to a kind of detachable multifunctional special type packaging Case.
Background technology
As now widely used equipment, its purposes has been not solely restricted to traffic and transport field to container.Increasingly Many application cases using Container Reconstruction making house, special equipment case emerge in an endless stream.But because container is as standard Change equipment, overall dimension is relatively fixed, and therefore, if there is bigger requirement application scenario to overall dimension, simple transformation is difficult to full Foot.Existing problem mainly has:1st, it is currently used in the container multiplex standard second hand cases transformation of various uses, its size mark Note, is readily transported.But there are a lot of demands to need the casing of special size, this point standard container changes cannot be realized;2nd, super large Casing needs to customize, and transport needs the transport license of ultra-wide superelevation, costly, needs special vehicle to support;3rd, second hand cases transformation cannot Accomplish to standardize, batch production is had any problem, difficult quality monitors;4th, for specific demand it may be necessary to splice second hand cases, The problems such as roof leaking, ground injustice can be produced it is difficult to solve;5th, erecting bed workload is big:Need ground, draining etc. to coordinate, need Will be using risky operation such as electric welding it is impossible to be used for the occasion having requirement of explosion proof;7th, not to negative greatly in existing movable plank house structure Lotus is cooked and optimizes, and especially chassis structure is unreliable the particular job such as repairs it is impossible to be used for being similar to carwash.
Utility model content
In order to solve problem present in background technology, the utility model is provided a kind of detachable multifunctional extraordinary collection Vanning, the features repairing specifically for carwash.
The technical solution adopted in the utility model is:
The utility model is mainly by chassis assembly, ceiling assembly, water treatment component, ramp assembly, column and lateral plate component Removably assemble, connected by upright supports between chassis assembly and ceiling assembly, chassis assembly and ceiling assembly edge Equipped with lateral plate component between the longitudinal both sides of casing, it is consequently formed rectangular container;Described container is along casing longitudinally Insertion can be used for automobile and enters and exits, and chassis assembly is connected with ramp assembly along the longitudinal two ends of casing, and chassis assembly is pacified Equipped with water treatment component, chassis assembly bottom surface is provided with adjustable feet.
During in-site installation, first by two pieces of chassis with long side to being spliced to form chassis assembly, place adjustable in the manner aforesaid Feet, two pieces of top boards are spliced to form ceiling assembly, form the body structure of container by connecting column and side plate, by ramp Assembly is installed to chassis assembly two ends, and water treatment component is installed to chassis assembly, completes to install.
The utility model can be used for carwash and repair etc. have the work of larger demand to casing yardstick, profile and standard sea-freight collection Vanning is similar.
Described chassis assembly includes cross member, bottom girder, cross member reinforcing plate, floor and ramp fix bar, and bottom girder leads to Long use, does not do and splices, many foundation longeron parallel interval uniformly arranges, and, along direction of traffic, intensity is high for bottom girder;Often adjacent two It is connected with cross member, many foundation crossbeam is fixedly connected between two foundation longerons along bottom girder distribution, thus between foundation longeron Form the netted structure of bottom girder that bottom girder and cross member build, longeron is welded with beam vertical;Put on netted structure of bottom girder There is floor, the every one end in many foundation longeron two ends is all connected by two foundation crossbeams, adds by cross member between two foundation crossbeams Strong plate docking.
In addition the utility model is considered because, in highway transportation, width highly needs to handle ultra-wide more than 4.2m more than 3m Superelevation transportation warrant, so, the floor of chassis assembly and the top board of ceiling assembly all along being divided longitudinally into symmetrical two pieces, both It is connected by cross member reinforcing plate.
The lateral surface of described cross member reinforcing plate is connected with perpendicular to the longitudinal ramp fix bar of casing, the side of ramp assembly While being provided with row stay hook uniformly at intervals, ramp fix bar is embedded in stay hook so that ramp assembly is tiltedly hung on cross member reinforcing plate Lateral surface.Ramp assembly can adopt structure steel fabrication, is connected with casing chassis ramp fix bar by fixed hook, for vehicle Up and down.
Described cross member and bottom girder all with steel profile (I-steel, channel-section steel, angle steel, etc.) or steel plate flap make.Excellent Select, all using channel-section steel, both are fixedly connected by welding for described cross member and bottom girder.
Described ceiling assembly includes two pieces of identical top board phases and is spliced, logical between the spliced side of two pieces of top boards Cross head piece reinforcing plate to fix with bolt.Ceiling assembly and chassis assembly are longitudinally spaced apart in structure, and left and right is spliced, thus vertical Axle does not need to splice.
Equipped with polylith lateral plate component between described chassis assembly and ceiling assembly same side, described lateral plate component bag Include three kinds of side plates of totally-enclosed side plate, windowing side plate and enabling side plate, three kinds of side plates are installed according to actual needs in combination, The end face of lateral plate component top and bottom is equipped with screw hole, and the edge of chassis assembly and ceiling assembly is equipped with screwed hole, spiral shell Make side plate top and bottom solid with chassis assembly and ceiling assembly respectively by the corresponding connection of bolt between pit and screw hole Fixed connection.
Described column includes head tree and side plate column, head tree be arranged on chassis assembly and ceiling assembly corner it Between, side plate column is arranged between adjacent side plates assembly.Described head tree is all by corner fittings and chassis assembly and ceiling assembly Connect, the corner of chassis assembly and ceiling assembly has been fixedly connected with corner fittings, corner fittings cross member and the bottom with chassis assembly respectively Longitudinal beam welding, corner fittings is fixedly connected by welding with the top board of ceiling assembly, and corner fittings is welded with corner fittings fixed plate, and corner fittings is fixed It is bolted to connection between plate and head tree.
The end face of described side plate column top and bottom is equipped with screwed hole, screwed hole and chassis assembly and ceiling assembly The screwed hole at edge is bolted to connection.
Described water treatment component is included draining grid and is connected the sedimentation basin communicating, draining bars case with draining grid Along the both sides of longitudinally (automobile sails direction into) on the floor of chassis assembly, sedimentation basin is located between both sides draining grid, sinks Shallow lake pond is provided with discharge outlet;Fall in draining grid with the water repairing in operation in carwash, be flowed into through the runner in draining grid In middle sedimentation basin, draw finally by discharge outlet.
Described feet includes height-adjustable main feet and auxiliary feet, and main feet is arranged on chassis assembly bottom surface Corner, multiple auxiliary feets are arranged on middle part and the four side edges of chassis assembly bottom surface, arrange as needed.
By the utility model component detachable special container as a kind of basic building block, it is critical only that proposition is a kind of new Making Disassemble container new construction, especially make large scale container.Such special container has expanded collection significantly The range of vanning.Meanwhile, in structure, it is optimized based on seavan structure, compared to movable plank house, tie More reliable on structure, versatility is more preferable.Purposes can be used for constructing working space or the device space, being equipped with car washing installation is Can carwash, be equipped with motor garage equipment can be used for repairing, can also be used for other purposes in the same manner.
The beneficial effects of the utility model are:
1. modularized design:Container is split into several components, there is versatility;It is applied to mass production;
2. detachable structure:Partition structure is readily transported it is not necessary to the transport of superelevation ultra-wide is permitted;
3. work on the spot amount is little:Assembling work based on fixing bolt, the engineering time short it is not necessary to dig ground, no Need the risky operation such as electric welding, be suitable to be constructed in the explosion-proof place requiring
4. built-in preliminary water processing establishment is it is not necessary to build gutter on ground;
5. carry adjustable feet, be suitable for out-of-flatness ground it is not necessary to ground coordinates.
6. optimized based on seavan structure, better adaptability higher than movable plank house intensity.
Brief description
Fig. 1 is overall structure figure of the present utility model.
Fig. 2 is overall structure of the explosion figure of the present utility model.
Fig. 3 is the structure chart of the utility model chassis assembly.
Fig. 4 is one piece of base arrangement figure of the utility model chassis assembly.
Fig. 5 is the top view of the utility model base plate.
Fig. 6 is the A-A sectional view of Fig. 5.
The structural side view of feet fixed plate supplemented by Fig. 7.
Fig. 8 is the structure chart of ramp assembly.
Fig. 9 is the various structures figure of lateral plate component.
Figure 10 is the a-quadrant partial enlarged drawing of Fig. 9.
Figure 11 is chassis assembly 1 structure sectional view.
Figure 12 is chassis assembly 1 structure cutaway top view.
Figure 13 is two container-combination figures.
In figure:Chassis assembly 1, cross member 11, bottom girder 12, cross member reinforcing plate 13, floor 14, ramp fix bar 15, Strengthen girder 16;Ceiling assembly 2, top board 21, head piece reinforcing plate 22;Lateral plate component 3, totally-enclosed side plate 31, windowing side plate 32, Enabling side plate 33, screw hole 34;Column 4, head tree 41, side plate column 42;Ramp assembly 5, stay hook 51;Water treatment component 6, Draining grid 61, grading sedimentation tank 62, discharge outlet 63;Feet 7, main feet 71, auxiliary feet 72, auxiliary feet fixed plate 73;Angle Part 8, corner fittings fixed plate 81.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment is described in further detail to the utility model.
As depicted in figs. 1 and 2, the utility model is mainly by chassis assembly 1, ceiling assembly 2, water treatment component 6, ramp group Part 5, column 4 and lateral plate component 3 removably assemble, and pass through column 4 and support even between chassis assembly 1 and ceiling assembly 2 Connect, chassis assembly 1 and ceiling assembly 2 equipped with lateral plate component 3, are consequently formed rectangular packaging along between the longitudinal both sides of casing Case;Container enters and exits along casing is longitudinally through for automobile, and casing is longitudinally the direction of traffic of washed car, chassis group Part 1 is connected with ramp assembly 5 along the longitudinal two ends of casing, and chassis assembly 1 is provided with water treatment component 6, chassis assembly 1 bottom surface Feet 7 is installed.
As shown in Fig. 3~Fig. 6, chassis assembly 1 includes cross member 11, bottom girder 12, cross member reinforcing plate 13, floor 14 and Ramp fix bar 15, many foundation longeron 12 parallel interval uniformly arranges, and, along direction of traffic, intensity is high for bottom girder 12;Often adjacent It is connected with cross member 11, many foundation crossbeam 11 is fixedly connected on two uniformly at intervals along bottom girder 12 between two foundation longerons 12 Between bottom girder 12, as shown in fig. 6, being connected with short cross member between the bottom girder grown, by cross member 11, bottom girder 12 shape It is spliced to form monoblock chassis about phase again after becoming two pieces of base plates, be consequently formed bottom girder 12 and that cross member 11 builds is netted Structure of bottom girder, longeron is welded with beam vertical, and as is illustrated by figs. 11 and 12, being diagonally additionally provided with of being connected between longeron and crossbeam adds Strong girder 16.Floor 14 is equipped with netted structure of bottom girder, the every one end in many foundation longeron 12 two ends is all by two foundation crossbeams 11 Connect, docked by cross member reinforcing plate 13 between two foundation crossbeams 11.Cross member reinforcing plate is when crossbeam docks, and is attached to two The position of crossbeam docking, connects the strengthening plate of left and right sides crossbeam end points.
As shown in Figure 3 and Figure 4, the lateral surface of cross member reinforcing plate 13 is connected with perpendicular to the longitudinal ramp fix bar of casing 15, ramp fix bar 15 is used for installing ramp assembly 5, as shown in figure 8, the side of ramp assembly 5 is provided with a row uniformly at intervals Stay hook 51, ramp fix bar 15 is embedded in stay hook 51 so that ramp assembly 5 is tiltedly hung on the lateral surface of cross member reinforcing plate 13.
Ceiling assembly 2 includes two pieces of identical top boards 21 and is mutually spliced, logical between the spliced side of two pieces of top boards 21 Cross head piece reinforcing plate 22 fixing, head piece reinforcing plate 22 is placed in the short side of top board 21, parallel with bottom girder 12.
As shown in figure 9, equipped with polylith lateral plate component, lateral plate component 3 between chassis assembly 1 and ceiling assembly 2 same side Including three kinds of side plates of totally-enclosed side plate 31, windowing side plate 32 and enabling side plate 33, three kinds of side plates are according to actual needs in combination Installed, its fixed form can be with modes such as buckle, chute or bolts.For bolt connection, on lateral plate component 3 top It is equipped with screw hole 34 with the end face of bottom, as shown in Figure 10, the edge of chassis assembly 1 and ceiling assembly 2 is equipped with screwed hole, Between screwed hole and screw hole 34 by the corresponding connection of bolt make lateral plate component 3 top and bottom respectively with chassis assembly 1 and Ceiling assembly 2 is fixedly connected.
As shown in Fig. 2 column 4 includes head tree 41 and side plate column 42, head tree 41 is arranged on chassis assembly 1 and ceiling Between the corner of assembly 2, side plate column 42 is arranged between adjacent side plates assembly 3.Head tree 41 is all by corner fittings 8 and chassis group Part 1 and ceiling assembly 2 connect, and the corner of chassis assembly 1 and ceiling assembly 2 has been fixedly connected with corner fittings 8, corner fittings 8 respectively with bottom The cross member 11 of disk assembly 1 and bottom girder 12 weld, and corner fittings 8 is bolted to connection with the top board 21 of ceiling assembly 2, corner fittings It is welded with corner fittings fixed plate 81 on 8, be bolted to connection between corner fittings fixed plate 81 and head tree 41.Side plate column 42 pushes up The end face of end and bottom is equipped with screwed hole, and screwed hole passes through bolt admittedly with the screwed hole at chassis assembly 1 and ceiling assembly 2 edge Fixed connection.
As shown in figure 3, water treatment component 6 includes draining grid 61 and is connected, with draining grid 61, the fractional precipitation communicating Pond 62 and related supporting pipeline, draining grid 61 is located at two on the floor 14 of chassis assembly 1 along longitudinally (automobile sails direction into) Side, grading sedimentation tank 62 is located between both sides draining grid 61, and draining grid 61 is discharged for car wash water, grading sedimentation tank 62 It is provided with discharge outlet 63;Fall in draining grid 61 with the water repairing in operation in carwash, flow into through the runner in draining grid 61 To in middle grading sedimentation tank 62, draw finally by discharge outlet.Grading sedimentation tank 62 is removably installed, and can take out at any time Maintained.
As shown in figure 4, feet 7 includes height-adjustable main feet 71 and auxiliary feet 72, main feet 71 is arranged on bottom The corner of disk assembly 1 bottom surface, multiple auxiliary feets 72 are arranged on middle part and the four side edges of chassis assembly 1 bottom surface, assist feet 72 are fixedly connected by the auxiliary feet fixed plates 73 of L-shaped, as shown in fig. 7, auxiliary feet fixed plate 73L shape be connected to chassis Assembly 1 bottom surface, another side is fixedly connected with auxiliary feet 72.Main feet 71 and the auxiliary height-adjustable feet of feet 72, fit Answer out-of-flatness ground.
Implementation process of the present utility model is as follows:
The utility model is embodied as item for the carwash service of repairing, and the typical sizes of casing are:7.2x4x3.5m.
Before assembling at the scene, bottom girder and cross member are welded netted structure of bottom girder by chassis assembly 1, are embodied as Middle cross member 11 and bottom girder 12, all using channel-section steel, are fixedly connected by welding, and corner fittings 8 are welded to netted bottom girder knot Structure and the corner of top board, corner fittings 8 is welded with corner fittings fixed plate 81, and before assembling, corner fittings is not independently of chassis assembly and ceiling group Part, it is integrally fixed at the part on chassis assembly and ceiling assembly.
In casing corner, stud, column two ends are substantially symmetrical, are by screw and corner fittings fixed plate and angle Part connects, and corner fittings fixed plate is welded on corner fittings.For chassis assembly 1, longeron is first welded corner fittings in housing, corner fittings is straight again Welded corner joint crossbeam.
During in-site installation, first splice chassis assembly, with cross member reinforcing plate, two pieces of chassis are stitched together, main brace pin withstands 4 Individual corner fittings;Auxiliary spike is installed as needed;Adjust each spike height, make plane holding level on chassis;As shown in Fig. 2 by 4 Individual head tree 41 lower end is fixedly connected with the corner fittings 8 of chassis assembly 1 by bolt, and two pieces of top boards 21 are spelled by crossbeam strengthening version Connect formation ceiling assembly 2, then ceiling assembly 2 sets up, on head tree 41, head tree 41 upper end passed through bolt and top board 21 Corner fittings 8 is fixedly connected.
Then installation side plate column, followed by lateral plate component 3, lateral plate component 3 between chassis assembly 1 and ceiling assembly 2 Upper and lower side is bolted to connection bottom girder and top board 21 edge at netted structure of bottom girder edge respectively, it is consequently formed collection The body structure of vanning.
Then sedimentation basin is installed, connects sedimentation basin pipeline, then laying floor 14, floor 14, can used as non-overboard ground Mated formation with steel plate or glass epoxy.Again water treatment component 6 is routed on the floor 14 of chassis assembly 1, ramp assembly 5 is installed To chassis assembly 1 two ends, complete after connecting pipeline to install, formed as shown in Figure 1.
When needing dismounting, dismantled successively using order contrary to the above, before reduction is divided into in-site installation All parts.
In being embodied as, single for the utility model container splicing arrangement can be obtained the operation of multistation, as Figure 13 institute Show, two containers are parallel to be arranged side by side, and forms double work operating environment.
Its multi-functional special type demand, convenient transport and dismounting, better adaptability, work(can be realized by this utility model Can there is it and project significant technique effect, solve the technical problem not solved in prior art comprehensively.

Claims (10)

1. a kind of detachable multifunctional special container it is characterised in that:Main by chassis assembly (1), ceiling assembly (2), Water treatment component (6), ramp assembly (5), column (4) and lateral plate component (3) removably assemble, chassis assembly (1) and Pass through column (4) between ceiling assembly (2) and support to connect, chassis assembly (1) and ceiling assembly (2) along casing longitudinal direction both sides it Between equipped with lateral plate component (3), be consequently formed rectangular container;Described container is sailed along casing is longitudinally through for automobile Enter and roll away from, chassis assembly (1) is connected with ramp assembly (5) along the longitudinal two ends of casing, chassis assembly (1) is upper to install water position Reason assembly (6), chassis assembly (1) bottom surface is provided with adjustable feet (7).
2. a kind of detachable multifunctional special container according to claim 1 it is characterised in that:During in-site installation, After described chassis assembly (1) and described ceiling assembly (2) are spliced in scene, then by connecting described column (4) and described side plate group Part (3) forms the body structure of container, described ramp assembly (5) is installed to described chassis assembly (1) two ends, by described water Process assembly (6) is mated formation and is completed to install on chassis assembly (1).
3. a kind of detachable multifunctional special container according to claim 1 it is characterised in that:Described chassis group Part (1) inclusion cross member (11), bottom girder (12), cross member reinforcing plate (13), floor (14) and ramp fix bar (15), many Bottom girder (12) parallel interval arranges, and bottom girder (12) is arranged along direction of traffic, often connects between two adjacent foundation longerons (12) It is connected to cross member (11), many foundation crossbeam (11) is fixedly connected between two foundation longerons (12) along bottom girder (12) distribution, leads to Cross bottom girder (12) and the base plate of two pieces of netted structure of bottom girder that cross member (11) builds, then be spliced to form monoblock chassis; Floor (14) is equipped with netted structure of bottom girder, the every one end in many foundation longeron (12) two ends is all by two foundation crossbeams (11) even Connect, pass through cross member reinforcing plate (13) between two foundation crossbeams (11) and dock.
4. a kind of detachable multifunctional special container according to claim 3 it is characterised in that:Described chassis group Two cross member (11) lateral surfaces at part (1) two ends are connected with perpendicular to the longitudinal ramp fix bar (15) of casing, ramp assembly (5) side is provided with row's stay hook (51), and ramp fix bar (15) is embedded in stay hook (51) and ramp assembly (5) is tiltedly hung Lateral surface in cross member reinforcing plate (13).
5. a kind of detachable multifunctional special container according to claim 3 it is characterised in that:Described cross member (11) and bottom girder (12) is all using section bar or sheet metal work, both are fixedly connected by welding.
6. a kind of detachable multifunctional special container according to claim 1 it is characterised in that:Described ceiling group Part (2) includes two pieces of identical top boards (21) with long side to being mutually spliced, between the spliced side of two pieces of top boards (21) Fixed with bolt by head piece reinforcing plate (22).
7. a kind of detachable multifunctional special container according to claim 1 it is characterised in that:Described chassis group Equipped with polylith lateral plate component (3) between part (1) and ceiling assembly (2) same side, described lateral plate component (3) includes totally-enclosed Multiple side plates such as side plate (31), windowing side plate (32) and enabling side plate (33), side plate is installed according to actual needs in combination, Lateral plate component (3) top and bottom is dismountable with the edge of chassis assembly (1) and ceiling assembly (2) respectively is connected.
8. a kind of detachable multifunctional special container according to claim 1 it is characterised in that:Described column (4) head tree (41) and side plate column (42) are included, head tree (41) is arranged on the four of chassis assembly (1) and ceiling assembly (2) Between angle, side plate column (42) is arranged between adjacent side plates assembly (3);Described head tree (41) all by corner fittings (8) with Chassis assembly (1) and ceiling assembly (2) connect, and the corner of chassis assembly (1) and ceiling assembly (2) has been fixedly connected with corner fittings (8), corner fittings (8) cross member (11) and bottom girder (12) welding, corner fittings (8) and the ceiling assembly (2) with chassis assembly (1) respectively Top board (21) be fixedly connected by welding, corner fittings (8) is welded with corner fittings fixed plate (81), corner fittings fixed plate (81) and main vertical Post is bolted to connection between (41);The end face of side plate column (42) top and bottom is equipped with screwed hole, screwed hole with The screwed hole at chassis assembly (1) and ceiling assembly (2) edge is bolted to connection.
9. a kind of detachable multifunctional special container according to claim 1 it is characterised in that:Described water process Assembly (6) is included draining grid (61) and is connected the grading sedimentation tank (62) communicating, draining grid with draining grid (61) (61) it is located at the upper both sides along longitudinally (automobile sails direction into) in floor (14) of chassis assembly (1), grading sedimentation tank (62) is located at Between both sides draining grid (61), grading sedimentation tank (62) is provided with discharge outlet (63);Fall in carwash and the water in operation that repairs To in draining grid (61), it is flowed in the grading sedimentation tank (62) of centre through the runner in draining grid (61), finally by Discharge outlet is drawn.
10. a kind of detachable multifunctional special container according to claim 1 it is characterised in that:Described feet (7) height-adjustable main feet (71) and auxiliary feet (72) are included, main feet (71) is arranged on chassis assembly (1) bottom surface Corner, multiple auxiliary feets (72) are arranged on middle part and the four side edges of chassis assembly (1) bottom surface.
CN201620507761.0U 2016-05-27 2016-05-27 Detachable multi -functional special container Expired - Fee Related CN205931909U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620507761.0U CN205931909U (en) 2016-05-27 2016-05-27 Detachable multi -functional special container

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620507761.0U CN205931909U (en) 2016-05-27 2016-05-27 Detachable multi -functional special container

Publications (1)

Publication Number Publication Date
CN205931909U true CN205931909U (en) 2017-02-08

Family

ID=57931671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620507761.0U Expired - Fee Related CN205931909U (en) 2016-05-27 2016-05-27 Detachable multi -functional special container

Country Status (1)

Country Link
CN (1) CN205931909U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105905461A (en) * 2016-05-27 2016-08-31 杭州众赢科技有限公司 Detachable multifunctional special container
CN107165264A (en) * 2017-06-27 2017-09-15 上海灿实工程设备有限公司 A kind of standard modular size design

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105905461A (en) * 2016-05-27 2016-08-31 杭州众赢科技有限公司 Detachable multifunctional special container
CN107165264A (en) * 2017-06-27 2017-09-15 上海灿实工程设备有限公司 A kind of standard modular size design

Similar Documents

Publication Publication Date Title
CN105905461B (en) detachable multifunctional special container
CN207079735U (en) A kind of beam-column node structure
CN204960296U (en) Adjustable shaped steel stencil assembly
CN202687190U (en) Swap car body tank container
CN101126223A (en) Mobile integral construction platform, construction method thereof and special sling for the same
CN205931909U (en) Detachable multi -functional special container
CN104213501B (en) A kind of cable-stayed type bent unlatching trestle work structure construction method
CN102433888A (en) Assembled steel bushing box
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN103411367A (en) Installation platform of integrated refrigeration station
CN112942735B (en) Vertical garbage transporting device for high-rise building construction site and construction method thereof
CN206873495U (en) A kind of Portable piping lane side wall formwork jumbo
CN209667317U (en) Check plate steel construction is consolidated in a kind of heavy die block suspension column sea
CN201573762U (en) Working platform rack
CN103469735A (en) Method for mounting curve ultrahigh hollow column plate type pier top solid section template
CN102913007B (en) Steel reinforcement processing shed and construction method therefor
CN102589913A (en) Horizontal tunnel lining model test platform modularization loading machine frame
CN203307733U (en) Construction platform system of concrete pier of viaduct
CN207244455U (en) Assembled variable cross-section contracture sliding mode system
CN202431011U (en) Tool type bolted reinforcing steel work shed capable of being used repeatedly on building construction site
CN213303599U (en) Modular field-mounted door head billboard
CN205804178U (en) Scalable without holder device for the liftable of bridge coping construction
CN109555268A (en) Prefabricated support column and its construction method based on H profile steel
CN217602029U (en) Well operation platform for sizing narrow space
CN112158306A (en) Floating type heavy-load platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hangzhou Huajie Intelligent Equipment Co.,Ltd.

Assignor: HANGZHOU ZHONGYING TECHNOLOGY Co.,Ltd.

Contract record no.: X2021980000598

Denomination of utility model: A detachable multifunctional special container

Granted publication date: 20170208

License type: Common License

Record date: 20210122

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170208

Termination date: 20210527