CN109881891A CN201910149545.1A CN201910149545A CN109881891A CN 109881891 A CN109881891 A CN 109881891A CN 201910149545 A CN201910149545 A CN 201910149545A CN 109881891 A CN109881891 A CN 109881891A
Authority
CN
China
Prior art keywords
gate stack
prefabricated
prefabricated gate
stack component
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910149545.1A
Other languages
Chinese (zh)
Inventor
秦宗凯
刘念
许峰
殷得权
王希克
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201910149545.1A priority Critical patent/CN109881891A/en
Publication of CN109881891A publication Critical patent/CN109881891A/en
Pending legal-status Critical Current

Links

Landscapes

  • Gates (AREA)

Abstract

The present invention relates to a kind of construction methods of prefabricated gate stack component, comprising the following steps: a) uses template construct mold, template two sides channel steel and split bolt are reinforced, and centre is separated;B) to template marker space casting concrete, artificial vibration compacting, surface carries out smoothing out receipts face, the middle position fixed position of reserved bolt;C) water seasoning form removal forms after the completion of pouring;When d) installing, the unwrapping wire on the shearing metope poured controls gate stack size and location;E) it is numbered according to gate stack Deepen Design figure and plate, on-site consolidation;F) viscose glue the prefabricated gate stack component back side is applied to be bonded;G) the prefabricated gate stack component after being bonded is pasted at door opening according to unwrapping wire position, and gently tapping keeps its bonding secured;H) prefabricated gate stack assembly finishes, and carries out the connection of contiguous prefabricated gate stack.It is an advantage of the invention that gate stack component strength is high, construction efficiency is high, at low cost, short time limit, time saving and energy saving.

Description

A kind of construction method of prefabricated gate stack component
Technical field
The invention belongs to technical field of building construction, and in particular to a kind of construction method of prefabricated gate stack component.
Background technique
Small-sized gate stack is relatively common in residential housing construction, and there are two types of current small-sized gate stack construction methods: first is that building block It builds;Second is that being formed during main structure construction with main structure one-time-concreting.In the work progress of above two mode In, all there are the following problems:
1, it is constructed using the small-sized gate stack of concrete block masonry construction method complicated, masonry quality is difficult to ensure, masonry itself is strong It spends lower, influences subsequent doorframe installation quality.
2, using with the molding small-sized gate stack of main structure one-time-concreting, because its section is smaller, formwork reinforcement is difficult, molding Quality is difficult to ensure that mould material and manpower consumption are big, increases construction cost.
Summary of the invention
Present invention aim to address the above problem, it is high to provide a kind of gate stack component strength, construction efficiency is high, it is at low cost, The construction method of short time limit, time saving and energy saving prefabricated gate stack component.
To achieve the above object, the invention provides the following technical scheme:
A kind of construction method of prefabricated gate stack component, comprising the following steps:
A) template construct mold is used, template two sides channel steel and split bolt are reinforced, and centre is according to prefabricated gate stack specification Size is separated;
B) gate stack concreting, artificial vibration compacting, prefabricated gate stack surface are carried out to each section that template is separated out It is carried out smoothing out receipts face with plasterer's trowel, at gate stack component middle position reserved two the fixed position of anchor bolt;
C) form removal forms after water seasoning 7 days after the completion of concreting;
When d) installing, first the unwrapping wire on the shearing metope poured, controls gate stack size and location;
E) it is numbered according to gate stack Deepen Design figure and plate, carries out live spelling using corresponding door opening position is manually transported to Dress;
F) viscose glue is uniformly applied to the prefabricated gate stack component back side be bonded;
G) the prefabricated gate stack component after bonding is pasted at door opening according to unwrapping wire position, and is gently tapped with cuticle hammer Prefabricated gate stack keeps its bonding secured;
H) prefabricated gate stack assembly finishes, and carries out the connection of contiguous prefabricated gate stack.
Further, the length of the prefabricated gate stack component is 600-1000mm, for gate stack thickness no more than 100mm's Door opening.
Preferably, being separated among the step a) template using aluminum alloy square tube.
It is poured preferably, carrying out gate stack using C25 concrete in the step b).
Preferably, the bonding of prefabricated gate stack component is carried out in the step f) using cloud stone glue.
The beneficial effects of the present invention are:
(1) Prefabrication, it is convenient to construct
Prefabricated gate stack can carry out at the scene concentrated processing according to in-depth figure, and each prefabricated components are compiled by door opening type Number, it is connected between prefabricated gate stack and metope using special connecting piece or bonding agent, construction is simple.
(2) it convenient for construction, shortens the construction period
Prefabricated gate stack surface is smooth, and Forming Quality is good, without installing gate stack template, prefabricated gate stack in main structure construction It instead of piled bricks, saves and largely uses brick, formwork or masonry link are cancelled, and have saved lot of materials and labour, have shortened the duration.
(3) intensity is higher, guarantees quality
Prefabricated gate stack intensity is significantly larger than brick setting intensity, can effectively improve the construction quality of gate stack.
Detailed description of the invention
Technical solution in order to illustrate the embodiments of the present invention more clearly, below will be to needed in embodiment description Attached drawing is briefly described, it should be apparent that, the accompanying drawings in the following description is only the present invention in order to illustrate more clearly of this hair Bright embodiment or technical solution in the prior art are not making the creative labor for those of ordinary skill in the art Under the premise of, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is that gate stack of the invention makes mold structure diagram;
Fig. 2 is prefabricated gate stack element structure schematic diagram of the invention.
Specific embodiment
A kind of construction method of prefabricated gate stack component as shown in Figs. 1-2, key points for operation are as follows:
1. concrete prefabricated gate stack Deepen Design
Concrete prefabricated gate stack acquisition can be divided into in-situ precast and precast plant purchases two kinds of methods.According to body design drawing Door opening size and height, carry out Deepen Design, short transverse can piecemeal it is assembled, for convenience of carrying and easy for installation, in advance The length of gate stack component processed is in 600-1000mm or so.
2. concrete prefabricated gate stack field fabrication
(1) template construct mold is used, two sides channel steel and split bolt are reinforced, the intermediate specification ruler according to prefabricated gate stack It is very little to be separated using aluminum alloy square tube, as shown in Figure 1.
(2) prefabricated gate stack casting concrete
It is poured using C25 concrete, artificial vibration compacting, prefabricated gate stack surface carries out receipts face, component with plasterer's trowel Middle position can reserve anchor bolt at two and fix position, as shown in Figure 2.
(3) after the completion of concreting, form removal is formed after water seasoning 7 days.
3. prefabricated gate stack installation
(1) unwrapping wire on the shearing metope poured, to control gate stack size and location;
(2) it is numbered according to gate stack Deepen Design figure and plate, carries out scene using corresponding door opening position is manually transported to It is assembled;
(3) prefabricated gate stack component uses marble glue sticking;
(4) cloud stone glue that modulation is completed uniformly is applied to the prefabricated gate stack component back side;
(5) the prefabricated gate stack component after smearing cloud stone glue is pasted at door opening according to unwrapping wire position, is hammered into shape with cuticle light The prefabricated gate stack of tapping keeps its bonding secured;
(6) prefabricated gate stack assembly finishes, and carries out contiguous prefabricated gate stack connection.
4. main material equipment
1 main material of table, plant
Replace traditional brick gate stack or gate stack with shear wall with concrete prefabricated gate stack component in main structure construction The molding of structure one-time-concreting.Prefabricated gate stack can be freely assembled according to the specification of door opening structure position, and assembly uses dedicated connection Part or binder, it is simple and efficient.In addition prefabricated gate stack component strength is higher than traditional brick masonry strength, forms gate stack than one-time-concreting It more can effectively ensure that gate stack Forming Quality.Cost is not only reduced using this technology, improves efficiency, shortens the duration, and Traditional piled bricks is avoided to build and the shortcomings such as time-consuming existing for supporting module, effort, at high cost.
The content not being described in detail in the present invention is the prior art.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (6)

1. a kind of construction method of prefabricated gate stack component, which comprises the following steps:
A) template construct mold is used, template two sides channel steel and split bolt are reinforced, and centre is according to prefabricated gate stack specification It is separated;
B) concreting is carried out to each section that template is separated out, artificial vibration compacting, prefabricated gate stack surface is smoothed out The fixed position of anchor bolt at two is reserved in receipts face, gate stack component middle position;
C) concreting is completed, and form removal forms after water seasoning 7 days;
When d) installing, first the unwrapping wire on the shearing metope poured, controls gate stack size and location;
E) it is numbered according to gate stack Deepen Design figure and plate, carries out on-site consolidation using corresponding door opening position is manually transported to;
F) viscose glue is uniformly applied to the prefabricated gate stack component back side be bonded;
G) the prefabricated gate stack component after bonding is pasted at door opening according to unwrapping wire position, and gently taps prefabricated gate stack, made It is bonded secured;
H) prefabricated gate stack assembly finishes, and carries out the connection of contiguous prefabricated gate stack.
2. a kind of construction method of prefabricated gate stack component according to claim 1, which is characterized in that the step a) template Centre is separated using aluminum alloy square tube.
3. a kind of construction method of prefabricated gate stack component according to claim 1, which is characterized in that adopted in the step b) Gate stack is carried out with C25 concrete to pour.
4. a kind of construction method of prefabricated gate stack component according to claim 1, which is characterized in that adopted in the step f) The bonding of prefabricated gate stack component is carried out with cloud stone glue.
5. a kind of construction method of prefabricated gate stack component according to claim 1, which is characterized in that the prefabricated gate stack structure The length of part is 600-1000mm.
6. a kind of construction method of prefabricated gate stack component according to any one of claims 1 to 5, which is characterized in that described Prefabricated gate stack component is suitable for the door opening that gate stack thickness is not more than 100mm.
CN201910149545.1A 2019-02-28 2019-02-28 A kind of construction method of prefabricated gate stack component Pending CN109881891A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910149545.1A CN109881891A (en) 2019-02-28 2019-02-28 A kind of construction method of prefabricated gate stack component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910149545.1A CN109881891A (en) 2019-02-28 2019-02-28 A kind of construction method of prefabricated gate stack component

Publications (1)

Publication Number Publication Date
CN109881891A true CN109881891A (en) 2019-06-14

Family

ID=66929863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910149545.1A Pending CN109881891A (en) 2019-02-28 2019-02-28 A kind of construction method of prefabricated gate stack component

Country Status (1)

Country Link
CN (1) CN109881891A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204235676U (en) * 2014-10-30 2015-04-01 中建海峡建设发展有限公司 L-shaped door buttress prefabricated section sizing punching block
CN105178431A (en) * 2015-09-28 2015-12-23 太原建工集团有限公司 Building prefabricated door buttress assembly and construction method thereof
CN206554239U (en) * 2017-03-17 2017-10-13 中建一局集团第一建筑有限公司 A kind of gate stack for the prefabricated installation of shear wall side door-window opening
CN109016089A (en) * 2018-07-18 2018-12-18 中天建设集团有限公司 A kind of mold, manufacture craft and the installation method of small-sized gate stack

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204235676U (en) * 2014-10-30 2015-04-01 中建海峡建设发展有限公司 L-shaped door buttress prefabricated section sizing punching block
CN105178431A (en) * 2015-09-28 2015-12-23 太原建工集团有限公司 Building prefabricated door buttress assembly and construction method thereof
CN206554239U (en) * 2017-03-17 2017-10-13 中建一局集团第一建筑有限公司 A kind of gate stack for the prefabricated installation of shear wall side door-window opening
CN109016089A (en) * 2018-07-18 2018-12-18 中天建设集团有限公司 A kind of mold, manufacture craft and the installation method of small-sized gate stack

Similar Documents

Publication Publication Date Title
CN208502433U (en) A kind of prefabricated assembled Assembled surrounding wall with vertical curtain wall penel component
CN106320691B (en) Aluminum wood template construction method
CN104746639B (en) A kind of installation method that the prefabricated window that floats is installed in composite wallboard
CN107558626A (en) A kind of prefabricated assembled wall structure and the method using this structure building house
CN206616862U (en) Formwork root bracing means
CN104947846B (en) A kind of prefabricated integral frame light filling lining and preparation method thereof
CN103334356A (en) Bridge type precast reinforced concrete hidden beam slab pavement system and construction method thereof
CN110005104A (en) A kind of fabricated heat preservation decoration integrative laminated floor slab and its construction method
CN210263131U (en) Assembled is from stagnant water underground pipe gallery structure
CN208514696U (en) The angle the roofing R prefabricated board of falling flashing rapid processing mold
CN209040349U (en) A kind of ring muscle fastening shear wall structure being easily installed
CN110344535A (en) A kind of prefabricated assembled combined wall board and construction method realized concealed beam and exempt from formwork
CN110450278A (en) A kind of production technology of sandwich heat preservation overlapped shear wall
CN103334360B (en) The dark beam slab wear-resistant pavement system of bridge-type prefabricated reinforced concrete and construction method thereof
CN205712565U (en) A kind of prefabricated two-sided wall
CN109881891A (en) A kind of construction method of prefabricated gate stack component
CN110259144A (en) A kind of novel energy-saving environment-friendly ash concrete lightweight wall plate construction method
CN107345438B (en) It is a kind of to realize that structure turns over the construction method of the prefabricated assembled awning of eaves based on EPS insulation board
CN110056190A (en) A kind of two-part slab thickness control sealing up screw
CN205444514U (en) Bearing light insulation intergral template
CN210152282U (en) Device for controlling thickness of cast-in-situ reinforced concrete floor
CN106914984A (en) A kind of construction method of prefabricated composite construction board
CN207484791U (en) A kind of unidirectional overlapping floorboard of assembled architecture
CN207934255U (en) A kind of prefabricated composite wallboard for exempting from formwork
CN102312578B (en) Integral vibration-free pouring and constructing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190614

RJ01 Rejection of invention patent application after publication