CN109881735A - Wisdom water utilities water supply scheduling decision equipment - Google Patents

Wisdom water utilities water supply scheduling decision equipment Download PDF

Info

Publication number
CN109881735A
CN109881735A CN201910251223.8A CN201910251223A CN109881735A CN 109881735 A CN109881735 A CN 109881735A CN 201910251223 A CN201910251223 A CN 201910251223A CN 109881735 A CN109881735 A CN 109881735A
Authority
CN
China
Prior art keywords
water
decision
water supply
wisdom
decision device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910251223.8A
Other languages
Chinese (zh)
Inventor
陈方亮
张帆
韩晓峰
黄丽娜
李伟
陈相森
刘杰
周磊
王辉
王欣
王一宁
杨晓雨
黄亚楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Shang Run Electronic Technology Co Ltd
Original Assignee
Zhengzhou Shang Run Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Shang Run Electronic Technology Co Ltd filed Critical Zhengzhou Shang Run Electronic Technology Co Ltd
Priority to CN201910251223.8A priority Critical patent/CN109881735A/en
Publication of CN109881735A publication Critical patent/CN109881735A/en
Pending legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of wisdom water utilities water supply scheduling decision equipment, including decision-making work platform, the bottom of the decision-making work platform offers multiple movable chambers, the internal activity of the movable chamber is equipped with moving assembly, the moving assembly is made of fixed column, support rod, sleeve, wheel mounting base and antiskid plate, and the bottom end of the fixed column and the top of support rod are fixedly connected to spring steel plate.The wisdom water utilities water supply scheduling decision equipment, scheduling of supplying water is operated using decision device convenient for staff, wherein maintenance door periodically carries out examination and maintenance to decision device inside convenient for staff, it ensure that decision device operates normally, improve the reliability of decision device, damping performance is preferable, improve the stability of decision device, convenient for the lift adjustment of decision device, facilitate adjusting, improves the flexibility of decision device.

Description

Wisdom water utilities water supply scheduling decision equipment
Technical field
The invention belongs to wisdom water utilities dispatching technique field, it is specifically related to a kind of wisdom water utilities water supply scheduling decision and sets It is standby.
Background technique
With the continuous quickening of urbanization, numerous large size cities, ultra-large type city have been gradually appeared.In these cities Numerous populations need a large amount of water resource.And surrounding city generally has large-scale industrial park, to guarantee urban population Employment and economic level.These large-scale industrial parks also need the confession of a large amount of water resource to be applied to industrial production.
In the supply of water resource, the demand according to each water demand side and the supply of water resource provider are needed Ability reasonably dispatches water resource, to play maximum resource and economic advantages.Mostly in the prior art is by scheduling Personnel's has had experience just to judge, then rough distribution is carried out to water resource, during distribution, further according to each side Demand is adjusted.
But above-mentioned technical solution in the prior art is mostly scheduled distribution to water resource with the experience of dispatcher, it is difficult To accomplish refinement;Or distribution is scheduled to water resource with the amount of demanding of water resource user, and the amount of demanding is often big In or be far longer than true demand, thereby result in water resource distribution it is unbalanced and waste, cause to can not achieve resource With maximization of the economic interests in society.
The application establishes the Innovative Management Mode of wisdom water utilities using front-end technology effectively to locate from the angle of wisdom water utilities The increasingly complicated water utilities operation management of reason, farthest can reasonably dispatch water resource, to play maximum money Source and economic advantages.Wisdom water utilities can help water enterprise to realize water-saving and energy conservation object, preferably manage throughout everywhere Water supply facilities.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, it the present invention provides a kind of wisdom water utilities water supply scheduling decision equipment, solves existing Refinement is difficult in water utilities dispatching distribution, or water resource is scheduled point with the amount of demanding of water resource user Match, and the amount of demanding commonly greater than or be far longer than true demand, thereby result in water resource distribution it is unbalanced and waste, Cause to can not achieve the maximized technical problem of resource and economic interests in society.
(2) technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs:
A kind of wisdom water utilities water supply scheduling decision equipment, including decision-making work platform, moving assembly, moving assembly, the decision work It include processor, memory, executing agency, power supply etc. as platform;The power supply is the electricity consumptions such as processor, memory, executing agency Equipment power supply.It will need to need water side to be divided into a, b, c etc. with each of water, it is each that water side is needed to be provided with aqueduct and water supply water Source connection;The executing agency is solenoid valve, and the solenoid valve is arranged on aqueduct, and the solenoid valve and processor connect It connects;And the solenoid valve is provided with number a1, b1, c1 etc., and needs water side corresponding with each.
Optionally, the processor has each former years water data input interface for needing water side and additionally temporarily needs water defeated Incoming interface, the former years water data input interface and additionally temporarily needs water input interface and has and is multiple.
Optionally, the resource of water supply can be river, reservoir, reservoir of water factory etc..
Optionally, the solenoid valve being arranged on the aqueduct is one or more.
Optionally, described to need water side a, b, c(by taking three need water side as an example) former years water consumption is followed successively by La, Lb, Lc;It is described The water that resource of water supply is capable of providing is W;
It is at this time Xn=α WLn/ (La+Lb+Lc) to the water supply of water side n is needed.Wherein, n a, one in b, c.α is to supply Water adjustment factor, when without temporarily water information is needed, value 1;When having temporarily needs water information, and temporarily needing water side is it Body, α value are 1-1.2;When having temporarily needs water information, and when temporarily to need water side not be itself, α value is 0.8-1.
Optionally, the unlatching and closure of processor control solenoid valve, and the amplitude opened, determine resource of water supply to The amount for needing water side to supply water.
Optionally, flowmeter is additionally provided on the aqueduct, the flowmeter is connect with processor, and passes through power supply It is powered.
Optionally, the bottom of the decision-making work platform offers multiple movable chambers, the internal activity installation of the movable chamber There is moving assembly, the moving assembly is made of fixed column, support rod, sleeve, wheel mounting base and antiskid plate, the fixed column Bottom end and the top of support rod be fixedly connected to spring steel plate, the junction of two spring steel plates is fixedly installed with Attachment base is plugged with the link block being arranged symmetrically between two attachment bases.
Optionally, the middle part screw thread of the attachment base is plugged with screw rod, and the left outer surface of the support rod is fixedly mounted There is rack gear, the bottom end activity of the support rod is plugged on the inside of sleeve.
Optionally, U-shaped frame, the external front face peace of the U-shaped frame are fixedly installed at the top of the left outer surface of the sleeve Equipped with adjustment disk.
Optionally, the external surface top of the adjustment disk is plugged with positioning pin, the inside front intermediate active of the U-shaped frame Adjustment axis is installed, the outer surface of the adjustment axis is fixedly installed with driving gear, side inner wall of the sleeve close to rack gear It is movably installed with linked gear.
Optionally, it is fixedly connected at the top of the bottom end of the sleeve and wheel mounting base, the bottom of the wheel mounting base It is fixedly connected with the guide post being arranged symmetrically.
Optionally, the bottom intermediate active of the wheel mounting base is equipped with wheel, and the guide post and antiskid plate sliding connect Connect, the bottom outer surface of the guide post offers card slot, and the inside of the antiskid plate offers driving chamber, the driving chamber it is interior Portion is slidably fitted with kelly.
Optionally, the inside of the driving chamber is equipped with baffle, and the baffle is fixedly attached to the outer surface of kelly, described The outer surface of kelly is socketed with the first spring.
Optionally, the front of the decision-making work platform is movably installed with maintenance door, the top right side of the decision-making work platform It is fixedly connected with touch-control manipulation screen, the touch-control manipulation screen is connect with processor.
Optionally, the outer surface of the fixed column is fixedly installed with Limit Bearing;The spring steel plate is arc shape;It is described Screw rod sequentially passes through link block and attachment base from inside to outside, and the both ends of the screw rod are fixedly installed with nut.
Optionally, the adjustment axis is fixedly connected through U-shaped frame and with adjustment disk;It nibbles respectively the two sides of the linked gear Connection driving gear and rack gear are closed, the front of the linked gear offers the location hole of circumferentially array arrangement;The positioning Pin is equipped with location hole.
Optionally, the wheel is slidably connected with antiskid plate;The kelly is equipped with card slot, the kelly and card slot Clamping.
Optionally, the kelly runs through the inner wall of driving chamber and is fixedly connected with pulling plate;The both ends of first spring point It is not fixedly connected with the inner wall and baffle of driving chamber.
Optionally, second spring is provided on the outside of the guide post, the both ends of the second spring are respectively fixedly connected with wheel Sub- mounting base and antiskid plate.
Optionally, first spring and second spring are pressure spring;The line footpath d1 of first spring is 0.8- 3.5mm, central diameter D1 are 6.5-37mm, and coefficient of rigidity E1 is (7.5-8.4) × 104MPa.The second spring Line footpath d2 be 0.5-0.95mm, central diameter D2 be 4.2-11.6mm, coefficient of rigidity E2 be (6.8-7.4) × 104MPa。
It optionally, is the active force of the inner wall and baffle that play the first spring to driving chamber, first bullet Meet d1D1 between line footpath d1, the central diameter D1 of spring and is less than or equal to 105.8 more than or equal to 12.5.
Optionally, the line of the line footpath d1 of first spring, central diameter D1 its coefficient of rigidity E1 and second spring Diameter d2, central diameter D2, meet following relationship between coefficient of rigidity E2:
E1/E2=φ·[(d1·D2)/(d2·D1)]+δ0
Wherein φ is coefficient of balance, value range 1.15-1.18;δ0For ratio mantissa, value range 0.02-0.05.
(3) beneficial effect
The present invention provides a kind of wisdom water utilities water supply scheduling decision equipment, have it is following the utility model has the advantages that
(1) the wisdom water utilities water supply scheduling decision equipment each needs water side to the demand data of water and additional by comprehensively considering Water is temporarily needed, and determines the amount at distribution water source according to resource of water supply amount, farthest water resource reasonably can be adjusted Degree helps water enterprise to realize water-saving and energy conservation object, preferably management is throughout each to play maximum resource and economic advantages The water supply facilities at place.
(2) the wisdom water utilities water supply scheduling decision equipment is shielded by setting maintenance door and manipulation, is used convenient for staff Decision device to supply water scheduling operate, wherein maintenance door convenient for staff periodically to decision device inside carry out check and Maintenance ensure that decision device operates normally, improve the reliability of decision device.
(3) the wisdom water utilities water supply scheduling decision equipment passes through setting spring steel plate, attachment base, link block, screw rod and spiral shell Mother, damping performance is preferable, improves the stability of decision device, avoids the damage of internal structure, extends service life, side Just it transports and shifts, improve the convenience of decision device.
(4) wisdom water utilities water supply scheduling decision equipment, by the way that rack gear, U-shaped frame, adjustment disk, adjustment axis, sliding tooth is arranged Wheel, positioning pin and linked gear prevent ground hollow and decision device are caused to put not convenient for the lift adjustment of decision device Smooth situation improves the using effect of decision device, facilitates adjusting.
(5) wisdom water utilities water supply scheduling decision equipment, by the way that guide post, card slot, driving chamber, kelly, pulling plate, gear is arranged Plate, the first spring, second spring and wheel, since the particularity of design is being needed using Concealable wheel to decision device In the case where fixation, antiskid plate increases the coefficient of friction with ground, avoids sliding, good antiskid effect, is needing mobile decision In the case where equipment, user pulls out pulling plate, so that kelly and exact separation, the effect that antiskid plate is resetted by second spring It is pulled upwardly under power, at this time antiskid plate and surface separation, i.e., it is removable, improve the flexibility of decision device.
(6) wisdom water utilities water supply scheduling decision equipment, by the way that the parameter of the first spring and second spring is arranged, with more preferable Performance pressure spring reaction force effect.
(7) the wisdom water utilities water supply scheduling decision equipment, by be arranged the first spring line footpath d1, central diameter D1 its cut The relationship met between the line footpath d2, central diameter D2, coefficient of rigidity E2 of elastic modulus E 1 and second spring is cut, so that intelligence The skid resistance of intelligent water utilities water supply scheduling decision equipment is improved.
Detailed description of the invention
Fig. 1 is decision device structural schematic diagram of the invention.
Fig. 2 is moving assembly appearance diagram of the invention.
Fig. 3 is moving assembly schematic cross-sectional view of the invention.
Fig. 4 is structure enlargement diagram at A in Fig. 3 of the invention.
Fig. 5 is structure enlargement diagram at B in Fig. 3 of the invention.
Fig. 6 is structure enlargement diagram at C in Fig. 3 of the invention.
In figure: 1, decision-making work platform;2, maintenance door;3, manipulation screen;4, movable chamber;5, moving assembly;6, fixed column;7, it props up Strut;8, sleeve;9, wheel mounting base;10, antiskid plate;11, Limit Bearing;12, spring steel plate;13, attachment base;14, it connects Block;15, screw rod;16, nut;17, rack gear;18, U-shaped frame;19, adjustment disk;20, adjustment axis;21, gear is driven;22, it positions Pin;23, linked gear;24, guide post;25, card slot;26, driving chamber;27, kelly;28, pulling plate;29, baffle;30, the first spring; 31, second spring;32, wheel.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
In the present invention unless specifically defined or limited otherwise, term " setting ", " installation ", " connected ", " connection ", Terms such as " fixations " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection;It can be mechanical connect It connects;It can be directly connected, it can also be indirectly connected through an intermediary.For the ordinary skill in the art, may be used To understand the concrete meaning of above-mentioned term in the present invention as the case may be.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more of the features.In the description of the present invention, the meaning of " plurality " is two or more, Unless otherwise specifically defined.
Embodiment 1
Fig. 1-6, a kind of wisdom water utilities water supply scheduling decision equipment, including decision-making work platform 1, moving assembly 5 are please referred to, it is described to determine Plan workbench 1 includes processor, memory, executing agency, power supply etc.;The power supply is processor, memory, executing agency etc. Power supply for electrical equipment.It will need to need water side to be divided into a, b, c etc. with each of water, it is each that water side is needed to be provided with aqueduct and supply The connection of water water source;Solenoid valve is provided on the aqueduct, the solenoid valve is connect with processor;And the solenoid valve It is provided with number a1, b1, c1 etc., and needs water side corresponding with each.
The processor has each former years water data input interface for needing water side and additionally temporarily needs water input interface, It the former years water data input interface and additionally temporarily needs water input interface and has and is multiple.
The resource of water supply can be river, reservoir, reservoir of water factory etc..The solenoid valve being arranged on the aqueduct For one or more.
It is described to need water side a, b, c(by taking three need water side as an example) former years water consumption is followed successively by La, Lb, Lc;The water supply water The water that source is capable of providing is W;
It is at this time Xn=α WLn/ (La+Lb+Lc) to the water supply of water side n is needed.Wherein, n a, one in b, c.α is to supply Water adjustment factor, when without temporarily water information is needed, value 1;When having temporarily needs water information, and temporarily needing water side is it Body, α value are 1-1.2;When having temporarily needs water information, and when temporarily to need water side not be itself, α value is 0.8-1.
The bottom of the decision-making work platform 1 offers multiple movable chambers 4, and the internal activity of movable chamber 4 is equipped with mobile group Part 5, moving assembly 5 are made of fixed column 6, support rod 7, sleeve 8, wheel mounting base 9 and antiskid plate 10, the bottom end of fixed column 6 It is fixedly connected to spring steel plate 12 with the top of support rod 7, the junction of two spring steel plates 12 is fixedly installed with connection Seat 13 is plugged with the link block 14 being arranged symmetrically between two attachment bases 13.
The middle part screw thread of the attachment base 13 is plugged with screw rod 15, and the left outer surface of support rod 7 is fixedly installed with rack gear 17, the bottom end activity of support rod 7 is plugged on the inside of sleeve 8, is fixedly installed with U-shaped frame 18 at the top of the left outer surface of sleeve 8, The external front face of U-shaped frame 18 is equipped with adjustment disk 19.
The external surface top of the adjustment disk 19 is plugged with positioning pin 22, the inside front intermediate active installation of U-shaped frame 18 There is adjustment axis 20, the outer surface of adjustment axis 20 is fixedly installed with driving gear 21, side inner wall activity of the sleeve 8 close to rack gear 17 Linked gear 23 is installed, the bottom end of sleeve 8 is fixedly connected with the top of wheel mounting base 9, and the bottom of wheel mounting base 9 is fixed It is connected with the guide post 24 being arranged symmetrically.
The bottom intermediate active of the wheel mounting base 9 is equipped with wheel 32, and guide post 24 is slidably connected with antiskid plate 10, leads The bottom outer surface of column 24 offers card slot 25, and the inside of antiskid plate 10 offers driving chamber 26, the internal slide of driving chamber 26 Kelly 27 is installed, the inside of driving chamber 26 is equipped with baffle 29, and baffle 29 is fixedly attached to the outer surface of kelly 27, kelly 27 Outer surface be socketed with the first spring 30.
The front of the decision-making work platform 1 is movably installed with maintenance door 2, and the top right side of decision-making work platform 1 is fixedly connected There is manipulation screen 3, by setting maintenance door 2 and manipulation screen 3, scheduling of supplying water is operated convenient for decision device, wherein maintenance door 2 Examination and maintenance periodically are carried out to decision device inside convenient for staff, ensure that decision device operates normally, improve decision The reliability of equipment.
The outer surface of the fixed column 6 is fixedly installed with Limit Bearing 11;Spring steel plate 12 is arc shape;Screw rod 15 is from interior To link block 14 and attachment base 13 is sequentially passed through outside, the both ends of screw rod 15 are fixedly installed with nut 16, by the way that Elastic Steel is arranged Plate 12, attachment base 13, link block 14, screw rod 15 and nut 16, damping performance is preferable, improves the stability of decision device, keeps away The damage for having exempted from internal structure extends service life, convenient transportation and transfer, improves the convenience of decision device.
The adjustment axis 20 is fixedly connected through U-shaped frame 18 and with adjustment disk 19;It engages respectively the two sides of linked gear 23 Connection driving gear 21 and rack gear 17, the front of linked gear 23 offer the location hole of circumferentially array arrangement;Positioning pin 22 It is equipped with location hole, passes through setting rack gear 17, U-shaped frame 18, adjustment disk 19, adjustment axis 20, driving gear 21, positioning pin 22 It prevents ground hollow convenient for the lift adjustment of decision device with linked gear 23 and decision device is caused to put out-of-flatness Situation improves the using effect of decision device, facilitates adjusting.
The wheel 32 is slidably connected with antiskid plate 10;Kelly 27 is equipped with card slot 25, and kelly 27 and card slot 25 block It connects.
The kelly 27 runs through the inner wall of driving chamber 26 and is fixedly connected with pulling plate 28;The both ends of first spring 30 connect respectively Connect the inner wall and baffle 29 of driving chamber 26.
The outside of the guide post 24 is provided with second spring 31, and the both ends of second spring 31 are respectively fixedly connected with wheel installation Seat 9 and antiskid plate 10, by setting guide post 24, card slot 25, driving chamber 26, kelly 27, pulling plate 28, baffle 29, the first spring 30, Second spring 31 and wheel 32, due to the particularity of design, using Concealable wheel 32, need to fix decision device In the case of, antiskid plate 10 increases the coefficient of friction with ground, avoids sliding, good antiskid effect, is needing mobile decision device In the case where, user pulls out pulling plate 28, so that kelly 27 is separated with card slot 25, antiskid plate 10 is resetted by second spring 31 Active force under be pulled upwardly, antiskid plate 10 and surface separation at this time are that is, removable, improve the flexibility of decision device.
In conclusion on the one hand the wisdom water utilities water supply scheduling decision equipment passes through setting maintenance in a situation of use where Door 2 and manipulation screen 3, operate scheduling of supplying water convenient for decision device, wherein maintenance door 2 is convenient for staff periodically to decision Examination and maintenance are carried out inside equipment, ensure that decision device operates normally, and improve the reliability of decision device, it is on the other hand logical Setting spring steel plate 12, attachment base 13, link block 14, screw rod 15 and nut 16 are crossed, damping performance is preferable, improves decision device Stability, avoid the damage of internal structure, extend service life, convenient transportation and transfer, improve decision device Convenience, on the one hand by the way that rack gear 17, U-shaped frame 18, adjustment disk 19, adjustment axis 20, driving gear 21, positioning pin 22 is arranged and connects Moving gear 23 prevents the case where ground hollow causes decision device to put out-of-flatness convenient for the lift adjustment of decision device, The using effect for improving decision device facilitates adjusting.
User extracts positioning pin 22 first, and then by positive and negative rotation adjustment disk 19, the liter of support rod 7 can be realized On the other hand drop passes through setting guide post 24, card slot 25, driving chamber 26, kelly 27, pulling plate 28, baffle 29, the first spring 30, the Two springs 31 and wheel 32, since the particularity of design is needing the feelings fixed to decision device using Concealable wheel 32 Under condition, antiskid plate 10 increases the coefficient of friction with ground, avoids sliding, good antiskid effect, is needing mobile decision device In the case of, user pulls out pulling plate 28, so that kelly 27 is separated with card slot 25, antiskid plate 10 is resetted by second spring 31 It is pulled upwardly under active force, at this time antiskid plate 10 and surface separation, i.e., it is removable, improve the flexibility of decision device.
Embodiment 2
A kind of wisdom water utilities water supply scheduling decision equipment, including decision-making work platform 1, moving assembly 5, the decision-making work platform 1 wrap Include processor, memory, executing agency, power supply etc.;The power supply is that the electrical equipments such as processor, memory, executing agency supply Electricity.It will need to need water side to be divided into a, b, c etc. with each of water, it is each that water side is needed to be provided with aqueduct and resource of water supply company It is logical;Solenoid valve is provided on the aqueduct, the solenoid valve is connect with processor;And the solenoid valve is provided with Number a1, b1, c1 etc., and need water side corresponding with each.
The processor has each former years water data input interface for needing water side and additionally temporarily needs water input interface, It the former years water data input interface and additionally temporarily needs water input interface and has and is multiple.
The resource of water supply can be river, reservoir, reservoir of water factory etc..The solenoid valve being arranged on the aqueduct For one or more.
It is described to need water side a, b, c(by taking three need water side as an example) former years water consumption is followed successively by La, Lb, Lc;The water supply water The water that source is capable of providing is W;
It is at this time Xn=α WLn/ (La+Lb+Lc) to the water supply of water side n is needed.Wherein, n a, one in b, c.α is to supply Water adjustment factor, when without temporarily water information is needed, value 1;When having temporarily needs water information, and temporarily needing water side is it Body, α value are 1-1.2;When having temporarily needs water information, and when temporarily to need water side not be itself, α value is 0.8-1.
The bottom of the decision-making work platform 1 offers multiple movable chambers 4, and the internal activity of movable chamber 4 is equipped with mobile group Part 5, moving assembly 5 are made of fixed column 6, support rod 7, sleeve 8, wheel mounting base 9 and antiskid plate 10, the bottom end of fixed column 6 It is fixedly connected to spring steel plate 12 with the top of support rod 7, the junction of two spring steel plates 12 is fixedly installed with connection Seat 13 is plugged with the link block 14 being arranged symmetrically between two attachment bases 13.
The middle part screw thread of the attachment base 13 is plugged with screw rod 15, and the left outer surface of support rod 7 is fixedly installed with rack gear 17, the bottom end activity of support rod 7 is plugged on the inside of sleeve 8, is fixedly installed with U-shaped frame 18 at the top of the left outer surface of sleeve 8, The external front face of U-shaped frame 18 is equipped with adjustment disk 19.
The external surface top of the adjustment disk 19 is plugged with positioning pin 22, the inside front intermediate active installation of U-shaped frame 18 There is adjustment axis 20, the outer surface of adjustment axis 20 is fixedly installed with driving gear 21, side inner wall activity of the sleeve 8 close to rack gear 17 Linked gear 23 is installed, the bottom end of sleeve 8 is fixedly connected with the top of wheel mounting base 9, and the bottom of wheel mounting base 9 is fixed It is connected with the guide post 24 being arranged symmetrically.
The bottom intermediate active of the wheel mounting base 9 is equipped with wheel 32, and guide post 24 is slidably connected with antiskid plate 10, leads The bottom outer surface of column 24 offers card slot 25, and the inside of antiskid plate 10 offers driving chamber 26, the internal slide of driving chamber 26 Kelly 27 is installed, the inside of driving chamber 26 is equipped with baffle 29, and baffle 29 is fixedly attached to the outer surface of kelly 27, kelly 27 Outer surface be socketed with the first spring 30.
The front of the decision-making work platform 1 is movably installed with maintenance door 2, and the top right side of decision-making work platform 1 is fixedly connected There is manipulation screen 3, by setting maintenance door 2 and manipulation screen 3, scheduling of supplying water is operated convenient for decision device, wherein maintenance door 2 Examination and maintenance periodically are carried out to decision device inside convenient for staff, ensure that decision device operates normally, improve decision The reliability of equipment.
The outer surface of the fixed column 6 is fixedly installed with Limit Bearing 11;Spring steel plate 12 is arc shape;Screw rod 15 is from interior To link block 14 and attachment base 13 is sequentially passed through outside, the both ends of screw rod 15 are fixedly installed with nut 16, by the way that Elastic Steel is arranged Plate 12, attachment base 13, link block 14, screw rod 15 and nut 16, damping performance is preferable, improves the stability of decision device, keeps away The damage for having exempted from internal structure extends service life, convenient transportation and transfer, improves the convenience of decision device.
The adjustment axis 20 is fixedly connected through U-shaped frame 18 and with adjustment disk 19;It engages respectively the two sides of linked gear 23 Connection driving gear 21 and rack gear 17, the front of linked gear 23 offer the location hole of circumferentially array arrangement;Positioning pin 22 It is equipped with location hole, passes through setting rack gear 17, U-shaped frame 18, adjustment disk 19, adjustment axis 20, driving gear 21, positioning pin 22 It prevents ground hollow convenient for the lift adjustment of decision device with linked gear 23 and decision device is caused to put out-of-flatness Situation improves the using effect of decision device, facilitates adjusting.
The wheel 32 is slidably connected with antiskid plate 10;Kelly 27 is equipped with card slot 25, and kelly 27 and card slot 25 block It connects.
The kelly 27 runs through the inner wall of driving chamber 26 and is fixedly connected with pulling plate 28;The both ends of first spring 30 are solid respectively Surely the inner wall and baffle 29 of driving chamber 26 are connected.
The outside of the guide post 24 is provided with second spring 31, and the both ends of second spring 31 are respectively fixedly connected with wheel installation Seat 9 and antiskid plate 10, by setting guide post 24, card slot 25, driving chamber 26, kelly 27, pulling plate 28, baffle 29, the first spring 30, Second spring 31 and wheel 32, due to the particularity of design, using Concealable wheel 32, need to fix decision device In the case of, antiskid plate 10 increases the coefficient of friction with ground, avoids sliding, good antiskid effect, is needing mobile decision device In the case where, user pulls out pulling plate 28, so that kelly 27 is separated with card slot 25, antiskid plate 10 is resetted by second spring 31 Active force under be pulled upwardly, antiskid plate 10 and surface separation at this time are that is, removable, improve the flexibility of decision device.
First spring and second spring are pressure spring;The line footpath d1 of first spring is 0.8-3.5mm, center Diameter D1 is 6.5-37mm, and coefficient of rigidity E1 is (7.5-8.4) × 104MPa.The line footpath d2 of the second spring is 0.5-0.95mm, central diameter D2 are 4.2-11.6mm, and coefficient of rigidity E2 is (6.8-7.4) × 104MPa。
Preferably to make the first spring play the active force of inner wall and baffle to driving chamber, the line footpath of first spring Meet d1D1 between d1, central diameter D1 and is less than or equal to 105.8 more than or equal to 12.5.
The line footpath d1 of first spring, central diameter D1 its coefficient of rigidity E1 and second spring line footpath d2, in Meet following relationship between core diameter D2, coefficient of rigidity E2:
E1/E2=φ·[(d1·D2)/(d2·D1)]+δ0
Wherein φ is coefficient of balance, value range 1.15-1.18;δ0For ratio mantissa, value range 0.02-0.05.
It should be noted that in the present invention unless specifically defined or limited otherwise, fisrt feature is in second feature It can be that the first and second features directly contact or the first and second features are by intermediary mediate contact "up" or "down". Moreover, fisrt feature can be above the second feature " above ", " above " and " above " fisrt feature right above second feature or tiltedly Top, or first feature horizontal height is merely representative of higher than second feature.Fisrt feature second feature " under ", " lower section " and " following " can be fisrt feature and be directly under or diagonally below the second feature, or be merely representative of first feature horizontal height less than Two features.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (7)

1. a kind of wisdom water utilities water supply scheduling decision equipment, it is characterised in that: including decision-making work platform (1), moving assembly (5), Resource of water supply, aqueduct;The decision-making work platform includes processor, memory, executing agency, power supply etc.;The power supply is The power supply for electrical equipment such as processor, memory, executing agency;It will need to need water side to be divided into a, b, c with each of water, it is each to need water Side is provided with aqueduct and is connected to resource of water supply;Solenoid valve, the solenoid valve and place are provided on the aqueduct Manage device connection;And the solenoid valve is provided with number a1, b1, c1 etc., and needs water side corresponding with each.
2. a kind of wisdom water utilities water supply scheduling decision equipment according to claim 1, it is characterised in that: the resource of water supply It can be river, reservoir, reservoir of water factory etc..
3. a kind of wisdom water utilities water supply scheduling decision equipment according to claim 1 or 2, it is characterised in that: the water delivery The solenoid valve being arranged on pipeline is one or more.
4. a kind of wisdom water utilities water supply scheduling decision equipment according to claim 1-3, it is characterised in that: described The bottom of decision-making work platform (1) offers multiple movable chambers (4), and the internal activity of the movable chamber (4) is equipped with moving assembly (5), the moving assembly (5) is by fixed column (6), support rod (7), sleeve (8), wheel mounting base (9) and antiskid plate (10) group At the bottom end of the fixed column (6) and the top of support rod (7) are fixedly connected to spring steel plate (12), two elasticity The junction of steel plate (12) is fixedly installed with attachment base (13), is plugged with and is arranged symmetrically between two attachment bases (13) Link block (14).
5. a kind of wisdom water utilities water supply scheduling decision equipment according to claim 4, it is characterised in that: the attachment base (13) middle part screw thread is plugged with screw rod (15), and the left outer surface of the support rod (7) is fixedly installed with rack gear (17), described The bottom end activity of support rod (7) is plugged on the inside of sleeve (8), is fixedly installed with U at the top of the left outer surface of the sleeve (8) The external front face of type frame (18), the U-shaped frame (18) is equipped with adjustment disk (19).
6. a kind of wisdom water utilities water supply scheduling decision equipment according to claim 1, it is characterised in that: the attachment base Middle part screw thread is plugged with screw rod, and the left outer surface of the support rod is fixedly installed with rack gear, the bottom end activity of the support rod It is plugged on the inside of sleeve.
7. a kind of wisdom water utilities water supply scheduling decision equipment according to claim 1, it is characterised in that: a left side for the sleeve It is fixedly installed with U-shaped frame at the top of side external surface, the external front face of the U-shaped frame is equipped with adjustment disk.
CN201910251223.8A 2019-03-29 2019-03-29 Wisdom water utilities water supply scheduling decision equipment Pending CN109881735A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910251223.8A CN109881735A (en) 2019-03-29 2019-03-29 Wisdom water utilities water supply scheduling decision equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910251223.8A CN109881735A (en) 2019-03-29 2019-03-29 Wisdom water utilities water supply scheduling decision equipment

Publications (1)

Publication Number Publication Date
CN109881735A true CN109881735A (en) 2019-06-14

Family

ID=66935221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910251223.8A Pending CN109881735A (en) 2019-03-29 2019-03-29 Wisdom water utilities water supply scheduling decision equipment

Country Status (1)

Country Link
CN (1) CN109881735A (en)

Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201915611U (en) * 2010-08-31 2011-08-03 中国二十冶集团有限公司 Mobile platform used for installation of transformer in place
CN205180845U (en) * 2015-10-28 2016-04-27 陕西理工学院 Stool with adjustable height
CN205535247U (en) * 2016-03-08 2016-08-31 四川宝利达光电科技有限公司 But height -adjusting's LED lamp
CN205672466U (en) * 2016-06-07 2016-11-09 郑州澍青医学高等专科学校 A kind of dancing teaching barre
CN206030012U (en) * 2016-12-22 2017-03-22 亳州市国一堂中药饮片有限公司 Portable novel traditional chinese medicine slicer
CN206221941U (en) * 2016-11-22 2017-06-06 华仁药业股份有限公司 A kind of air quantity shield auxiliary stand
CN107024762A (en) * 2017-06-21 2017-08-08 刘影 It is a kind of to be easy to mobile high-grade stereoscope
CN107392792A (en) * 2017-08-02 2017-11-24 华北水利水电大学 A kind of water resource dispatching method
CN108005015A (en) * 2017-10-31 2018-05-08 江苏省水利勘测设计研究院有限公司 A kind of water transfer system Water Resources Allocation device and collocation method
CN207438861U (en) * 2017-06-29 2018-06-01 浙江工业职业技术学院 A kind of floor standing type air-conditioner support base easy to remove
CN207518100U (en) * 2017-11-29 2018-06-19 王云涛 A kind of hydraulic engineering easy to remove, which is built, uses power distribution cabinet
CN207574375U (en) * 2017-11-26 2018-07-06 庄淑敏 A kind of environmental protection stable agricultural fog machine
CN108545580A (en) * 2018-06-26 2018-09-18 瑞普兰德电梯有限公司 A kind of shock-damping structure for transport device in elevator
CN108545579A (en) * 2018-06-26 2018-09-18 瑞普兰德电梯有限公司 The apparatus for placing of article in a kind of elevator
CN208123346U (en) * 2018-05-02 2018-11-20 江苏众康塑胶科技有限公司 A kind of damping device of PET slice export pipeline
CN208221466U (en) * 2018-05-23 2018-12-11 皖西学院 A kind of spring lower base for automobile damper based on substep cushion technique
CN109014975A (en) * 2018-08-31 2018-12-18 佛山科学技术学院 A kind of building field cutting equipment
CN109050628A (en) * 2018-08-29 2018-12-21 佟海涛 A kind of multifunction radar transport protective device
CN109056471A (en) * 2018-08-21 2018-12-21 孙磊 A kind of concrete flattening device
CN109163195A (en) * 2018-09-06 2019-01-08 刘四凤 A kind of textile machinery damping adjustment seat
CN208418606U (en) * 2018-08-20 2019-01-22 郭永祥 A kind of mobile LED lamp that stability is high
CN208484702U (en) * 2018-05-09 2019-02-12 湖北京峻汽车零部件有限公司 A kind of dedicated transition car of auto parts and components
CN208601046U (en) * 2018-07-01 2019-03-15 新昌县金瓯新能源科技有限公司 A kind of agricultural livestock guardrail numerical control machine tool

Patent Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201915611U (en) * 2010-08-31 2011-08-03 中国二十冶集团有限公司 Mobile platform used for installation of transformer in place
CN205180845U (en) * 2015-10-28 2016-04-27 陕西理工学院 Stool with adjustable height
CN205535247U (en) * 2016-03-08 2016-08-31 四川宝利达光电科技有限公司 But height -adjusting's LED lamp
CN205672466U (en) * 2016-06-07 2016-11-09 郑州澍青医学高等专科学校 A kind of dancing teaching barre
CN206221941U (en) * 2016-11-22 2017-06-06 华仁药业股份有限公司 A kind of air quantity shield auxiliary stand
CN206030012U (en) * 2016-12-22 2017-03-22 亳州市国一堂中药饮片有限公司 Portable novel traditional chinese medicine slicer
CN107024762A (en) * 2017-06-21 2017-08-08 刘影 It is a kind of to be easy to mobile high-grade stereoscope
CN207438861U (en) * 2017-06-29 2018-06-01 浙江工业职业技术学院 A kind of floor standing type air-conditioner support base easy to remove
CN107392792A (en) * 2017-08-02 2017-11-24 华北水利水电大学 A kind of water resource dispatching method
CN108005015A (en) * 2017-10-31 2018-05-08 江苏省水利勘测设计研究院有限公司 A kind of water transfer system Water Resources Allocation device and collocation method
CN207574375U (en) * 2017-11-26 2018-07-06 庄淑敏 A kind of environmental protection stable agricultural fog machine
CN207518100U (en) * 2017-11-29 2018-06-19 王云涛 A kind of hydraulic engineering easy to remove, which is built, uses power distribution cabinet
CN208123346U (en) * 2018-05-02 2018-11-20 江苏众康塑胶科技有限公司 A kind of damping device of PET slice export pipeline
CN208484702U (en) * 2018-05-09 2019-02-12 湖北京峻汽车零部件有限公司 A kind of dedicated transition car of auto parts and components
CN208221466U (en) * 2018-05-23 2018-12-11 皖西学院 A kind of spring lower base for automobile damper based on substep cushion technique
CN108545580A (en) * 2018-06-26 2018-09-18 瑞普兰德电梯有限公司 A kind of shock-damping structure for transport device in elevator
CN108545579A (en) * 2018-06-26 2018-09-18 瑞普兰德电梯有限公司 The apparatus for placing of article in a kind of elevator
CN208601046U (en) * 2018-07-01 2019-03-15 新昌县金瓯新能源科技有限公司 A kind of agricultural livestock guardrail numerical control machine tool
CN208418606U (en) * 2018-08-20 2019-01-22 郭永祥 A kind of mobile LED lamp that stability is high
CN109056471A (en) * 2018-08-21 2018-12-21 孙磊 A kind of concrete flattening device
CN109050628A (en) * 2018-08-29 2018-12-21 佟海涛 A kind of multifunction radar transport protective device
CN109014975A (en) * 2018-08-31 2018-12-18 佛山科学技术学院 A kind of building field cutting equipment
CN109163195A (en) * 2018-09-06 2019-01-08 刘四凤 A kind of textile machinery damping adjustment seat

Similar Documents

Publication Publication Date Title
CN201224900Y (en) Intelligent water-supply device
CN107274303A (en) City heat supply energy consumption wisdom management and control technology platform
CN208975578U (en) A kind of radionuclide liquid medicine dilution packing instrument
CN109881735A (en) Wisdom water utilities water supply scheduling decision equipment
CN202500710U (en) Domestic waste water hydroelectric power apparatus
CN209099432U (en) A kind of device with unlatching pump discharge operating valve function
CN105204467A (en) Low-energy-consumption water resource monitoring system based on technology of Internet of things
CN201167250Y (en) Power supply for electric control valve for controlling liquid flow
CN202534149U (en) Intelligent district system
CN211044522U (en) Wisdom traffic guiding device
CN201593998U (en) Angular-shaped water meter based on ZigBee wireless technology
CN206626347U (en) A kind of intelligent grid dispatches system
CN201195017Y (en) Water fire extinguishing system of transforming plant with integrated structure
CN204137169U (en) A kind of single wheel balance truck pedal type auxiliary balance device
CN205179979U (en) Safe energy -conserving water feeder
CN211456266U (en) Low-voltage powerless compensation cabinet convenient to install
CN212256747U (en) A multi-functional indicating device for landscape garden is vwatched
CN203051948U (en) Novel throttling faucet
CN210238341U (en) Road diversion guiding device for highway engineering
CN209461956U (en) A kind of left and right adjusting trailing arm in piping lane
CN108517922A (en) A kind of energy-saving water supply system
CN209463073U (en) A kind of water-saving spray device of nursery
CN205062914U (en) Inverter type does not have negative pressure water supply equipment
CN213924286U (en) Intelligent water saving system
CN213955250U (en) 5g wisdom lamp pole that stability is strong

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination