CN109871329A CN201910146692.3A CN201910146692A CN109871329A CN 109871329 A CN109871329 A CN 109871329A CN 201910146692 A CN201910146692 A CN 201910146692A CN 109871329 A CN109871329 A CN 109871329A
Authority
CN
China
Prior art keywords
whole machine
cabinet
machine cabinet
test
centralized management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910146692.3A
Other languages
Chinese (zh)
Inventor
周磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Wave Intelligent Technology Co Ltd
Original Assignee
Suzhou Wave Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Wave Intelligent Technology Co Ltd filed Critical Suzhou Wave Intelligent Technology Co Ltd
Priority to CN201910146692.3A priority Critical patent/CN109871329A/en
Publication of CN109871329A publication Critical patent/CN109871329A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Power Sources (AREA)

Abstract

The present invention provides a kind of method and system of whole machine cabinet server progress multinode AC test, and cabinet centralized management unit R MC control all nodes of whole machine cabinet are switched on simultaneously and shut down simultaneously;After shutdown, cabinet manages all power-supply unit PSU power-off of unit R MC control whole machine cabinet concentratedly;Before booting, all power-supply unit PSU of cabinet centralized management unit R MC control whole machine cabinet are powered on.System includes: that test script starting module, whole machine cabinet node starting module, whole machine cabinet booting determining module, whole machine cabinet node shutdown module, whole machine cabinet shutdown determining module, whole machine cabinet PSU power-off modular, AC testing time judgment module and whole machine cabinet PSU power on module.The present invention realizes that the automation of the multiple node AC tests of whole machine cabinet server greatly reduces the manual operation time, reduce artificial test errors for big density server;Meanwhile test log is automatically grabbed, testing efficiency is high, and precision is big.

Description

A kind of whole machine cabinet server carries out the method and system of multinode AC test
Technical field
The invention belongs to server stability test fields, and in particular to a kind of whole machine cabinet server progress multinode AC survey The method and system of examination.
Background technique
RMC (Rack Management Controller) cabinet manages unit concentratedly, and SmartRack breaches traditional clothes The operation management architectural schemes of device of being engaged in pass through RMC (Rack Management with whole machine cabinet rwan management solution RWAN as a whole Controller) centralized management unit realize whole system resource implementing monitoring, RMC be SmartRack information inquiry and The platform of condition monitoring has the positioning of node assets, power consumption monitoring, heat dissipation three big basic functions of regulation.Using centralized management SmartRack can be by RMC to the unified monitoring and management of each module of whole cabinet, node, power supply, one mesh of configuration information So, batch switching on and shutting down can also be carried out, temperature, restarted, power consumption control, rotation speed of the fan automatic/hand adjusts, the healthy shape of fan Condition, function.The visualized management software that SmartRack design is aimed in collocation, can easily realize summary intelligent management.
BMC is the abbreviation of Baseboard Management Controller, and baseboard management controller supports industry mark Quasi- IPMI specification.The specification describes the management function being built on mainboard.These functions include: local and remote examine Disconnected, console support, configuration management, hardware management and troubleshooting.
PSU is the abbreviation of power supply unit, power-supply unit, for the node confession to whole machine cabinet server Electricity.
AC power test is to measure one of the important indicator of server stability, and prior art process is all to grasp manually Make, and whole machine cabinet server node density is big, and it is long to carry out the solid-state disk cold restart testing time, and is not able to achieve automatic test.
This is the deficiencies in the prior art, therefore, in view of the above-mentioned drawbacks in the prior art, provides a kind of whole machine cabinet server The method and system for carrying out multinode AC test, are necessary.
Summary of the invention
Manual operation is tested for the above-mentioned existing whole machine cabinet server A C of the prior art, the testing time is long and fails reality The defect of existing automatic test, the present invention provide a kind of method and system of whole machine cabinet server progress multinode AC test, with Solve above-mentioned technical problem.
In a first aspect, the present invention provides a kind of method that whole machine cabinet server carries out multinode AC test, cabinet concentrate tube Reason unit R MC control all nodes of whole machine cabinet are switched on simultaneously and shut down simultaneously;
After shutdown, cabinet manages all power-supply unit PSU power-off of unit R MC control whole machine cabinet concentratedly;
Before booting, all power-supply unit PSU of cabinet centralized management unit R MC control whole machine cabinet are powered on.
Further, specifically comprise the following steps:
S1. cabinet centralized management unit R MC runs test script;
S2. cabinet centralized management unit R MC automatically controls all nodes of whole machine cabinet and is switched on simultaneously;
S3. after cabinet centralized management unit R MC waits the first set period of time, judge whether that all nodes of whole machine cabinet have been opened Machine;
If so, after cabinet centralized management unit R MC waits the second set period of time, all node shutdown of control whole machine cabinet;
S4. after cabinet centralized management unit R MC waits third set period of time, judge whether that all nodes of whole machine cabinet have closed Machine;
If so, all power-supply unit PSU power-off of cabinet centralized management unit R MC control whole machine cabinet;
S5. cabinet centralized management unit R MC judges whether to reach setting AC testing time;
If it is not, controlling all power-supply units of whole machine cabinet after cabinet centralized management unit R MC waits the 4th set period of time PSU is powered on;Return step S2.Cabinet manages time that unit R MC is powered on and powered off by controlling power-supply unit PSU concentratedly Number realizes the AC test of all nodes of whole machine cabinet server.
Further, in step S3, if there are also nodes to be not keyed up for whole machine cabinet, be switched on time-out, and test is exited.Whole machine cabinet clothes It is engaged in device AC test there are node booting time-out, test can not carry out, and test is exited.
Further, in step S4, if there are also nodes not to shut down for whole machine cabinet, time-out of shutting down, test is exited.
There are node shutdown time-out in whole machine cabinet server A C test, test can not be carried out, and test is exited.
Further, in step S5, if reaching setting AC testing time, test log is collected, test terminates.
Reach AC testing time, AC test terminates.
Further, specific step is as follows by step S2:
S21. cabinet manages unit R MC concentratedly and sends first control signal from trend baseboard management controller BMC;
S22.BMC baseboard management controller sends starting-up signal to all nodes of whole machine cabinet according to first control signal.Substrate pipe Manage the controlled all nodes progress switching on and shutting down control with cabinet centralized management unit R MC to whole machine cabinet server of controller BMC.
Further, specific step is as follows by step S3:
S31. after cabinet centralized management unit R MC waits the first set period of time, whole machine cabinet system log is obtained, obtains substrate pipe Manage controller BMC log;
S32. cabinet centralized management unit R MC judges whether according to whole machine cabinet system log and baseboard management controller BMC log All nodes of whole machine cabinet have been switched on;
S33. if so, being sent after cabinet centralized management unit R MC the second set period of time of waiting to baseboard management controller BMC Second control signal;
S34. baseboard management controller BMC sends off signal to all nodes of whole machine cabinet according to second control signal;
Specific step is as follows by step S4:
S41. after cabinet centralized management unit R MC waits third set period of time, whole machine cabinet system log is obtained, obtains substrate pipe Manage controller BMC log;
S42. cabinet centralized management unit R MC judges whether complete machine according to whole machine cabinet system log and baseboard management controller BMC All nodes of cabinet have shut down;
S43. if so, cabinet, which manages unit R MC concentratedly, sends third control signal to baseboard management controller;
S44. baseboard management controller BMC controls signal and sends to all PSU power-supply unit PSU of whole machine cabinet and breaks according to third Electric signal.Whole machine cabinet system log and baseboard management controller BMC log record baseboard management controller BMC to whole machine cabinet service The switching on and shutting down control action of device node and the on-off state of whole machine cabinet server node.
Further, specific step is as follows by step S5:
S51. cabinet centralized management unit R MC obtains RMC log, is judged whether to reach setting AC testing time according to RMC log;
S52. if it is not, sending the 4th to baseboard management controller BMC after cabinet centralized management unit the 4th set period of time of waiting Control signal;
S53. baseboard management controller BMC is according to the 4th control signal in all power-supply unit PSU transmissions of whole machine cabinet Electric signal;Return step S21.Storage setting AC testing time and current AC testing time in RMC log.
Second aspect, the present invention provide a kind of system that whole machine cabinet server carries out multinode AC test, comprising:
Test script starting module, for configuring cabinet centralized management unit R MC operation test script;
Whole machine cabinet node starting module automatically controls all nodes of whole machine cabinet simultaneously for configuring cabinet centralized management unit R MC Booting;
Whole machine cabinet be switched on determining module, for configure cabinet centralized management unit R MC wait the first set period of time after when, judgement Whether all nodes have been switched on;
Whole machine cabinet node shutdown module, for when all nodes of whole machine cabinet have been switched on, configuration cabinet to manage unit R MC concentratedly After waiting the second set period of time, all node shutdown of control whole machine cabinet;
Whole machine cabinet shutdown determining module, after configuring cabinet centralized management unit R MC waiting third set period of time, judgement is No all nodes of whole machine cabinet have shut down;
Whole machine cabinet PSU power-off modular, for when all nodes of whole machine cabinet have shut down, configuration cabinet to manage unit R MC concentratedly Control all power-supply unit PSU power-off of whole machine cabinet;
AC testing time judgment module judges whether to reach setting AC testing time for configuring cabinet centralized management unit R MC;
Whole machine cabinet PSU powers on module, for when not up to setting AC testing time, configuration cabinet to manage unit R MC etc. concentratedly After the 4th set period of time, all power-supply unit PSU for controlling whole machine cabinet are powered on.
Further, further includes:
Module is exited in test, and for when whole machine cabinet is not shut down there are also node, determining shutdown time-out, test is exited;Alternatively, complete machine When cabinet is not keyed up there are also node, booting time-out is judged, test is exited;Alternatively, reaching setting AC testing time, test day is collected Will, test are exited.
The beneficial effects of the present invention are,
The present invention manages unit R MC concentratedly to substrate manager BMC transmission signal, control whole machine cabinet clothes by automatically controlling cabinet The PSU's of business device powering on and powering off, to realize the automation of the multiple node AC tests of whole machine cabinet server, big density is taken Business device, greatly reduces the manual operation time, reduces artificial test errors;Meanwhile test log is automatically grabbed, for testing Analysis, testing efficiency is high, and precision is big.
In addition, design principle of the present invention is reliable, structure is simple, has very extensive application prospect.
It can be seen that compared with prior art, the present invention implementing with substantive distinguishing features outstanding and significant progress Beneficial effect be also obvious.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, for those of ordinary skill in the art Speech, without creative efforts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the schematic flow chart of the method for the embodiment of the present invention 1.
Fig. 2 is the schematic flow chart of the method for the embodiment of the present invention 2.
Fig. 3 is the schematic block diagram of the device of the embodiment of the present invention 3.
In figure, 1- test script starting module;2- whole machine cabinet node starting module;3- whole machine cabinet booting determining module;4- Whole machine cabinet node shutdown module;5- whole machine cabinet shutdown determining module;6- whole machine cabinet PSU power-off modular;The judgement of 7-AC testing time Module;8- whole machine cabinet PSU powers on module;Module is exited in 9- test.
Specific embodiment
Technical solution in order to enable those skilled in the art to better understand the present invention, below in conjunction with of the invention real The attached drawing in example is applied, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described implementation Example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without making creative work, all should belong to protection of the present invention Range.
Embodiment 1:
A kind of method that whole machine cabinet server carries out multinode AC test, it is all that cabinet manages unit R MC control whole machine cabinet concentratedly Node is switched on simultaneously and shuts down simultaneously;
After shutdown, cabinet manages all power-supply unit PSU power-off of unit R MC control whole machine cabinet concentratedly;
Before booting, all power-supply unit PSU of cabinet centralized management unit R MC control whole machine cabinet are powered on;
As shown in Figure 1, specifically comprising the following steps:
S1. cabinet centralized management unit R MC runs test script;
S2. cabinet centralized management unit R MC automatically controls all nodes of whole machine cabinet and is switched on simultaneously;
S3. after cabinet centralized management unit R MC waits the first set period of time, judge whether that all nodes of whole machine cabinet have been opened Machine;
If so, after cabinet centralized management unit R MC waits the second set period of time, all node shutdown of control whole machine cabinet;
If it is not, the time-out that is then switched on, test are exited;
S4. after cabinet centralized management unit R MC waits third set period of time, judge whether that all nodes of whole machine cabinet have closed Machine;
If so, all power-supply unit PSU power-off of cabinet centralized management unit R MC control whole machine cabinet;
If it is not, time-out of then shutting down, test are exited;
S5. cabinet centralized management unit R MC judges whether to reach setting AC testing time;
If it is not, controlling all power-supply units of whole machine cabinet after cabinet centralized management unit R MC waits the 4th set period of time PSU is powered on;Return step S2;
If so, collecting test log, test terminates.
Embodiment 2:
As shown in Fig. 2, the present invention provides a kind of method that whole machine cabinet server carries out multinode AC test, specific steps are such as Under:
S1. cabinet centralized management unit R MC runs test script;
S21. cabinet manages unit R MC concentratedly and sends first control signal from trend baseboard management controller BMC;
S22.BMC baseboard management controller sends starting-up signal to all nodes of whole machine cabinet according to first control signal;
S31. after cabinet centralized management unit R MC waits the first set period of time, whole machine cabinet system log is obtained, obtains substrate pipe Manage controller BMC log;
S32. cabinet centralized management unit R MC judges whether according to whole machine cabinet system log and baseboard management controller BMC log All nodes of whole machine cabinet have been switched on;
S33. if so, being sent after cabinet centralized management unit R MC the second set period of time of waiting to baseboard management controller BMC Second control signal;
S34. baseboard management controller BMC sends off signal to all nodes of whole machine cabinet according to second control signal;
S41. after cabinet centralized management unit R MC waits third set period of time, whole machine cabinet system log is obtained, obtains substrate pipe Manage controller BMC log;
S42. cabinet centralized management unit R MC judges whether complete machine according to whole machine cabinet system log and baseboard management controller BMC All nodes of cabinet have shut down;
S43. if so, cabinet, which manages unit R MC concentratedly, sends third control signal to baseboard management controller;
S44. baseboard management controller BMC controls signal and sends to all PSU power-supply unit PSU of whole machine cabinet and breaks according to third Electric signal;
S51. cabinet centralized management unit R MC obtains RMC log, is judged whether to reach setting AC testing time according to RMC log;
S52. if it is not, sending the 4th to baseboard management controller BMC after cabinet centralized management unit the 4th set period of time of waiting Control signal;
S53. baseboard management controller BMC is according to the 4th control signal in all power-supply unit PSU transmissions of whole machine cabinet Electric signal;Return step S21.
Embodiment 3:
As shown in figure 3, the present invention provides a kind of system that whole machine cabinet server carries out multinode AC test, comprising:
Test script starting module 1, for configuring cabinet centralized management unit R MC operation test script;
Whole machine cabinet node starting module 2 automatically controls all nodes of whole machine cabinet simultaneously for configuring cabinet centralized management unit R MC Booting;
Whole machine cabinet be switched on determining module 3, for configure cabinet centralized management unit R MC wait the first set period of time after when, sentence It is disconnected that whether all nodes have been switched on;
Whole machine cabinet node shutdown module 4, for when all nodes of whole machine cabinet have been switched on, configuration cabinet to manage unit concentratedly After RMC waits the second set period of time, all node shutdown of control whole machine cabinet;
Whole machine cabinet shutdown determining module 5, after configuring cabinet centralized management unit R MC waiting third set period of time, judgement Whether all nodes of whole machine cabinet have shut down;
Whole machine cabinet PSU power-off modular 6, for when all nodes of whole machine cabinet have shut down, configuration cabinet to manage unit R MC concentratedly Control all power-supply unit PSU power-off of whole machine cabinet;
AC testing time judgment module 7 judges whether to reach setting AC test time for configuring cabinet centralized management unit R MC Number;
Whole machine cabinet PSU powers on module 8, for when not up to setting AC testing time, configuration cabinet to manage unit R MC etc. concentratedly After the 4th set period of time, all power-supply unit PSU for controlling whole machine cabinet are powered on;
Module 9 is exited in test, and for when whole machine cabinet is not shut down there are also node, determining shutdown time-out, test is exited;Alternatively, whole When cabinet is not keyed up there are also node, booting time-out is judged, test is exited;Alternatively, reaching setting AC testing time, then test is collected Log, test terminate.
Although by reference to attached drawing and combining the mode of preferred embodiment to the present invention have been described in detail, the present invention It is not limited to this.Without departing from the spirit and substance of the premise in the present invention, those of ordinary skill in the art can be to the present invention Embodiment carry out various equivalent modifications or substitutions, and these modifications or substitutions all should in covering scope of the invention/appoint What those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, answer It is included within the scope of the present invention.Therefore, protection scope of the present invention is answered described is with scope of protection of the claims It is quasi-.

Claims (10)

1. a kind of method that whole machine cabinet server carries out multinode AC test, which is characterized in that cabinet manages unit R MC control concentratedly All nodes of whole machine cabinet processed are switched on simultaneously and shut down simultaneously;
After shutdown, cabinet manages all power-supply unit PSU power-off of unit R MC control whole machine cabinet concentratedly;
Before booting, all power-supply unit PSU of cabinet centralized management unit R MC control whole machine cabinet are powered on.
2. the method that a kind of whole machine cabinet server as described in claim 1 carries out multinode AC test, which is characterized in that specific Include the following steps:
S1. cabinet centralized management unit R MC runs test script;
S2. cabinet centralized management unit R MC automatically controls all nodes of whole machine cabinet and is switched on simultaneously;
S3. after cabinet centralized management unit R MC waits the first set period of time, judge whether that all nodes of whole machine cabinet have been opened Machine;
If so, after cabinet centralized management unit R MC waits the second set period of time, all node shutdown of control whole machine cabinet;
S4. after cabinet centralized management unit R MC waits third set period of time, judge whether that all nodes of whole machine cabinet have closed Machine;
If so, all power-supply unit PSU power-off of cabinet centralized management unit R MC control whole machine cabinet;
S5. cabinet centralized management unit R MC judges whether to reach setting AC testing time;
If it is not, controlling all power-supply units of whole machine cabinet after cabinet centralized management unit R MC waits the 4th set period of time PSU is powered on;Return step S2.
3. the method that a kind of whole machine cabinet server as claimed in claim 2 carries out multinode AC test, which is characterized in that step In S3, if there are also nodes to be not keyed up for whole machine cabinet, be switched on time-out, and test is exited.
4. the method that a kind of whole machine cabinet server as claimed in claim 2 carries out multinode AC test, which is characterized in that step In S4, if there are also nodes not to shut down for whole machine cabinet, time-out of shutting down, test is exited.
5. the method that a kind of whole machine cabinet server as claimed in claim 2 carries out multinode AC test, which is characterized in that step In S5, if reaching setting AC testing time, test log is collected, test terminates.
6. the method that a kind of whole machine cabinet server as claimed in claim 2 carries out multinode AC test, which is characterized in that step Specific step is as follows by S2:
S21. cabinet manages unit R MC concentratedly and sends first control signal from trend baseboard management controller BMC;
S22.BMC baseboard management controller sends starting-up signal to all nodes of whole machine cabinet according to first control signal.
7. the method that a kind of whole machine cabinet server as claimed in claim 6 carries out multinode AC test, which is characterized in that step Specific step is as follows by S3:
S31. after cabinet centralized management unit R MC waits the first set period of time, whole machine cabinet system log is obtained, obtains substrate pipe Manage controller BMC log;
S32. cabinet centralized management unit R MC judges whether according to whole machine cabinet system log and baseboard management controller BMC log All nodes of whole machine cabinet have been switched on;
S33. if so, being sent after cabinet centralized management unit R MC the second set period of time of waiting to baseboard management controller BMC Second control signal;
S34. baseboard management controller BMC sends off signal to all nodes of whole machine cabinet according to second control signal;
Specific step is as follows by step S4:
S41. after cabinet centralized management unit R MC waits third set period of time, whole machine cabinet system log is obtained, obtains substrate pipe Manage controller BMC log;
S42. cabinet centralized management unit R MC judges whether complete machine according to whole machine cabinet system log and baseboard management controller BMC All nodes of cabinet have shut down;
S43. if so, cabinet, which manages unit R MC concentratedly, sends third control signal to baseboard management controller;
S44. baseboard management controller BMC controls signal and sends to all PSU power-supply unit PSU of whole machine cabinet and breaks according to third Electric signal.
8. the method that a kind of whole machine cabinet server as claimed in claim 7 carries out multinode AC test, which is characterized in that step Specific step is as follows by S5:
S51. cabinet centralized management unit R MC obtains RMC log, is judged whether to reach setting AC testing time according to RMC log;
S52. if it is not, sending the 4th to baseboard management controller BMC after cabinet centralized management unit the 4th set period of time of waiting Control signal;
S53. baseboard management controller BMC is according to the 4th control signal in all power-supply unit PSU transmissions of whole machine cabinet Electric signal;Return step S21.
9. the system that a kind of whole machine cabinet server carries out multinode AC test characterized by comprising
Test script starting module (1), for configuring cabinet centralized management unit R MC operation test script;
Whole machine cabinet node starting module (2), it is same for configuring cabinet centralized management unit R MC automatic control all nodes of whole machine cabinet Shi Kaiji;
Whole machine cabinet be switched on determining module (3), for configure cabinet centralized management unit R MC wait the first set period of time after when, Judge whether that all nodes have been switched on;
Whole machine cabinet node shuts down module (4), for when all nodes of whole machine cabinet have been switched on, configuration cabinet to manage unit concentratedly After RMC waits the second set period of time, all node shutdown of control whole machine cabinet;
Whole machine cabinet is shut down determining module (5), after configuring cabinet centralized management unit R MC waiting third set period of time, is sentenced It is disconnected that whether all nodes of whole machine cabinet have shut down;
Whole machine cabinet PSU power-off modular (6), for when all nodes of whole machine cabinet have shut down, configuration cabinet to manage unit concentratedly RMC controls all power-supply unit PSU power-off of whole machine cabinet;
AC testing time judgment module (7) judges whether to reach setting AC test time for configuring cabinet centralized management unit R MC Number;
Whole machine cabinet PSU powers on module (8), for when not up to setting AC testing time, configuration cabinet to manage unit R MC concentratedly After waiting the 4th set period of time, all power-supply unit PSU for controlling whole machine cabinet are powered on.
10. the system that a kind of whole machine cabinet server as claimed in claim 9 carries out multinode AC test, which is characterized in that also Include:
Module (9) are exited in test, and for when whole machine cabinet is not shut down there are also node, determining shutdown time-out, test is exited;Alternatively, When whole machine cabinet is not keyed up there are also node, booting time-out is judged, test is exited;Alternatively, reaching setting AC testing time, then survey is collected Log is tried, test terminates.
CN201910146692.3A 2019-02-27 2019-02-27 A kind of whole machine cabinet server carries out the method and system of multinode AC test Withdrawn CN109871329A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910146692.3A CN109871329A (en) 2019-02-27 2019-02-27 A kind of whole machine cabinet server carries out the method and system of multinode AC test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910146692.3A CN109871329A (en) 2019-02-27 2019-02-27 A kind of whole machine cabinet server carries out the method and system of multinode AC test

Publications (1)

Publication Number Publication Date
CN109871329A true CN109871329A (en) 2019-06-11

Family

ID=66919365

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910146692.3A Withdrawn CN109871329A (en) 2019-02-27 2019-02-27 A kind of whole machine cabinet server carries out the method and system of multinode AC test

Country Status (1)

Country Link
CN (1) CN109871329A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111488250A (en) * 2020-04-17 2020-08-04 苏州浪潮智能科技有限公司 High-density multi-node server testing method, system, terminal and storage medium
CN111983292A (en) * 2020-07-17 2020-11-24 苏州浪潮智能科技有限公司 PSU voltage detection system based on server test

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111488250A (en) * 2020-04-17 2020-08-04 苏州浪潮智能科技有限公司 High-density multi-node server testing method, system, terminal and storage medium
CN111983292A (en) * 2020-07-17 2020-11-24 苏州浪潮智能科技有限公司 PSU voltage detection system based on server test
CN111983292B (en) * 2020-07-17 2022-12-16 苏州浪潮智能科技有限公司 PSU voltage detection system based on server test

Similar Documents

Publication Publication Date Title
CN100440084C (en) Apparatus for controlling standby power
CN102132523B (en) Device power management using network connections
CN106055438A (en) Method and system for rapidly locating anomaly of memory banks on mainboard
CN104238480A (en) Cabinet server BMC startup and shutdown control system and method
CN109871329A (en) A kind of whole machine cabinet server carries out the method and system of multinode AC test
WO2014120165A1 (en) Unified control of an electronic control system and a facility control system
CN106055440B (en) A kind of test method and system for realizing server exception power-off by BMC
CN110008070A (en) A kind of AEP memory AC test method powered off at random based on power supervisor
CN104899120A (en) Server stability testing method based on BMC (baseboard management controller) startup and shutdown functions
CN109800117A (en) A kind of DC automated testing method and system based on IPMI
CN105024849A (en) Method for batch operation of high-density cabinet server on each node BMC
CN113746501B (en) Test method for evaluating high-speed power line carrier HPLC deepening application function
CN103412203B (en) Motor variable-frequency driver ageing tester and method of testing thereof
CN109581911A (en) A kind of fan of the dual control storage equipment during booting powers on surely controls method and device
CN107612775A (en) A kind of node two level connects the DC method of testings and system of server
CN105389242A (en) Method for achieving batch acquisition of server information of whole cabinet
US20180233947A1 (en) Device operating state modification with uninterruptible power source
CN103576819B (en) Server starts control system, method and device on a large scale
CN110061532A (en) A kind of unattended intelligent charging cabinet for small device
CN209297143U (en) A kind of abnormality monitoring system
CN109840186A (en) A kind of data center is health management system arranged and method
CN101741577A (en) Method and system for testing baseboard management controller
CN108650132A (en) A kind of cabinet power supply stability detection method, device, equipment and storage medium
CN116610430A (en) Method for realizing electrified operation and maintenance of processor and server system
CN116033725A (en) Control device, system and method for liquid cooling system of data machine room

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190611

WW01 Invention patent application withdrawn after publication