- Prior art keywords
- hole
- electrical verification
- earthing tool
- clamping portion
- gag lever
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Distribution Board (AREA)
- Electric Cable Installation (AREA)
Abstract
The present invention discloses a kind of power construction grounded monitoring system and monitoring method, background monitoring terminal is set, GPS chip is set on earthing tool, background monitoring terminal can monitor the location information of earthing tool in real time, to supervise the earthing tool in work progress, avoid omitting;Earthing tool of the invention can also real-time monitoring power equipment electrification situation, and can be shown in background monitoring terminal, when dismantling earthing tool, can first ensure power equipment power failure, to prevent electrification disassembly, cause security risk.
Description
Technical field
The present invention relates to earthing or grounding means, and in particular to a kind of grounded monitoring system for power construction.
Background technique
Earthing or grounding means is the necessary equipment in power construction, needs for power equipment to be grounded in work progress, in order to avoid cause to set
Standby damage or the personal safety for jeopardizing staff.But multiple earthing tools can be generally used in work progress, be easy to cause something lost
Leakage, is not easy to unified supervision.
Summary of the invention
To solve the above problems, the present invention provides a kind of novel power construction grounded monitoring system and monitoring method.
The technical scheme is that a kind of power construction grounded monitoring system, comprising: earthing tool and background monitoring are whole
It holds (500);
Microprocessor (400), GPS chip (402), wireless communication chips, storage chip (401), electricity are provided on earthing tool
Source switch (403);The GPS chip (402), wireless communication chips, storage chip (401), power switch (403) respectively with it is micro-
Processor (400) electrical connection;Module (404) communicates microprocessor (400) with background monitoring terminal (500) by wireless communication;
Background monitoring terminal (500) includes:
Project under construction creates module (501): for establishing project under construction, remarks project under construction information;
Earthing tool remarks module (502): for being grounded work used in remarks project under construction in the project under construction of foundation
Has quantity and earthing tool information;
Map import modul (503): for importing map in the project under construction of foundation;
Map refresh module (504): for refreshing map, position and the earthing tool of used earthing tool are shown on map
Information.
Further, the earthing tool includes: jaw (101), insulating bar (301) and ground line (201);Jaw
(101) ground line exit is provided on, ground line (201) is connect by the ground line exit with jaw (101);
The jaw (101) includes upper head plate (110), bottom plate (140), side plate (120) and movable plate (130);Upper head plate
(110) setting is arranged in side plate (120) upper end, bottom plate (140) in side plate (120) lower end;Side plate (120) medial surface is provided with
Sliding rail;Movable plate (130) side is slidably connected by sliding rail with side plate (120);
The upper head plate (110) includes upper clamping portion (115) and upper electrical verification portion (111), upper clamping portion (115) and upper electrical verification portion
(111) formation is ladder-like, and upper electrical verification portion (111) is higher than upper clamping portion (115);
The movable plate (130) includes lower clamping portion (138) and lower electrical verification portion (132), lower clamping portion (138) and lower electrical verification portion
(132) formation is ladder-like, and upper electrical verification portion (111) is lower than upper clamping portion (115);
It is provided in lower electrical verification portion (132) the first gag lever post (1341), first through hole, lower card is provided on lower clamping portion (138)
Socket part (138) is through on the first gag lever post (1341) by first through hole set;
Clamping groove (113) are provided on upper clamping portion (115) and lower clamping portion (138);It is provided on upper electrical verification portion (111)
Mutual inductance iron core (114) is provided with the lower mutual inductance iron core being adapted to the upper mutual inductance iron core (114) in lower electrical verification portion (132)
(133);
The second through-hole for being provided on bottom plate (140) below lower clamping portion (138) and it is located at below lower electrical verification portion (132)
Third through-hole;Lower clamping portion (138) lower end is connected with first support bar (1361), and it is logical that first support bar (1361) passes through second
Hole, and connect with the second through hole whorl;First support bar (1361) lower end is connected with cross bar (139);The setting of cross bar (139) lower end
Have support tube (137), and be provided with fourth hole on cross bar (139), fourth hole is connected to support tube (137);Fourth hole
Immediately below third through-hole;
The insulating bar (301) and support tube (137) are detachably clamped, and insulating bar (301) is hollow structure, in the hollow structure
It inserts a motion bar (320), the handle (310) of insulating bar (301) outside, insulating bar are stretched out in motion bar (320) lower end connection one
(301) handle slip draw-in groove (330) are provided on;When motion bar (320) moves up, passes through support tube (137) and third is logical
Hole resists lower electrical verification portion (132);
Further include: current detecting conducting wire, signal conditioning circuit, alarm;Current detecting conducting wire is wrapped in lower mutual inductance iron core (133)
On, current detecting conducting wire is electrically connected with signal conditioning circuit input terminal, and signal conditioning circuit output end and microprocessor (400) are defeated
Enter end electrical connection, microprocessor (400) output end is electrically connected with alarm.
Further, upper head plate (110) further includes upper reinforcing portion (112);Upper reinforcing portion (112) and upper clamping portion (115)
It is symmetricly set on electrical verification portion (111) two sides;
Movable plate (130) further includes lower reinforcing portion (131);Lower reinforcing portion (131) is symmetricly set on down with lower clamping portion (138) and tests
Electric portion (132) two sides;
Clamping groove (113) are provided in upper reinforcing portion (112) and lower reinforcing portion (131).
Further, it is additionally provided with the second gag lever post (134) in lower electrical verification portion (132), is provided on lower reinforcing portion (131)
Fifth hole, lower fixed part are through on the second gag lever post (134) by fifth hole set.
Further, the 6th through-hole being additionally provided on bottom plate (140) below lower reinforcing portion (131);
Lower reinforcing portion (131) lower end is connected with second support bar (136), and second support bar (136) passes through the 6th through-hole, and with the
The connection of six through hole whorls;Second support bar (136) lower end connects cross bar (139).
Further, limited location snap ring (135) are provided on the first gag lever post (1341) and the second gag lever post (134).
Further, third gag lever post and the 4th gag lever post (141), lower clamping portion are additionally provided on bottom plate (140)
(138) the 7th through-hole is also set up on, is additionally provided with the 8th through-hole on lower reinforcing portion (131);Lower clamping portion (138) is logical by the 7th
Hole set is across third gag lever post, and lower reinforcing portion (131) is by the 8th through-hole set across the 4th gag lever post (141).
Further, the band telecommunications of power equipment where earthing tool is also shown on the map of map refresh module (504)
Breath.
The present invention also provides a kind of power constructions to be grounded monitoring method, comprising the following steps:
Background monitoring terminal (500) establishes project under construction, remarks project under construction information;
Earthing tool quantity used in the remarks project under construction and earthing tool information in established project under construction;
Map is imported in the project under construction established;
Earthing tool is mounted into power equipment, and turns on the power switch (403), earthing tool continues to monitor charged electric power apparatus
Situation;
Background monitoring terminal (500) refreshes map, and position, earthing tool information and the ground connection work of earthing tool are shown on map
Charged electric power apparatus situation where tool.
Background monitoring terminal, earthing tool is arranged in power construction grounded monitoring system provided by the invention and monitoring method
Upper setting GPS chip, background monitoring terminal can monitor the location information of earthing tool in real time, so as to the ground connection in work progress
Tool is supervised, and avoids omitting;Earthing tool of the invention can also real-time monitoring power equipment electrification situation, and can be rear
Platform monitor terminal is shown, when dismantling earthing tool, can first ensure power equipment power failure, to prevent electrification disassembly, causes safety hidden
Suffer from.
Detailed description of the invention
Fig. 1 is one schematic illustration of embodiment.
Fig. 2 is one earthing tool structural schematic diagram of embodiment.
Fig. 3 is one upper head plate of embodiment and movable plate structural schematic diagram.
Fig. 4 is one insulating bar structural schematic diagram of embodiment.
In figure, 101- jaw, 201- ground line, 301- insulating bar, 110- upper head plate, 120- side plate, 130- movable plate,
140- bottom plate, the upper electrical verification portion 111-, the upper reinforcing portion of 112-, 113- clamping groove, the upper mutual inductance iron core of 114-, the upper clamping portion 115-,
Reinforcing portion under 131-, electrical verification portion under 132-, mutual inductance iron core under 133-, the first gag lever post of 1341-, the second gag lever post of 134-, 135-
Limited location snap ring, 1361- first support bar, 136- second support bar, 137- support tube, clamping portion under 138-, 139- cross bar, 141-
4th gag lever post, 310- handle, 320- motion bar, 330- handle slip draw-in groove, 400- microprocessor, 401- storage chip,
402-GPS chip, 403- power switch, 404- wireless communication module, 500- background monitoring terminal, 501- project under construction newly model
Block, 502- earthing tool remarks module, 503- map import modul, 504- map refresh module.
Specific embodiment
The present invention will be described in detail with reference to the accompanying drawing and by specific embodiment, and following embodiment is to the present invention
Explanation, and the invention is not limited to following implementation.
Embodiment one
As shown in Figure 1, power construction grounded monitoring system provided in this embodiment, including earthing tool and background monitoring terminal
500。
Microprocessor 400, GPS chip 402, wireless communication chips, storage core are provided on the earthing tool of the present embodiment
Piece 401, power switch 403.GPS chip 402, wireless communication module 404, storage chip 401, power switch 403 respectively with it is micro-
Processor 400 is electrically connected;Module 404 communicates microprocessor 400 with background monitoring terminal 500 by wireless communication.When ground connection work
When tool safety is mounted on power equipment, 403 are turned on the power switch, microprocessor 400 transmits the location information of earthing tool
To background monitoring terminal 500, for its monitoring.It should be noted that earthing tool information is stored in storage chip 401, such as
Earthing tool number, earthing tool information can be transmitted to background monitoring terminal 500 by microprocessor 400, to monitor.
The background monitoring terminal 500 of the present embodiment includes:
Project under construction creates module 501: for establishing project under construction, remarks project under construction information;Project under construction information includes applying
Work title, construction time etc., can remarks as needed.
Earthing tool remarks module 502: for being grounded used in remarks project under construction in the project under construction of foundation
Number of tools and earthing tool information;Earthing tool information includes earthing tool number, so as to used in work progress
Earthing tool is supervised.
Map import modul 503: for importing map in the project under construction of foundation.
Map refresh module 504: for refreshing map, position and the ground connection work of used earthing tool are shown on map
Has information.After microprocessor 400 on earthing tool works, location information and earthing tool information are sent to background monitoring end
End 500 refreshes map, can show the earthing tool to work.
It should be noted that the earthing tool of the present embodiment can also real-time detection power equipment electrification situation, simultaneously
The band power information of power equipment where also showing earthing tool on the map of figure refresh module 504.When needing to dismantle earthing tool
When, if background monitoring terminal 500 shows that corresponding power equipment also charges, dismantled after notifying staff to power off, to prevent causing
Safety accident.
As in Figure 2-4, the earthing tool of the present embodiment, structure include jaw 101, insulating bar 301 and ground line
201;Ground line exit is provided on jaw 101, ground line 201 is connect by being grounded exit with jaw 101.Jaw
101 clamping power equipments, ground line 201 are connect with jaw 101, realize power equipment ground connection.
Jaw 101 includes upper head plate 110, bottom plate 140, side plate 120 and movable plate 130;Upper head plate 110 is arranged in side plate
120 upper ends, bottom plate 140 are arranged in 120 lower end of side plate;120 medial surface of side plate is provided with sliding rail;130 side of movable plate passes through
Sliding rail is slidably connected with side plate 120, and movable plate 130 can be slided up and down along side plate 120, can be in bottom plate to enhance its stability
Gag lever post is set on 140, and 130 sets of movable plate are through on gag lever post, slide along gag lever post.
The jaw 101 of the present embodiment also sets up electroscope function, first to examine whether power equipment charges, if electrification, stops
Only 130 continuation activity of movable plate, avoids contacting power equipment again, causes power equipment damage or personal injury.Specifically, upper end
Plate 110 includes upper clamping portion 115 and upper electrical verification portion 111, and upper clamping portion 115 and upper electrical verification portion 111 form ladder-like, and upper electrical verification
Portion 111 is higher than upper clamping portion 115.Movable plate 130 includes lower clamping portion 138 and lower electrical verification portion 132, and lower clamping portion 138 is tested under
Electric portion 132 formed it is ladder-like, and upper electrical verification portion 111 be lower than upper clamping portion 115.It is all provided on upper clamping portion 115 and lower clamping portion 138
It is equipped with clamping groove 113, for being clamped power equipment.Mutual inductance iron core 114 is provided in upper electrical verification portion 111, in lower electrical verification portion 132
It is provided with the lower mutual inductance iron core 133 being adapted to upper mutual inductance iron core 114, upper mutual inductance iron core 114 and lower mutual inductance iron core 133 are arc,
Mutual inductor is formed after fastening.The present embodiment also sets up current detecting conducting wire, signal conditioning circuit, alarm.Current detecting conducting wire
It is wrapped on lower mutual inductance iron core 133, current detecting conducting wire is electrically connected with signal conditioning circuit input terminal, signal conditioning circuit output
End is electrically connected with 400 input terminal of microprocessor, and 400 output end of microprocessor is electrically connected with alarm, when power equipment passes through mutually
Sensor, and when charged electric power apparatus, electric current is generated on current detecting conducting wire, is conveyed into micro process after signal conditioning circuit improves
Device 400, microprocessor 400 control alarm equipment alarm, remind staff's stopping movement.This field can be used in microprocessor 400
Common processor.
To realize that jaw 101 is move freely, be clamped after realizing first electrical verification, avoid electrical ground, the device also set up with
Lower specific structure: being provided with the first gag lever post 1341 in lower electrical verification portion 132, first through hole, lower card are provided on lower clamping portion 138
Socket part 138 is through on the first gag lever post 1341 by first through hole set, when realizing that lower electrical verification portion 132 can not rise, lower clamping
Portion 138 can continue to rise.It is provided on bottom plate 140 positioned at the second through-hole of lower 138 lower section of clamping portion and positioned at lower electrical verification portion
The third through-hole of 132 lower sections;Lower 138 lower end of clamping portion is connected with first support bar 1361, and first support bar 1361 passes through second
Through-hole, and connect with the second through hole whorl;1361 lower end of first support bar is connected with cross bar 139;139 lower end of cross bar is provided with branch
Stay tube 137, and fourth hole is provided on cross bar 139, fourth hole is connected to support tube 137;Fourth hole is logical positioned at third
Immediately below hole.Insulating bar 301 and support tube 137 are detachably clamped, and insulating bar 301 is hollow structure, inserting in the hollow structure
One motion bar 320,320 lower end of motion bar connection one stretch out the handle 310 outside insulating bar 301, are provided with handle on insulating bar 301
Slip draw-in groove 330;When motion bar 320 moves up, lower electrical verification portion 132 is resisted across support tube 137 and third through-hole.
In addition, further increasing the stability that device uses, upper head plate 110 further includes upper reinforcing portion for convenience of using
112;Upper reinforcing portion 112 is symmetricly set on 111 two sides of electrical verification portion with upper clamping portion 115;Movable plate 130 further includes lower reinforcing portion
131;Lower reinforcing portion 131 is symmetricly set on lower 132 two sides of electrical verification portion with lower clamping portion 138.Upper reinforcing portion 112 and lower reinforcing portion
Clamping groove 113 is provided on 131, for being clamped power equipment.The second gag lever post 134 is additionally provided in lower electrical verification portion 132, under
Fifth hole is provided in reinforcing portion 131, lower fixed part is through on the second gag lever post 134 by fifth hole set.Bottom plate 140
On be additionally provided with the 6th through-hole positioned at 131 lower section of lower reinforcing portion;Lower 131 lower end of reinforcing portion is connected with second support bar 136, the
Two support rods 136 pass through the 6th through-hole, and connect with the 6th through hole whorl;136 lower end of second support bar connects cross bar 139.Under
It is additionally provided with third gag lever post and the 4th gag lever post 141 on end plate 140, the 7th through-hole, lower reinforcing are also set up on lower clamping portion 138
The 8th through-hole is additionally provided in portion 131;By the 7th through-hole set across third gag lever post, lower reinforcing portion 131 is logical for lower clamping portion 138
The 8th through-hole set is crossed across the 4th gag lever post 141.Jaw 101 forms symmetrical structure, and the electrical verification portion for being equipped with mutual inductor is located at
Between, both sides card line, and movable plate 130 is slided along third gag lever post and the 4th gag lever post 141, enhance jaw 101 use it is steady
Solidity.
In the present embodiment, it is also provided with limited location snap ring 135 on the first gag lever post 1341 and the second gag lever post 134, works as card
When socket part and reinforcing portion are connected on power equipment, guarantee that electrical verification portion is fixed, mutual inductor persistency check charged electric power apparatus situation,
It is powered on anti-error.
The working principle of this earthing tool is: insulating bar 301 is clamped support tube 137, and motion bar 320 is pushed up and is resisted
The upper clamping portion 115 of upper head plate 110 and upper reinforcing portion 112 are clamped power equipment, while upper electrical verification portion 111 by lower electrical verification portion 132
Upper mutual inductance iron core 114 across power equipment.Rotate insulating bar 301, first support bar 1361, second support bar 136 and activity
Bar 320 pushes up lower clamping portion 138, lower reinforcing portion 131 and lower electrical verification portion 132 simultaneously.When design, guarantee lower mutual inductance iron core
133 first with upper mutual inductance iron core 114 fasten, and this at present clamping portion 138 and lower reinforcing portion 131 also not in contact with power equipment.If
Charged electric power apparatus is then made of upper and lower mutual inductance iron core 133 transformer induced to electric current, the control alarm of microprocessor 400
Alarm reminds staff's stopping movement, charged electric power apparatus is avoided to be grounded.If power equipment is not charged, in upper and lower mutual inductance
When iron core 133 fastens, because upper and lower mutual inductance iron core 133 offsets, movable plate 130 can not then be pushed by being rotated further by insulating bar 301, at this time will
Motion bar 320 moves down, it is made no longer to resist lower electrical verification portion 132.Lower electrical verification portion 132 moves down, and the first gag lever post
1341 and the second limited location snap ring 135 on gag lever post 134 so that lower clamping portion 138 and lower reinforcing portion 131 is lifted lower electrical verification portion 132.
Insulating bar 301 is continued to rotate, first support bar 1361, second support bar 136 push up lower clamping portion 138, lower reinforcing simultaneously
Portion 131, while lower electrical verification portion 132 being driven to move up.Instantly when clamping portion 138, lower reinforcing portion 131 are clamped power equipment,
Upper and lower mutual inductance iron core 133 fastens again, to continue to monitor charged electric power apparatus situation.When disassembly, backwards rotation insulating bar 301 is
It can.
Embodiment two
The present embodiment provides a kind of power constructions to be grounded monitoring method, comprising the following steps:
Background monitoring terminal 500 establishes project under construction, remarks project under construction information;
Earthing tool quantity used in the remarks project under construction and earthing tool information in established project under construction;
Map is imported in the project under construction established;
Earthing tool is mounted into power equipment, and turns on the power switch 403, earthing tool continues to monitor charged electric power apparatus feelings
Condition;
Background monitoring terminal 500 refreshes map, and position, earthing tool information and the earthing tool of earthing tool are shown on map
Place charged electric power apparatus situation.
The power construction grounded monitoring system and monitoring method, background monitoring terminal 500 that this programme provides can monitor in real time
The location information of earthing tool avoids omitting to supervise the earthing tool in work progress;Earthing tool can also be real
When monitor the electrification situation of power equipment, and can show in background monitoring terminal 500, when dismantling earthing tool, can first ensure
Power equipment power failure causes security risk to prevent electrification disassembly.
Disclosed above is only the preferred embodiment of the present invention, but the present invention is not limited to this, any this field
What technical staff can think does not have creative variation, and without departing from the principles of the present invention made by several improvement and
Retouching, should all be within the scope of the present invention.
Claims (9)
1. a kind of power construction grounded monitoring system characterized by comprising earthing tool and background monitoring terminal (500);
Microprocessor (400), GPS chip (402), wireless communication chips, storage chip (401), electricity are provided on earthing tool
Source switch (403);The GPS chip (402), wireless communication chips, storage chip (401), power switch (403) respectively with it is micro-
Processor (400) electrical connection;Module (404) communicates microprocessor (400) with background monitoring terminal (500) by wireless communication;
Background monitoring terminal (500) includes:
Project under construction creates module (501): for establishing project under construction, remarks project under construction information;
Earthing tool remarks module (502): for being grounded work used in remarks project under construction in the project under construction of foundation
Has quantity and earthing tool information;
Map import modul (503): for importing map in the project under construction of foundation;
Map refresh module (504): for refreshing map, position and the earthing tool of used earthing tool are shown on map
Information.
2. power construction grounded monitoring system according to claim 1, which is characterized in that the earthing tool includes: pincers
Mouth (101), insulating bar (301) and ground line (201);Ground line exit is provided on jaw (101), ground line (201) is logical
The ground line exit is crossed to connect with jaw (101);
The jaw (101) includes upper head plate (110), bottom plate (140), side plate (120) and movable plate (130);Upper head plate
(110) setting is arranged in side plate (120) upper end, bottom plate (140) in side plate (120) lower end;Side plate (120) medial surface is provided with
Sliding rail;Movable plate (130) side is slidably connected by sliding rail with side plate (120);
The upper head plate (110) includes upper clamping portion (115) and upper electrical verification portion (111), upper clamping portion (115) and upper electrical verification portion
(111) formation is ladder-like, and upper electrical verification portion (111) is higher than upper clamping portion (115);
The movable plate (130) includes lower clamping portion (138) and lower electrical verification portion (132), lower clamping portion (138) and lower electrical verification portion
(132) formation is ladder-like, and upper electrical verification portion (111) is lower than upper clamping portion (115);
It is provided in lower electrical verification portion (132) the first gag lever post (1341), first through hole, lower card is provided on lower clamping portion (138)
Socket part (138) is through on the first gag lever post (1341) by first through hole set;
Clamping groove (113) are provided on upper clamping portion (115) and lower clamping portion (138);It is provided on upper electrical verification portion (111)
Mutual inductance iron core (114) is provided with the lower mutual inductance iron core being adapted to the upper mutual inductance iron core (114) in lower electrical verification portion (132)
(133);
The second through-hole for being provided on bottom plate (140) below lower clamping portion (138) and it is located at below lower electrical verification portion (132)
Third through-hole;Lower clamping portion (138) lower end is connected with first support bar (1361), and it is logical that first support bar (1361) passes through second
Hole, and connect with the second through hole whorl;First support bar (1361) lower end is connected with cross bar (139);The setting of cross bar (139) lower end
Have support tube (137), and be provided with fourth hole on cross bar (139), fourth hole is connected to support tube (137);Fourth hole
Immediately below third through-hole;
The insulating bar (301) and support tube (137) are detachably clamped, and insulating bar (301) is hollow structure, in the hollow structure
It inserts a motion bar (320), the handle (310) of insulating bar (301) outside, insulating bar are stretched out in motion bar (320) lower end connection one
(301) handle slip draw-in groove (330) are provided on;When motion bar (320) moves up, passes through support tube (137) and third is logical
Hole resists lower electrical verification portion (132);
Further include: current detecting conducting wire, signal conditioning circuit, alarm;Current detecting conducting wire is wrapped in lower mutual inductance iron core (133)
On, current detecting conducting wire is electrically connected with signal conditioning circuit input terminal, and signal conditioning circuit output end and microprocessor (400) are defeated
Enter end electrical connection, microprocessor (400) output end is electrically connected with alarm.
3. power construction grounded monitoring system according to claim 2, which is characterized in that on upper head plate (110) further includes
Reinforcing portion (112);Upper reinforcing portion (112) and upper clamping portion (115) are symmetricly set on electrical verification portion (111) two sides;
Movable plate (130) further includes lower reinforcing portion (131);Lower reinforcing portion (131) is symmetricly set on down with lower clamping portion (138) and tests
Electric portion (132) two sides;
Clamping groove (113) are provided in upper reinforcing portion (112) and lower reinforcing portion (131).
4. power construction grounded monitoring system according to claim 3, which is characterized in that also set on lower electrical verification portion (132)
It is equipped with the second gag lever post (134), fifth hole is provided on lower reinforcing portion (131), lower fixed part is through by fifth hole set
On second gag lever post (134).
5. power construction grounded monitoring system according to claim 4, which is characterized in that bottom plate is also set up on (140)
There is the 6th through-hole being located at below lower reinforcing portion (131);
Lower reinforcing portion (131) lower end is connected with second support bar (136), and second support bar (136) passes through the 6th through-hole, and with the
The connection of six through hole whorls;Second support bar (136) lower end connects cross bar (139).
6. power construction grounded monitoring system according to claim 4, which is characterized in that the first gag lever post (1341) and
Limited location snap ring (135) are provided on two gag lever posts (134).
7. power construction grounded monitoring system according to claim 2, which is characterized in that bottom plate is also set up on (140)
There are third gag lever post and the 4th gag lever post (141), the 7th through-hole is also set up on lower clamping portion (138), is gone back on lower reinforcing portion (131)
It is provided with the 8th through-hole;For lower clamping portion (138) by the 7th through-hole set across third gag lever post, lower reinforcing portion (131) passes through the
Eight through-hole sets are across the 4th gag lever post (141).
8. power construction grounded monitoring system according to claim 6, which is characterized in that map refresh module (504)
The band power information of power equipment where also showing earthing tool on map.
9. a kind of power construction is grounded monitoring method, which comprises the following steps:
Background monitoring terminal (500) establishes project under construction, remarks project under construction information;
Earthing tool quantity used in the remarks project under construction and earthing tool information in established project under construction;
Map is imported in the project under construction established;
Earthing tool is mounted into power equipment, and turns on the power switch (403), earthing tool continues to monitor charged electric power apparatus
Situation;
Background monitoring terminal (500) refreshes map, and position, earthing tool information and the ground connection work of earthing tool are shown on map
Charged electric power apparatus situation where tool.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910143446.2A CN109870955B (en) | 2019-02-26 | 2019-02-26 | Electric power construction grounding monitoring system and monitoring method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910143446.2A CN109870955B (en) | 2019-02-26 | 2019-02-26 | Electric power construction grounding monitoring system and monitoring method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109870955A true CN109870955A (en) | 2019-06-11 |
CN109870955B CN109870955B (en) | 2021-09-07 |
Family
ID=66919374
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910143446.2A Active CN109870955B (en) | 2019-02-26 | 2019-02-26 | Electric power construction grounding monitoring system and monitoring method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109870955B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110190424A (en) * | 2019-06-24 | 2019-08-30 | 国网山东省电力公司莒县供电公司 | A kind of protection against electric shock electric power apparatus examination earthed system |
CN112736760A (en) * | 2020-11-30 | 2021-04-30 | 国网山东省电力公司滨州供电公司 | Power equipment grounding wire operation system |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102298379A (en) * | 2011-08-22 | 2011-12-28 | 重庆电力设计院 | Ground wire status monitoring and management method, device and system |
CN202189269U (en) * | 2011-08-22 | 2012-04-11 | 重庆电力设计院 | System for monitoring and managing states of grounding wires |
KR20120049750A (en) * | 2010-11-09 | 2012-05-17 | 전남도시가스(주) | Underground pipe line moniroting system using indication nail |
CN104931770A (en) * | 2015-05-18 | 2015-09-23 | 国家电网公司 | Internet of things technology-based transformer iron core grounding current detection method |
CN106249087A (en) * | 2016-09-18 | 2016-12-21 | 国网山东省电力公司德州供电公司 | A kind of on-line real time monitoring system and method for cable metal sheath earth lead |
CN107150670A (en) * | 2016-03-06 | 2017-09-12 | 王涛 | A kind of photovoltaic System in Substation |
CN107450430A (en) * | 2017-08-14 | 2017-12-08 | 广东电网有限责任公司清远供电局 | A kind of transformer substation grounding wire uses management platform |
CN108169536A (en) * | 2017-12-18 | 2018-06-15 | 国网山东省电力公司济南供电公司 | The cable tunnel grounding circulation monitoring device and method of a kind of wide-range high-precision |
CN108598735A (en) * | 2018-06-07 | 2018-09-28 | 圣耀(集团)有限公司 | A kind of Portable short-circuit grounding wire monitoring platform |
-
2019
- 2019-02-26 CN CN201910143446.2A patent/CN109870955B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20120049750A (en) * | 2010-11-09 | 2012-05-17 | 전남도시가스(주) | Underground pipe line moniroting system using indication nail |
CN102298379A (en) * | 2011-08-22 | 2011-12-28 | 重庆电力设计院 | Ground wire status monitoring and management method, device and system |
CN202189269U (en) * | 2011-08-22 | 2012-04-11 | 重庆电力设计院 | System for monitoring and managing states of grounding wires |
CN104931770A (en) * | 2015-05-18 | 2015-09-23 | 国家电网公司 | Internet of things technology-based transformer iron core grounding current detection method |
CN107150670A (en) * | 2016-03-06 | 2017-09-12 | 王涛 | A kind of photovoltaic System in Substation |
CN106249087A (en) * | 2016-09-18 | 2016-12-21 | 国网山东省电力公司德州供电公司 | A kind of on-line real time monitoring system and method for cable metal sheath earth lead |
CN107450430A (en) * | 2017-08-14 | 2017-12-08 | 广东电网有限责任公司清远供电局 | A kind of transformer substation grounding wire uses management platform |
CN108169536A (en) * | 2017-12-18 | 2018-06-15 | 国网山东省电力公司济南供电公司 | The cable tunnel grounding circulation monitoring device and method of a kind of wide-range high-precision |
CN108598735A (en) * | 2018-06-07 | 2018-09-28 | 圣耀(集团)有限公司 | A kind of Portable short-circuit grounding wire monitoring platform |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110190424A (en) * | 2019-06-24 | 2019-08-30 | 国网山东省电力公司莒县供电公司 | A kind of protection against electric shock electric power apparatus examination earthed system |
CN112736760A (en) * | 2020-11-30 | 2021-04-30 | 国网山东省电力公司滨州供电公司 | Power equipment grounding wire operation system |
Also Published As
Publication number | Publication date |
---|---|
CN109870955B (en) | 2021-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109870955A (en) | A kind of power construction grounded monitoring system and monitoring method | |
CN201364488Y (en) | Electric switching control module for nuclear power station electric power plant | |
CN103954883A (en) | Voltage transformer secondary connection inspecting method and device | |
CN110164723B (en) | Distribution network error-prevention management system and method for whole process closed loop | |
CN203148982U (en) | Test fixture for loop resistance of circuit breaker | |
CN202562960U (en) | 10-kilovolt (kV) arrester test-bed rack | |
CN208568952U (en) | CT polarity and protection direction-adaptive detection device for main transformer | |
CN204694579U (en) | The reliability testing machine that a kind of plug is connected with electric wire | |
CN205015380U (en) | Quick connecting device of intelligent ammeter voltage wiring | |
EP0351724A3 (en) | Electric power circuit breaker | |
CN203301006U (en) | Rapid electricity testing grounding telescoping dolly of high voltage switch cabinet | |
CN203849356U (en) | Voltage transformer secondary wire connection inspection device | |
CN206671410U (en) | A kind of high pressure power frequency self-monitoring electroscope | |
CN205406337U (en) | Circuit breaker moment rocker | |
CN203101493U (en) | High voltage electroscope | |
CN203250629U (en) | Mutual inductor secondary winding connection box | |
CN105675927A (en) | Portable low voltage nuclear phase insulating rod | |
CN211148703U (en) | Aviation plug protection test conversion device | |
CN204228882U (en) | A kind of winding polarity test checking apparatus of electric power mutual-inductor | |
CN106353661A (en) | Lifting device for checking and detecting inventory power equipment | |
CN202651659U (en) | Drainage apparatus capable of replacing isolating switch with load | |
CN203149112U (en) | Hand-operated tool for calibrating electric energy meter | |
CN202917878U (en) | Transformer station intelligent patrol robot capable of recognizing disconnection and connection state of breaker switch | |
CN105629111B (en) | quick whole-set test device and method for ultrahigh-voltage main transformer microcomputer protection | |
CN114131581B (en) | Mechanical touch arm robot capable of conducting verification operation on autonomous nuclei |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |