CN109869168A CN201910173293.6A CN201910173293A CN109869168A CN 109869168 A CN109869168 A CN 109869168A CN 201910173293 A CN201910173293 A CN 201910173293A CN 109869168 A CN109869168 A CN 109869168A
Authority
CN
China
Prior art keywords
arch
trolley
tunnel
jacking
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910173293.6A
Other languages
Chinese (zh)
Inventor
高雪池
王�琦
齐辉
李术才
胡超
许英东
刘兆新
鹿伟
孙辉
栾英成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Shandong High Speed Group Co Ltd
Original Assignee
Qilu Transportation Development Group Co Ltd
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qilu Transportation Development Group Co Ltd, Shandong University filed Critical Qilu Transportation Development Group Co Ltd
Priority to CN201910173293.6A priority Critical patent/CN109869168A/en
Publication of CN109869168A publication Critical patent/CN109869168A/en
Pending legal-status Critical Current

Links

Abstract

The present invention discloses a kind of tunnel arch fabricated construction device and method, and device includes: along the longitudinally arranged track in tunnel;Trolley, the bottom of the trolley is equipped with the pulley with track cooperation, and the trolley is equipped with jacking apparatus, and the jacking apparatus includes to install pedestal on the car, jacking cylinder is fixed on the pedestal, the top of the piston rod of the jacking cylinder is connect with support steel plate.Fabricated construction device provided by the present application can be coupled the arch of various different cross section shapes, and the jacking apparatus of arch installation trolley can be adjusted according to the size in arch section;The precise positioning of arch can be achieved, easily and efficiently solve mechanization arch and problem is installed;Mechanized construction can be achieved, mitigate labor intensity, shorten the construction period, speed of application is fast, and scene needs number of workers few, saves great amount of cost.

Description

A kind of tunnel arch fabricated construction device and method
Technical field
The present invention relates to Construction Technique of Underground Works field more particularly to a kind of tunnel arch fabricated construction device and sides Method.
Background technique
In recent years, underground engineering cause in China's is developed rapidly, and is not only shown the growth of quantity, is technically also existed It rapidly develops and constantly breaks through.With the fast development of underground engineering construction scale and speed, as underground preliminary bracing Steel arch-shelf installation speed, the quality of main body are particularly important to working hour is saved, and are mainly propped up currently as China's underground engineering The steel arch-shelf of component is protected still using the manually installed mode in scene.
Traditional arch construction mode has the following disadvantages: 1. needed for number of workers it is more, large labor intensity, efficiency compared with It is low.Existing arch mostly uses conventional flange, casing connection, when in-site installation, needs largely manually to carry out coordinative construction;2. safety Difference.In installation process, needing a large amount of workers, non-support space carries out prolonged high-intensitive construction operation at the scene, and safety is difficult To guarantee;3. existing arch connection type can not cooperate the mechanization site operation of arch.
Therefore, it is badly in need of a kind of tunnel I-shaped steel arch-shelf mechanized construction method.Carry out research in this respect, can be tunnel The popularization of assembled I-steel arch mechanized construction lays the foundation, engineering value with higher.
Summary of the invention
In view of the foregoing deficiencies of prior art, the purpose of the present invention is at least that provide a kind of tunnel arch assembled The construction of arch motorization assembly may be implemented in constructing device and method, improves worker's working security, while high degree shortens Construction period.
In order to achieve the above objects and other related objects, an embodiment of the invention provides a kind of tunnel arch assembly Formula constructing device, comprising:
Along the longitudinally arranged track in tunnel;
Trolley, the bottom of the trolley are equipped with the pulley with track cooperation, and the trolley is equipped with jacking apparatus, The jacking apparatus includes that jacking cylinder, the jacking oil are fixed on the pedestal to install pedestal on the car The top of the piston rod of cylinder is connect with support steel plate.
The jacking apparatus is equipped with three groups, is located at centre and two side positions of the arch.
Top positioned at the piston rod of the jacking apparatus of two sides is connect by hinge member with the support steel plate, institute State the contact portion that support steel plate equipped with bossy body, the lower end of the bossy body there is vertical section to be arc-shaped;The piston rod Top be fixedly connected with fixed body, the outer end face of the fixed body has to be contacted with the arc-shaped cooperation to match Portion, the contact portion are contacted with the cooperation contact portion.
The top of the fixed body and the piston rod is welded, and the blade and pin shaft of the hinge member are matched for gap It closes.By the setting of protrusion and fixed body, it can make support steel plate while can freely adjust jacking angle, have very Good stress performance.
Another embodiment of the invention provides a kind of tunnel arch assembly construction method, comprising the following steps:
Step 1: the pre-splicing arch installed being placed on arch installation trolley, the arch installation trolley slides into along track Setting position, both ends of them portion arch unit using can the flange components of plane internal rotation where arch be connected to adjacent arch On frame unit;
Step 2: top and shoulder arch are lifted using the jacking cylinder on arch installation trolley, it is auxiliary using arch It helps fitting machine to open two sides arch springing position, places arch in designated position;
Step 3: arch being adjusted using jacking cylinder, so that longitudinal positioning device is connected with previous Pin arch, is encircleing Top and two sides arch springing position setting laser orientation instru-ment carry out position correction, complete the accurate positioning of whole Pin arch;
Step 4: setting lock foot anchoring stock.
Wherein, in step 1, the arch is divided into 6 arch units, wherein uses between top and shoulder arch unit Mounting flange plate is attached, and is attached between shoulder and leg arch unit using the flanged plate of strap bolt.
While carrying out the operation of the step 1, installs in the setting position of arch and match with the longitudinal positioning device The longitudinal register corollary apparatus of conjunction.
In the step 2, before arch installation, arch installation site is positioned using laser locating apparatus, is moved Dynamic arch installs trolley, and arch and anchor point on trolley is made to be in the same horizontal position.
In the step 3, arch decorating position is calibrated using laser orientation instru-ment, refers to vault and two sides arch springing three The laser orientation instru-ment mark point corresponding with face of point position carries out the calibration of position, cooperates with longitudinal positioning device, passes through Adjust the accurate positioning that arch lifting device realizes arch.
In the step 4, it is described set lock foot anchoring stock before, utilize laser ranging system carry out tunnel cross-section check.
The above-mentioned technical proposal that embodiment of the present invention provides, can be coupled the arch of various different cross section shapes, and The jacking apparatus of arch installation trolley can be adjusted according to the size in arch section;The precise positioning of arch can be achieved, it is convenient, fast Solution mechanization arch install problem;Mechanized construction can be achieved, mitigate labor intensity, shorten the construction period, construction Speed is fast, and scene needs number of workers few, saves great amount of cost.
Detailed description of the invention
Fig. 1 is arrangement and method for construction overall flow figure;
Fig. 2 is steel pipe node form figure;
Fig. 3 is the arrangement schematic diagram of arch on the car;
Fig. 4 is trolley jacking cylinder schematic diagram;
Fig. 5 is that arch springing assists fitting machine schematic diagram;
Fig. 6 is arch longitudinal positioning device schematic diagram;
Fig. 7 is the main view of two sides jacking apparatus top structure;
Fig. 8 is the side view of two sides jacking apparatus top structure.
Component label instructions
1 arch unit
2 flanged plates
3 trolleys
4 movable pulleies
5 arches fix device
6 jacking apparatus
7 auxiliary fitting machines
8 longitudinal positioning devices
9 support steel plates
10 bossy bodies
11 contact portions
12 fixed bodies
13 cooperation contact portions
14 piston rods
15 blades
16 pin shafts
Specific embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be by this explanation Content disclosed by book is understood other advantages and efficacy of the present invention easily.
It should be clear that structure, ratio, size etc. depicted in this specification attached drawing, only to cooperate disclosed in specification Content be not intended to limit the invention enforceable qualifications, therefore not so that those skilled in the art understands and reads Has technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size are not influencing institute of the present invention Under the effect of capable of generating and the purpose that can reach, the range that disclosed technology contents can be covered should all be still fallen in It is interior.Meanwhile cited such as "upper" in this specification, "lower", "left", "right", " centre " and " one " term, also only just In being illustrated for narration, rather than to limit the scope of the invention, relativeness is altered or modified, without substantive change Under more technology contents, when being also considered as the enforceable scope of the present invention.
Tunnel arch fabricated construction device provided by the embodiments of the present application, comprising: along the longitudinally arranged track in tunnel;Platform Vehicle, the bottom of trolley are equipped with the pulley with track cooperation, and trolley is equipped with jacking apparatus 6 comprising to be mounted on trolley On pedestal, be fixed with jacking cylinder on pedestal, the top of the piston rod of jacking cylinder is connect with support steel plate 9.
Jacking apparatus 6 is equipped with three groups, is located at centre and two side positions of arch.
Top positioned at the piston rod of the jacking apparatus of two sides is connect by hinge member with support steel plate, on support steel plate Equipped with bossy body 10, the contact portion 11 that there is vertical section to be arc-shaped for the lower end of bossy body 10;The top of piston rod 14 and fixation Body 12 is fixedly connected, and the outer end face of fixed body has and the arc-shaped cooperation contact portion to match, contact portion 11 and cooperation Contact portion 13 contacts.
The top of fixed body and piston rod is welded, and the blade 15 and pin shaft 16 of hinge member are clearance fit.By convex The setting in portion and fixed body out can make support steel plate while can freely adjust jacking angle, have good stress Performance.
A kind of tunnel arch fabricated construction device and method provided by the embodiments of the present application, comprising the following steps:
(1) arch preassembling: according to shelf's design on arch bridge profile, arch is divided into 6 sections of arch units 1, and utilizes flanged joint will Intermediate three sections are attached, and both ends arch carries out splicing installation using rotatable flange plate node, while in the finger of arch Installation longitudinal register corollary apparatus is set in positioning.Wherein, connected between top and shoulder arch unit using mounting flange plate 2 It connects, is attached between shoulder and leg arch unit using the flanged plate of strap bolt, as shown in Figure 1.
(2) arch handling is placed: pre-installation arch being placed in arch installation trolley 3 using handling appliance outside tunnel and is specified Position.Wherein, arch installation trolley is the trolley with movable pulley 4, and respective rail is laid outside tunnel and in tunnel, Trolley can move freely in orbit.Arch installs the top of trolley with the fixed device 5 of arch and jacking apparatus 6, fixed dress Set for arch to be placed in the positioning and fixing after trolley, jacking apparatus is made of hydraulic cylinder, for arch jacking and Installation.
(3) trolley is mobile in place: arch installation pallet bottom is equipped with movable pulley 4, and movable pulley is located on track, track It is arranged along length of tunnel direction, the trolley for being placed with arch is moved to the position of pre-installation arch in front of working face along track, And arch is fixed.Wherein, it before arch installation, is positioned in arch pre-installed position using laser locating apparatus, Mobile arch installs trolley, and arch and anchor point on trolley is made to be in the same horizontal position.
(4) arch jacking installation: 6 pairs of tops of the jacking cylinder on trolley are installed using arch and shoulder arch is lifted It rises, two sides arch springing position is opened using arch auxiliary fitting machine 7, places arch in designated position.Wherein, arch installs trolley On share three groups of jacking cylinders, be located at intermediate and two side positions.
Preferably, the oil cylinder in middle position is for jacking top arch, and the oil cylinder of two side positions is for jacking shoulder position Oil cylinder, two sides position oil cylinder have hinged stressing device, can freely adjust jacking angle.Above-mentioned oil cylinder top position is welded with Groove profile steel plate, U-steel intralamellar part clear span are slightly larger than arch external width.
(5) arch precise positioning: being adjusted arch using jacking cylinder, encircles longitudinal positioning device 8 and previous Pin Frame is connected, and carries out position correction in vault and two sides arch springing position setting laser orientation instru-ment, it may be assumed that three point of vault and two sides arch springing The laser orientation instru-ment set mark point corresponding with face carries out the calibration of position, cooperates with longitudinal positioning device, passes through adjusting Arch lifting device completes the accurate positioning of whole Pin arch.
One-above-the-other layout includes the targeting port device being set on previous Pin arch, the understructure on arch to be installed And connection rod structure;It is equipped with groove structure inside targeting port device, is placed with plum blossom retainer ring in groove;Understructure is screw thread Pedestal can be fixedly connected with rod structure;Connection rod structure leading portion is provided with bulge-structure, can be placed in plum blossom retainer ring fixed;End Screw thread is provided with to be securable on understructure.The length of one-above-the-other layout can be set according to the practical arch spacing in scene Meter.
(6) section is checked: being carried out section check using laser ranging system, is set lock foot anchoring stock.Specifically, using Laser Measuring Section check is carried out away from device, such as meets arch installation requirement, sets lock foot anchoring stock and be fixed;Arch installation is not met such as to want It asks, using arch jacking apparatus and auxiliary fitting machine is finely adjusted and repetition measurement.Wherein, laser ranging system is filled by Laser emission It sets, movable axle sleeve and fixture form.
Section check method refers to that laser ranging system is installed at arch arch springing surveys arch spacing certain distance Amount, and it is corresponding in design drawing, the super deficient position of arch is obtained, to carry out arch adjustment or apply reinforcement measure.
(7) other processes: following this procedure, installing the circulation residue arch, welds remaining longitudinally connected muscle, is laid with reinforcing bar Net and multiple pneumatically placed concrete.
The above-described embodiments merely illustrate the principles and effects of the present invention, and is not intended to limit the present invention.It is any ripe The personage for knowing this technology all without departing from the spirit and scope of the present invention, carries out modifications and changes to above-described embodiment.Cause This, institute is complete without departing from the spirit and technical ideas disclosed in the present invention by those of ordinary skill in the art such as At all equivalent modifications or change, should be covered by the claims of the present invention.

Claims (10)

1. a kind of tunnel arch fabricated construction device characterized by comprising
Along the longitudinally arranged track in tunnel;
Trolley, the bottom of the trolley are equipped with the pulley with track cooperation, and the trolley is equipped with jacking apparatus, described Jacking apparatus includes that jacking cylinder is fixed on the pedestal to install pedestal on the car, the jacking cylinder The top of piston rod is connect with support steel plate.
2. tunnel arch fabricated construction device according to claim 1, which is characterized in that the jacking apparatus is equipped with three Group is located at centre and two side positions of the arch.
3. tunnel arch fabricated construction device according to claim 2, which is characterized in that the jacking positioned at two sides The top of the piston rod of device is connect by hinge member with the support steel plate, and the support steel plate is equipped with bossy body, institute State the contact portion that there is vertical section to be arc-shaped for the lower end of bossy body;The top of the piston rod is fixedly connected with fixed body, The outer end face of the fixed body, which has, matches splice grafting with described with the arc-shaped cooperation contact portion to match, the contact portion Contact portion contact.
4. tunnel arch fabricated construction device according to claim 3, which is characterized in that the fixed body with it is described The top of piston rod is welded, and the blade and pin shaft of the hinge member are clearance fit.
5. a kind of tunnel arch assembly construction method, which comprises the following steps:
Step 1: the pre-splicing arch installed being placed on arch installation trolley, the arch installation trolley slides into setting along track Position, both ends of them portion arch unit using can the flange components of plane internal rotation where arch be connected to adjacent arch list In member;
Step 2: top and shoulder arch being lifted using the jacking cylinder on arch installation trolley, assist pacifying using arch Two sides arch springing position is opened in installation, places arch in designated position;
Step 3: arch is adjusted using jacking cylinder, longitudinal positioning device is made to be connected with previous Pin arch, in vault and Two sides arch springing position is arranged laser orientation instru-ment and carries out position correction, completes the accurate positioning of whole Pin arch;
Step 4: setting lock foot anchoring stock.
6. tunnel arch assembly construction method according to claim 5, which is characterized in that in step 1, the arch point For 6 arch units, wherein be attached between top and shoulder arch unit using mounting flange plate, shoulder and leg arch It is attached between frame unit using the flanged plate of strap bolt.
7. tunnel arch assembly construction method according to claim 5, which is characterized in that carrying out the step 1 While operation, the longitudinal register corollary apparatus of installation and longitudinal positioning device cooperation in the setting position of arch.
8. tunnel arch assembly construction method according to claim 5, which is characterized in that in the step 2, in arch Before installation, arch installation site is positioned using laser locating apparatus, mobile arch installs trolley, makes arch on trolley The same horizontal position is in anchor point.
9. tunnel arch assembly construction method according to claim 5, which is characterized in that in the step 3, using sharp Light-seeking instrument calibrates arch decorating position, refers to the laser orientation instru-ment and face of 3 positions of vault and two sides arch springing Corresponding mark point carries out the calibration of position, cooperates with longitudinal positioning device, realizes arch by adjusting arch lifting device It is accurately positioned.
10. tunnel arch assembly construction method according to claim 5, which is characterized in that in the step 4, in institute It states before setting lock foot anchoring stock, carries out tunnel cross-section check using laser ranging system.
CN201910173293.6A 2019-03-07 2019-03-07 A kind of tunnel arch fabricated construction device and method Pending CN109869168A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910173293.6A CN109869168A (en) 2019-03-07 2019-03-07 A kind of tunnel arch fabricated construction device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910173293.6A CN109869168A (en) 2019-03-07 2019-03-07 A kind of tunnel arch fabricated construction device and method

Publications (1)

Publication Number Publication Date
CN109869168A true CN109869168A (en) 2019-06-11

Family

ID=66920007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910173293.6A Pending CN109869168A (en) 2019-03-07 2019-03-07 A kind of tunnel arch fabricated construction device and method

Country Status (1)

Country Link
CN (1) CN109869168A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111880579A (en) * 2020-08-05 2020-11-03 长沙科达智能装备股份有限公司 Automatic arch supporting adjustment control device and method for arch centering trolley

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988768A (en) * 2017-05-05 2017-07-28 山东大学 Tunnel bow member erects the new type mechanical device and operating method of construction
CN107701207A (en) * 2017-11-28 2018-02-16 山东天勤工程科技有限公司 Subterranean tunnel assembled bow member support system and mechanized construction method
CN209855824U (en) * 2019-03-07 2019-12-27 齐鲁交通发展集团有限公司 Tunnel bow member assembled construction equipment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988768A (en) * 2017-05-05 2017-07-28 山东大学 Tunnel bow member erects the new type mechanical device and operating method of construction
CN107701207A (en) * 2017-11-28 2018-02-16 山东天勤工程科技有限公司 Subterranean tunnel assembled bow member support system and mechanized construction method
CN209855824U (en) * 2019-03-07 2019-12-27 齐鲁交通发展集团有限公司 Tunnel bow member assembled construction equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111880579A (en) * 2020-08-05 2020-11-03 长沙科达智能装备股份有限公司 Automatic arch supporting adjustment control device and method for arch centering trolley
CN111880579B (en) * 2020-08-05 2024-02-09 长沙科达智能装备股份有限公司 Automatic arch supporting adjusting control device and method for arch frame trolley

Similar Documents

Publication Publication Date Title
CN105442459B (en) Large-Span Continuous girder span building up station rotator construction rotor system and construction method
CN107701207B (en) Subterranean tunnel assembled arch support system and mechanized construction method
CN105003080B (en) A kind of fan-shaped steel building construction technology
CN109839315B (en) Bidirectional sliding type physical model box and cross-fault tunnel mechanical behavior testing method
CN108333054A (en) Tunnel threedimensional model bracket loading test platform and the test method observed for tunnel defect
CN103033374B (en) Test device of vertical structure model of shield tunnel
Morgenthal et al. Engineering the tower and main span construction of stonecutters bridge
CN111188276A (en) Segmental beam sliding and assembling construction method
CN105152032A (en) Installing method for bridge crane in enclosed environment workshop
CN111561175B (en) Prestress underpinning static force cutting and column pulling construction process
CN107630709B (en) A kind of construction method of the mobile trolley of bored tunnel construction
CN102619144A (en) Construction technology for prefabricated assembled steel spring floating slab track
CN108708265A (en) A kind of steel camber arch bridge construction method
CN102912693B (en) Floating track bed precast slab and construction method for precast slab assembled floating track bed
CN108678757A (en) Shield machine thread-changing method of reseptance based on steel bushing reception device
CN109869168A (en) A kind of tunnel arch fabricated construction device and method
CN108104832B (en) underground engineering assembled confined concrete arch center and mechanized construction method
CN206971012U (en) A kind of positioning tool for the installation of the type telescopic joints of medium-and low-speed maglev track J III
CN103924528A (en) Overall long-distance pushing slippage construction method for large-span bridge box girder structure of large-span bridge
CN110468731A (en) A kind of traversing lifting walking rail set of Bridge Erector
CN110029585A (en) A kind of device and application method for precast segment assembly straight bridge alignment control
CN207933903U (en) The slipping-shoe device of box girder with variable cross section pushing tow
CN109629449A (en) A kind of steel case arch bridge arch springing toughened internal stress installation locating support and alignment method
CN209855824U (en) Tunnel bow member assembled construction equipment
JPH0254002A (en) Method and device for adjusting and fixing functional surface of travelling path of electromagnetic levitation car

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200930

Address after: No.8, Longao North Road, Lixia District, Jinan City, Shandong Province

Applicant after: Shandong high speed Group Co.,Ltd.

Applicant after: SHANDONG University

Address before: 250013 Block D, Yinfeng Fortune Plaza, No. 1 Longaoxi Road, Jinan City, Shandong Province

Applicant before: QILU TRANSPORTATION DEVELOPMENT GROUP Co.,Ltd.