CN110468731A - A kind of traversing lifting walking rail set of Bridge Erector - Google Patents

A kind of traversing lifting walking rail set of Bridge Erector Download PDF

Info

Publication number
CN110468731A
CN110468731A CN201910865712.2A CN201910865712A CN110468731A CN 110468731 A CN110468731 A CN 110468731A CN 201910865712 A CN201910865712 A CN 201910865712A CN 110468731 A CN110468731 A CN 110468731A
Authority
CN
China
Prior art keywords
bridge erector
lifting
connector
bridge
downside
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910865712.2A
Other languages
Chinese (zh)
Inventor
刘杰
保礼阳
时建朋
王志文
魏仁明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Municipal Engineering Co Ltd
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Municipal Engineering Co Ltd
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Municipal Engineering Co Ltd, Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Municipal Engineering Co Ltd
Priority to CN201910865712.2A priority Critical patent/CN110468731A/en
Publication of CN110468731A publication Critical patent/CN110468731A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B23/00Easily dismountable or movable tracks, e.g. temporary railways; Details specially adapted therefor
    • E01B23/10Shiftable tracks for heavy loads, e.g. carrying excavators
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of traversing lifting walking rail sets of Bridge Erector, including attachment beam and the lifting arm coaxially connected with the attachment beam, electric walking cucurbit is equipped on the downside of the lifting arm, the attachment beam is connected by mounting device with Bridge Erector, the mounting device includes guide rail, first connector and the second connector, second connector clamps the attachment beam, the guide rail is fixed on the downside of the attachment beam, first connector and second connector are rotatablely connected the angular adjustment to realize the Bridge Erector, second connector is slided along the guide rail to be adjusted with the span for realizing the Bridge Erector.The above-mentioned traversing lifting walking rail set of Bridge Erector can accelerate Bridge Erector to the working efficiency of the front leg strut walking traversing lifting of track girder, to realize the whole lateral moving lifting for solving the problems, such as wide cut Skew Bridge walking track voluntarily changed and changed in time.

Description

A kind of traversing lifting walking rail set of Bridge Erector
Technical field
The present invention relates to science of bridge building Bridge Erector prefabricated components mounting technique fields, in particular to a kind of Bridge Erector is traversing to be hung Dress walking rail set.
Background technique
In bridge, track is overhead, highway using Bridge Erector carries out prestressing force prefabricated components (box beam, T beam, U-shaped beam Deng) erection process in, realize that the whole lateral moving of the walking track girder of front leg strut is more troublesome using traditional form of construction work With time-consuming.The wide cut or wide cut Skew Bridge for especially crossing over rivers massif need bridge auxiliary on external lifting machine, or use Walking track girder, the integral (rail of reconnection fixed Cantilever Beams on Bridge Erector, be segmented traversing lifting front leg strut with jack cucurbit again Road beam is too long disturb at present seriously can not integral hoisting).
Firstly, front leg strut track girder needs Bridge Erector rear portion counterweight (counterweight is generally prefabricated components) when traversing, middle supporting leg Ground, which supports front end, makes front leg strut de-orbit the overhanging lever state of beam, and Bridge Erector is in via hole least favorable and topples shape at this time State has biggish security risk.Secondly, needing processing prefabricated components top surface pre-buried steel before the lifting of bridge auxiliary on external lifting machine Muscle, temperature pier prefabricated component lateral connection both increase additional workload, and vibration in operation process has set rigid frame Box beam stability and support or temporary support installation accuracy have certain influence, and double-machine lifting crane is dangerous when whole for track girder longer Property it is larger, segmentation needs repeatedly traversing ceiling mounted tracks beam time-consuming and uneconomical.Using fixing Cantilever Beams on Bridge Erector again with falling The traversing lifting walking track girder of chain block segmentation is time-consuming and laborious and progress slowly seriously ties down bridge formation speed, and front outrigger for bridge girder erection machine is de- Risk of toppling is increased from track girder overlong time, and more people's cooperations is needed to increase operating personnel in high altitude operation and high-temperature operation Construction risk.
Therefore, how to provide it is a kind of quickening Bridge Erector to front leg strut walking the traversing lifting of track girder working efficiency, Realize the traversing lifting walking of Bridge Erector voluntarily changed with the solution wide cut Skew Bridge walking track whole lateral moving lifting changed in time The technical issues of rail set is those skilled in the art's urgent need to resolve.
Summary of the invention
The object of the present invention is to provide a kind of traversing lifting walking rail sets of Bridge Erector, can accelerate Bridge Erector to preceding branch The working efficiency of the leg walking traversing lifting of track girder, to realize the solution wide cut Skew Bridge walking track voluntarily changed and changed in time Whole lateral moving lift problem.
To achieve the above object, the present invention provides a kind of Bridge Erector traversing lifting walking rail set, including attachment beam with And the coaxially connected lifting arm with the attachment beam, electric walking cucurbit is equipped on the downside of the lifting arm, and the attachment beam passes through Mounting device is connected with Bridge Erector, and the mounting device includes guide rail, the first connector and the second connector, first connection The fixed Bridge Erector of body, second connector clamp the attachment beam, and the guide rail is fixed on the downside of the attachment beam, institute The first connector and second connector rotation connection are stated to realize the angular adjustment of the Bridge Erector, second connector It slides along the guide rail and is adjusted with the span for realizing the Bridge Erector.
Preferably, the lifting arm and the quantity of the electric walking cucurbit are two, two lifting arm difference Positioned at the both ends of the attachment beam, two electric walking cucurbits are respectively arranged on the downside of two lifting arm.
Preferably, the wirerope to ceiling mounted tracks beam is equipped on the downside of the electric walking cucurbit.
Preferably, the wirerope is equipped with jack cucurbit on one side.
Preferably, the downside of the lifting arm outer end is equipped with video-unit.
Preferably, the quantity of the video-unit is two, and two video-units are respectively arranged on two liftings The downside of arm outer end.
Preferably, the downside at the lifting arm both ends is equipped with to limit the electric walking cucurbit only along the lifting arm The limiting device of movement.
Preferably, the Bridge Erector is fixedly connected by bolt with first connector.
Preferably, the quantity of the Bridge Erector is multiple, the quantity phase of the quantity of the mounting device and the Bridge Erector Together, multiple Bridge Erectors pass through multiple mounting devices respectively and are sequentially arranged on the downside of the attachment beam.
Preferably, the quantity of the Bridge Erector is two, and the quantity of the mounting device is two, two Bridge Erectors It is symmetricly set on the downside of the attachment beam by two mounting devices respectively.
Relative to above-mentioned background technique, the traversing lifting walking rail set of Bridge Erector provided by the present invention includes attachment beam And the coaxially connected lifting arm with attachment beam, the downside of lifting arm are equipped with electric walking cucurbit, the downside of attachment beam is equipped with logical The Bridge Erector that mounting device is connect with attachment beam is crossed, mounting device includes guide rail, the first connector and the second connector, and second connects Junctor clamps attachment beam, and guide rail is fixed on the downside of attachment beam, and the first connector and the second connector are rotatablely connected, the second connection Body is slided along guide rail, and the traversing lifting walking rail set of the Bridge Erector is oblique especially suitable for the wide cut or wide cut for crossing over rivers massif Hand over bridge erection, can accelerate Bridge Erector to front leg strut walking the traversing lifting of track girder working efficiency, realize automation and and When solve the problems, such as wide cut Skew Bridge walking track whole lateral moving lifting safe construction, in specific work progress In, electric walking cucurbit lifts track girder, after track girder is integrally promoted and is detached from steel pier or sleeper, traversing walking section, Stopping in place is traversing, after track girder is stablized, declines on dropping place track girder to steel pier or sleeper, circulation lifting is traversing Step after adjusting track girder to appropriate location, carries out temperature pier, front leg strut stress when Bridge Erector in whereabouts;Connect by first Junctor and Bridge Erector be fixedly connected and the clamping of the second connector and attachment beam is installed to realize Bridge Erector and attachment beam Connection realizes that the span of Bridge Erector is adjusted along the sliding of guide rail by the second connector, passes through the first connector opposite second The rotation of connector to realize the angular adjustment of Bridge Erector, Bridge Erector attachment beam it is adjustable to realize Bridge Erector via hole when to track The integral hoisting of beam and with one of via hole of Bridge Erector (track girder hold out against Bridge Erector walking rail wheel), it is ensured that installation one-time-reach-place, Greatly accelerate Bridge Erector working efficiency.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 is the structural schematic diagram of the traversing lifting walking rail set of Bridge Erector provided in an embodiment of the present invention;
Fig. 2 is the partial enlargement diagram in Fig. 1 at attachment beam;
Fig. 3 is the partial enlargement diagram of mounting device in Fig. 1;
Fig. 4 is the connection relationship diagram of the first connector and the second connector in Fig. 3.
Wherein:
1- attachment beam, 2- lifting arm, 3- limiting device, 4- video-unit, 5- Bridge Erector, 6- wirerope, 7- jack cucurbit, 8- front outrigger for bridge girder erection machine, 9- track girder, the first connector of 10-, the second connector of 11-, 12- guide rail.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
In order to make those skilled in the art more fully understand the present invention program, with reference to the accompanying drawing and it is embodied The present invention is described in further detail for mode.
Please refer to figs. 1 to 4, wherein Fig. 1 is the traversing lifting walking rail set of Bridge Erector provided in an embodiment of the present invention Structural schematic diagram, Fig. 2 is the partial enlargement diagram in Fig. 1 at attachment beam, and Fig. 3 is the partial enlargement of mounting device in Fig. 1 Schematic diagram, Fig. 4 are the connection relationship diagram of the first connector and the second connector in Fig. 3.
In the first specific embodiment, the traversing lifting walking rail set of Bridge Erector provided by the invention includes connecting Connect beam 1 and the lifting arm 2 coaxially connected with attachment beam 1, the downside of lifting arm 2 is equipped with electric walking cucurbit, under attachment beam 1 Side is equipped with Bridge Erector 5, and Bridge Erector 5 is connected by mounting device with attachment beam 1.Wherein, mounting device include the first connector 10, Second connector 11 and guide rail 12, the fixed Bridge Erector 5 of the first connector 10, the second connector 11 clamp attachment beam 1, and guide rail 12 is solid Due to the downside of attachment beam 1, the first connector 10 and the second connector 11 are rotatablely connected, and the second connector 11 is sliding along guide rail 12 It is dynamic.
In specific work progress, track girder 9 is located at the downside of attachment beam 1, and electric walking cucurbit lifts track girder 9, After being promoted by 9 entirety of track girder and be detached from steel pier or sleeper, traversing walking section, stopping in place is traversing, to track After beam 9 is stablized, decline on dropping place track girder 9 to steel pier or sleeper, circulation lifts traversing step, and adjustment track girder 9 is to appropriate Behind position, temperature pier is carried out;The downside of Bridge Erector 5 is equipped with front outrigger for bridge girder erection machine 8, props up before Bridge Erector in whereabouts Bridge Erector 5 8 stress of leg, for the especially wide bridge of banner, Bridge Erector 5 can laterally walk, and it is horizontal that Bridge Erector 5 carries out 9 integral hoisting of track girder It moves.
In addition to this, by the first connector 10 and Bridge Erector 5 be fixedly connected and the second connector 11 and attachment beam 1 Clamping installation to realize the adjustable span and angle of the connection namely Bridge Erector 5 of Bridge Erector 5 and attachment beam 1 on the downside of attachment beam 1 The installation of degree is fixed.
Specifically, realizing that the span of Bridge Erector 5 is adjusted along the sliding of guide rail 12 by the second connector 11, by the One connector 10 realizes that the angular adjustment of Bridge Erector 5, the span and angle of Bridge Erector 5 are equal relative to the rotation of the second connector 11 Adjustable, to the integral hoisting of track girder 9 when realizing 5 via hole of Bridge Erector and with one of the via hole of Bridge Erector 5, (track girder 9 is held out against The walking rail wheel of Bridge Erector 5), it is ensured that installation one-time-reach-place greatly accelerates the working efficiency of Bridge Erector 5.
In the present embodiment, guide rail 12 is travel screw, carries out limit adjustment by travel screw.In order to adapt to different shaped The Bridge Erector 5 of number width, Bridge Erector 5 are bolted and fixed with the first connector 10, and angular adjustment is by the first connector 10 It rotates and realizes relative to the second connector 11, span, which is adjusted, carries out limit adjustment by travel screw, the traversing lifting walking of the Bridge Erector Rail set is generally applicable to the Bridge Erector 5 of each model.
It should be noted that the traversing lifting walking rail set of the Bridge Erector is particularly suitable for the wide cut across rivers massif Or wide cut Skew Bridge is set up, and accelerates the work effect of the traversing lifting for the track girder 9 that Bridge Erector 5 walk to front outrigger for bridge girder erection machine 8 Rate realizes automation, the safe construction of automation and the solution wide cut Skew Bridge changed in time walking track whole lateral moving lifting Problem.
In addition to this, lifting arm 2 and the quantity of electric walking cucurbit are two, and two lifting arm 2 are located at attachment beam 1 Both ends, two electric walking cucurbits are respectively arranged on the downside of two lifting arm 2.By electric walking cucurbit to track girder 9 into Row lifting, specifically, the downside of electric walking cucurbit is equipped with the wirerope 6 of ceiling mounted tracks beam 9, wirerope 6 is equipped on one side Jack cucurbit 7.
In the present embodiment, in order to increase the need of the traversing stationarity of 9 integral hoisting of track girder, synchronism and adaptability It asks, lifting arm 2, which overhangs 5 two sides of Bridge Erector difference, one electric walking cucurbit of each setting, electric walking cucurbit out, individually to be grasped Work can also can reach specified Hoisting Position with simultaneously operating, individually operated electric walking cucurbit, and simultaneously operating can be protected Card lifts traversing steady synchronization.Electric walking cucurbit can also assist hoisting large-size support and some construction materials (such as steel pier, Sleeper, husky cylinder etc.), achieve the effect that further speed up construction efficiency.
For superior technique effect, the downside of 2 outer end of lifting arm is equipped with video-unit 4, illustratively, video-unit 4 Quantity be two, two video-units 4 are respectively arranged on the downside of two 2 outer ends of lifting arm.In order to accelerate working efficiency, this Bridge machine traversing lifting walking rail set uses the dismountable design scheme of modular implementation, and when use installs in advance, used It can be removed after finishing.It is driven using Electric Power Automation Equipment, with 5 power common source of Bridge Erector.Wherein, video-unit 4 be with The video monitoring system of camera, camera is towards the setting of track girder 9 and captured in real-time operating condition picture, video monitoring system are incorporated to The former monitoring system of Bridge Erector 5 is, it can be achieved that front commander's consistency operation, consistent with erection process commander's step, without additional increasing Add personnel.Realize that voluntarily changes, automates, visualizes and change in time solves the problems, such as that lifting is traversing.
In the present embodiment, the downside at 2 both ends of lifting arm is equipped with and only moves along lifting arm 2 to limit electric walking cucurbit Limiting device 3, specifically, limiting device 3 is located on the downside of the outer end of lifting arm 2 and the end with 1 junction of attachment beam Downside, limiting device 3 can be using structures such as limited block, limit plates, here without limitation.
In addition to this, the quantity of Bridge Erector 5 is multiple, and the quantity of mounting device is identical as the quantity of Bridge Erector 5, Bridge Erector 5 match corresponding one by one with mounting device, and multiple Bridge Erectors 5 are sequentially arranged in the downside of attachment beam 1 by multiple mounting devices respectively. Illustratively, the quantity of Bridge Erector 5 is two, and the quantity of mounting device is two, and two Bridge Erectors 5 pass through two installations respectively Device is symmetricly set on the downside of attachment beam 1.
To sum up, the traversing lifting walking rail set of the Bridge Erector has modularization and automation beneficial to progress, accelerates frame The working efficiency of the traversing lifting for the track girder 9 that bridge machine 5 walks to front outrigger for bridge girder erection machine 8 realizes automation, automates and timely The safe construction for solving the problems, such as the walking track whole lateral moving lifting of wide cut Skew Bridge of change.
For the traversing lifting walking rail set of clearer explanation Bridge Erector, now provides one kind and specifically implemented Journey.It is sequentially followed successively by, Bridge Erector 5 is assembled, and Bridge Erector 5 is fixedly mounted on 1 downside of attachment beam, is adjusted and is built bridge by mounting device The visualization vision signal connection of the span and angle of machine 5, power circuit connection and video-unit 4, device debugging is qualified, frame The whole acceptance(check) of bridge machine 5,5 preparation of Bridge Erector is in place, hoisting prefabricated component, and 5 rear portion counterweight front of Bridge Erector overhangs just Position, by electric walking cucurbit to track girder 9 lift it is traversing in place, the front outrigger for bridge girder erection machine 8 of Bridge Erector 5 lands and preparation In place, hoisting prefabricated component, 5 rear portion counterweight integral hoisting track girder of Bridge Erector, 9 one of via hole, track girder 9 is traversing to be lifted in place, The front outrigger for bridge girder erection machine 8 of Bridge Erector 5 lands and preparation is in place, hoisting prefabricated component, and 5 cycle operation of Bridge Erector completion is applied Work.
It should be noted that in the present specification, such as first and second etc relational terms are used merely to one Entity is distinguished with other several entities, and without necessarily requiring or implying between these entities, there are any this actual Relationship or sequence.
Lifting walking rail set traversing to Bridge Erector provided by the present invention is described in detail above.It answers herein With a specific example illustrates the principle and implementation of the invention, the explanation of above example is only intended to help to manage Solve method and its core concept of the invention.It should be pointed out that for those skilled in the art, not departing from , can be with several improvements and modifications are made to the present invention under the premise of the principle of the invention, these improvement and modification also fall into this hair In bright scope of protection of the claims.

Claims (10)

  1. The rail set 1. a kind of traversing lifting of Bridge Erector is walked, which is characterized in that including attachment beam (1) and with the attachment beam (1) coaxially connected lifting arm (2), lifting arm (2) downside are equipped with electric walking cucurbit, and the attachment beam (1) passes through peace Assembling device is connected with Bridge Erector (5), and the mounting device includes guide rail (12), the first connector (10) and the second connector (11), the fixed Bridge Erector (5) of first connector (10), second connector (11) clamp the attachment beam (1), The guide rail (12) is fixed on the downside of the attachment beam (1), and first connector (10) and second connector (11) turn The dynamic angular adjustment connected to realize the Bridge Erector (5), second connector (11) are slided along the guide rail (12) with reality The span of the existing Bridge Erector (5) is adjusted.
  2. The rail set 2. the traversing lifting of Bridge Erector according to claim 1 is walked, which is characterized in that the lifting arm (2) Quantity with the electric walking cucurbit is two, and two lifting arm (2) are located at the two of the attachment beam (1) End, two electric walking cucurbits are respectively arranged on the downside of two lifting arm (2).
  3. The rail set 3. the traversing lifting of Bridge Erector according to claim 2 is walked, which is characterized in that the electric walking calabash The wirerope (6) to ceiling mounted tracks beam (9) is equipped on the downside of reed.
  4. The rail set 4. the traversing lifting of Bridge Erector according to claim 3 is walked, which is characterized in that the wirerope (6) It is equipped with jack cucurbit (7) on one side.
  5. The rail set 5. the traversing lifting of Bridge Erector according to claim 2 is walked, which is characterized in that the lifting arm (2) The downside of outer end is equipped with video-unit (4).
  6. The rail set 6. the traversing lifting of Bridge Erector according to claim 5 is walked, which is characterized in that the video-unit (4) quantity is two, and two video-units (4) are respectively arranged on the downside of two lifting arm (2) outer ends.
  7. The rail set 7. the traversing lifting of Bridge Erector according to claim 1 is walked, which is characterized in that the lifting arm (2) The downside at both ends is equipped with to limit the electric walking cucurbit only along the limiting device (3) of the lifting arm (2) movement.
  8. The rail set 8. the traversing lifting of Bridge Erector according to claim 1 is walked, which is characterized in that the Bridge Erector (5) It is fixedly connected by bolt with first connector (10).
  9. The rail set 9. the traversing lifting of Bridge Erector according to any one of claims 1 to 8 is walked, which is characterized in that described The quantity of Bridge Erector (5) be it is multiple, the quantity of the mounting device is identical as the quantity of the Bridge Erector (5), multiple framves Bridge machine (5) is sequentially arranged on the downside of the attachment beam (1) by multiple mounting devices respectively.
  10. The rail set 10. the traversing lifting of Bridge Erector according to claim 9 is walked, which is characterized in that the Bridge Erector (5) Quantity be two, the quantity of the mounting device is two, and two Bridge Erectors (5) are filled by two installations respectively It sets and is symmetricly set on the downside of the attachment beam (1).
CN201910865712.2A 2019-09-12 2019-09-12 A kind of traversing lifting walking rail set of Bridge Erector Pending CN110468731A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910865712.2A CN110468731A (en) 2019-09-12 2019-09-12 A kind of traversing lifting walking rail set of Bridge Erector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910865712.2A CN110468731A (en) 2019-09-12 2019-09-12 A kind of traversing lifting walking rail set of Bridge Erector

Publications (1)

Publication Number Publication Date
CN110468731A true CN110468731A (en) 2019-11-19

Family

ID=68515859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910865712.2A Pending CN110468731A (en) 2019-09-12 2019-09-12 A kind of traversing lifting walking rail set of Bridge Erector

Country Status (1)

Country Link
CN (1) CN110468731A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110886233A (en) * 2019-12-17 2020-03-17 中交路桥建设有限公司 Construction method for connecting T-shaped beam with bridge
CN113389093A (en) * 2021-07-23 2021-09-14 中铁五局集团第六工程有限责任公司 Transverse moving track of railway beam moving trolley
CN114808736A (en) * 2022-05-20 2022-07-29 中昕重工(宁波)有限公司 Bridge prefabricated part cross-inside transverse flat-turning hoisting device and hoisting process method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08209629A (en) * 1995-01-31 1996-08-13 Mitsubishi Heavy Ind Ltd Overhanging type construction device for bridge
CN2712993Y (en) * 2004-07-20 2005-07-27 彭功根 Lifting frame integrated bridge erector
CN105970829A (en) * 2016-07-19 2016-09-28 中铁六局集团有限公司 Construction method for erecting 2209 sound barrier beam through DJ180 railway launching machine
CN110158487A (en) * 2019-06-04 2019-08-23 中铁九局集团第七工程有限公司 It is glued assembling construction engineering method in single-track railway simple supported box beam segment
CN210797300U (en) * 2019-09-12 2020-06-19 上海宝冶市政工程有限公司 Bridge girder erection machine sideslip hoist and mount walking track device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08209629A (en) * 1995-01-31 1996-08-13 Mitsubishi Heavy Ind Ltd Overhanging type construction device for bridge
CN2712993Y (en) * 2004-07-20 2005-07-27 彭功根 Lifting frame integrated bridge erector
CN105970829A (en) * 2016-07-19 2016-09-28 中铁六局集团有限公司 Construction method for erecting 2209 sound barrier beam through DJ180 railway launching machine
CN110158487A (en) * 2019-06-04 2019-08-23 中铁九局集团第七工程有限公司 It is glued assembling construction engineering method in single-track railway simple supported box beam segment
CN210797300U (en) * 2019-09-12 2020-06-19 上海宝冶市政工程有限公司 Bridge girder erection machine sideslip hoist and mount walking track device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110886233A (en) * 2019-12-17 2020-03-17 中交路桥建设有限公司 Construction method for connecting T-shaped beam with bridge
CN113389093A (en) * 2021-07-23 2021-09-14 中铁五局集团第六工程有限责任公司 Transverse moving track of railway beam moving trolley
CN114808736A (en) * 2022-05-20 2022-07-29 中昕重工(宁波)有限公司 Bridge prefabricated part cross-inside transverse flat-turning hoisting device and hoisting process method
CN114808736B (en) * 2022-05-20 2024-04-12 中昕重工(宁波)有限公司 Bridge prefabricated part inner-span transverse horizontal rotation hoisting device and hoisting process method

Similar Documents

Publication Publication Date Title
CN110468731A (en) A kind of traversing lifting walking rail set of Bridge Erector
CN105780660B (en) A kind of section assembling box girder construction technique
CN104894979B (en) Side coil feeding beam Bridge Erector and beam erecting method
CN106758828B (en) The application method of fixed asymmetric bridge girder cantilever assembly equipment
CN103882812A (en) Construction method for midspan main beams of cable-stayed bridge
CN104060835A (en) Lifting-sliding construction method for single plane truss
CN108103949A (en) A kind of Cable stayed Bridge Main Tower composite steel anchor beam integral assembling process
CN106836000B (en) Curve via holes Summarized Account of Bridge Erection Construction method based on DJ series Bridge Erectors
CN1609341A (en) Over head bridge erection construction technology
CN105484166B (en) A kind of ladder type masts type cantilever loop wheel machine
CN104110002A (en) Method for replacing bridge deck slabs of steel truss girder bridge
CN103184721B (en) Method for performing block-by-block suspension, glue splicing and linear control on precast segments to assemble polycarbonate (PC) continuous box girder
CN105648925B (en) Section assembling box beam erection Bridge Erector
CN114808747A (en) Multifunctional bridge girder erection machine and bridge girder erection construction method
CN202176343U (en) Self-propelled multifunctional template trolley combining device
CN103806374B (en) The overall track erection supplying system of assembly type steel bridge on highway and erection push technique
CN205529915U (en) Ladder type masts type hangs pieces together loop wheel machine
CN105839548B (en) Section assembling box beam erection construction technology based on down-type bridge-erecting machine
CN210797300U (en) Bridge girder erection machine sideslip hoist and mount walking track device
CN111350131A (en) Construction method of three-span bridge tail beam feeding bridge girder erection machine
CN201605110U (en) Device for hoisting waveform steel webs at the front end of truss in cantilever construction
CN104060838B (en) A kind of vestibule divides into groups aerial group to Method for Installation
CN114934449A (en) Assembled bridge segment assembling continuous beam bridge erecting machine
CN205531393U (en) Pier stud construction system
CN210368664U (en) Wide-body bridge girder erection machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination