CN109867237A - Boiler maintenance platform - Google Patents

Boiler maintenance platform Download PDF

Info

Publication number
CN109867237A
CN109867237A CN201910175041.7A CN201910175041A CN109867237A CN 109867237 A CN109867237 A CN 109867237A CN 201910175041 A CN201910175041 A CN 201910175041A CN 109867237 A CN109867237 A CN 109867237A
Authority
CN
China
Prior art keywords
guide rod
seat
sitting posture
boiler
safety
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910175041.7A
Other languages
Chinese (zh)
Other versions
CN109867237B (en
Inventor
郭余庆
王军
王读根
施吉祥
季荣华
于冬梅
郭维
朱华山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU NENGJIAN ELECTROMECHANICAL INDUSTRIAL Co Ltd
Original Assignee
JIANGSU NENGJIAN ELECTROMECHANICAL INDUSTRIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU NENGJIAN ELECTROMECHANICAL INDUSTRIAL Co Ltd filed Critical JIANGSU NENGJIAN ELECTROMECHANICAL INDUSTRIAL Co Ltd
Priority to CN201910175041.7A priority Critical patent/CN109867237B/en
Publication of CN109867237A publication Critical patent/CN109867237A/en
Application granted granted Critical
Publication of CN109867237B publication Critical patent/CN109867237B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This case is related to a kind of boiler maintenance platform, is lifted and is gone up and down by lifting rope, including the guide rod and sitting posture inspection rack assembled;The sitting posture inspection rack includes sitting posture maintenance chair and safety seat, and the sitting posture maintenance chair includes the chair back, seat, foot support face from top to bottom, and the seat and foot support face are horizontally disposed, and foot support face rear portion is fixed with seat front by vertical connecting rod;The guide rod is horizontally disposed, the first guide rod including being set to the chair back rear portion, and set on the second guide rod of the bottom seat, third guide rod set on the connecting rod or foot support face bottom, each guide rod is slidably connected by guide tube and sitting posture inspection rack;Boiler maintenance platform of the invention, structure is simple, build rapidly, overall weight it is small, service personnel can be allowed to be seated and overhauled, above and below Mechanical course and move left and right, adapt to Anomalistic space inside and outside boiler, securely and reliably.

Description

Boiler maintenance platform
Technical field
The invention belongs to boiler maintenance technical fields, and in particular to a kind of boiler maintenance platform.
Background technique
Currently, the maintenance of China overwhelming majority heat power plant boiler burner hearth is all made of boiler hearth overhauling platform.Conventional Inspection platform mostly uses scaffolding steel pipe to be built layer by layer, is then being laid with bamboo raft or stationary grid formation operation horizontal above Face, service personnel moves back and forth between different work surfaces to overhaul.Boiler hearth overhauling platform has easy to use, safety The features such as property is high.
It is very easy in the service work face that the outside of boiler is built using scaffold, and if to be carried out to boiler furnace Maintenance, then overhauled by building scaffold it is then cumbersome, since people or object disengaging boiler will be by diameters about The manhole of 450MM transmits, and transports several tons even tens of tons of scaffolding steel pipe and enters in furnace, then building steel pipe one by one With connect, build several meters even the high hanging working faces of tens of rice, in boiler it is narrow closing, illumination is bad and has more In the environment of prominent sharp portion, this building is time-consuming, laborious and dangerous work, and careless slightly, scaffolding steel pipe falls Or water-cooling wall or other devices in touching boiler, the damage of device in boiler or water-cooling wall just face wear-and corrosion-resistant will be may cause Protective layer is damaged, and service personnel may cause grievous injury as fallen accidentally.
It is overhauled under environment in such boiler, the scaffold inspection platform for building 600 sides or so cube generally requires 2 days Time, and dismounting also at least needs one day time, and the every blowing out of boiler one day, biggish economy can be all caused to manufacturer Loss;Also, the price for asking construction brigade to build scaffolding steel pipe is equally high.
After the completion of scaffold inspection platform is built, service personnel moves back and forth in different operational levels carries out maintenance behaviour Make, it is dangerous and inconvenient, due to scaffolding steel pipe block, also will affect spraying abrasion-proof layer, the defect repair welding of service personnel Deng operation;It is mobile in working face because usually having the gap and being uneven between the bamboo raft or screen that are laid on working face Large-scale or compared with heavy equipment when, has no idea smoothly to be moved or be easy to above to be stuck, and service personnel is when moving above It is also possible to be tripped.
And for the boiler maintenance platform of lift-on/lift-off type, it builds simply, it is at low cost, but since it is not adapted in boiler not The space environment of rule, leading to it, there are more detection dead angles, and larger by the self weight of the boiler maintenance platform of lift-on/lift-off type, upper It rises or such as encounters boiler inner wall when declining, be easy to damage boiler internal facility, lose more than gain, therefore, producer is less to adopt It is overhauled with the boiler maintenance platform of lift-on/lift-off type.
In addition, the boiler maintenance platform of lift-on/lift-off type is for when overhauling, the long-term unstable standing of service personnel to be in boiler It on inspection platform, and needs constantly to walk up and down, is easy tired and easily causes danger.
In view of this, it is necessary to propose a kind of boiler for the lift-on/lift-off type that structure is simple, weight is small, adaptability and safety are good Inspection platform.
Summary of the invention
The object of the present invention is to provide a kind of structures simply, builds boiler maintenance platform rapid, that overall weight is small.
It is a further object to provide it is a kind of can allow service personnel be seated overhaul, above and below the Mechanical course and It moves left and right, adapt to Anomalistic space inside and outside boiler, safe and reliable boiler maintenance platform.
In order to solve the above-mentioned technical problem, the invention discloses a kind of boiler maintenance platforms, are lifted and are gone up and down by lifting rope, packet Include the guide rod assembled and sitting posture inspection rack;
The sitting posture inspection rack includes sitting posture maintenance chair and safety seat, and the sitting posture maintenance chair includes the chair back, chair from top to bottom Face, foot support face, the seat and foot support face are horizontally disposed, and foot support face rear portion passes through vertical with seat front Connecting rod is fixed;
The guide rod is horizontally disposed, and the first guide rod including being set to the chair back rear portion, second set on the bottom seat leads Bar, the third guide rod set on the connecting rod or foot support face bottom, each guide rod are slided by guide tube and sitting posture inspection rack Connection;The guide tube is fixedly welded on sitting posture inspection rack, and is socketed respectively with each guide rod;Second guide rod is arranged in parallel Two, two spacing and seat width are adapted;
The safety seat is the L shape pad adaptable with the chair back and seat, and the bottom of safety seat and rear portion edge hang down Directly it is equipped with safety pole;Lantern ring is welded on the chair back or seat of the sitting posture maintenance chair, the safety pole is separable to be inserted It is connected in lantern ring;
The bottom seat is equipped with the power device with driving wheel;The driving wheel is run by track of the second guide rod, the seat Formula inspection rack slides under power device driving along guide rod level;
Side is equipped with the first universal wheel in face of the foot support, and the first universal wheel body surfaces are equipped with magnetic strip, and described the One universal wheel and foot support face are connected and fixed by the first telescopic rod;
The second universal wheel is equipped in front of the seat, second universal wheel and seat are connected and fixed by the second telescopic rod;
Sitting posture inspection rack both sides is equipped with the shelf for placing maintenance instrument and material;
Sitting posture inspection rack two sides are equipped with backplate.
Preferably, the guide rod is straight-bar or the curved bar adaptable with boiler maintenance face.
Preferably, the safety seat surface is equipped with flexible fabric layer.
Preferably, the safety seat is equipped with the safety belt due to fixed service personnel.
Preferably, when in use, service personnel must match safety rope to the boiler maintenance platform;When there is emergency case hair Raw, when boiler maintenance platform falls, service personnel and safety seat are moved with safety rope, under the action of safety rope, the peace Full seat cushion and sitting posture maintenance chair separation, service personnel are able to safe escape.
Preferably, the power device is by storage battery power supply.
Preferably, each guide rod both ends by guide rod frame install fix, the guide rod frame be equipped with hanging ring, for Lifting rope is connected.
It preferably, further include controller, for controlling lifting rope folding and unfolding and moving left and right sitting posture inspection rack along guide rod.
Preferably, the controller is remote controler.
Preferably, when maintenance, first universal wheel and the second universal wheel are in contact with boiler wall.
Boiler maintenance platform of the invention, has at least the following advantages:
1. structure is simple, installation build rapidly, overall weight it is small, it is small with boiler contact area, boiler internal facility will not be made At apparent collision injury, manhole is passed through after detachable and is sent into boiler, can be used for the inside and outside maintenance of boiler.
It overhauls 2. service personnel is seated, above and below Mechanical course and move left and right, greatly reducing service personnel Labor intensity, reduce due to it is tired, rock caused by service personnel injure unexpectedly, carry out service personnel more patiently Careful inspection operation promotes the Quality advance of maintenance.
3. the guide rod for being adapted shape can be selected according to maintenance face shape, Anomalistic space inside and outside boiler is adapted to, significantly Less maintenance dead angle.
4. the accidents such as lifting rope, guide rod fracture occur, safety seat is separated with service personnel with boiler maintenance platform, safety Reliably.
5. the first universal wheel and the second universal wheel are in contact with boiler wall, and the first universal wheel can by magnetic-adsorption in On boiler wall, so that sitting posture inspection rack moves up and down or when along guide rod horizontal movement, it is not in shake, motion profile is stablized, There is stable impetus in maintenance.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of boiler maintenance platform.
Fig. 2 is a kind of structural schematic diagram of guide rod.
Fig. 3 is the structural schematic diagram of a kind of guide rod and driving device.
Fig. 4 is the structural schematic diagram that a kind of sitting posture overhauls chair.
Fig. 5 is a kind of structural schematic diagram of safety seat.
Fig. 6 is a kind of structural schematic diagram of sitting posture inspection rack.
Fig. 7 is the structural schematic diagram of another guide rod.
Specific embodiment
Below by embodiment, the present invention is described in further detail, to enable those skilled in the art referring to specification Text can be implemented accordingly.
Such as " have " it should be appreciated that used herein, "comprising" and " comprising " term are not precluded one or more The presence or addition of a other elements or combinations thereof.
Embodiment 1
As shown in figures 1 to 6, a kind of boiler maintenance platform is lifted by lifting rope and is gone up and down, and is examined including the guide rod 1 assembled and sitting posture Repair platform 2;
The sitting posture inspection rack 2 includes sitting posture maintenance chair 210 and safety seat 220, and the sitting posture maintenance chair 210 wraps from top to bottom The chair back 211, seat 212, foot support face 214 are included, the seat 212 and foot support face 214 are horizontally disposed, foot support face 214 rear portions are fixed by vertical connecting rod 213 with 212 front of seat;Service personnel's foot is put on foot support face 214, is being protected Demonstrate,prove safety under the premise of, service personnel and can with the short time stand inspection operation is carried out on foot support face.
The guide rod 1 is horizontally disposed, and the first guide rod 110 including being set to 211 rear portion of the chair back is set to the seat Second guide rod 120 of 212 bottoms, the third guide rod 130 set on 214 bottom of foot support face, each guide rod is by leading Cylinder 3 is slidably connected with sitting posture inspection rack 2;The guide tube 3 is fixedly welded on sitting posture inspection rack 2, and is socketed respectively with each guide rod; Second guide rod 120 has two disposed in parallel, and two spacing and 212 width of seat are adapted.Guide rod is sitting posture maintenance Platform provides set motion profile, and support plays sitting posture inspection rack;The shape of guide rod 1 can according to the difference in boiler maintenance face and into The corresponding selection of row, improves adaptability of the invention.
The safety seat 220 is the L shape pad adaptable with the chair back and seat, and the bottom of safety seat 220 is with after Portion's edge is vertically equipped with safety pole 221;Lantern ring 215, the safety are welded on the chair back 211 of the sitting posture maintenance chair Bar 221 is separable to be plugged in lantern ring 215;Vertical grafting designs so that when sitting posture inspection rack 2 falls, safety seat 220 It can be disconnected rapidly.
212 bottom of seat is equipped with the power device 216 with driving wheel 217;The driving wheel 217 is with the second guide rod 120 run for track, and the sitting posture inspection rack 2 is under the driving of power device 216, along the horizontal sliding of guide rod 1;
The first universal wheel 214a is equipped in front of the foot support face 214, the first universal wheel 214a body surfaces are equipped with magnetic Power item (is not shown), and the first universal wheel 214a is connected with foot support face 214 by the first telescopic rod 214b solid It is fixed;
It is flexible by second that the second universal wheel 212a, the second universal wheel 212a and seat 212 are equipped in front of the seat 212 Bar 212b is connected and fixed;First universal wheel 214a and the first telescopic rod 214b, the second universal wheel 212a and the second telescopic rod 212b It matches, being in rolling contact for sitting posture inspection rack 2 and boiler wall may be implemented, sitting posture inspection rack is avoided to make on the move to boiler wall At hard damage, also, the first telescopic rod 214b and the second telescopic rod 214b length are adjustable, can be used for adjusting sitting posture inspection rack 2 with The distance between boiler wall makes the service personnel of different heights, brachium that can overhaul distance in comfortable.
2 both sides of sitting posture inspection rack is equipped with the shelf 230 for placing maintenance instrument and material;
Sitting posture inspection rack two sides are equipped with backplate 240.Backplate can be used for protecting the maintenance instrument and material placed on shelf Material, and the two sides sight of service personnel can be partially obstructed, prevent service personnel from occurring the feelings such as dizziness caused by vision at high-altitude Condition
The guide rod 1 is straight-bar.
220 surface of safety seat is equipped with flexible fabric layer (being not shown), so that service personnel is sat more easypro Clothes.
The safety seat 220 is equipped with the safety belt (being not shown) due to fixed service personnel.
When in use, service personnel must match safety rope to the boiler maintenance platform;When having emergency case, boiler maintenance When platform falls, service personnel and safety seat are moved with safety rope, under the action of safety rope, the safety seat and sitting posture Chair separation is overhauled, service personnel is able to safe escape.
The power device 216 is by storage battery power supply.
Each guide rod both ends are fixed by the installation of guide rod frame 4, and the guide rod frame is equipped with hanging ring 401, are used for and lifting rope It is connected.
It further include controller, for controlling lifting rope folding and unfolding and moving left and right sitting posture inspection rack along guide rod.
The controller is remote controler (being not shown).Remote controler makes the autonomous of service personnel more square Just, physical strength is saved.
When maintenance, the first universal wheel 214a and the second universal wheel 212a are in contact with boiler wall.First universal wheel and Second universal wheel can offset the opposition in inspection operation as fulcrum, shake caused by greatly reducing therefore, improve Operational stability and safety.
Embodiment 2
As shown in fig. 7, similar to Example 1, difference is, directional wheel 402, the directional wheel are equipped in front of the guide rod frame 402 body surfaces are equipped with magnetic strip, the directional wheel 402 and guide rod frame 4 and are connected and fixed by third telescopic rod 403;
Directional wheel 402 can only scroll up, can be by magnetic-adsorption in boiler wall, and sitting posture inspection rack moves horizontally When, the reaction force therefore generated to guide rod can be offset, stability is increased.
Embodiment 3
It needs temporarily to stand when carrying out inspection operation, the safety belt on safety seat can not be unlocked, can pass through and increase safety belt Extension property simultaneously adds safety belt in foot to guarantee safety.
Embodiment 4
Similar to Example 1, difference place is, the guide rod is the curved bar being adapted with boiler maintenance face.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed With it can be fully applied to various fields suitable for the present invention, for those skilled in the art, can be easily Realize other modification, therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited In specific details and embodiment shown and described herein.

Claims (10)

1. a kind of boiler maintenance platform is lifted by lifting rope and is gone up and down, it is characterised in that: examined including the guide rod assembled and sitting posture Repair platform;
The sitting posture inspection rack includes sitting posture maintenance chair and safety seat, and the sitting posture maintenance chair includes the chair back, chair from top to bottom Face, foot support face, the seat and foot support face are horizontally disposed, and foot support face rear portion passes through vertical with seat front Connecting rod is fixed;
The guide rod is horizontally disposed, and the first guide rod including being set to the chair back rear portion, second set on the bottom seat leads Bar, the third guide rod set on the connecting rod or foot support face bottom, each guide rod are slided by guide tube and sitting posture inspection rack Connection;The guide tube is fixedly welded on sitting posture inspection rack, and is socketed respectively with each guide rod;Second guide rod is arranged in parallel Two, two spacing and seat width are adapted;
The safety seat is the L shape pad adaptable with the chair back and seat, and the bottom of safety seat and rear portion edge hang down Directly it is equipped with safety pole;Lantern ring is welded on the chair back or seat of the sitting posture maintenance chair, the safety pole is separable to be inserted It is connected in lantern ring;
The bottom seat is equipped with the power device with driving wheel;The driving wheel is run by track of the second guide rod, the seat Formula inspection rack slides under power device driving along guide rod level;
Side is equipped with the first universal wheel in face of the foot support, and the first universal wheel body surfaces are equipped with magnetic strip, and described the One universal wheel and foot support face are connected and fixed by the first telescopic rod;
The second universal wheel is equipped in front of the seat, second universal wheel and seat are connected and fixed by the second telescopic rod;
Sitting posture inspection rack both sides is equipped with the shelf for placing maintenance instrument and material;
Sitting posture inspection rack two sides are equipped with backplate.
2. boiler maintenance platform as described in claim 1, which is characterized in that the guide rod be straight-bar or with boiler maintenance face phase The curved bar of adaptation.
3. boiler maintenance platform as claimed in claim 2, which is characterized in that the safety seat surface is equipped with flexible fabric Layer.
4. boiler maintenance platform as claimed in claim 3, which is characterized in that the safety seat is equipped with to be overhauled due to fixed The safety belt of personnel.
5. boiler maintenance platform as claimed in claim 4, which is characterized in that the boiler maintenance platform when in use, overhauls Personnel must match safety rope;When there is emergency case, when boiler maintenance platform falls, service personnel and safety seat are with safety rope Movement, under the action of safety rope, the safety seat and sitting posture maintenance chair separation, service personnel are able to safe escape.
6. boiler maintenance platform as claimed in claim 5, which is characterized in that the power device is by storage battery power supply.
7. boiler maintenance platform as claimed in claim 6, which is characterized in that installed by guide rod frame solid in each guide rod both ends Fixed, the guide rod frame is equipped with hanging ring, for being connected with lifting rope.
8. boiler maintenance platform as claimed in claim 7, which is characterized in that further include controller, for controlling lifting rope folding and unfolding With move left and right sitting posture inspection rack along guide rod.
9. boiler maintenance platform as claimed in claim 8, which is characterized in that the controller is remote controler.
10. boiler maintenance platform as claimed in claim 9, which is characterized in that when maintenance, first universal wheel and the 20000th It is in contact to wheel with boiler wall.
CN201910175041.7A 2019-03-08 2019-03-08 Boiler maintenance platform Active CN109867237B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910175041.7A CN109867237B (en) 2019-03-08 2019-03-08 Boiler maintenance platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910175041.7A CN109867237B (en) 2019-03-08 2019-03-08 Boiler maintenance platform

Publications (2)

Publication Number Publication Date
CN109867237A true CN109867237A (en) 2019-06-11
CN109867237B CN109867237B (en) 2020-11-06

Family

ID=66920058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910175041.7A Active CN109867237B (en) 2019-03-08 2019-03-08 Boiler maintenance platform

Country Status (1)

Country Link
CN (1) CN109867237B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2240004Y (en) * 1994-08-11 1996-11-13 宝山钢铁(集团)公司 Hanging basket for maintaining hearth
KR20100062764A (en) * 2008-12-02 2010-06-10 문범국 Car Air Conditioning Chair
CN204625111U (en) * 2015-02-13 2015-09-09 中建六局建设发展有限公司 The safe fall-proof seat that a kind of liftable controls
CN206244226U (en) * 2016-09-30 2017-06-13 仕腾达电梯(北京)有限公司 It is a kind of can rate controlling intellectual staircase
CN107893544A (en) * 2017-11-26 2018-04-10 山东建筑大学 Brick wall supplementary building wall device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2240004Y (en) * 1994-08-11 1996-11-13 宝山钢铁(集团)公司 Hanging basket for maintaining hearth
KR20100062764A (en) * 2008-12-02 2010-06-10 문범국 Car Air Conditioning Chair
CN204625111U (en) * 2015-02-13 2015-09-09 中建六局建设发展有限公司 The safe fall-proof seat that a kind of liftable controls
CN206244226U (en) * 2016-09-30 2017-06-13 仕腾达电梯(北京)有限公司 It is a kind of can rate controlling intellectual staircase
CN107893544A (en) * 2017-11-26 2018-04-10 山东建筑大学 Brick wall supplementary building wall device

Also Published As

Publication number Publication date
CN109867237B (en) 2020-11-06

Similar Documents

Publication Publication Date Title
JP5246555B2 (en) Blade lifting method and apparatus for wind power generation equipment
CN201923740U (en) Construction operation hanging basket for installing elevators
CN205452906U (en) Combination dock switch overhauls platform
CN209443751U (en) A kind of facade construct when with the matching used no balance weight hanging mechanism of hanging basket
KR20140092727A (en) Scaffold for hanging the boiler and assembly method the same
CN109867237A (en) Boiler maintenance platform
CN106090433A (en) The support means of a kind of pipeline of passing a bridge and be provided with the bridge of this support means
CN110252823A (en) The steering gliding method of heavy mill housing under restricted clearance
CN207596409U (en) A kind of dedicated electric up-down inspection platform of thermal power plant boiler burner hearth
CN101786585B (en) Crane supporting device for field installation of boiler
CN207019264U (en) A kind of high air-cooler installation fixed equipment of security performance
CN209618724U (en) A kind of swing arm tower crane promotion foot guard device certainly
CN208309394U (en) A kind of template assembly platform of prefabricated stand column
CN106284961A (en) Small-sized attachment type raise scaffold
CN220178462U (en) Steel chimney assembling platform structure
CN205676105U (en) A kind of Modular assembled dismounting burner hearth inspection platform
CN201817240U (en) Crane supporting device for field installation of boiler
CN211173028U (en) Peripheral wall mounted air frame of building engineering
CN207484921U (en) Assembled moving operating platform
CN209885914U (en) Ball mill safety device
CN204778118U (en) High security elevator cab rail guard
CN220789393U (en) Water tank type gap bridge
CN217417962U (en) Converter slide is with equipment of lifting by crane that has protective effect
CN219772176U (en) Safety device for LF refining furnace and LF refining furnace
CN216196500U (en) Combined assembly type electric hanging basket for pier body construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant