CN209443751U - A kind of facade construct when with the matching used no balance weight hanging mechanism of hanging basket - Google Patents
A kind of facade construct when with the matching used no balance weight hanging mechanism of hanging basket Download PDFInfo
- Publication number
- CN209443751U CN209443751U CN201822196681.XU CN201822196681U CN209443751U CN 209443751 U CN209443751 U CN 209443751U CN 201822196681 U CN201822196681 U CN 201822196681U CN 209443751 U CN209443751 U CN 209443751U
- Authority
- CN
- China
- Prior art keywords
- vertical
- poppet
- hanging basket
- balance weight
- lengthening beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 238000007665 sagging Methods 0.000 claims abstract description 4
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 10
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 230000003044 adaptive effect Effects 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims description 2
- 230000000149 penetrating effect Effects 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 8
- 238000009434 installation Methods 0.000 description 8
- 239000000725 suspension Substances 0.000 description 6
- 230000008901 benefit Effects 0.000 description 4
- 229910000975 Carbon steel Inorganic materials 0.000 description 3
- 239000010962 carbon steel Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000004140 cleaning Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model discloses a kind of facade construction when with the matching used no balance weight hanging mechanism of hanging basket, including vertical after-poppet, vertical fore-stock, lengthening beam, upper pillar stand, wirerope, vertical after-poppet is installed on facade, slide mass is installed thereon, it is fixed after lengthening beam desired height position can be slid into its height direction, lengthening beam one end is fixedly connected with slide mass, the other end extends outward and installs safe wire cable lock on the end, this section between safe wire cable lock and vertical after-poppet, which lengthens the intermediate position of beam section, to be supported by vertical fore-stock, upper pillar stand is mounted on the intermediate position, the starting point selection lengthening beam of wirerope is after the hole location fixation of vertical after-poppet, sagging connection hanging basket after wire rope hole and safe wire cable at the top of upper pillar stand are locked is sequentially passed through again.The utility model is safe and reliable, under conditions of not using counterweight, can bear 500 kilograms or more hanging basket weight using lever principle in narrow space.
Description
Technical field
The utility model relates to outdoor architecture installation technical field, refer in particular to a kind of facade construction when with hang
The matching used no balance weight hanging mechanism of basket.
Background technique
Known in the industry, building hanging basket is as construction outer wall hanging basket, compared with wall face completely takes steel pipe scaffold, has and takes
If speed is fast, saves a large amount of scaffoldings, saves the advantages that labour, easy to operate, flexible, Technological Economy, preferable benefit,
It is obtained extensively in the high altitude operation such as external wall construction, curtain wall installation, thermal insulation construction and the maintenance cleaning exterior wall of high layer multi-layer high building
Approve.It arranges in pairs or groups the suspension mechanism that uses with hanging basket, usually utilizes lever principle, need to arrange in pairs or groups counterweight to bear the weight of hanging basket,
Keep suspension mechanism occupied area larger, the requirement to construction site is more.It, can with the appearance of the various innovation structures of modern architecture
Very limited for the space of nacelle construction, the suspension mechanism of existing traditional architecture hanging basket can not be suitable for narrow operating space.
Utility model content
The shortcomings that the purpose of the utility model is to overcome the prior arts and deficiency propose a kind of facade construction
When with the matching used no balance weight hanging mechanism of hanging basket, the suspension mechanism completely without counterweight, integrated operation get up safety can
It leans on, adaptable, the hanging basket especially suitable for narrow space operates.
To achieve the above object, technical solution provided by the utility model are as follows: a kind of facade construct when with hang
The matching used no balance weight hanging mechanism of basket, including vertical after-poppet, vertical fore-stock, lengthening beam, upper pillar stand, wirerope,
In, the vertical after-poppet is installed on facade, and is fixed on building ground, installs on the vertical after-poppet useful
In adjusting slide mass of the lengthening beam apart from building ground height, the slide mass can be slided in the short transverse of vertical after-poppet
It is fixed after moving to lengthening beam desired height position, one end and the slide mass of the lengthening beam are fixedly connected, and the other end is past
Outer extension is simultaneously equipped with safe wire cable lock on the end, that Duan Jiachang between the safe wire cable lock and vertical after-poppet
The intermediate position of beam section is supported by vertical fore-stock, and the upper pillar stand is removably mounted on the intermediate position,
The starting point selection lengthening beam of the wirerope is after the hole location fixation of vertical after-poppet, then sequentially passes through at the top of upper pillar stand
Wire rope hole and safe wire cable lock after sagging connection hanging basket.
Further, the slide mass is the external member being sleeved on vertical after-poppet, with vertical after-poppet and lengthening beam it
Between be all made of bolt and fix.
Further, the main body of the vertical after-poppet is made of more vertical square tubes parallel to each other, the slide mass
It is sleeved in the more vertical square tubes.
Further, the top of the vertical after-poppet resists the building structure of top by top plate, is able to bear lengthening beam
The power passed over, bottom is by pedestal to increase its contact area with building ground.
Further, the vertical fore-stock is the telescopically adjustable structure for capableing of adaptive lengthening beam height and position, by can
Vertical square tube of stretching and the triangular structure pedestal for being used to support extendible vertical square tube composition, the extendible vertical square tube
It is fixed by bolts between lengthening beam.
Further, the triangular structure pedestal increases its contact area with building ground by pad square tube.
Further, the upper pillar stand is made of vertical square tube and U-shaped bottom seat, and the U-shaped bottom seat is mounted on by bolt to be added
On long beam, the vertical square tube is fixed on the U-shaped bottom seat, and top is provided with the wire rope hole for steel wire penetrating.
Further, bolt hole is arranged at intervals on the lengthening beam.
The utility model compared with prior art, have the following advantages that with the utility model has the advantages that
1, the building structure stress at the top of column after-poppet is made full use of, under conditions of not using counterweight, in narrow sky
It is interior to bear 500 kilograms or more hanging basket weight using lever principle, and it is suitable for after-poppet and fore-stock in different level
The place in face.
2, entire suspension mechanism occupied area is small, and using area and installation environment are flexible, height and adjustable in length, can be very
Narrow operating space is adapted to well, is very suitable for using between building structure.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the utility model without balance weight hanging mechanism.
Fig. 2 is the structural schematic diagram of lengthening beam.
Fig. 3 is the structural schematic diagram of vertical fore-stock.
Specific embodiment
The utility model is described in further detail combined with specific embodiments below.
Referring to shown in Fig. 1 to Fig. 3, facade provided by the present embodiment is matched when constructing with the matching used nothing of hanging basket
Suspension mechanism is resuspended, includes vertical after-poppet 1, vertical fore-stock 2, (material is Q235B structural carbon steel to lengthening beam 3, and specification is
80mm × 80mm × 4mm), upper pillar stand 4 (material be Q235B structural carbon steel), wirerope 5.Vertical after-poppet 1 by four each other
Parallel vertical square tube 11 (material is Q235B structural carbon steel, having a size of 80mm × 80mm × 4mm) is formed in rectanglar arrangement,
The vertical after-poppet 1 is installed on facade, and top is resisted the building structure of top by top plate 12, can bear to lengthen
The power that beam 3 passes over, without using additional weight, bottom increases its connecing with building ground by pedestal 13
Contacting surface product, to protect mattess;It is equipped on vertical after-poppet 1 for adjusting lengthening beam 3 apart from building ground height
Slide mass 6, the slide mass 6 are specially the sheath assembly being sleeved in above-mentioned four vertical square tubes 11, can be in four vertical square tubes
It is fixed after sliding into 3 desired height position of lengthening beam in 11 short transverse using bolt;One end of lengthening beam 3 and sliding
Body 6, which is bolted, to connect, and the other end laterally extends outward and is equipped with safe wire cable lock 7, wirerope on the end
That section between safety lock 7 and vertical after-poppet 1, which lengthens the intermediate position of beam section, to be supported by vertical fore-stock 2, i.e., should
Duan Jiachang beam section midpoint is the installation site of vertical fore-stock 2, is equally also the installation site of upper pillar stand 4, upper pillar stand 4 passes through spiral shell
Bolt is mounted in the installation site, which is made of vertical square tube 41 and U-shaped bottom seat 42, which passes through bolt
It is mounted on lengthening beam 3, which is fixed on U-shaped bottom seat 42, and top is provided with the wirerope passed through for wirerope 5
Hole 43;Vertical fore-stock 2 is the telescopically adjustable structure for capableing of 3 height and position of adaptive lengthening beam, by extendible vertical square tube
21 and triangular structure pedestal 22 form, be fixed between the top and lengthening beam 3 of extendible vertical square tube 21 using bolt,
Its bottom is fixed on triangular structure pedestal 22, and triangular structure pedestal 22 increases itself and building ground by pad square tube 23
Contact area, to protect protection mattess;It is arranged at intervals with bolt hole 31 on lengthening beam 3, can according to need freedom
Selection installation;For wirerope 5 using the special wirerope of Φ 8.3mm, starting point selects lengthening beam 3 near vertical after-poppet 1
Hole location it is fixed after, the wire rope hole 43 across 4 top of upper pillar stand is then passed through safe wire cable lock 7, can sagging connection hanging basket
(being not drawn into figure).
In conclusion the utility model is suitable for after-poppet and fore-stock in the place of different level, make full use of vertical
Building structure stress at the top of formula after-poppet, it has been proved by practice that utilizing thick stick in narrow space under conditions of not using counterweight
Rod principle can bear 500 kilograms or more of hanging basket weight, and occupied area is small, and using area and installation environment are flexible, high
Degree and adjustable in length, can be well adapted for narrow operating space, be very suitable for using between building structure, have and actually answer
With value, it is worthy to be popularized.
Embodiment described above is only the preferred embodiment of the utility model, and the implementation of the utility model is not limited with this
Range, therefore all shapes according to the utility model, change made by principle, it should all cover within the protection scope of the present utility model.
Claims (8)
1. a kind of facade construct when with the matching used no balance weight hanging mechanism of hanging basket, which is characterized in that including vertical
After-poppet, vertical fore-stock, lengthening beam, upper pillar stand, wirerope, wherein the vertical after-poppet is installed on facade, and
It is fixed on building ground, the sliding for adjusting lengthening beam apart from building ground height is installed on the vertical after-poppet
Body, the slide mass are fixed after capable of sliding into lengthening beam desired height position in the short transverse of vertical after-poppet,
One end of the lengthening beam is fixedly connected with slide mass, and the other end extends outward and is equipped with safe wire cable on the end
Lock, that section between the safe wire cable lock and vertical after-poppet, which lengthens the intermediate position of beam section, to be carried out by vertical fore-stock
Support, the upper pillar stand is removably mounted on the intermediate position, the starting point selection lengthening beam of the wirerope near
After the hole location of nearly vertical after-poppet is fixed, then sequentially pass through sagging company after the wire rope hole and safe wire cable lock at the top of upper pillar stand
Connect hanging basket.
2. a kind of facade according to claim 1 construct when with the matching used no balance weight hanging mechanism of hanging basket,
It is characterized by: the slide mass is equal between the external member being sleeved on vertical after-poppet, with vertical after-poppet and lengthening beam
It is fixed by bolts.
3. a kind of facade according to claim 2 construct when with the matching used no balance weight hanging mechanism of hanging basket,
It is characterized by: the main body of the vertical after-poppet is made of more vertical square tubes parallel to each other, the slide mass suit
In the more vertical square tubes.
4. a kind of facade according to claim 1 or 2 or 3 construct when with the matching used no balance weight hanging of hanging basket
Mechanism, it is characterised in that: the top of the vertical after-poppet resists the building structure of top by top plate, is able to bear lengthening beam
The power passed over, bottom is by pedestal to increase its contact area with building ground.
5. a kind of facade according to claim 1 construct when with the matching used no balance weight hanging mechanism of hanging basket,
It is characterized by: the vertical fore-stock is the telescopically adjustable structure for capableing of adaptive lengthening beam height and position, by scalable
Vertical square tube and be used to support the extendible vertical square tube triangular structure pedestal composition, the extendible vertical square tube with plus
It is fixed by bolts between long beam.
6. a kind of facade according to claim 5 construct when with the matching used no balance weight hanging mechanism of hanging basket,
It is characterized by: the triangular structure pedestal increases its contact area with building ground by pad square tube.
7. a kind of facade according to claim 1 construct when with the matching used no balance weight hanging mechanism of hanging basket,
It is characterized by: the upper pillar stand is made of vertical square tube and U-shaped bottom seat, the U-shaped bottom seat is mounted on lengthening beam by bolt
On, the vertical square tube is fixed on the U-shaped bottom seat, and top is provided with the wire rope hole for steel wire penetrating.
8. a kind of facade according to claim 1 construct when with the matching used no balance weight hanging mechanism of hanging basket,
It is characterized by: being arranged at intervals with bolt hole on the lengthening beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822196681.XU CN209443751U (en) | 2018-12-26 | 2018-12-26 | A kind of facade construct when with the matching used no balance weight hanging mechanism of hanging basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822196681.XU CN209443751U (en) | 2018-12-26 | 2018-12-26 | A kind of facade construct when with the matching used no balance weight hanging mechanism of hanging basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209443751U true CN209443751U (en) | 2019-09-27 |
Family
ID=68015508
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822196681.XU Withdrawn - After Issue CN209443751U (en) | 2018-12-26 | 2018-12-26 | A kind of facade construct when with the matching used no balance weight hanging mechanism of hanging basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209443751U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109441091A (en) * | 2018-12-26 | 2019-03-08 | 豪尔赛科技集团股份有限公司 | A kind of facade construct when with the matching used no balance weight hanging mechanism of hanging basket |
CN113356556A (en) * | 2021-05-31 | 2021-09-07 | 上海二十冶建设有限公司 | Steel structure-based counterweight-free hanging basket installation method |
CN113775040A (en) * | 2021-09-22 | 2021-12-10 | 中国十七冶集团有限公司 | High-altitude large-span steel corridor curtain wall installation and construction method |
CN115247491A (en) * | 2022-08-25 | 2022-10-28 | 中国五冶集团有限公司 | Roof flower stand counterweight-free hanging basket suspension mechanism and construction method thereof |
-
2018
- 2018-12-26 CN CN201822196681.XU patent/CN209443751U/en not_active Withdrawn - After Issue
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109441091A (en) * | 2018-12-26 | 2019-03-08 | 豪尔赛科技集团股份有限公司 | A kind of facade construct when with the matching used no balance weight hanging mechanism of hanging basket |
CN109441091B (en) * | 2018-12-26 | 2024-02-20 | 豪尔赛科技集团股份有限公司 | Counterweight-free suspension mechanism matched with hanging basket for use in building outer elevation construction |
CN113356556A (en) * | 2021-05-31 | 2021-09-07 | 上海二十冶建设有限公司 | Steel structure-based counterweight-free hanging basket installation method |
CN113775040A (en) * | 2021-09-22 | 2021-12-10 | 中国十七冶集团有限公司 | High-altitude large-span steel corridor curtain wall installation and construction method |
CN115247491A (en) * | 2022-08-25 | 2022-10-28 | 中国五冶集团有限公司 | Roof flower stand counterweight-free hanging basket suspension mechanism and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209443751U (en) | A kind of facade construct when with the matching used no balance weight hanging mechanism of hanging basket | |
CN205777425U (en) | A kind of scalable hanging basket support means | |
CN201228207Y (en) | Portable window hoister | |
CN116356947A (en) | Hollow grid ultra-long sightseeing platform and overhanging large-span awning integrated structure | |
CN109441091A (en) | A kind of facade construct when with the matching used no balance weight hanging mechanism of hanging basket | |
CN109537793A (en) | It is easily installed the ceiling structure and its installation method of leveling | |
CN201714051U (en) | High altitude operation hanging frame | |
CN209891695U (en) | A construction equipment that is used for oblique roofing eaves decoration that encorbelments | |
CN104860245B (en) | A kind of two grades of inspection platforms of energy-saving appliance of boiler | |
CN209285347U (en) | Windproof pin concave surface is close to system | |
CN207609149U (en) | Lattice type operating platform | |
CN212376246U (en) | Vault bridge supports building and climbs frame device | |
CN206494694U (en) | A kind of Multi-layer electric hanging basket | |
CN213061709U (en) | Hanging basket for road and bridge construction | |
CN207596409U (en) | A kind of dedicated electric up-down inspection platform of thermal power plant boiler burner hearth | |
CN202596142U (en) | Ascending frame for indoor decoration | |
CN106049793B (en) | A kind of clay brick stainless steel perforated support system | |
CN207484995U (en) | A kind of green construction integration discharging platform | |
CN201704037U (en) | Adjustable hanging basket suspension mechanism | |
CN205804914U (en) | A kind of umbrella shape expansion platform | |
CN214942253U (en) | Hanging basket hanging mechanism for special-shaped building structure | |
CN217027998U (en) | Heightened hanging basket suspension structure | |
CN208280566U (en) | A kind of Worker carrying basket | |
CN220599128U (en) | Assembled fixed suspension mechanism of electric hanging basket | |
CN216552981U (en) | Hanging flower basket device for construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20190927 Effective date of abandoning: 20240220 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20190927 Effective date of abandoning: 20240220 |
|
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |